Building structure system close to land red line
By designing a building structure system close to the land red line, using the openings of the retaining wall and the outer load-bearing beams, the construction difficulty and structural safety problems of the building when it closes to the land red line are solved, and the structural safety and construction efficiency are improved. .
Patent Information
- Application Number
- CN202421041209.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-13
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-05-13
AI Technical Summary
In urban construction, when a building is close to the land red line, conventional practices affect the internal functional layout and appearance effects of the ground building, and the construction is difficult and the construction period is long, and the height difference between the retaining wall and the building leads to the structure. The stress is complicated and affects safety.
Design a building structure system close to the red line of the land, including retaining walls and ground buildings. The retaining wall is equipped with vertical wall panels and heel panels. There are multiple holes on the heel panels. The first pile foundation of the ground building is penetrated. At the entrance through the hole, the outer load bearing beam is located above the wall panel, which bears the load load of the outer load bearing column, ensures the safety and reliability of the structure, and reduces the length of the outer load, reducing the difficulty of construction.
It achieves no impact on retaining walls and ground buildings, ensures safety and reliability of the structure, reduces construction difficulty and construction period, effectively utilizes the land area, and maintains the internal space and appearance of the building.
Smart Images

Figure CN222349751U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building structures, in particular to a building structure system close to a land red line. Background Art
[0002] When most houses are constructed, they are usually built a certain distance away from the land redline to meet planning conditions and facilitate the laying of underground pipelines. With the rapid development of urban construction in recent years, the shortage of urban construction land has become increasingly prominent, which sometimes leads to the need to move buildings to the edge of the land redline to maximize the layout of limited underground buildings. In particular, buildings need to be built close to the land redline and there is a large height difference between the inside and outside of the redline. At this time, the construction parties will set up traditional retaining walls at the height difference according to conventional practices, and at the same time move the load-bearing columns and structural foundations of the ground buildings inward a large distance to avoid the area affected by the retaining wall, so that the retaining wall and the building are separated from each other.
[0003] The main shortcomings of this conventional approach are:
[0004] (1) Generally speaking, the inward movement of the outermost row of load-bearing columns of ground buildings will seriously affect the internal functional layout and use of the building, making the building unable to meet the use requirements of related functions and the requirements of the overall appearance effect.
[0005] (2) The greater the height difference between the inside and outside of the site red line, the greater the distance that the outermost row of load-bearing columns of the building move inward, which means that the load-bearing structure needs to have a larger cantilever. The larger the cantilever, the more complex the load-bearing structure is in terms of force, which increases the difficulty of construction and makes it difficult to ensure construction quality, which has an adverse impact on building safety.
[0006] (3) In order to ensure that the foundation of the building is not affected, it is necessary to first construct a retaining wall at the red line of the land. Only after the retaining wall is completed and the foundation pit is backfilled to the ground can the foundation of the ground building be constructed. The entire construction process is complex and the construction period is long. Utility Model Content
[0007] The utility model aims to provide a building structure system in which a retaining wall and a ground building do not affect each other and a force-bearing structure is safe and reliable and close to the land red line.
[0008] In order to solve the above technical problems, the utility model provides a building structure system close to the land red line, including a retaining wall and a ground building, the retaining wall includes a vertical wall panel and a heel plate, one side of the vertical wall panel is close to the land red line, the bottom of the vertical wall panel on the side away from the land red line is provided with the heel plate, the heel plate is provided with a plurality of openings arranged in the longitudinal direction, the ground building includes a first pile foundation, a first pedestal, an externally cantilevered load-bearing beam, an external row of load-bearing columns, a second pile foundation, a second pedestal and an internal balance beam, the first pile foundation is located on the side of the vertical wall panel away from the land red line, the The first pile foundations are arranged in plurality and correspond one to one with the plurality of the openings, the first pile foundation passes through the opening, the first pedestal is arranged on the top of the first pile foundation, the cantilevered load-bearing beam is arranged on the side of the first pedestal close to the red line of the land, the cantilevered load-bearing beam is located above the vertical wall panel, the outer row of load-bearing columns are arranged on the cantilevered load-bearing beam, the second pile foundation is arranged on the side of the first pile foundation away from the vertical wall panel, the second pedestal is arranged on the top of the second pile foundation, and the second pedestal is connected to the first pedestal adjacent to it through the internal balance beam.
