Cooling and dewatering pretreatment device used before hydrogen leakage in steam is measured
By designing a combination device of steam input pipeline, water cooling mechanism, water washing tank and automatic liquid discharge tank, the problems of poor cooling effect and large condensation accumulation of cyclone cooler are solved, and multiple cooling and automatic liquid discharge of steam are achieved, improving the The detection accuracy and reliability of hydrogen online analytical instruments are provided.
Patent Information
- Application Number
- CN202421052888.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-05-15
AI Technical Summary
In the prior art, the cyclone cooler is used to reduce the temperature of the cooling steam, resulting in excessive gas temperature in the hydrogen online analysis instrument and a lot of condensation accumulation, which requires manual discharge, which easily damages the instrument, affects the detection accuracy and result accuracy. .
A cooling and hydrophobic pretreatment device including steam input pipeline, water cooling mechanism, water washing tank, automatic liquid discharge tank and vortex cooler was designed. Through multiple cooling and automatic liquid discharge, the condensate does not enter the hydrogen online analysis instrument, which improves the Detection accuracy.
Multiple cooling and automatic discharge of sample steam are achieved, reducing the risk of damage to the online hydrogen analyzer, improving detection accuracy and accuracy, reducing labor waste, and enhancing the reliability of the process.
Smart Images

Figure CN222278248U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of gas detection, and in particular to a cooling and hydrophobic pretreatment device before measuring hydrogen leakage in steam. Background Art
[0002] In the related art, a hydrogen online analyzer is used to measure the amount of hydrogen leaked in steam. However, before the hydrogen online analyzer detects and analyzes the hydrogen content in the steam, only a cyclone refrigerator is used to cool the sample steam, and the gas after the cooling treatment is then sent to the hydrogen online analyzer. This sample steam pretreatment method has the following problems: only using a cyclone refrigerator results in poor cooling effect, so that the temperature of the gas entering the hydrogen online analyzer is still too high, which will damage the hydrogen online analyzer; after the cooling treatment, a lot of condensate accumulates, and the staff needs to manually drain the liquid regularly. Once the staff fails to drain the liquid in time, the condensate will enter the hydrogen online analyzer with the gas, which is easy to damage the hydrogen online analyzer; because the sample gas introduced into the hydrogen online analyzer does not meet the preset measurement gas conditions, it is easy to cause damage to the hydrogen online analyzer and measurement distortion, which in turn leads to the low accuracy of the hydrogen content detection result obtained according to the hydrogen online analyzer, which is easy to cause the process to misjudge the operation according to the hydrogen content detection result and cause shutdown. Utility Model Content
[0003] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a cooling and hydrophobic pretreatment device before measuring hydrogen leakage in steam, which can realize multiple cooling of sample steam and can automatically drain the condensate obtained after cooling, ensuring that the liquid will not be brought into the hydrogen online analysis instrument, thereby improving the instrument detection accuracy.
[0004] The present application provides a cooling and draining pretreatment device before measuring hydrogen leakage in steam, comprising: a steam input pipeline, a water cooling mechanism, a water washing tank, an automatic drain tank, a vortex refrigerator, a hydrogen online analyzer and a condensate drain pipeline; the output end of the steam input pipeline is connected to the input end of the water cooling mechanism, the output end of the water cooling mechanism is connected to the input end of the water washing tank, the steam output end of the water washing tank is connected to the input end of the vortex refrigerator, the steam output end of the vortex refrigerator is connected to the hydrogen online analyzer; the tank body of the water washing tank is connected to the top of the third Overflow holes are opened at two places, and the top input end of the automatic drain tank is connected to the water washing tank through the overflow holes, and the output end of the automatic drain tank and the condensate output end of the vortex refrigerator are both connected to the input end of the condensate emptying pipeline; the water washing tank is used to transport the condensate accumulated after condensation of the sample steam transported through the water cooling mechanism to the automatic drain tank through the overflow holes when the condensate accumulates and reaches the preset overflow liquid level of the water washing tank, and the automatic drain tank is used to output the condensate to the condensate emptying pipeline and discharge it from the condensate emptying pipeline.
