Temperature monitoring device for concrete panel pouring site
By designing a concrete panel casting site temperature monitoring device with telescopic rods and magnetic suction components, the problem of difficulty in carrying and transporting existing devices is solved, and more stable support and convenient transportation is achieved.
Patent Information
- Application Number
- CN202420967829.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-05-07
AI Technical Summary
The floor area of the existing concrete pouring site temperature monitoring device is large, difficult to carry and transport, and takes up more space.
A concrete panel casting site temperature monitoring device including a workbench and an assembly table is designed. Through the combination of telescopic rods and magnetic suction components, the components are disassembled, classified storage and folded devices are realized, which is convenient for carrying and transportation.
It provides more stable support and convenient transportation mode, and ensures the stability and convenience of the device during use and transportation through the adsorption and fixation of the magnetic suction assembly.
Smart Images

Figure CN222336563U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete pouring, in particular to a temperature monitoring device for concrete panel pouring site. Background Art
[0002] When pouring large-area panels with concrete, attention must be paid to the pouring temperature. Concrete has the property of thermal expansion and contraction. When the temperature inside the structure changes drastically, the concrete will deform. If the deformation is constrained, stress will be generated in the structure. When the stress exceeds the tensile strength of the concrete, temperature cracks will occur. The existing patent (Announcement No.: CN220084190U) discloses a temperature monitoring device for concrete pouring. The utility model is provided with a base and a storage box. After the monitoring is completed, each component can be disassembled and placed in the storage box for easy storage. However, in actual applications, the bottom plate area is large. Even after the components are stored, the bottom plate still needs to be moved, and the space occupied is large, which is not convenient to carry and transport. To this end, we propose a temperature monitoring device for concrete panel pouring. Utility Model Content
[0003] In order to solve the above problems, the utility model provides a temperature monitoring device for concrete panel pouring site.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A temperature monitoring device for pouring a concrete panel is designed, comprising a workbench and an assembly table, wherein the workbench comprises a pair of table plates, a support plate is fixed between the table plates, the upper table plate is detachably connected to a telescopic rod, the movable end of the telescopic rod is detachably connected to a telescopic rod, the movable end of the telescopic rod is threadedly connected to a mounting frame, and a floating ball and a temperature monitoring probe are slidably connected to the mounting frame;
[0006] The assembly table includes a pair of table plates 2, a support plate 2 is fixed between the table plates 2, a plug hole is provided on the support plate 2, a baffle is provided on the outer side of the support plate 2, a limiting cylinder is fixed on the baffle, a storage drawer is movably provided between the support plates 1, the lower table plates 1 and 2 are hinged, and a magnetic suction component is provided between the workbench and the assembly table.
[0007] In the above solution, a stud is fixed on the top of the table, and a bottom end of the telescopic rod is threadedly connected to the stud.
[0008] In the above scheme, a limiting rod is fixed in the mounting frame, a connecting rod is fixed on the top of the float, a sliding sleeve is provided on the limiting rod, and the connecting rod is fixed to the sliding sleeve through a connecting arm 1.
[0009] In the above solution, the connecting rod is fixed with a sleeve via a second connecting arm, and the temperature monitoring probe is threadedly connected to the sleeve.
[0010] In the above scheme, the magnetic attraction component includes a support block one fixed to the table top one, a support block two fixed to the table top two, and a magnetic block. A magnetic ball is fixed to the bottom of the support block one, and a magnetic attraction groove with a magnetism opposite to that of the magnetic ball is provided at the bottom of the support block two. The magnetic blocks are respectively fixed to the table top one and the table top two, and the magnetism of the relative magnetic blocks is opposite.
[0011] In the above scheme, a handle is provided on the top of the upper platform one, a connecting seat is fixed on the platform one, and the handle is installed on the connecting seat through a rotating shaft.
[0012] In the above solution, the movable end of the telescopic rod one is connected to the mounting seat, and the end of the telescopic rod two away from the mounting frame is connected to the mounting seat through a bolt.
[0013] The advantages and beneficial effects of the utility model are as follows: by arranging a workbench, an assembly table, a storage drawer and a magnetic suction component, after completing the monitoring work, the relevant components above the workbench are disassembled, and the relevant components are divided by type and placed between the two support plates and in the storage drawer respectively; after completing the storage, the workbench and the assembly table are folded and stacked, and at the same time, the magnetic suction component is used to stably adsorb and fix the workbench and the assembly table. Compared with the prior art, on the one hand, the workbench and the assembly table are used to provide a more stable support, and on the other hand, the device can be lifted as a whole by lifting the workbench for easy carrying and transportation, which is convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0015] Figure 1 This is a top view of a temperature monitoring device for concrete panel pouring site proposed by the utility model;
[0016] Figure 2 This is a bottom view of a temperature monitoring device for concrete panel pouring site proposed by the utility model;
[0017] Figure 3 The utility model discloses a structural schematic diagram of a workbench of a temperature monitoring device for concrete panel pouring site.
