Power tower pole mounting device

By using the design of the card block and spring in the power tower rod installation device, the problems of poor fixing effect and inconvenient operation in the prior art are solved, the rapid, convenient installation and position consistency of the crossbar are achieved, and the installation efficiency is improved and aesthetics.

CN222350376UActive Publication Date: 2025-01-14SHANDONG HUIZHONG ELECTRIC POWER TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420201942.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2025-01-14
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

When installing photovoltaic panels, the existing tower steel pipe mounting frame has poor fixing effect and inconvenient operation. Especially when the bolts are required to be clamped and locked at high places, it is difficult to achieve rapid and convenient installation.

Method used

Design a power tower rod mounting device, which abuts the right angle surface of the second block through the first block, provides a reverse tension using the swing arm and the connecting rod, and realizes the cross-burst limit through the stopper. Quick installation, more convenient operation.

Benefits of technology

Through the design of the clamp and spring, the device achieves rapid installation and position consistency of the crossbar, ensuring the aesthetics of installation and convenience of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222350376U_ABST
    Figure CN222350376U_ABST
Patent Text Reader

Abstract

The utility model discloses an electric power pole mounting device, which belongs to the technical field of electric power devices, and comprises a pole body, assembly holes are symmetrically formed in the side wall of the pole body, cross arms are mounted on the inner sides of the assembly holes, and a first clamping block is integrally formed at the top of one end, located on the inner side of the pole body, of each cross arm. Shaft rods are symmetrically and fixedly connected to the inner side of the top end of the rod body, swing arms are rotationally connected to the shaft rods, second clamping blocks clamped with the first clamping blocks are integrally formed at the bottom ends of the swing arms, and the right-angle faces of the first clamping blocks abut against the right-angle faces of the second clamping blocks, so that the swing arms are matched with the shaft rods to rotate, and meanwhile the swing arms are clamped with the first clamping blocks. The tension spring installed between the first connecting rod and the second connecting rod is used for providing reverse tension for the swing arm, after the first clamping block and the second clamping block are staggered, the inclined faces of the first clamping block and the second clamping block are attached to each other, the swing arm is limited through the check block, and therefore the cross arm can be rapidly installed, and operation is very convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electric power devices, and more specifically to an electric power tower installation device. Background Art

[0002] As we all know, clean energy like solar energy has the advantage of being inexhaustible, but it also has serious disadvantages. The high cost of power generation will gradually improve with the advancement of technology and its wide application, but its unstable natural law cannot be changed. For example, solar power generation becomes unstable with the change of light intensity, and most power loads require stable power supply, which seriously hinders its direct application. The existing technical method is to store solar power in a storage battery, and then the storage battery is converted into electricity through an inverter and then connected to the power grid or supplied to the power load. In the process of solar power generation, the photovoltaic panels used for power generation need to be fixed on the power tower.

[0003] However, the existing steel pipe mounting frame for the iron tower has the following shortcomings: 1. It adopts a simple clamping piece to directly clamp and fix, and the fixing effect is poor; 2. It is impossible to adjust the spacing between the fixing pieces according to the actual size of the photovoltaic panel. The existing patent is a new energy power iron tower steel pipe mounting frame, and the patent authorization number is CN 209453440 U. The bearing plate, the slide groove, the fixing piece, the lower clamp plate, the upper clamp plate, the fixing sleeve and the fixing seat are set. The bearing plate fixes the photovoltaic panel on the iron tower. The structure is simple and fixed, and the operation is convenient. The fixing effect is good and it is convenient to install and remove the photovoltaic panel. The slider at the bottom of the fixing piece slides on the slide groove surface of the bearing plate, and the spacing between the fixing pieces can be arbitrarily adjusted. It is convenient to adjust the spacing between the fixing pieces according to the size of the photovoltaic panel, thereby facilitating the fixing of photovoltaic panels of different sizes.

