Device for reducing axis deviation in urban underground pipeline construction
By using deviation reduction devices and reinforcement devices in urban underground pipeline construction, and using technologies such as airbags, air pressure bays and threaded rods, the problem of excessive deviation of the pipeline axis is solved, achieving more efficient construction and better quality.
Patent Information
- Application Number
- CN202421273584.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2025-01-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During urban underground pipeline construction, due to uneven resistance on the front of the formation and uneven stress on the tool pipe, the pipeline axis deviation is too large, and pipeline bending problems occur, making it difficult to meet the project quality requirements.
A device including a reduction device and a reinforcement device is designed. The reduction device drives the air pressure rod and fixing clip to fix the top tube through the airbag and air pressure bay. The reinforcement device reinforces the top tube through the threaded rod and screw, effectively reducing it. Axial deviation and reinforcement of the top tube.
It effectively reduces the deviation of the pipeline axis, speeds up the construction progress, improves the practicality and quality of the construction, and meets the design requirements.
Smart Images

Figure CN222316141U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of urban construction, in particular to a device for reducing axis deviation for urban underground pipeline construction. Background Art
[0002] Urban underground pipelines are an important part of urban infrastructure, with the functions of transmitting information, transporting energy and discharging waste. It is a complex system engineering, which has developed rapidly under the background of rapid development of urban modernization and informatization. At present, its role and function are becoming more and more important. If the traditional excavation construction technology is used, it will not only have a heavy economic burden, but also have adverse effects on society and the environment. The pipe jacking construction technology can effectively solve this problem.
[0003] Pipe jacking technology is often used in underground concealed projects. The complexity of concealed projects is difficult to predict. It includes the transportation of tap water, sewage treatment, gas and heating transportation, etc., which all rely on the city's underground pipe network. my country now has a large underground pipeline system. In order to avoid conflicts with existing pipelines, the buried depth of pipelines in the future will inevitably increase, which further demonstrates that pipe jacking construction has significant economic and social benefits. It is a complex system project, and due to the uneven frontal resistance of the formation and the uneven force on the tool pipe, the pipeline axis will deviate too much, resulting in the problem of pipeline bending, making the quality requirements of the project unable to meet the design requirements.
[0004] The main problems with pipe jacking technology in our country are insufficient professional talents, outdated machinery and equipment, and uneven levels of expertise among regions. Most of those currently active in the construction front are "latecomers". Some were originally civil engineering majors who switched careers, and some are from other industries. These people have relatively little professional knowledge and find it difficult to adapt to changing construction needs. Because pipe jacking technology is often used in concealed underground projects, the complexity of concealed projects is difficult to predict, and due to the uneven frontal resistance of the stratum and the uneven force on the tool pipe, the pipeline axis will deviate too much, resulting in pipeline bending, making it impossible for the quality requirements of the project to meet the design requirements.
[0005] How to solve the above-mentioned problem of excessive axis deviation and pipe bending is the object of this project. Utility Model Content
[0006] The utility model aims to provide a device for reducing axis deviation for urban underground pipeline construction, and solves the existing problems through the deviation reducing device and the reinforcement device.
[0007] In order to solve the above technical problems, the utility model is realized by the following technical solutions:
[0008] The utility model is a device for reducing axis deviation for urban underground pipeline construction, comprising a shell, the interior of the shell is fixedly connected to a limit block, the exterior of the shell is fixedly connected to a fixing plate, and the shell is provided with a deviation reducing device and a reinforcement device;
[0009] The deviation reducing device includes an airbag, a side of the airbag is fixedly connected with an air inlet pipe and an air supply pipe, a side of the air supply pipe away from the airbag is fixedly connected with an air pressure cabin, a side of the air pressure cabin is slidably connected with an air pressure rod, a side of the air pressure rod away from the air pressure cabin is fixedly connected with a fixing clamp, and a side of the air pressure cabin away from the air pressure rod is provided with an exhaust valve.
[0010] Furthermore, an airbag is fixedly connected to the limit block, the size of the butt joint of the limit block is adapted to the size of the top pipe, the shape of the airbag is set to be ring-shaped, and the limit block can effectively limit the butt joint of the top pipe.
[0011] Furthermore, the pressure chamber is fixedly connected to the side of the fixing plate, and there are four pressure chambers, which are symmetrically arranged. After gas is injected into the pressure chamber, the pressure rod and the fixing clamp are driven to move.
[0012] Furthermore, the fixing clip is made of rubber with strong friction, and the size of the fixing clip is adapted to the size of the top pipe, so the fixing clip can effectively fix the outside of the top pipe.
[0013] Furthermore, the reinforcement device includes reinforcement block one and reinforcement block two, reinforcement block one is provided with a threaded rod, the side of the threaded rod is fixedly connected with a knob, and the side of reinforcement block two is provided with a screw, and the reinforcement device can effectively reinforce the fixed state of the jacking pipe.