[0018] In the figure: workbench 1, table top 101, support plate 1 102, storage drawer 103, support block 1 104, magnetic ball 105, assembly table 2, table top 201, support plate 202, jack 203, baffle 204, limit cylinder 205, support block 206, magnetic groove 207, connecting seat 3, rotating shaft 4, handle 5, stud 6, telescopic rod 1 7, mounting seat 8, bolt 9, telescopic rod 2 10, mounting frame 11, limit rod 12, float 13, connecting rod 14, connecting arm 1 15, sliding sleeve 16, sleeve 17, temperature monitoring probe 18, connecting arm 2 19, magnetic block 20. DETAILED DESCRIPTION
[0019] The following is a further description of the specific implementation of the present invention in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0020] See also Figure 1-3 The utility model provides a technical solution: a temperature monitoring device for concrete panel pouring site, comprising a workbench 1 and an assembly table 2, the workbench 1 comprising a pair of upper and lower parallel table plates 101, a support plate 102 is vertically fixed between the table plates 101, and the upper table plate 101 is detachably connected to a telescopic rod 7;
[0021] Furthermore, a stud 6 is vertically fixed on the top of the table 101, and the bottom end of the telescopic rod 7 is threadedly connected to the stud 6. The bottom end of the telescopic rod 7 is provided with a screw hole 1 that matches the stud 6 to facilitate the disassembly and assembly of the telescopic rod 7;
[0022] The movable end of the telescopic rod 1 7 is detachably connected to the horizontally arranged telescopic rod 2 10;
[0023] Further, the movable end of the telescopic rod 1 7 is connected with a mounting seat 8, and the mounting seat 8 can be threadedly connected with the movable end of the telescopic rod 1 7. The end of the telescopic rod 2 10 away from the mounting frame 11 is connected to the mounting seat 8 through a bolt 9, and the end of the telescopic rod 2 10 close to the telescopic rod 1 7 is provided with a mounting hole that matches the bolt 9; so as to separate the telescopic rod 2 10 from the telescopic rod 1 7;
[0024] The movable end of the telescopic rod 10 is threadedly connected to the mounting frame 11, a screw is horizontally fixed to the side of the mounting frame 11, and a screw hole 2 is provided at the end of the telescopic rod 10 to match the screw, and a floating ball 13 and a temperature monitoring probe 18 are slidably connected to the mounting frame 11;
[0025] Specifically, a limit rod 12 is vertically fixed in the mounting frame 11, a connecting rod 14 is fixed on the top of the floating ball 13, a sliding sleeve 16 is slidably provided on the limit rod 12, the sliding sleeve 16 is slidably connected to the limit rod 12, the connecting rod 14 is fixed to the sliding sleeve 16 through a connecting arm 15, and the cooperation of the sliding sleeve 16 and the limit rod 12 is utilized to cooperate with the floating ball 13 to float up and down along the surface of the newly poured concrete;
[0026] Further, the connecting rod 14 is fixed with a sleeve 17 through a connecting arm 2 19, and a temperature monitoring probe 18 is threadedly connected to the sleeve 17; the sleeve 17 has openings at both ends, and the temperature monitoring probe 18 is inserted into the sleeve 17 from top to bottom, and the bottom end of the temperature monitoring probe 18 passes through the sleeve 17, so as to monitor the internal temperature of the concrete;
[0027] The assembly table 2 includes a pair of upper and lower parallel table plates 201, a support plate 202 is vertically fixed between the table plates 201, and the support plate 202 is provided with a socket 203 that matches the telescopic rod 1 7 and the telescopic rod 2 10 respectively. A baffle 204 fixed to the table plate 201 is provided on the outer side of the support plate 202, and a limiting cylinder 205 that docks with the socket 203 is fixed on the baffle 204, and the telescopic rod 1 7 and the telescopic rod 2 10 are respectively placed between the socket 203, and by adjusting the telescopic rod 1 7 and The length of the telescopic rod 10 is such that the baffle 204 and the limiting cylinder 205 limit the ends of the telescopic rod 1 7 and the telescopic rod 2 10 to prevent the telescopic rod 1 7 and the telescopic rod 2 10 from being separated from the supporting plate 202. A storage drawer 103 is movably provided between the supporting plates 102. A slider is fixed at the bottom of the storage drawer 103. A sliding groove matching the slider is fixed on the supporting plate 102. The lower table 101 and the table 2 201 are hinged, and a magnetic suction component is provided between the workbench 1 and the assembly table 2.
