Pipeline laying and fixing structure for water and electricity heating installation

The pipe laying and fixing structure with rotating shafts, spacers, and pulleys addresses pipe entanglement issues by separating and guiding pipes, enhancing installation and maintenance efficiency.

CN222256792UActive Publication Date: 2024-12-27SHENNENG NANJING ENERGY HLDG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421070362.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2024-12-27
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

Water, electricity, and heating pipes installed in underground trenches often intertwine during installation and maintenance, causing entanglement issues that complicate removal and replacement.

Method used

A pipe laying and fixing structure with fixed bases, rotating shafts, spacers, pulleys, and partition plates that separate and guide the pipes, allowing for easy installation and replacement by rotating the pulleys on the shafts to minimize friction and entanglement.

Benefits of technology

The structure effectively prevents pipe entanglement and reduces friction during installation and replacement, making it easier to manage and maintain water, electricity, and heating pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222256792U_ABST
    Figure CN222256792U_ABST
Patent Text Reader

Abstract

The utility model provides a pipeline laying fixing structure for water and electricity heating installation, which comprises a plurality of fixing bases, two ends above the fixing bases are fixedly connected with fixing plates, a rotating shaft is embedded in the middle of each fixing plate, and the middle of each rotating shaft is fixedly connected with a spacer. Due to the fact that the water heating pipe and the electric heating pipe extending to the position between the next set of fixing equipment are separated through the partition plate, the situation that when the water heating pipe and the electric heating pipe are installed or taken out for use, the water heating pipe and the electric heating pipe are prone to being staggered is improved, and the situation that the water heating pipe and the electric heating pipe are wound is avoided; due to the fact that the distance exists between the water heating pipe and the ground on the pulley, when the water heating pipe is distributed or replaced, the water heating pipe is pulled on the pulley and the pulley rotates on the rotating shaft to send out the water heating pipe, and the situation that friction force between pipeline equipment is large when the water heating pipe is installed or replaced is improved. And the water-electric heating pipe can be conveniently taken out for replacement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline fixing equipment, in particular to a pipeline laying and fixing structure for water, electricity and heating installation. Background Art

[0002] Plumbing, electric and heating pipes are used to provide water supply, electricity and heating services in buildings. Heating pipes are used to distribute heat energy and provide indoor heating. When installing, plumbing, electric and heating pipes are buried underground in the form of trenches opened in the ground. This can reduce their occupancy of indoor space and keep the building's appearance neat. At the same time, underground installation also helps the pipes to provide indoor heating more effectively in winter.

[0003] Since the water, electricity and heating pipes are installed in underground trenches, multiple water, electricity and heating pipes will be placed in the same trench during installation and use. The multiple water, electricity and heating pipes in the same trench are easily intertwined, causing the water, electricity and heating pipes to be entangled with each other. When the water, electricity and heating pipes need to be maintained or replaced, the water, electricity and heating pipes are entangled with each other and distributed in the underground trenches. Therefore, the friction is large when the water, electricity and heating pipes are pulled out for replacement, and the water, electricity and heating pipes are entangled with each other, making it inconvenient to remove, replace and maintain the water, electricity and heating pipes.

[0004] For this purpose, we provide a pipe laying and fixing structure for water, electricity and heating installation. Utility Model Content

[0005] The main purpose of the utility model is to provide a pipe laying and fixing structure for water, electricity and heating installation, which can effectively solve the problem proposed in the background technology that the water and electricity equipment are easily intertwined, causing the water, electricity and heating pipes to be entangled with each other, and when the pipes are entangled with each other, it is inconvenient to remove, replace and maintain the pipe equipment.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A pipe laying fixing structure for water, electricity and heating installation includes multiple fixed bases, both ends of the upper part of the fixed base are fixedly connected with fixed plates, a rotating shaft is embedded between the two fixed plates, a spacer is fixedly connected to the rotating shaft, a protrusion is fixedly connected to one side of the fixed base, and an inlay groove is provided on the other side of the fixed base. Two adjacent fixed bases are connected by the protrusion and the inlay groove, and pulleys are movably installed on both sides of the spacer on the rotating shaft.

[0008] In the above scheme, preferably, partition plates are fixedly connected to the front and rear sides of the fixed base, fixed blocks are provided under the partition plates, and the fixed blocks are fixedly connected to the fixed base, and fixing bolts are embedded in the middle of the fixed blocks.

[0009] In the above scheme, preferably, the top of the fixed plate is provided with a lifting groove, the upper part of the fixed plate is provided with a limiting plate, and movable grooves are provided on both sides of the limiting plate.

[0010] In the above scheme, preferably, adjustment rods are provided on both sides of the limit plate, and the adjustment rods are embedded in the lifting grooves, and the upper part of the adjustment rods is fixedly connected with the limit plates, and the limit plates are embedded in the movable grooves on both sides of the limit plate.

