Prefabricated canal anti-deformation connecting structure
By burying linear steel bars and casings at the joints of prefabricated waterways and filling asphalt mud bodies, the misalignment deformation problem caused by uneven settlement is solved, and the leakage prevention and drainage prevention of prefabricated waterways is achieved, especially in cold weather. The region effectively overcomes the impact of frost swelling.
Patent Information
- Application Number
- CN202323526646.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The prefabricated water canals are dislocated and deformed due to uneven settlement at the connecting gap, resulting in water leakage or poor drainage, especially in cold areas, which has a greater impact on repeated freezing and swelling.
The linear steel bars and the corresponding embedded casing are embedded at the joints. The steel bars can be retracted and inserted into the casing, and asphalt mud is filled at the joints. The casing can be filled with lubricating oil, and the steel bars are buried in the wall of the prefabricated canal. Thick inside to maintain the elasticity of the connection.
It effectively avoids water leakage and poor drainage at the joints, maintains the horizontal plane consistency of the prefabricated canals, and reduces soil erosion and channel costs caused by traditional connecting structures.
Smart Images

Figure CN222332917U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a prefabricated water channel anti-deformation connection structure. Background Art
[0002] Drainage channels are usually constructed by connecting multiple sections of prefabricated channels. In the prefabricated channel connection structure, thickened waterproof membrane layers and additional waterproof membrane layers are generally set at the joints to improve the waterproof performance by utilizing the hydrophobicity and thickness of the waterproof membrane. However, when the connection gaps between the prefabricated channels are deformed due to uneven settlement, the waterproof membrane will break, and leakage or poor drainage due to height difference will occur at the joints. Especially in cold areas, when the joints of prefabricated channels are repeatedly frozen and heaved after winter, the toughness of the waterproof membrane will decrease and the brittleness will increase, which is very easy to cause fracture, resulting in leakage or poor drainage at the joints of the drainage channels. When the connection structure of the prefabricated channels on both sides is buried with water-stop steel plates at the joints, leakage at the joints can be effectively prevented. However, when the connection gaps between the prefabricated channels are deformed due to uneven settlement, the water-stop steel plates are prone to detachment from the concrete structure, and leakage or poor drainage due to height difference will still occur, especially in cold areas that are more affected by repeated freezing and heaving in winter. Therefore, how to prevent dislocation and deformation at the joints of each section of the prefabricated water channel from being subjected to uneven settlement, and avoid leakage or poor drainage due to height differences is a technical problem that urgently needs to be solved in this field. Utility Model Content
[0003] The utility model aims to provide a prefabricated water channel anti-deformation connection structure to solve the problem of uneven settlement of each section of the prefabricated water channel, preventing dislocation deformation at the joint, and avoiding water leakage at the joint or poor drainage due to height difference.
[0004] In order to solve the above technical problems, the utility model provides a prefabricated water channel anti-deformation connection structure, including a plurality of linear steel bars embedded in the wall thickness of the prefabricated water channel on one side of the joint, the linear steel bars are exposed at the end face of the prefabricated water channel on this side, and a plurality of linear embedded sleeves corresponding to the linear steel bars are embedded in the wall thickness of the prefabricated water channel on the other side of the splicing, the linear embedded sleeves do not expose the end face of the prefabricated water channel on this side, the prefabricated water channels on both sides of the joint are inserted and connected with the linear embedded sleeves through the linear steel bars, the linear steel bars are telescopically inserted and connected in the linear embedded sleeves, and asphalt mastic is filled at the joint of the prefabricated water channel.
[0005] Furthermore, in the prefabricated water channel anti-deformation connection structure provided by the embodiment of the utility model, the linear prefabricated casing is filled with lubricating oil.
[0006] Furthermore, in the prefabricated water channel anti-deformation connection structure provided by the embodiment of the utility model, the linear steel bars are embedded in the wall thickness of the bottom wall and two side walls of the prefabricated water channel.
[0007] Furthermore, in the anti-deformation connection structure of the prefabricated water channel provided by the embodiment of the utility model, the straight-line steel bars are evenly distributed and centrally embedded in the wall thickness of the prefabricated water channel.
[0008] Furthermore, in the prefabricated water channel anti-deformation connection structure provided by the embodiment of the utility model, the diameter of the straight steel bar is 20 mm, and the inner diameter of the straight embedded sleeve is 30 mm.
[0009] Furthermore, in the embodiment of the utility model, the prefabricated water channel anti-deformation connection structure provided has a lifting ring arranged on the prefabricated water channel.
