Anti-pulling iron tower spiral extension ground pile foundation

Through the spiral-type ground pile foundation of anti-pull-resistant tower, the problems of earth excavation and mud discharge in areas with strict ecological protection and environmental protection requirements have been solved, and the effect of resource conservation and shortening of construction cycles has been achieved.

CN222314057UActive Publication Date: 2025-01-07JIANGSU MINGYUAN TOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421138189.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-01-07
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

Traditional tower construction methods have problems in areas with strict ecological protection and environmental protection requirements, such as earth excavation, mud discharge and large-scale machinery use, especially in ultra-high pressure and long-distance lines construction.

Method used

The spiral-type ground pile foundation of the anti-pull-type iron tower is used to connect the foundation pier and the support platform through anchor screws, and the ground anchor piles are used to fix it with the ground to reduce earth excavation and mud discharge, which is suitable for transportation and construction equipment to enter difficult areas.

Benefits of technology

It has achieved the reduction of earth excavation, mud discharge and construction sewage discharge, save costs and site, shorten the construction cycle, and is suitable for areas with strict environmental protection requirements and high labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222314057U_ABST
    Figure CN222314057U_ABST
Patent Text Reader

Abstract

The utility model provides an anti-pulling iron tower spiral extension ground pile foundation which comprises a foundation pier and a bearing platform which are connected through anchor screws, the foundation pier is located on the ground, the bearing platform is buried underground, the bearing platform is fixed to the ground through a plurality of ground anchor piles, ground anchor tips are arranged at the bottoms of the ground anchor piles, spiral plates are arranged on the outer edges of the bottoms of the ground anchor piles, and the spiral plates are arranged on the ground anchor piles. Welding nails and welding meshes are arranged at the tops of the ground anchor piles, and the ground anchor piles are fixed to the bearing platform through the welding nails and the welding meshes. The utility model has the advantages of reducing earth excavation, slurry discharge and construction sewage discharge, occupying less space, using less concrete, using less large-scale construction machinery and the like, and is particularly suitable for being used in areas where transportation, roads and construction equipment are difficult to enter, areas where the industrial manufacturing industry and the building industry are not developed, and places where the labor cost is higher and the environmental protection requirement is particularly strict.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of power pole towers and communication pole towers, in particular to a pull-out resistant iron tower spirally connected to a ground pile foundation. Background Art

[0002] In deserts, wetlands, forests, grasslands and other places, due to ecological protection, environmental emissions, transportation difficulties, and difficulty in large-scale machinery access, many factors have caused the on-site tower construction to use the original traditional construction methods of digging holes, drilling holes, large excavation, etc., which do not meet the requirements of environmental protection and ecological protection, especially in the case of ultra-high voltage and long-distance lines. Utility Model Content

[0003] In order to solve the problems of the prior art, the utility model provides a pull-out resistant iron tower spirally extended ground pile foundation, which has the advantages of reducing earth excavation, mud discharge, construction sewage discharge, occupying less space, using very little concrete, and using less large construction machinery. It is particularly suitable for areas with difficult access to transportation, roads and construction equipment, areas with underdeveloped industrial manufacturing and construction industries, and places with high labor costs and particularly strict environmental protection requirements.

[0004] The utility model comprises a foundation pier and a cap connected by anchor screws, the foundation pier is located on the ground, the cap is buried underground, the cap is fixed to the ground by a plurality of anchor piles, the bottom of the anchor pile is provided with an anchor tip, the outer edge of the bottom is provided with a spiral plate, the top of the anchor pile is provided with a welding nail and a welding mesh, and the anchor pile is fixed to the cap by the welding nail and the welding mesh.

[0005] Further improvement, the anchor pile comprises an upper section, an intermediate section and a lower section connected in sequence, the welding nails and the welding mesh are fixed to the upper section, and the anchor tip and the spiral plate are fixed to the lower section. The upper section, the intermediate section and the lower section are connected by an intermediate joint, and a connection hole is opened on the outer edge of the connection, and the fixing screws fix the upper section, the intermediate section and the lower section through the connection hole.

[0006] As a further improvement, the portion of the top of the anchor screw extending out of the foundation pier is provided with an anchor thread, and the anchor screw fixes the bottom of the pole tower to the foundation pier through the anchor thread.

[0007] The beneficial effects of the utility model are: reducing earth excavation, mud discharge, construction sewage discharge, occupying less space, using very little concrete, using less large construction machinery, etc., saving about 40% of costs, saving about 70% of site, saving more than 60% of on-site construction period, reducing emissions by more than 70%, etc., and is particularly suitable for areas with difficult transportation, roads and construction equipment access, and areas such as Africa and South America where industrial manufacturing and construction industries are underdeveloped, as well as places with high labor costs and particularly strict environmental protection requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0009] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0010] Figure 2 Schematic diagram of the anchor pile structure.