[0009] As a preferred embodiment of the present utility model, the ground building also includes an inner row of load-bearing columns and floor load-bearing beams. The inner row of load-bearing columns are provided on the second supporting platform. The inner row of load-bearing columns are arranged opposite to the outer row of load-bearing columns. The floor load-bearing beams are respectively connected to the inner row of load-bearing columns and the outer row of load-bearing columns.
[0010] As a preferred solution of the utility model, the diameter of the hole is larger than the diameter of the pile foundation.
[0011] As a preferred solution of the utility model, there is a gap between the bottom of the cantilevered load-bearing beam and the top of the vertical wall panel.
[0012] As a preferred solution of the utility model, an anti-slip tenon is provided at the bottom of the vertical wall panel.
[0013] As a preferred solution of the present invention, a toe plate is provided at the bottom of the vertical wall panel on one side close to the land red line.
[0014] The utility model embodiment provides a building structure system close to the land red line. Compared with the prior art, its beneficial effects are: the cantilevered load-bearing beam bears the load of the outer row of load-bearing columns of the ground building, and there is no need to change the internal structure arrangement of the ground building, thereby not affecting the use of the interior space of the building and the appearance effect; the heel plate of the retaining wall is provided with a plurality of openings, so that the first pile foundation of the ground building can directly and simply pass through the heel plate of the retaining wall to the reliable rock and soil layer below it, ensuring the safety of the pile foundation and the structure, and at the same time making the first pile foundation pedestal of the ground building as close to the outer row of load-bearing columns as possible, thereby reducing the cantilever length of the cantilevered load-bearing beam, reducing the difficulty of design and construction, making it easier to ensure the construction quality, and making the structure safer and more reliable; the cantilevered load-bearing beam is located above the vertical wall panel, so that the retaining wall is arranged below the ground building, and the two do not affect each other, so that the ground building can be close to the land red line and the area of the buildable land is effectively utilized. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the utility model;
[0016] Figure 2 yes Figure 1 The cross-sectional view at AA in FIG.
[0017] In the figure, 1. retaining wall; 11. vertical wall panel; 12. heel plate; 121. opening; 13. protective tenon; 14. toe plate; 2. ground building; 21. first pile foundation; 22. first pedestal; 23. cantilevered load-bearing beam; 24. outer row of load-bearing columns; 25. second pile foundation; 26. second pedestal; 27. internal balance beam; 28. inner row of load-bearing columns; 29. floor load-bearing beam; 3. land red line. DETAILED DESCRIPTION
[0018] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0019] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like used in the present invention to indicate the orientation or position relationship is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0020] like Figure 1-2 As shown, a building structure system close to the land red line in a preferred embodiment of the utility model comprises a retaining wall 1 and a ground building 2, wherein the retaining wall 1 comprises a vertical wall panel 11 and a heel panel 12, wherein one side of the vertical wall panel 11 is close to the land red line 3, and the bottom of the vertical wall panel 11 away from the land red line 3 is provided with a heel panel 12, and the heel panel 12 is provided with a plurality of openings 121 arranged in the longitudinal direction, and the ground building 2 comprises a first pile foundation 21, a first bearing platform 22, an externally projecting load-bearing beam 23, an externally row of load-bearing columns 24, a second pile foundation 25, a second bearing The first pile foundation 21 is located on the side of the vertical wall panel 11 away from the land red line 3. The first pile foundation 21 is provided with a plurality of holes 121 corresponding to each other. The first pile foundation 21 passes through the corresponding holes 121. The top of the first pile foundation 21 is provided with a first pedestal 22. The side of the first pedestal 22 close to the land red line 3 is provided with an externally projecting load-bearing beam 23. It