[0011] In the above scheme, preferably, the protrusion and the inlay groove are connected in an engaging and movable manner, and the protrusion and the inlay groove are detachably installed.

[0012] In the above scheme, preferably, a spacer is provided between the pulleys, and the partition plate is extended. Beneficial Effects

[0013] Compared with the prior art, the utility model has the following beneficial effects: the pipe laying and fixing structure for water and electric heating installation is improved in structure and is provided with spacers, pulleys, partition plates and other devices. Since partition plates are provided on both sides of the fixed base, and the partition plates are extended to separate the water and electric heating pipes between the next set of fixed equipment, and since spacers are provided between the rotating shafts, when the pulley rotates on the rotating shaft, it will not affect the pulley on the other side, thereby improving the situation that the water and electric heating pipe equipment are easily intertwined when installing or removing for use, and avoiding the situation that the water and electric heating pipe parts are entangled with each other. Secondly, the water and electric heating pipe is inserted into the limit plate and placed on the pulley. Since there is a distance between the water and electric heating pipe and the ground on the pulley, when laying or replacing the water and electric heating pipe, the water and electric heating pipe is pulled on the pulley, and the pulley rotates on the rotating shaft to send the water and electric heating pipe out, thereby improving the situation that the friction between the pipeline equipment is large when the water and electric heating pipe is installed or replaced, and it is convenient to remove, replace and use the water and electric heating pipe, which is beneficial to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0016] Figure 2 It is a schematic diagram of the local structure of the adjusting rod of the utility model.

[0017] Figure 3It is a schematic diagram of the local structure of the fixing plate of the utility model.

[0018] Figure 4 It is a schematic diagram of the local structure of the rotating shaft of the utility model.

[0019] Figure 1-4 In: 1. Fixed base; 2. Fixed bolt; 3. Fixed plate; 301. Lifting slot; 4. Rotating shaft; 401. Spacer; 5. Limiting plate; 6. Adjusting rod; 601. Limiting plate; 7. Bump; 8. Inlay slot; 9. Pulley; 10. Partition plate; 11. Fixed block. DETAILED DESCRIPTION

[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0021] like Figure 1-4 As shown, in this embodiment, a pipe laying fixing structure for water, electricity and heating installation includes a plurality of fixed bases 1, both ends of the upper part of the fixed base 1 are fixedly connected with fixed plates 3, a rotating shaft 4 is embedded and installed between the two fixed plates 3, a spacer 401 is fixedly connected to the rotating shaft 4, a protrusion 7 is fixedly connected to one side of the fixed base 1, and an inlay groove 8 is provided on the other side of the fixed base 1, pulleys 9 are movably installed on both sides of the spacer 401 on the rotating shaft 4, and a partition plate 10 is fixedly connected to the front and rear sides of the fixed base 1, the protrusion 7 and the inlay groove 8 are in an embedded and movably connected arrangement, and the protrusion 7 and the inlay groove 8 are detachably installed, a spacer 401 is provided between the pulleys 9, and the partition plate 10 is extended;

[0022] Specifically, through this arrangement, when it is needed to lay the water and electric heating pipe, the water and electric heating pipe is first inserted into the inner side of the limit plate 5 and placed on the pulley 9. Since the pulley 9 is an arc-shaped recessed arrangement and the water and electric heating pipe is at a distance from the ground on the pulley 9, when laying or replacing the water and electric heating pipe, the water and electric heating pipe is pulled on the pulley 9, and the pulley 9 rotates on the rotating shaft 4 to send the water and electric heating pipe out, which improves the situation of large friction when the pipe is taken out, and is convenient for the installation and replacement of the water and electric heating pipe. Secondly, since both sides of the fixed base 1 are provided with The partition plate 10 is extended to the next set of fixing devices to separate the pipes, thereby improving the entanglement of the pipes. At the same time, since a spacer 401 is provided between the rotating shafts 4, when the pulley 9 rotates on the rotating shaft 4, it will not affect the pulley 9 on the other side, so as to avoid affecting the pipes on other pulleys 9 when taking out or arranging a single water and electric heating pipe. The protrusion 7 is inlaid and installed through the inlay groove 8, and then in actual use, it can be installed and fixed according to the actual number of uses, which is convenient for use.