[0010] Furthermore, the prefabricated water channel anti-deformation connection structure provided by the embodiment of the utility model also includes a water channel foundation laid at the bottom of the prefabricated water channel.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0012] The embodiment of the utility model provides a prefabricated water channel deformation-proof connection structure. When two adjacent sections of prefabricated water channels undergo uneven settlement, the prefabricated water channels on both sides of the joint are connected by telescopic insertion through linear steel bars and linear embedded sleeves, so that the prefabricated water channels on both sides of the joint are maintained on the same horizontal plane and are displaced in the vertical direction, thereby avoiding height differences between the two adjacent sections of prefabricated water channels at the joint and the problem of poor drainage. When a horizontal gap occurs at the joint between two adjacent sections of prefabricated water channels, the prefabricated water channels on both sides of the joint are telescopically connected through linear steel bars and linear embedded sleeves, and the soft connection of the asphalt mastic body and the resulting telescopic deformation are combined to prevent the joint from cracking or disconnecting, thereby avoiding the problem of water leakage at the joint. The utility model can overcome the problem of uneven settlement and misalignment of the prefabricated channels on both sides of the joint caused by repeated frost heaving at the joint due to the influence of low temperature and cold waves when constructing drainage channels in cold areas through prefabricated water channels.
[0013] The anti-deformation connection structure of the prefabricated water channel provided in the embodiment of the utility model can overcome the soil erosion caused by leakage at the joints of the prefabricated water channel, and avoid the increased channel clearing cost caused by poor drainage due to the traditional connection structure at the joints of the prefabricated water channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the plan structure of the prefabricated channel anti-deformation connection structure;
[0015] Figure 2 This is an enlarged view of the prefabricated channel anti-deformation connection structure at the joint;
[0016] Figure 3 It is a schematic diagram of the elevation structure of the prefabricated water channel anti-deformation connection structure;
[0017] Figure 4 It is a schematic diagram of the cross-sectional structure of a linear steel bar and a linear embedded casing;
[0018] As shown in the figure:
[0019] 100. Prefabricated channel deformation-proof connection structure;
[0020] 110. Prefabricated water channel, 111. Linear steel bar, 112. Linear embedded casing, 113. Asphalt mastic, 114. Lubricating oil, 115. Lifting ring;
[0021] 120. Canal foundation. DETAILED DESCRIPTION
[0022] The utility model is described in detail below in conjunction with the accompanying drawings: According to the following description, the advantages and features of the utility model will be more clearly understood. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the utility model.
[0023] Please refer to Figures 1 to 4 The embodiment of the utility model provides a prefabricated water channel anti-deformation connection structure 100, including a plurality of linear steel bars 111 embedded in the wall thickness of a prefabricated water channel 110 on one side of a joint, wherein the linear steel bars 111 are exposed at the end face of the prefabricated water channel 110 on this side, and a plurality of linear embedded sleeves 112 corresponding to the linear steel bars 111 are embedded in the wall thickness of the prefabricated water channel 110 on the other side of the joint, wherein the linear embedded sleeves 112 do not expose the end face of the prefabricated water channel 110 on this side, and the prefabricated water channels 110 on both sides of the joint are connected by inserting the linear steel bars 111 into the linear embedded sleeves 112, wherein the linear steel bars 111 are telescopically inserted and connected in the linear embedded sleeves 112, and an asphalt mastic body 113 is filled at the joint of the prefabricated water channel 110. The asphalt mortar is preferably thickened and vibrated to ensure that there is no gap in the mortar at the joint and the filling is dense. The linear steel bar 111 and the linear embedded casing 112 can be hydraulic rods. The linear steel bar 111 is prefabricated with the prefabricated water channel 110, and the linear embedded casing 112 is prefabricated with the prefabricated water channel 110.
[0024] The prefabricated water channel anti-deformation connection structure 100 provided by the embodiment of the utility model has the following advantages: when two adjacent sections of prefabricated water channels 110 undergo uneven settlement, the prefabricated water channels 110 on both sides of the joint are connected by a linear steel bar 111 and a linear embedded sleeve 112 which can be retracted and inserted, so that the prefabricated water channels 110 on both sides of the joint are kept on the same horizontal plane and are displaced in the vertical direction, thereby avoiding the height difference between the two adjacent sections of prefabricated water channels 110 at the joint and avoiding the problem of poor drainage. When the two adjacent sections of prefabricated water channels 110 are in the joint, the prefabricated water channels 110 are connected by a linear steel bar 111 and a linear embedded sleeve 112 which can be retracted and inserted, so that the prefabricated water channels 110 on both sides of the joint are kept on the same horizontal plane and are displaced in the vertical direction. When horizontal gaps occur at the joints, the prefabricated water channels 110 on both sides of the joints maintain a telescopic connection with the linear embedded sleeves 112 through the linear steel bars 111. Combined with the soft connection of the asphalt mastic body 113 and the resulting telescopic deformation, the joints will not crack or break, thus avoiding the problem of water leakage at the joints. This can overcome the problem of repeated frost heaving at the joints caused by low temperatures and cold waves when constructing drainage channels in cold regions using prefabricated water channels 110, resulting in uneven settlement and misalignment of the prefabricated water channels 110 on both sides of the joints.