[0005] According to the cooling and hydrophobic pretreatment device for measuring hydrogen leakage in steam according to the embodiment of the present application, at least the following beneficial effects are achieved: the steam input pipeline is used to transport the sample steam to the water cooling mechanism, the water cooling mechanism is used to perform the initial cooling and cooling of the sample steam and transport the sample steam after the initial cooling and cooling to the water washing tank, the water washing tank is used to perform water washing on the sample steam to separate the impurities, condensate and gas in the sample steam, the sample gas obtained after separation is transported to the vortex refrigerator, the impurities and condensate obtained after separation fall to the bottom of the water washing tank due to gravity, and when the condensate in the water washing tank accumulates and reaches the preset overflow level of the water washing tank, it flows into the automatic drain tank through the overflow hole, and is output in turn through the automatic drain pipe and the condensate drain line. Through this setting, the present application can realize multiple cooling of the sample steam, and can automatically drain the condensate obtained after cooling, so as to ensure that the liquid will not be brought into the hydrogen online analyzer, thereby improving the instrument detection accuracy.
[0006] According to some embodiments of the present application, the water cooling mechanism includes a first water-cooling tank and a second water-cooling tank, the input end of the first water-cooling tank is connected to the output end of the steam input pipeline, the output end of the first water-cooling tank is connected to the input end of the second water-cooling tank, and the output end of the second water-cooling tank is connected to the input end of the water washing tank.
[0007] According to some embodiments of the present application, the cooling and draining pretreatment device before measuring the hydrogen leakage in the steam also includes a first drain valve and a first drain pipeline, a first drain port is opened at the bottom of the automatic drain tank, the input end of the first drain pipeline is connected to the automatic drain tank through the first drain port, the output end of the first drain pipeline is connected to the input end of the condensate drain pipeline, and the first drain valve is arranged on the first drain pipeline.
[0008] According to some embodiments of the present application, the cooling and draining pretreatment device before measuring the hydrogen leakage in the steam also includes a second drain valve and a second drain pipeline, and a second drain port is opened at two-thirds of the tank body of the automatic drain tank near the top, and the input end of the second drain pipeline is connected to the automatic drain tank through the second drain port, and the output end of the second drain pipeline is connected to the input end of the condensate drain pipeline, and the second drain valve is arranged on the second drain pipeline.
[0009] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0011] Figure 1 A schematic structural diagram of a cooling and hydrophobic pretreatment device before measuring hydrogen leakage in steam provided in an embodiment of the present application.
[0012] Reference numerals:
[0013] Steam input pipeline 110, first water cooling tank 111, second water cooling tank 112, water washing tank 113, vortex refrigerator 114, hydrogen online analyzer 115, condensate drain pipeline 116;
[0014] Automatic liquid drain tank 120 , first liquid drain valve 121 , first liquid drain pipeline 122 , second liquid drain valve 123 , second liquid drain pipeline 124 . DETAILED DESCRIPTION
[0015] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.
[0016] In the description of the present application, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0017] In the description of this application, if there is a description of first or second, it is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0018] In the description of this application, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in this application based on the specific content of the technical solution.
[0019] In the related art, a hydrogen online analyzer is used to measure the amount of hydrogen leaked in steam. However, before the hydrogen online analyzer detects and analyzes the hydrogen content in the steam, only a cyclone refrigerator is used to cool the sample steam, and the gas after the cooling treatment is then sent to the hydrogen online analyzer. This sample steam pretreatment method has the following problems: only using a cyclone refrigerator results in poor cooling effect, so that the temperature of the gas entering the hydrogen online analyzer is still too high, which will damage the hydrogen online analyzer; after the cooling treatment, a lot of condensate accumulates, and the staff needs to manually drain the liquid regularly. Once the staff fails to drain the liquid in time, the condensate will enter the hydrogen online analyzer with the gas, which is easy to damage the hydrogen online analyzer; because the sample gas introduced into the hydrogen online analyzer does not meet the preset measurement gas conditions, it is easy to cause damage to the hydrogen online analyzer and measurement distortion, which in turn leads to the low accuracy of the hydrogen content detection result obtained according to the hydrogen online analyzer, which is easy to cause the process to misjudge the operation according to the hydrogen content detection result and cause shutdown.
[0020] In order to solve the above-mentioned problem, the present application proposes a cooling and draining pretreatment device before measuring hydrogen leakage in steam. The embodiments of the present application are further described below in conjunction with the accompanying drawings.