[0023] like Figure 1-4As shown, in this embodiment, a fixing block is provided at the bottom of the partition plate 10, and the fixing block is fixedly connected to the fixed base 1, a fixing bolt 2 is embedded in the middle of the fixing block 11, a lifting groove 301 is provided at the top of the fixing plate 3, a limiting plate 5 is provided at the top of the fixing plate 3, and movable grooves are provided on both sides of the limiting plate 5, and the two ends of the limiting plate 5 are respectively connected to the tops of the two fixing plates 3, and an adjusting rod 6 is provided at both sides of the limiting plate 5, and the adjusting rod 6 is embedded in the lifting groove 301, and a limiting piece 601 is fixedly connected to the top of the adjusting rod 6, and the limiting piece 601 is embedded in the movable grooves on both sides of the limiting plate 5;

[0024] Specifically, through this arrangement, when in use, the fixing blocks on both sides of the fixed base 1 are fitted against the wall, and the fixed base 1 is fixedly installed by the fixing bolts 2. When the water and electric heating pipe is thicker, the limiting plate 601 is rotated in the movable groove in the limiting plate 5 by twisting the adjusting rod 6, and at the same time, the adjusting rod 6 rotates in the lifting groove 301 in the fixing plate 3, and then the height of the limiting plate 5 on the fixing plate 3 is adjusted to install and use water and electric heating pipes of different sizes.

[0025] It should be noted that when using the utility model as a pipe laying fixing structure for water and electric heating installation, first, the fixing blocks on both sides of the fixing base 1 are fitted with the wall, and the fixing base 1 is fixed and installed by the fixing bolts 2. When the water and electric heating pipe is thicker, the limiting piece 601 is rotated in the movable groove in the limiting plate 5 by twisting the adjusting rod 6, and the adjusting rod 6 is rotated in the lifting groove 301 in the fixing plate 3, and then the limiting plate 5 is adjusted on the fixing plate 3. The height can be installed and used for water and electric heating pipes of different sizes. The water and electric heating pipe is inserted into the limiting plate 5 and placed on the pulley 9. Since the pulley 9 is an arc-shaped recessed setting, and the water and electric heating pipe is at a distance from the ground on the pulley 9, when laying or replacing the water and electric heating pipe. The water and electricity heating pipe is pulled on the pulley 9, and the pulley 9 rotates on the rotating shaft 4 to send the water and electricity heating pipe out, which improves the situation of large friction when the pipe is taken out, and is convenient for the installation and replacement of the water and electricity heating pipe. Secondly, since partition plates 10 are provided on both sides of the fixed base 1, and the partition plates 10 are extended to the next set of fixed equipment, the entanglement between the pipes is improved. At the same time, since a spacer 401 is provided between the rotating shafts 4, when the pulley 9 rotates on the rotating shaft 4, it will not affect the pulley 9 on the other side, so as to avoid affecting the pipes on other pulleys 9 when taking out or arranging a single water and electricity heating pipe. The protrusion 7 is inlaid and installed through the inlay groove 8, and then in actual use, it can be installed and fixed according to the actual number of uses, which is convenient for use.

[0026] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to only specific implementation methods. The utility model is not limited by the above embodiments. The above embodiments and the specification only describe the principles of the utility model. The utility model may have various changes and improvements without departing from the spirit and scope of the utility model, and these changes and improvements fall within the scope of the utility model to be protected. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is only limited by the claims and their full scope and equivalents.

Claims

1. A pipe laying and fixing structure for water, electricity and heating installation, comprising a plurality of fixing bases (1), characterized in that: Both ends of the upper side of the fixed base (1) are fixedly connected to fixed plates (3), a rotating shaft (4) is fitted between the two fixed plates (3), a spacer (401) is fixedly connected to the rotating shaft (4), a convex block (7) is fixedly connected to one side of the fixed base (1), an inlay groove (8) is provided on the other side of the fixed base (1), two adjacent fixed bases (1) are connected to the inlay groove (8) via the convex block (7), and pulleys (9) are movably installed on both sides of the spacer (401) on the rotating shaft (4).

2. A pipe laying and fixing structure for water, electricity and heating installation according to claim 1, characterized in that: Partition plates (10) are fixedly connected to both the front and rear sides of the fixed base (1), a fixing block (11) is provided below the partition plate (10), and the fixing block (11) is fixedly connected to the fixed base (1), and a fixing bolt (2) is embedded in the middle of the fixing block (11).

3. A pipe laying and fixing structure for water, electricity and heating installation according to claim 1, characterized in that: A lifting slot (301) is provided at the top of each of the fixed plates (3), a limiting plate (5) is installed above each of the fixed plates (3), and movable slots are provided on both sides of each of the limiting plates (5).

4. A pipe laying and fixing structure for water, electricity and heating installation according to claim 3, characterized in that: Adjustment rods (6) are provided on both sides of the limit plate (5), and the adjustment rods (6) are engaged with the lifting grooves (301). The upper parts of the adjustment rods (6) are fixedly connected with limit plates (601), and the limit plates (601) are engaged with the movable grooves on both sides of the limit plate (5).

5. A pipe laying and fixing structure for water, electricity and heating installation according to claim 1, characterized in that: The protrusion (7) and the inlay groove (8) are arranged in an engaging and movable connection, and the protrusion (7) and the inlay groove (8) are detachably installed.

6. A pipe laying and fixing structure for water, electricity and heating installation according to claim 2, characterized in that: The partition plate (10) is extended.