Waste copper preheating device based on copper smelting flue gas waste heat

By introducing rotating pipes into the waste copper preheating device for waste copper smelting flue gas waste heat for cleaning and crushing rollers, the problem of insufficient cleaning and crushing of waste copper in the existing device is solved, and the preheating efficiency and smelting effect are improved.

CN222352909UActive Publication Date: 2025-01-14XINXIANG HONGHE VIBRATING MACHINERY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423087027.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-01-14
Estimated Expiration
2034-12-13

AI Technical Summary

Technical Problem

The existing copper smelting preheating device lacks the structure to clean and crush waste copper, resulting in poor smelting effect.

Method used

A waste copper preheating device based on the waste heat of copper smelting flue gas is designed, including a rotary tube for cleaning and crushing roller for crushing, and the crushed waste copper is introduced into the preheating box through the discharge cover for preheating.

Benefits of technology

Effective cleaning and crushing of scrap copper is achieved, preheating efficiency and smelting effect are improved, and the impact of impurities is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222352909U_ABST
    Figure CN222352909U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste copper preheating device based on copper smelting flue gas waste heat, and relates to the technical field of copper smelting. The device comprises a preheating box, a cleaning assembly is arranged on the upper portion in the preheating box, and a crushing assembly is further arranged on the top of the preheating box; the cleaning assembly comprises a mounting frame fixedly connected to the upper portion of the interior of the preheating box, rotating pipes rotationally penetrate through the two sides of the interior of the mounting frame, a plurality of nozzles fixedly communicate with one side of each rotating pipe at equal intervals in the longitudinal direction, and the rear end of each rotating pipe is rotationally connected with a connecting pipe through a rotating connector. Clean water and fresh air are provided for waste copper in the preheating box through the rotating pipe, cleaning and air drying of the waste copper are achieved, the problem that the waste copper to be preheated is inconvenient to clean in the prior art is solved, meanwhile, the waste copper is crushed through the crushing roller, the crushed waste copper is guided into the preheating box through the discharging cover to be preheated, and the waste copper can be recycled. The problem that an existing preheating effect is poor is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of copper smelting, and particularly relates to a waste copper preheating device based on the residual heat of copper smelting fume. Background Art

[0002] Copper smelting refers to the process of extracting copper from ore or scrap copper. There are two methods of copper smelting, namely pyrometallurgy and hydrometallurgy. Pyrometallurgy produces a large amount of flue gas, which contains not only various harmful substances but also a large amount of waste heat. In order to reduce energy loss, the treated flue gas is usually introduced into a preheating device to preheat the ore or scrap copper.

[0003] The existing document with announcement number CN218687524U discloses a raw material preheating device for copper purification, comprising a preheating box, a sealing door panel is provided on the front of the preheating box, an operating handle is fixedly installed on the front of the sealing door panel, a ventilation filter device is fixedly installed on the bottom of the left and right sides of the preheating box, and a stabilizing ring is fixedly installed on the inner wall of the bottom of the preheating box;

[0004] However, it still has the following disadvantages in actual use:

[0005] The above-mentioned preheating device has ventilation and filtering devices fixedly installed at the bottom of the left and right sides of the preheating box, a stabilizing ring fixedly installed on the inner wall of the bottom of the preheating box, a driving motor fixedly installed on the inner wall of the bottom of the preheating box, and a preheating disc that rotates with the upper surface of the stabilizing ring fixedly installed on the output end of the driving motor. Scrap copper and other raw materials are placed in the preheating disc, and the preheating disc is driven by the driving motor to rotate, thereby cooperating with the setting of the heating disc to realize preheating of scrap copper and other raw materials. However, during use, it lacks a structure for cleaning scrap copper and other raw materials, and dust, oil and other impurities will adhere to the surface of scrap copper and other raw materials. The presence of these impurities will affect the subsequent smelting effect;

[0006] The above-mentioned preheating device has ventilation and filtering devices fixedly installed at the bottom of the left and right sides of the heat box, a stabilizing ring fixedly installed on the inner wall of the bottom of the preheating box, a driving motor fixedly installed on the inner wall of the bottom of the preheating box, and a preheating disc rotating relative to the upper surface of the stabilizing ring fixedly installed on the output end of the driving motor. Scrap copper and other raw materials are placed in the preheating disc, and the preheating disc is driven to rotate by the driving motor, thereby preheating the scrap copper and other raw materials is achieved in conjunction with the setting of the heating disc. However, during use, it lacks a structure for cutting and crushing the scrap copper and other raw materials, which affects the preheating efficiency due to the large volume of the scrap copper and other raw materials.

[0007] To this end, we provide a scrap copper preheating device based on the waste heat of copper smelting flue gas to solve the above problems. Utility Model Content

[0008] The utility model aims to provide a waste copper preheating device based on the waste heat of copper smelting fume, which provides clean water and fresh air to the waste copper in the preheating box through a rotating tube, thereby realizing the cleaning and air drying of the waste copper, solving the problem that it is inconvenient to clean the waste copper to be preheated. At the same time, the waste copper is crushed by a crushing roller, and the crushed waste copper is introduced into the preheating box for preheating through a discharging cover, solving the problem of poor preheating effect.