[0004] However, in the patent authorization number CN 209453440 U, ​​the fixing sleeve is first placed on the steel pipe position of the iron tower at the installation position, and then the bolt connection seat on the fixing sleeve is connected together by a second fixing bolt to fix the fixing sleeve at this position. Since it needs to be installed at a high place of the iron tower, it also needs to be clamped and locked with bolts, which is very inconvenient to operate. In order to facilitate the installation and fixation of the cross arm, we have proposed a power tower installation device to solve the above-mentioned problems. Utility Model Content

[0005] 1. Technical problems to be solved

[0006] In view of the problems existing in the prior art, the purpose of the utility model is to provide a power tower installation device, which can make the swing arm cooperate with the shaft rod to rotate by abutting the right-angle surface of the first clamping block with the right-angle surface of the second clamping block, while utilizing the tension spring installed between the first connecting rod and the second connecting rod to provide a reverse pulling force for the swing arm. When the first clamping block and the second clamping block are misaligned, their inclined surfaces fit each other, and the swing arm is limited by the stop block, so that the installation of the cross arm can be completed quickly, and the operation is very convenient.

[0007] 2. Technical solution

[0008] To solve the above problems, the utility model adopts the following technical solutions.

[0009] An electric power tower pole installation device comprises a pole body;

[0010] The side wall of the rod body is symmetrically provided with assembly holes;

[0011] A cross arm is installed inside the assembly hole, and a first clamping block is integrally formed on the top of one end of the cross arm located inside the rod body;

[0012] A shaft is symmetrically fixedly connected to the inner side of the top end of the rod body, a swing arm is rotatably connected to the shaft, and a second clamping block engaged with the first clamping block is integrally formed at the bottom end of the swing arm;

[0013] A stopper in an L-shaped structure is symmetrically welded on the inner wall of the top end of the rod body, and the bottom end of the stopper is in contact with the swing arm;

[0014] A first groove is provided on the surface of the swing arm near the stopper, and a first connecting rod is welded to the bottom end of the first groove. A second groove is provided at the top of the stopper near the corner of the swing arm, and a second connecting rod is fixedly connected to the inner side of the second groove, and a tension spring is installed between the second connecting rod and the first connecting rod.

[0015] Furthermore, a limiting block is integrally formed on the bottom wall of the cross arm located on the outer side of the rod body, and the limiting block abuts against the outer wall of the rod body.

[0016] Furthermore, a bearing is installed at the top end of the swing arm, and the bearing is interference connected with the shaft rod.

[0017] Furthermore, the first card block and the second card block are both arranged in an isosceles right triangle structure, and the inclined surfaces of the first card block and the second card block abut against each other.

[0018] Furthermore, both ends of the tension spring are integrally formed with tension rings, and the tension rings are respectively connected to the first connecting rod and the second connecting rod.

[0019] Furthermore, the tension spring is arranged at an angle, and the angle between the tension spring and the center line of the rod body is 30°.

[0020] Furthermore, a mounting hole is formed at one end of the cross arm away from the limiting block, and a plurality of the mounting holes are equidistantly arranged.

[0021] 3. Beneficial effects

[0022] Compared with the prior art, the advantages of the present invention are:

[0023] (1) In this scheme, one end of the cross arm provided with the first clamping block is inserted into the assembly hole, and the right-angled surface of the first clamping block abuts against the right-angled surface of the second clamping block, so that the swing arm cooperates with the shaft rod to rotate, and the tension spring installed between the first connecting rod and the second connecting rod is used to provide a reverse pulling force for the swing arm. When the first clamping block and the second clamping block are misaligned, their inclined surfaces fit each other, and the swing arm is limited by the stop block, so that the installation of the cross arm can be completed quickly, and the operation is very convenient.