can be understood that the externally projecting load-bearing beam 23 will not extend beyond the land red line 3. Generally, the externally projecting load-bearing beam 23 away from the first pedestal 22 is provided. There is a distance between one end of the vertical wall plate 11 and the land red line 3, the externally projecting load-bearing beam 23 is located above the vertical wall plate 11, and an external row of load-bearing columns 24 are arranged on the externally projecting load-bearing beam 23. A second pile foundation 25 is arranged on the side of the first pile foundation 21 away from the vertical wall plate 11, and a second pile foundation 25 is arranged on one side of each first pile foundation 21, that is, a plurality of second pile foundations 25 are arranged and correspond to a plurality of first pile foundations 21 one by one, and a second cap 26 is arranged on the top of the second pile foundation 25, and a corresponding group of first pile foundations 21 and second pile foundations 2 5, the first cap 22 on the first pile foundation 21 and the second cap 26 on the second pile foundation 25 are arranged opposite to each other, and the second cap 26 is connected to its adjacent (in the transverse direction) first cap 22 through an internal balance beam 27. In this embodiment, the top surfaces of the first cap 22, the second cap 26 and the internal balance beam 27 are respectively flush with the ground; it should be noted that the utility model mainly describes the building structure close to the land red line 3, and the structures at other positions are conventional building structures, so they are not described in detail.
[0021] In this embodiment, without changing the internal structural arrangement of the ground building 2, a first pile foundation 21 is set at an appropriate distance from the outer row of load-bearing columns 24, and a cantilevered load-bearing beam 23 of a certain length is cantilevered outward using the first pile foundation 21 as a fulcrum. The cantilevered load-bearing beam 23 is used as a load-bearing beam to bear the vertical load of the outermost row of load-bearing columns 24 of the ground building 2, and the first pedestal 22 is connected to the second pedestal 26 through an internal balance beam 27 to achieve the purpose of balancing the force of the cantilevered load-bearing beam 23, and the structure is safe and reliable; for the site height difference at the red line 3 of the land, according to the force A permanent independent retaining wall 1 of varying sizes is set up to effectively solve the safety and stability of the slope. In order to reliably bear the load of the ground building 2, an opening 121 is provided on the heel plate 12 of the retaining wall 1 of this embodiment. The first pile foundation 21 can directly and simply pass through the heel plate 12 to the rock and soil layer below it through the opening 121, ensuring that the first pile foundation 21 does not affect and does not damage the retaining wall 1, and can reliably bear the load of the ground building 2. The cantilevered load-bearing beam 23 is located above the vertical wall panel 11, ensuring that the retaining wall 1 does not affect the setting of the ground building 2.
[0022] The externally projecting load-bearing beam 23 of the present embodiment bears the load of the external row of load-bearing columns 24 of the ground building 2, and there is no need to change the internal structural arrangement of the ground building 2, thereby not affecting the use of the internal space of the building and the appearance effect; the heel plate 12 of the retaining wall 1 is provided with a plurality of openings 121, so that the first pile foundation 21 of the ground building 2 can directly and simply pass through the heel plate 12 of the retaining wall 1 to extend to the reliable rock and soil layer below it, ensuring the safety of the pile foundation and the structural stress, while making the pedestal of the first pile foundation 21 of the ground building 2 as close as possible to the external row of load-bearing columns 24, thereby reducing the cantilever length of the externally projecting load-bearing beam 23, reducing the difficulty of design and construction, making it easier to ensure the construction quality, and making the structural stress safer and more reliable; the externally projecting load-bearing beam 23 is located above the vertical wall plate 11, so that the retaining wall 1 is arranged below the ground building 2, and the two do not affect each other, so that the ground building 2 can be close to the land red line 3, effectively utilizing the area of the buildable land.