[0009] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0010] The utility model is a waste copper preheating device based on the waste heat of copper smelting flue gas, comprising a preheating box, a cleaning component is arranged above the interior of the preheating box, and a crushing component is also arranged on the top of the preheating box;

[0011] The cleaning assembly includes a mounting frame fixedly connected to the upper part of the preheating box, a rotating tube is rotatably penetrated on both sides of the mounting frame, a plurality of nozzles are fixedly connected to one side of the rotating tube at equal intervals in the longitudinal direction, a connecting tube is rotatably connected to the rear end of the rotating tube through a rotating joint, a water supply pipe and an air supply pipe are fixedly connected to the end of the connecting tube away from the rotating tube through a four-way joint, an air supply pipe is fixedly connected to the air supply shell at the end of the air supply pipe away from the connecting tube, a second gear is sleeved on the front end of the rotating tube, and a rack is meshed on one side of the second gear;

[0012] The crushing assembly includes a feed hopper that passes through the top of the preheating box, crushing rollers are rotatably connected to the lower part of both sides of the feed hopper, second drive motors are fixedly connected to both sides of the front end surface of the feed hopper through second motor frames, the output shaft of the second drive motor is fixedly connected to the front end of the crushing roller, the bottom of the feed hopper is fixedly connected to a telescopic tube, the bottom end of the telescopic tube is fixedly connected to a discharge hood, and the discharge hood is located above the interior of the preheating box.

[0013] The utility model is further configured as follows: the air supply shell is fixedly connected above the rear end surface of the preheating box, the interior of the air supply shell is fixedly connected with an air supply fan, and the air inlet of the air supply shell is fixedly connected with a filter.

[0014] The utility model is further configured as follows: a preheating assembly is arranged at the lower part of the interior of the preheating box, the preheating assembly includes a mounting plate fixedly connected to the bottom of the inner side of the preheating box, an air inlet pipe is penetrated at the center position of the surface of the mounting plate, an end of the air inlet pipe away from the mounting plate penetrates the rear end surface of the preheating box and extends to the rear outside of the preheating box, a rotating plate is sleeved on the outer side of the mounting plate, a placing plate is clamped on the top of the mounting plate, an outer side of the bottom of the rotating plate is welded with an outer gear ring, and first gears are meshed on both sides of the rear end of the outer gear ring.

[0015] The utility model is further configured as follows: a protrusion is welded to the rear end of the top of the rotating disk, a positioning hole is opened on the front end surface of the protrusion, a positioning column is matched with the internal gap of the positioning hole, the front end of the positioning column is welded to the rear end surface of the placing disk, and heat-insulating handles are fixedly connected to the front end surface and the outer walls on both sides of the placing disk, and a plurality of through holes are evenly opened on the inner bottom of the placing disk.

[0016] The utility model is further configured as follows: a rotating shaft is rotatably connected to the lower part of the inner walls on both sides of the preheating box through a mounting seat, a first gear sleeve is arranged on the center position of the outer wall of the rotating shaft, a first driving motor is fixedly connected to the outer walls on both sides of the preheating box through a first motor frame, and a bevel gear is sleeved on the output shaft of the first driving motor and the bottom end of the rotating shaft, and the bevel gears are meshed with each other.

[0017] The utility model is further configured as follows: a first hydraulic cylinder is fixedly connected to the top of the preheating box, and limit seats are fixedly connected to the upper parts of the inner walls on both sides of the preheating box, a piston shaft of the first hydraulic cylinder passes through the top of the preheating box and is fixedly connected to a lifting plate, movable rods are welded to both sides of the lower surface of the lifting plate, the bottom end of the movable rod movably passes through the limit seat and is fixedly connected to a mounting block, and a rack is fixedly connected to an outer wall on one side of the mounting block along the vertical direction.

[0018] The utility model is further configured as follows: guide plates are fixedly connected above the inner walls on both sides of the feed hopper, and one end of the guide plate away from the inner wall of the feed hopper extends to above the crushing roller.

[0019] The utility model is further configured as follows: mounting plates are welded on both side outer walls of the discharge cover, a second hydraulic cylinder is hinged on the upper surface of the mounting plate, and the top end of the second hydraulic cylinder is hinged on the inner top of the preheating box.

[0020] The utility model has the following beneficial effects:

[0021] The utility model provides a cleaning component, wherein the waste copper is placed in a placement tray, and a water supply pipe is connected to an external water source, thereby providing clean water into the rotating tube, and the clean water in the rotating tube is sprayed on the waste copper in the placement tray through a nozzle, thereby achieving cleaning of the waste copper, and then fresh air is provided into the rotating tube through a blower, thereby achieving air drying of the cleaned waste copper, and simultaneously starting the first hydraulic cylinder, the piston rod of the first hydraulic cylinder drives the rack to reciprocate in a straight line through a lifting plate and a movable rod, and under the action of the meshing connection between the rack and the second gear, the second gear drives the rotating tube to reciprocate, thereby enabling the clean water and the fresh air to be evenly dispersed on the waste copper, thereby preventing impurities on the waste copper from affecting the preheating effect and subsequent smelting effect of the waste copper, thereby improving the preheating effect of the waste copper.