[0021] Reference Figure 1The present application provides a cooling and draining pretreatment device for measuring hydrogen leakage in steam, comprising: a steam input pipeline 110, a water cooling mechanism, a water washing tank 113, an automatic drain tank 120, a vortex refrigerator 114, a hydrogen online analyzer 115 and a condensate drain pipeline 116; the output end of the steam input pipeline 110 is connected to the input end of the water cooling mechanism, the output end of the water cooling mechanism is connected to the input end of the water washing tank 113, the steam output end of the water washing tank 113 is connected to the input end of the vortex refrigerator 114, the steam output end of the vortex refrigerator 114 is connected to the hydrogen online analyzer 115; the water washing tank 113 An overflow hole is provided at two-thirds of the tank body near the top, and the top input end of the automatic drain tank 120 is connected to the water washing tank 113 through the overflow hole, and the output end of the automatic drain tank 120 and the condensate output end of the vortex refrigerator 114 are both connected to the input end of the condensate drain line 116; the water washing tank 113 is used to transport the condensate accumulated after condensation of the sample vapor transported through the water cooling mechanism to the automatic drain tank 120 through the overflow hole when the condensate accumulates and reaches the preset overflow level of the water washing tank 113, and the automatic drain tank 120 is used to output the condensate to the condensate drain line 116 and discharge it from the condensate drain line 116.
[0022] It should be noted that the input end of the water cooling mechanism is arranged at the top of the water cooling mechanism, and the output end of the water cooling mechanism is arranged at the bottom of the water cooling mechanism; the steam output end of the water washing tank 113 and the input end of the water washing tank 113 are respectively arranged on both sides of the top of the water washing tank 113, the input end of the vortex refrigerator 114 and the steam output end of the vortex refrigerator 114 are respectively arranged on both sides of the top of the vortex refrigerator 114, and the condensate output end of the vortex refrigerator 114 is arranged at the bottom of the vortex refrigerator 114.
[0023] It should be noted that, by providing an automatic drain tank 120 , when the liquid level in the water wash tank 113 reaches a preset overflow level at two-thirds of the tank body near the top, the liquid can be automatically drained to prevent the liquid from entering the hydrogen online analyzer 115 .
[0024] It should be noted that when the liquid level reaches the preset overflow level by the overflow method, the excess accumulated liquid overflows; the automatic drainage function of the automatic drain tank 120 is utilized to realize automatic drainage, reduce labor waste, and there is no need to arrange special personnel for drainage, thereby reducing labor waste and achieving efficiency improvement and cost reduction; the liquid can be drained automatically as the process changes, and the hydrogen online analyzer 115 can be protected in a timely and effective manner.
[0025] In the present application, the steam input pipeline 110 is used to transport the sample steam to the water cooling mechanism, the water cooling mechanism is used to perform the initial cooling and cooling of the sample steam and transport the sample steam after the initial cooling to the water washing tank 113, the water washing tank 113 is used to perform water washing on the sample steam to separate the impurities, condensate and gas in the sample steam, and the sample gas obtained after separation is transported to the vortex refrigerator 114, and the impurities and condensate obtained after separation fall to the bottom of the water washing tank 113 due to gravity. When the condensate accumulated in the water washing tank 113 reaches the preset overflow level of the water washing tank 113, it flows into the automatic drain tank 120 through the overflow hole, and is output in turn through the automatic drain pipe and the condensate emptying pipeline 116. Through this setting, the present application can realize multiple cooling of the sample steam, and can automatically drain the condensate obtained after cooling, to ensure that the accumulated liquid will not be brought into the hydrogen online analyzer 115, and improve the instrument detection accuracy.
[0026] Reference Figure 1 It can be understood that the water cooling mechanism includes a first water cooling tank 111 and a second water cooling tank 112, the input end of the first water cooling tank 111 is connected to the output end of the steam input pipeline 110, the output end of the first water cooling tank 111 is connected to the input end of the second water cooling tank 112, and the output end of the second water cooling tank 112 is connected to the input end of the water washing tank 113.
[0027] It should be noted that by arranging the first water-cooling tank 111 and the second water-cooling tank 112 in the water cooling mechanism, the cooling effect on the sample vapor is improved, so that after the sample vapor that has been cooled and treated is transported to the water washing tank 113, it loses moisture and becomes a relatively dry gas, thereby further reducing the liquid content of the gas transported to the hydrogen online analyzer 115.
[0028] Reference Figure 1 It can be understood that the cooling and draining pretreatment device before measuring the leakage of hydrogen in the steam also includes a first drain valve 121 and a first drain pipeline 122. A first drain port is opened at the bottom of the automatic drain tank 120. The input end of the first drain pipeline 122 is connected to the automatic drain tank 120 through the first drain port. The output end of the first drain pipeline 122 is connected to the input end of the condensate emptying pipeline 116. The first drain valve 121 is arranged on the first drain pipeline 122.