[0023] Exemplarily, the ground building 2 also includes an inner row of load-bearing columns 28 and a floor load-bearing beam 29. The inner row of load-bearing columns 28 are provided on the second pedestal 26. The inner row of load-bearing columns 28 are arranged opposite to the outer row of load-bearing columns 24. Specifically, there are multiple inner row of load-bearing columns 28 and multiple outer row of load-bearing columns 24, and the multiple inner row of load-bearing columns 28 and the multiple outer row of load-bearing columns 24 are arranged opposite to each other. The floor load-bearing beams 29 are respectively connected to the inner row of load-bearing columns 28 and the outer row of load-bearing columns 24, that is, the inner row of load-bearing columns 28 and the outer row of load-bearing columns 24 opposite to them are connected through the floor load-bearing beams 29, and the floor load-bearing beams 29 transfer the loads they receive to the outer row of load-bearing columns 24 and the inner row of load-bearing columns 28 to ensure the stability of the overall structure.
[0024] Exemplarily, the diameter of the hole 121 is larger than the diameter of the first pile foundation 21 , so that the first pile foundation 21 can pass through the hole 121 and ensure that the first pile foundation 21 and the heel plate 12 do not affect each other. Generally, the diameter of the hole 121 is 200 mm larger than the diameter of the first pile foundation 21 .
[0025] Exemplarily, there is a gap between the bottom of the overhanging load-bearing beam 23 and the top of the vertical wall panel 11, that is, the retaining wall 1 and the ground building 2 are separated from each other.
[0026] Exemplarily, an anti-skid tenon 13 is provided at the bottom of the vertical wall panel 11 , which helps to increase the anti-skid stability of the retaining wall 1 .
[0027] Exemplarily, a toe plate 14 is provided at the bottom of the vertical wall panel 11 on one side close to the land red line 3 , and the toe plate 14 can transfer the force exerted on the vertical wall panel 11 to the foundation and provide necessary anti-overturning stability.
[0028] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.
Claims
1. A building structure system close to the land red line, characterized by: The invention comprises a retaining wall and a ground building, wherein the retaining wall comprises a vertical wall panel and a heel panel, wherein one side of the vertical wall panel is close to the land red line, and the heel panel is provided at the bottom of the vertical wall panel on the side away from the land red line, and the heel panel is provided with a plurality of openings arranged in the longitudinal direction, and the ground building comprises a first pile foundation, a first pedestal, an outwardly projecting load-bearing beam, an outwardly row of load-bearing columns, a second pile foundation, a second pedestal and an internal balance beam, wherein the first pile foundation is located on the side of the vertical wall panel away from the land red line, a plurality of the first pile foundations are provided and correspond to the plurality of openings one by one, the first pile foundation passes through the opening, the first pedestal is provided at the top of the first pile foundation, the outwardly projecting load-bearing beam is provided on the side of the first pedestal close to the land red line, the outwardly projecting load-bearing beam is located above the vertical wall panel, the outwardly row of load-bearing columns are provided on the outwardly projecting load-bearing beam, the second pile foundation is provided on the side of the first pile foundation away from the vertical wall panel, the second pedestal is provided at the top of the second pile foundation, and the second pedestal is connected to the first pedestal adjacent to the first pedestal through the internal balance beam.
2. The building structure system close to the land boundary according to claim 1, characterized in that: The ground building also includes an inner row of load-bearing columns and floor load-bearing beams. The inner row of load-bearing columns are arranged on the second supporting platform. The inner row of load-bearing columns are arranged opposite to the outer row of load-bearing columns. The floor load-bearing beams are respectively connected to the inner row of load-bearing columns and the outer row of load-bearing columns.
3. The building structure system close to the land boundary according to claim 1 is characterized by: The diameter of the hole is greater than the diameter of the pile foundation.
4. The building structure system close to the land boundary according to claim 1 is characterized by: There is a gap between the bottom of the overhanging load-bearing beam and the top of the vertical wall panel.
5. The building structure system close to the land boundary according to claim 1 is characterized by: The bottom of the vertical wall plate is provided with an anti-slip tenon.
6. The building structure system close to the land boundary according to claim 1 is characterized by: A toe plate is provided at the bottom of the vertical wall panel on one side close to the land red line.