[0024] (2) In this solution, during the installation of the crossarm through the assembly hole, the bottom of the crossarm is abutted against the bottom wall of the assembly hole until the limit block fits against the outer wall of the rod body, thereby ensuring that the installed crossarm is plugged in at the same position, thereby ensuring the aesthetics of the installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0026] Figure 2 It is a schematic diagram of the side structure of the rod body of the utility model;

[0027] Figure 3 It is a schematic cross-sectional view of the AA part of the utility model;

[0028] Figure 4 This is a schematic diagram of the swing arm structure of the utility model;

[0029] Figure 5 It is an enlarged schematic diagram of part A of the utility model;

[0030] Figure 6 This is a schematic diagram of the inner structure of the rod body of the utility model;

[0031] Figure 7 It is a schematic diagram of the limit block structure of the utility model.

[0032] Description of the numbers in the figure:

[0033] 1. Rod body; 2. Cross arm; 3. Axle rod; 4. Swing arm; 5. First clamping block; 6. Stop block; 7. First connecting rod; 8. Second connecting rod; 9. Tension spring; 10. Second clamping block; 11. Assembly hole; 12. Limit block. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.

[0035] Example:

[0036] See also Figure 1-7 , a power tower installation device, comprising a pole body 1;

[0037] The side wall of the rod body 1 is symmetrically provided with assembly holes 11;

[0038] A cross arm 2 is installed inside the assembly hole 11, and a first clamping block 5 is integrally formed on the top of one end of the cross arm 2 located inside the rod body 1;

[0039] A shaft 3 is symmetrically fixedly connected to the inner side of the top of the rod body 1, and a swing arm 4 is rotatably connected to the shaft 3. A second clamping block 10 engaged with the first clamping block 5 is integrally formed at the bottom of the swing arm 4.

[0040] A stopper 6 in an L-shaped structure is symmetrically welded on the inner wall of the top end of the rod body 1, and the bottom end of the stopper 6 is in contact with the swing arm 4;

[0041] A first groove is formed on the surface of the swing arm 4 near the stopper 6, and a first connecting rod 7 is welded to the bottom end of the first groove. A second groove is formed on the top of the stopper 6 near the corner of the swing arm 4, and a second connecting rod 8 is fixedly connected to the inner side of the second groove, and a tension spring 9 is installed between the second connecting rod 8 and the first connecting rod 7;

[0042] It should be noted that the staff climbs to the assembly hole 11 opened on the rod body 1 with the help of tools, and then inserts one end of the crossarm 2 provided with the first clamping block 5 from the assembly hole 11, and the right-angled surface of the first clamping block 5 abuts against the right-angled surface of the second clamping block 10, so that the swing arm 4 cooperates with the rotation of the shaft rod 3, and the tension spring 9 installed between the first connecting rod 7 and the second connecting rod 8 is used to provide a reverse pulling force for the swing arm 4. When the first clamping block 5 and the second clamping block 10 are misaligned, their inclined surfaces fit each other, and the swing arm 4 is limited by the block 6, so that the installation of the crossarm 2 can be completed quickly, and the operation is very convenient.

[0043] like Figure 1 , Figure 7 As shown, the bottom wall of the cross arm 2 located outside the rod body 1 is integrally formed with a limiting block 12, and the limiting block 12 abuts against the outer wall of the rod body 1;

[0044] It should be noted that during the installation of the crossarm 2 through the assembly hole 11, the bottom of the crossarm 2 is abutted against the bottom wall of the assembly hole 11 until the limit block 12 fits against the outer wall of the rod body 1, ensuring that the installed crossarm 2 is plugged in at the same position, thereby ensuring the aesthetics of the installation.

[0045] like Figure 5 , Figure 6 As shown, a bearing is installed at the top of the swing arm 4, and the bearing is interference-connected with the shaft rod 3;

[0046] It should be noted that the friction between the swing arm 4 and the shaft rod 3 is reduced, and the swing accuracy of the swing arm 4 is guaranteed.

[0047] like Figure 5 As shown, the first card block 5 and the second card block 10 are both arranged in an isosceles right triangle structure, and the inclined surfaces of the first card block 5 and the second card block 10 abut against each other;

[0048] It should be noted that the first clamping block 5 is engaged with the second clamping block 10 , thereby clamping the cross arm 2 , so that the cross arm 2 cannot move to the outside of the rod body 1 .