[0025] The prefabricated water channel anti-deformation connection structure 100 provided in the embodiment of the utility model can overcome the soil erosion caused by leakage at the joints of the prefabricated water channel 110, and avoid the increased channel clearing cost caused by poor drainage due to the traditional connection structure at the joints of the prefabricated water channel 110.
[0026] Please refer to Figure 1 to Figure 2 In order to improve the expansion and contraction effect of the prefabricated water channel 110 on both sides of the joint through the linear steel bars 111 and the linear embedded sleeves 112 to prevent rust, the prefabricated water channel anti-deformation connection structure 100 provided by the embodiment of the utility model is filled with lubricating oil 114 in the linear prefabricated sleeves. The lubricating oil 114 can be butter or the like.
[0027] Please refer to Figure 3 and Figure 4 In order to improve the reliability of the connection between two adjacent sections of prefabricated water channels 110, the embodiment of the utility model provides a prefabricated water channel anti-deformation connection structure 100, wherein the linear steel bars 111 are pre-buried in the wall thickness of the bottom wall and two side walls of the prefabricated water channel 110.
[0028] Please refer to Figure 3 to Figure 4 In order to improve the embedding effect of the linear steel bar 111 and the linear embedded sleeve 112, the embodiment of the utility model provides a prefabricated water channel anti-deformation connection structure 100, wherein the linear steel bar 111 is evenly distributed and centrally embedded in the wall thickness of the prefabricated water channel 110. The diameter of the linear steel bar 111 can be 20 mm, and the inner diameter of the linear embedded sleeve 112 can be 30 mm.
[0029] Please refer to Figure 1In order to hoist the prefabricated water channel 110 , the prefabricated water channel anti-deformation connection structure 100 provided in the embodiment of the utility model has a hoisting ring 115 disposed on the prefabricated water channel 110 .
[0030] Please refer to Figure 3 In order to improve the construction quality of the drainage channel, the prefabricated water channel anti-deformation connection structure 100 provided by the embodiment of the utility model further includes a water channel foundation 120 laid at the bottom of the prefabricated water channel 110 .
[0031] The prefabricated water channel anti-deformation connection structure 100 provided in the embodiment of the utility model also has the following advantages:
[0032] 1. Easy to obtain materials. The materials can be selected from the common steel bars and casings on the construction site. The materials are easy to obtain and the cost is low.
[0033] Second: Simple operation, pre-embed the steel bars and casing in the water channel structure on both sides of the joint, and fill the middle with engineering lubricating oil. Ensure good expansion and contraction effect at the joint, and use thick slurry asphalt mastic to seal the joint to improve the soft connection effect.
[0034] 3. Waterproof and airtight, with good expansion and contraction effect. Since the middle of the joint is connected and fixed with steel bars and the embedded casing, and the outside of the casing is sealed with thick slurry asphalt mastic, the expansion and contraction and vertical height deformation of the joint after operation are effectively controlled.
[0035] The present utility model is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments obtained by ordinary technicians in this field based on the described embodiments of the present utility model belong to the scope of protection of the present utility model. Those skilled in the art can make other levels of modifications and changes to the present utility model. In this way, if these modifications and changes of the present utility model fall within the scope of the claims of the present utility model, the present utility model is also intended to include these changes and changes.
Claims
1. A prefabricated water channel anti-deformation connection structure, characterized in that: It includes pre-embedded multiple linear steel bars in the wall thickness of the prefabricated water channel on one side of the joint, the linear steel bars are exposed at the end face of the prefabricated water channel on this side, and multiple linear embedded sleeves corresponding to the linear steel bars are pre-embedded in the wall thickness of the prefabricated water channel on the other side of the splicing, the linear embedded sleeves do not expose the end face of the prefabricated water channel on this side, the prefabricated water channels on both sides of the joint are inserted and connected with the linear embedded sleeves through the linear steel bars, the linear steel bars are telescopically inserted and connected in the linear embedded sleeves, and asphalt mastic is filled at the joint of the prefabricated water channel.
2. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: The linear embedded sleeve is filled with lubricating oil.
3. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: The linear steel bars are embedded in the thickness of the bottom wall and two side walls of the prefabricated water channel.
4. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: The straight steel bars are evenly distributed and centrally embedded in the wall thickness of the prefabricated water channel.
5. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: The diameter of the linear steel bar is 20 mm, and the inner diameter of the linear embedded sleeve is 30 mm.
6. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: The prefabricated water channel is provided with a hanging ring.
7. The prefabricated water channel anti-deformation connection structure according to claim 1, characterized in that: It also includes a channel foundation laid at the bottom of the prefabricated channel.