[0011] In the figure, 1. spiral anchor, 2. spiral plate, 3. anchor tip, 4. middle joint, 5. middle section, 6. connecting hole, 7. welding nail, 8. welding mesh, 9. anchor screw, 10. foundation pier, 11. foundation platform, 12. anchor thread, 13. anchor pile. DETAILED DESCRIPTION

[0012] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0013] The utility model structure is as follows Figure 1 and Figure 2 As shown, it includes a foundation pier 10 and a cap 11 connected by anchor screws 9, the foundation pier 10 is located on the ground, the cap 11 is buried underground, the cap 11 is fixed to the ground through a plurality of anchor piles 13, the bottom of the anchor pile 13 is provided with an anchor tip 3, the outer edge of the bottom is provided with a spiral plate 2, the top of the anchor pile is provided with a weld 7 and a welded mesh 8, and the anchor pile is fixed to the cap by welding nails and the welded mesh.

[0014] Further improvement, the anchor pile comprises an upper section, an intermediate section 5 and a lower section connected in sequence, the welding nails and the welding mesh are fixed to the upper section, the lower section is a spiral anchor 1, and the anchor tip and the spiral plate are fixed to the lower section. The upper section, the intermediate section and the lower section are connected by an intermediate joint 4, and a connection hole 6 is opened on the outer edge of the connection, and the fixing screws fix the upper section, the intermediate section and the lower section through the connection hole.

[0015] As a further improvement, the portion of the top of the anchor screw extending out of the foundation pier is provided with an anchor thread 12, and the anchor screw fixes the bottom of the tower to the foundation pier through the anchor thread.

[0016] The utility model belongs to the field of environmentally friendly construction of power tower and communication tower foundation. In deserts, wetlands, forests, grasslands and other places, due to ecological protection, environmental emissions, transportation difficulties, and difficulties in large-scale machinery entering, many factors have caused the on-site iron tower construction to adopt the original digging, drilling, large excavation and other forms of traditional construction methods that do not meet environmental protection requirements and ecological protection requirements, especially in the case of ultra-high voltage, long-distance lines, etc., when the force calculation meets the requirements, spiral ground piles are used. The spiral ground piles adopt a central steel pipe plus a spiral wing plate structure and a bottom pointed head. The diameter and thickness of the steel pipe, the thickness and width of the wing plate are related to the force parameter bearing capacity and the depth. The ground piles can be extended in sections according to the depth requirements. The bottom section is generally 3-8 meters for the spiral section, and the middle is extended as needed. Connecting holes are set around the steel pipe at the extension point for plug-in bolt connection. The upper section adopts the method of welding nails and the top welding threaded steel mesh. The mesh can be connected to the upper section by bolts at multiple points to facilitate the casting of the concrete base into a whole. The number of spiral piles can be arranged at multiple points according to the force requirements, site conditions, and geological conditions. Deepening the arrangement reduces the number and area occupied. The cap is a combination of the integrity of the spiral pile and the foundation anchor bolts. There are welded nails and meshes on the top of the spiral steel pipe pile. There is a threaded steel skeleton between the foundation anchor bolts and the concrete of the cap and foundation pier, and they are welded firmly to each other to form a complete whole. All parts of the spiral piles are thickened and hot-dip galvanized, and the welds reach level one. Special spiral piling equipment is used. This method and the utility model mainly reduce earth excavation, mud discharge, construction sewage discharge, occupy less space, use very little concrete, and use less large construction machinery. It saves about 40% of costs, about 70% of sites, saves more than 60% of on-site construction period, reduces emissions by more than 70%, etc. It is particularly suitable for areas with difficult access to transportation, roads and construction equipment, as well as for areas where industrial manufacturing and construction industries are underdeveloped, labor costs are high, and environmental protection requirements are particularly strict.

[0017] Each embodiment in this specification is described in a progressive manner, and the same and similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, the above is only a preferred implementation of the utility model. Since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field is within the technical scope disclosed by the utility model. For ordinary technicians in the technical field, changes or replacements that can be easily thought of should be included in the protection scope of the utility model without departing from the principle of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.

Claims

1. A pull-out resistant iron tower spirally connected pile foundation, comprising a foundation pier and a cap connected by anchor screws, wherein the foundation pier is located on the ground and the cap is buried underground, and is characterized in that: The foundation is fixed to the ground through a plurality of anchor piles, wherein the bottom of the anchor pile is provided with an anchor tip, the outer edge of the bottom is provided with a spiral plate, the top of the anchor pile is provided with a welding nail and a welding mesh, and the anchor pile is fixed to the foundation through the welding nail and the welding mesh.

2. The pull-out resistant iron tower spirally connected pile foundation according to claim 1 is characterized in that: The ground anchor pile comprises an upper section, a middle section and a lower section which are connected in sequence, the welding nails and the welding mesh are fixed to the upper section, and the ground anchor tip and the spiral plate are fixed to the lower section.

3. The pull-out resistant iron tower spirally connected pile foundation according to claim 2 is characterized in that: The upper section, the middle section and the lower section are connected by an intermediate joint, and a connecting hole is opened on the outer edge of the connection. The fixing screws fix the upper section, the middle section and the lower section through the connecting hole.

4. The pull-out resistant iron tower spirally connected pile foundation according to claim 1 is characterized in that: The part of the top of the anchor screw extending out of the foundation pier is provided with an anchor thread, and the anchor screw fixes the bottom of the pole tower on the foundation pier through the anchor thread.