[0049] like Figure 5 As shown, both ends of the tension spring 9 are integrally formed with tension rings, and the tension rings are respectively connected to the first connecting rod 7 and the second connecting rod 8. The tension spring 9 is set at an angle, and the angle between the tension spring 9 and the center line of the rod body 1 is 30°;

[0050] It should be noted that the stability of the connection between the two ends of the tension spring 9 and the first connecting rod 7 and the second connecting rod 8 is ensured.

[0051] like Figure 1 As shown, a mounting hole is provided at one end of the cross arm 2 away from the limit block 12, and a plurality of mounting holes are arranged at equal distances;

[0052] It should be noted that an insulator can be installed at the end of the cross arm 2 through the installation hole.

[0053] During use: the staff climbs to the assembly hole 11 opened on the rod body 1 with the help of tools, and then inserts one end of the cross arm 2 provided with the first clamping block 5 from the assembly hole 11, and the right-angle surface of the first clamping block 5 abuts against the right-angle surface of the second clamping block 10, so that the swing arm 4 cooperates with the shaft rod 3 to rotate, and the tension spring 9 installed between the first connecting rod 7 and the second connecting rod 8 is used to provide a reverse pulling force for the swing arm 4. When the first clamping block 5 and the second clamping block 10 are misaligned, their inclined surfaces fit each other, and the swing arm 4 is limited by the block 6, so that the installation of the cross arm 2 can be quickly completed.

[0054] The above is only a preferred specific implementation of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and improved ideas of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model.

Claims

1. A power tower installation device, characterized in that: It comprises a rod body (1); The side wall of the rod body (1) is symmetrically provided with assembly holes (11); A cross arm (2) is installed inside the assembly hole (11), and a first clamping block (5) is integrally formed on the top of one end of the cross arm (2) located inside the rod body (1); A shaft (3) is symmetrically fixedly connected to the inner side of the top end of the rod body (1); a swing arm (4) is rotatably connected to the shaft (3); and a second clamping block (10) is integrally formed at the bottom end of the swing arm (4) and is engaged with the first clamping block (5); A stopper (6) having an L-shaped structure is symmetrically welded on the inner wall of the top end of the rod body (1), and the bottom end of the stopper (6) is in contact with the swing arm (4); A first groove is provided on the surface of the swing arm (4) near the stopper (6), and a first connecting rod (7) is welded to the bottom end of the first groove; a second groove is provided on the top end of the stopper (6) near the corner of the swing arm (4), and a second connecting rod (8) is fixedly connected to the inner side of the second groove, and a tension spring (9) is installed between the second connecting rod (8) and the first connecting rod (7).

2. The power tower installation device according to claim 1, characterized in that: The bottom wall of the cross arm (2) located outside the rod body (1) is integrally formed with a limiting block (12), and the limiting block (12) abuts against the outer wall of the rod body (1).

3. The power tower installation device according to claim 1, characterized in that: A bearing is installed at the top end of the swing arm (4), and the bearing is interference-connected with the shaft rod (3).

4. The power tower installation device according to claim 1, characterized in that: The first card block (5) and the second card block (10) are both arranged in an isosceles right triangle structure, and the inclined surfaces of the first card block (5) and the second card block (10) abut against each other.

5. The power tower installation device according to claim 1, characterized in that: Both ends of the tension spring (9) are integrally formed with tension rings, and the tension rings are respectively connected to the first connecting rod (7) and the second connecting rod (8).

6. The power tower installation device according to claim 1, characterized in that: The tension spring (9) is arranged at an angle, and the angle between the tension spring (9) and the center line of the rod body (1) is 30°.

7. The power tower installation device according to claim 2, characterized in that: An installation hole is provided at one end of the cross arm (2) away from the limiting block (12), and a plurality of the installation holes are arranged at equal intervals.

Citation Information

Patent Citations

  • New energy electric power iron tower steel pipe installation frame

    CN209453440U