[0014] Furthermore, the reinforcement block 1 and the reinforcement block 2 are fixedly connected on both sides of the fixing clamp, the reinforcement block 1 and the reinforcement block 2 are symmetrically arranged, and threaded holes are provided on the reinforcement block 1 and the reinforcement block 2. The reinforcement block 1 and the reinforcement block 2 can strengthen the fixation of the top pipe through threaded rods and screws.
[0015] Furthermore, the sizes of the threaded rod and the screw are adapted to each other, and the materials of the threaded rod and the screw are both corrosion-resistant metal steel, and the threaded rod and the screw can effectively strengthen the fixation of the jacking pipe.
[0016] The utility model has the following beneficial effects:
[0017] 1. The utility model uses a deviation reducing device to squeeze the airbag through the jacking pipe after the jacking pipe is docked with the shell. The airbag will transport the internal gas to the inside of the air pressure cabin through the air pipe. The air pressure cabin will drive the air pressure rod and the fixing clamp to fix the outside of the jacking pipe, which can effectively reduce the axis deviation, speed up the construction progress, and has strong practicality.
[0018] 2. The utility model uses a reinforcement device, which can fit the reinforcement block 1 and the reinforcement block 2 together after the fixing clamp completes the external fixation of the top pipe. At this time, turning the knob drives the threaded rod to rotate, and the threaded rod enters the inner side of the reinforcement block 2 and docks with the screw, thereby strengthening the fixing clamp to fix the external part of the top pipe, and further enhancing the practicality of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional appearance structure of the utility model;
[0020] Figure 2 It is a three-dimensional side structural schematic diagram of the utility model;
[0021] Figure 3 It is a schematic diagram of the three-dimensional cross-sectional structure of the utility model;
[0022] Figure 4 It is a schematic diagram of the enlarged structure of the deviation reducing device of the utility model;
[0023] Figure 5 It is a schematic diagram of the enlarged structure of the reinforcement device of the utility model.
[0024] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0025] 1. Shell; 2. Limit block; 3. Fixing plate; 4. Deviation reduction device; 41. Air bag; 42. Air intake pipe; 43. Air delivery pipe; 44. Air pressure chamber; 45. Air pressure rod; 46. Fixing clamp; 47. Exhaust valve; 5. Reinforcement device; 51. Reinforcement block 1; 52. Threaded rod; 53. Knob; 54. Reinforcement block 2; 55. Screw. DETAILED DESCRIPTION
[0026] See also Figure 1-5 The utility model is a device for reducing axis deviation for urban underground pipeline construction, comprising a shell 1, a limited block 2 is fixedly connected inside the shell 1, a fixing plate 3 is fixedly connected outside the shell 1, and a deviation reducing device 4 and a reinforcement device 5 are arranged on the shell 1;
[0027] The deviation reducing device 4 includes an airbag 41, the side of the airbag 41 is fixedly connected with an air inlet pipe 42 and an air supply pipe 43, the side of the air supply pipe 43 away from the airbag 41 is fixedly connected with an air pressure cabin 44, the side of the air pressure cabin 44 is slidably connected with an air pressure rod 45, the side of the air pressure rod 45 away from the air pressure cabin 44 is fixedly connected with a fixing clamp 46, and the side of the air pressure cabin 44 away from the air pressure rod 45 is provided with an exhaust valve 47.
[0028] The airbag 41 is fixedly connected to the limit block 2. The size of the joint of the limit block 2 is adapted to the size of the top pipe. The shape of the airbag 41 is set to be ring-shaped. The limit block 2 can effectively limit the top pipe.
[0029] The air pressure chamber 44 is fixedly connected to the side of the fixing plate 3. There are four air pressure chambers 44, and the four air pressure chambers 44 are symmetrically arranged. After the air pressure chamber 44 is injected with gas, it will drive the air pressure rod 45 and the fixing clamp 46 to move.
[0030] The material of the fixing clip 46 is rubber with strong friction. The size of the fixing clip 46 is adapted to the size of the top pipe. The fixing clip 46 can effectively fix the outside of the top pipe.
[0031] The reinforcement device 5 includes a reinforcement block 1 51 and a reinforcement block 2 54. The reinforcement block 1 51 is provided with a threaded rod 52, and the side of the threaded rod 52 is fixedly connected with a knob 53. The side of the reinforcement block 2 54 is provided with a screw 55. The reinforcement device 5 can effectively reinforce the fixed state of the jacking pipe.
[0032] Reinforcement block 1 51 and reinforcement block 2 54 are fixedly connected on both sides of the fixing clamp 46 . Reinforcement block 1 51 and reinforcement block 2 54 are symmetrically arranged. Threaded holes are provided on reinforcement block 1 51 and reinforcement block 2 54 . Reinforcement block 1 51 and reinforcement block 2 54 can strengthen the fixation of the top pipe through threaded rods 52 and screws 55 .
[0033] The sizes of the threaded rod 52 and the screw 55 are adapted to each other. The threaded rod 52 and the screw 55 are both made of corrosion-resistant metal steel. The threaded rod 52 and the screw 55 can effectively strengthen the fixation of the jacking pipe.