[0029] It should be noted that, by setting the first drain line 122 and the first drain valve 121, the first drain port is opened at the bottom of the automatic drain tank 120, so that the condensate flowing into the automatic drain tank 120 flows to the condensate emptying line 116 through the first drain port and the first drain pipeline 122 in turn, and the first drain valve 121 is always in a half-open state to control the amount of condensate flowing from the bottom of the automatic drain tank 120 to the condensate emptying line 116, and the staff can adjust the amount of condensate flowing from the bottom of the automatic drain tank 120 to the condensate emptying line 116 through the first drain valve 121.
[0030] In some embodiments, the first liquid discharge valve 121 is always in a half-open state.
[0031] Reference Figure 1 It can be understood that the cooling and draining pretreatment device before measuring the leakage of hydrogen in the steam also includes a second drain valve 123 and a second drain pipeline 124. A second drain port is opened at two-thirds of the tank body of the automatic drain tank 120 near the top. The input end of the second drain pipeline 124 is connected to the automatic drain tank 120 through the second drain port, and the output end of the second drain pipeline 124 is connected to the input end of the condensate emptying pipeline 116. The second drain valve 123 is arranged on the second drain pipeline 124.
[0032] It should be noted that by opening a second drain port at two-thirds of the tank body of the automatic drain tank 120 near the top, the input end of the second drain line 124 is connected to the automatic drain tank 120 through the second drain port, and the output end of the second drain line 124 is connected to the input end of the condensate emptying line 116, so that when the condensate content in the automatic drain tank 120 reaches two-thirds of the total height, it overflows into the condensate emptying line 116 through the second drain port and the second drain line 124, thereby preventing the condensate in the automatic drain tank 120 from accumulating too much condensate in the automatic drain tank 120 due to the slow outflow speed from the first drain port at the bottom and then flowing back to the washing tank 113 from the top input end of the automatic drain tank 120, and the staff can adjust the amount of condensate flowing from the second drain port of the automatic drain tank 120 to the condensate emptying line 116 through the second drain valve 123.
[0033] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0034] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications are also considered to be within the scope of protection of the present application.
[0035] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A cooling and draining pretreatment device for measuring hydrogen leakage in steam, characterized in that: include: Steam input pipeline, water cooling mechanism, water washing tank, automatic drain tank, vortex refrigerator, hydrogen online analyzer and condensate drain pipeline; The output end of the steam input pipeline is connected to the input end of the water cooling mechanism, the output end of the water cooling mechanism is connected to the input end of the water washing tank, the steam output end of the water washing tank is connected to the input end of the vortex refrigerator, and the steam output end of the vortex refrigerator is connected to the hydrogen online analyzer; An overflow hole is provided at two-thirds of the tank body of the water washing tank near the top, the top input end of the automatic drain tank is connected to the water washing tank through the overflow hole, and the output end of the automatic drain tank and the condensate output end of the vortex refrigerator are both connected to the input end of the condensate drain pipeline; The water washing tank is used to transport the condensate after condensation of the sample steam transported through the water cooling mechanism to the automatic drain tank through the overflow hole when the condensate accumulates and reaches the preset overflow level of the water washing tank. The automatic drain tank is used to output the condensate to the condensate drain line and discharge it from the condensate drain line.
2. The cooling and draining pretreatment device for measuring hydrogen leakage in steam according to claim 1, characterized in that: The water cooling mechanism includes a first water cooling tank and a second water cooling tank, the input end of the first water cooling tank is connected to the output end of the steam input pipeline, the output end of the first water cooling tank is connected to the input end of the second water cooling tank, and the output end of the second water cooling tank is connected to the input end of the water washing tank.
3. The cooling and draining pretreatment device for measuring hydrogen leakage in steam according to claim 1, characterized in that: The cooling and draining pretreatment device before measuring hydrogen leakage in steam also includes a first drain valve and a first drain pipeline. A first drain port is provided at the bottom of the automatic drain tank. The input end of the first drain pipeline is connected to the automatic drain tank through the first drain port. The output end of the first drain pipeline is connected to the input end of the condensate drain pipeline. The first drain valve is arranged on the first drain pipeline.
4. The cooling and draining pretreatment device for measuring hydrogen leakage in steam according to claim 1, characterized in that: The cooling and draining pretreatment device before measuring hydrogen leakage in steam also includes a second drain valve and a second drain pipeline. A second drain port is provided at two-thirds of the tank body of the automatic drain tank near the top. The input end of the second drain pipeline is connected to the automatic drain tank through the second drain port, and the output end of the second drain pipeline is connected to the input end of the condensate drain pipeline. The second drain valve is arranged on the second drain pipeline.