[0028] Further, the magnetic attraction component includes a support block 104 fixed to the platform 101, a support block 206 fixed to the platform 201, and a magnetic block 20. The support block 104 and the support block 206 are respectively arranged at the corresponding positions of the four corners of the bottom of the platform 101 and the platform 201. A magnetic ball 105 is fixed to the bottom of the support block 104. A magnetic attraction groove 207 with a magnetism opposite to that of the magnetic ball 105 is provided at the bottom of the support block 206. The magnetic ball 105 includes a sphere with a magnetic coating 1 coated on the surface. The inner wall of the magnetic groove 207 is coated with a magnetic coating 2 having a magnetic property opposite to that of the magnetic coating 1, so that when the workbench 1 and the assembly table 2 are stacked, the two are fixed by magnetic adsorption force, thereby improving the stability of the reorganized structure. The magnetic blocks 20 are respectively fixed to the sides of the table 1 101 and the table 2 201, and the relative magnetic blocks 20 have opposite magnetic properties. When the workbench 1 and the assembly table 2 are in the unfolded state, the adsorption force between the magnetic blocks 20 is used to stably maintain the unfolded state of the two, thereby improving the stability of the device operation.
[0029] Furthermore, a handle 5 is provided on the top of the upper platform 101, a connecting seat 3 is fixed on the platform 101, and the handle 5 is installed on the connecting seat 3 through a rotating shaft 4; when the workbench 1 and the assembly platform 2 are in a stacked state, the device can be lifted as a whole by the handle 5 for carrying and transportation;
[0030] Specifically, by setting up the workbench 1, the assembly table 2, the storage drawer 103 and the magnetic suction component, after completing the monitoring work, the relevant components above the workbench 1 are disassembled, and the relevant components are divided by type and placed between the support plates 202 and in the storage drawer 103 respectively. After the storage is completed, the workbench 1 and the assembly table 2 are folded and stacked, and at the same time, the magnetic suction component is used to stably adsorb and fix the workbench 1 and the assembly table 2. Compared with the prior art, on the one hand, the workbench 1 and the assembly table 2 are used to provide more stable support, and on the other hand, the device can be lifted as a whole by lifting the workbench 1 for easy carrying and transportation, which is convenient to use.
[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A temperature monitoring device for concrete panel pouring site, comprising a workbench (1) and an assembly table (2), characterized in that: The workbench (1) comprises a pair of table plates (101), a support plate (102) is fixed between the table plates (101), the upper table plate (101) is detachably connected to a telescopic rod (7), the movable end of the telescopic rod (7) is detachably connected to a telescopic rod (10), the movable end of the telescopic rod (10) is threadedly connected to a mounting frame (11), and a floating ball (13) and a temperature monitoring probe (18) are slidably connected to the mounting frame (11); The assembly table (2) comprises a pair of table tops (201), a support plate (202) is fixed between the table tops (201), a plug hole (203) is provided on the support plate (202), a baffle (204) is provided on the outer side of the support plate (202), a limiting cylinder (205) is fixed on the baffle (204), a storage drawer (103) is movably provided between the support plates (102), the lower table top (101) and the table top (201) are hinged, and a magnetic attraction component is provided between the workbench (1) and the assembly table (2).
2. A temperature monitoring device for concrete panel pouring site according to claim 1, characterized in that: A stud (6) is fixed on the top of the platform (101), and the bottom end of the telescopic rod (7) is threadedly connected to the stud (6).
3. A temperature monitoring device for concrete panel pouring site according to claim 1, characterized in that: A limit rod (12) is fixed inside the mounting frame (11), a connecting rod (14) is fixed on the top of the floating ball (13), a sliding sleeve (16) is provided on the limit rod (12), and the connecting rod (14) is fixed to the sliding sleeve (16) via a connecting arm 1 (15).
4. A temperature monitoring device for concrete panel pouring site according to claim 3, characterized in that: The connecting rod (14) is fixed with a sleeve (17) via a second connecting arm (19), and the temperature monitoring probe (18) is threadedly connected to the sleeve (17).
5. A temperature monitoring device for concrete panel pouring site according to claim 1, characterized in that: The magnetic attraction component comprises a support block 1 (104) fixed to the table plate 1 (101), a support block 2 (206) fixed to the table plate 2 (201) and a magnetic block (20); a magnetic ball (105) is fixed to the bottom of the support block 1 (104); a magnetic attraction groove (207) having a magnetism opposite to that of the magnetic ball (105) is provided at the bottom of the support block 2 (206); the magnetic blocks (20) are respectively fixed to the table plate 1 (101) and the table plate 2 (201); and the magnetism of the relative magnetic blocks (20) is opposite.
6. A temperature monitoring device for concrete panel pouring site according to claim 1, characterized in that: A handle (5) is provided on the top of the upper platform (101), a connecting seat (3) is fixed on the platform (101), and the handle (5) is installed on the connecting seat (3) through a rotating shaft (4).
7. A temperature monitoring device for concrete panel pouring site according to claim 1, characterized in that: The movable end of the telescopic rod one (7) is connected to a mounting seat (8), and the end of the telescopic rod two (10) away from the mounting frame (11) is connected to the mounting seat (8) via a bolt (9).
Citation Information
Patent Citations
Concrete pouring site temperature monitoring device
CN220084190U