[0034] The utility model uses the deviation reduction device 4 to squeeze the airbag 41 through the top pipe after the top pipe is docked with the shell 1. The airbag 41 will transport the internal gas to the inside of the air pressure chamber 44 through the air pipe 43. The air pressure chamber 44 will drive the air pressure rod 45 and the fixing clamp 46 to fix the outside of the top pipe, which can effectively reduce the axis deviation and speed up the construction progress. It is highly practical. The utility model uses the reinforcement device 5 to fit the reinforcement block 1 51 and the reinforcement block 2 54 after the fixing clamp 46 completes the fixing of the outside of the top pipe. At this time, the knob 53 is turned to drive the threaded rod 52 to rotate. The threaded rod 52 will enter the inner side of the reinforcement block 2 54 and dock with the screw 55, and the fixing clamp 46 will fix the outside of the top pipe, further enhancing the practicality of the entire device.
[0035] A specific application of this embodiment is: first dock one end of the jacking pipe with the docking point of the limit block 2, the jacking pipe will squeeze the airbag 41, and the airbag 41 will transport the internal gas to the inside of the air pressure cabin 44 through the air pipe 43 after being squeezed, and the air pressure cabin 44 will drive the air pressure rod 45 and the fixing clamp 46 to fix the outside of the jacking pipe, reduce the axis deviation, and speed up the construction progress. When it is necessary to separate the jacking pipe from the shell 1, open the exhaust valve 47, the gas inside the air pressure cabin 44 will be discharged, the air pressure rod 45 and the fixing clamp 46 will return to their original positions, and the fixing state of the outside of the jacking pipe will be released. After the jacking pipe is separated from the shell 1, the airbag 41 will not If it continues to be squeezed, the airbag 41 will allow external gas to enter its interior through the air inlet pipe 42, so that it will restore its expanded state, which is convenient for the next use. It is very practical. After the fixing clamp 46 completes the external fixation of the top pipe, the reinforcement block 1 51 and the reinforcement block 2 54 will fit together. At this time, turn the knob 53, the knob 53 will drive the threaded rod 52 to rotate into the interior of the reinforcement block 2 54, and cooperate with the screw 55 to strengthen the fixing state of the outside of the top pipe. When it is necessary to release the fixing state setting of the outside of the top pipe, just turn the knob 53 in the opposite direction to drive the threaded rod 52 to return to its original position, thereby further enhancing the practicality of the entire device.
Claims
1. A device for reducing axis deviation for urban underground pipeline construction, comprising a housing (1), characterized in that: The interior of the housing (1) is fixedly connected to a limit block (2), the exterior of the housing (1) is fixedly connected to a fixing plate (3), and the housing (1) is provided with a deviation reducing device (4) and a reinforcement device (5); The deviation reduction device (4) comprises an air bag (41), the side of the air bag (41) is fixedly connected to an air intake pipe (42) and an air supply pipe (43), the side of the air supply pipe (43) away from the air bag (41) is fixedly connected to an air pressure chamber (44), the side of the air pressure chamber (44) is slidably connected to an air pressure rod (45), the side of the air pressure rod (45) away from the air pressure chamber (44) is fixedly connected to a fixing clamp (46), and the side of the air pressure chamber (44) away from the air pressure rod (45) is provided with an exhaust valve (47).
2. A device for reducing axis deviation for urban underground pipeline construction according to claim 1, characterized in that: An air bag (41) is fixedly connected to the limit block (2); the size of the joint of the limit block (2) is adapted to the size of the top pipe; and the shape of the air bag (41) is set to be ring-shaped.
3. A device for reducing axis deviation for urban underground pipeline construction according to claim 2, characterized in that: The air pressure cabin (44) is fixedly connected to the side of the fixing plate (3), and there are four air pressure cabins (44), and the four air pressure cabins (44) are arranged in a symmetrical state.
4. A device for reducing axis deviation for urban underground pipeline construction according to claim 3, characterized in that: The material of the fixing clip (46) is rubber with strong friction, and the size of the fixing clip (46) is adapted to the size of the top pipe.
5. A device for reducing axis deviation for urban underground pipeline construction according to claim 4, characterized in that: The reinforcement device (5) comprises a reinforcement block 1 (51) and a reinforcement block 2 (54); the reinforcement block 1 (51) is provided with a threaded rod (52); a knob (53) is fixedly connected to the side of the threaded rod (52); and a screw (55) is provided on the side of the reinforcement block 2 (54).
6. The device for reducing axis deviation for urban underground pipeline construction according to claim 5, characterized in that: The reinforcing block 1 (51) and the reinforcing block 2 (54) are fixedly connected to the two sides of the fixing clamp (46); the reinforcing block 1 (51) and the reinforcing block 2 (54) are symmetrically arranged; and threaded holes are provided on the reinforcing block 1 (51) and the reinforcing block 2 (54).
7. A device for reducing axis deviation for urban underground pipeline construction according to claim 6, characterized in that: The threaded rod (52) and the screw (55) are adapted in size, and the threaded rod (52) and the screw (55) are both made of corrosion-resistant metal steel.