[0022] The utility model sets a crushing component and starts the second hydraulic cylinder so that the telescopic amounts of the two second hydraulic cylinders are the same. At this time, the discharge cover moves vertically downward and puts the waste copper into the feed hopper. At the same time, the second drive motor is started, and the output shaft of the second drive motor drives the crushing roller to rotate. The waste copper is crushed by the rotating crushing roller, and the crushed waste copper enters the preheating box through the telescopic tube and the discharge cover. Then, the telescopic amounts of the second hydraulic cylinders are different. At this time, the discharge cover rotates in the preheating box, so that the crushed waste copper is evenly distributed in the preheating box, thereby improving the preheating effect of the waste copper. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0024] Figure 1 The figure is a schematic diagram of the overall structure of a scrap copper preheating device based on the waste heat of copper smelting flue gas.

[0025] Figure 2 It is a structural schematic diagram of the preheating component of the utility model.

[0026] Figure 3 It is a rear view structural diagram of the placement plate of the utility model.

[0027] Figure 4 It is a structural schematic diagram of the first gear of the utility model.

[0028] Figure 5 It is a structural schematic diagram of the cleaning component of the utility model.

[0029] Figure 6 It is a structural schematic diagram of the rotary tube of the utility model.

[0030] Figure 7 This is a structural disassembly diagram of the air supply housing of the utility model.

[0031] Figure 8 It is a structural schematic diagram of the rack of the utility model.

[0032] Fig. 9 It is a structural schematic diagram of the crushing component of the utility model.

[0033] Fig.10 It is a structural schematic diagram of the crushing roller of the utility model.

[0034] Fig.11 It is a structural schematic diagram of the discharge cover of the utility model.

[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0036] 1-preheating box, 2-preheating assembly, 201-mounting plate, 202-air inlet pipe, 203-rotating plate, 203a-outer gear ring, 203b-bump, 203c-positioning hole, 204-placing plate, 204a-positioning column, 204b-insulating handle, 204c-through hole, 205-first gear, 205a-mounting seat, 205b-rotating shaft, 206-first drive motor, 206a-first motor frame, 206b-conical gear, 3-cleaning assembly, 301-mounting frame, 302-rotating tube, 302a-spray head, 302b-rotating joint, 302c-second gear , 303-connecting pipe, 303a-four-way joint, 303b-water supply pipe, 303c-air supply pipe, 304-air supply shell, 304a-air fan, 304b-filter, 305-rack, 305a-first hydraulic cylinder, 305b-lifting plate, 305c-movable rod, 305d-mounting block, 305e-limiting seat, 4-crushing assembly, 401-feed hopper, 401a-guide plate, 402-crushing roller, 402a-second motor frame, 402b-second drive motor, 403-telescopic tube, 404-discharge cover, 404a-mounting plate, 404b-second hydraulic cylinder. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example 1

[0038] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 As shown, it is the first embodiment of the utility model, which provides a waste copper preheating device based on the waste heat of copper smelting flue gas, including a preheating box 1, and a cleaning component 3 is arranged on the upper part of the interior of the preheating box 1. The cleaning component 3 includes a mounting frame 301, a rotating tube 302, a connecting tube 303, an air supply shell 304 and a rack 305. The rotating tube 302 is driven by the rack 305 to reciprocate in the preheating box 1, and clean water and fresh air are provided to the waste copper in the preheating box 1 through the rotating tube 302, thereby solving the existing problem that it is inconvenient to clean the waste copper to be preheated.

[0039] Specifically, the installation frame 301 is fixedly connected to the upper part of the interior of the preheating box 1, and the interior of the installation frame 301 is rotatably penetrated by a rotating tube 302 on both sides, and a plurality of nozzles 302a are fixedly connected to one side of the rotating tube 302 at equal intervals in the longitudinal direction. The rear end of the rotating tube 302 is rotatably connected to a connecting tube 303 through a rotating joint 302b, and the end of the connecting tube 303 away from the rotating tube 302 is fixedly connected to a water supply pipe 303b and an air supply pipe 303c through a four-way joint 303a, and the end of the air supply pipe 303c away from the connecting tube 303 is fixedly connected to an air supply shell 304, and the front end of the rotating tube 302 is sleeved with a second gear 302c, and a rack 305 is meshed on one side of the second gear 302c. The installation frame 301 is configured to rotate The rotary tube 302 is installed, the rotating tube 302 and the nozzle 302a are arranged to clean and dry the waste copper in the preheating box 1, the rotating joint 302b is arranged to rotatably connect the rotating tube 302 and the connecting tube 303, the second gear 302c is arranged to drive the rotating tube 302 to reciprocate, the connecting tube 303 and the four-way joint 303a are arranged to connect the water supply pipe 303b and the air supply pipe 303c with the rotating tube 302, the water supply pipe 303b and the air supply pipe 303c are arranged to provide clean water and fresh air to the rotating tube 302 respectively, the air supply shell 304 is arranged to provide fresh air to the air supply pipe 303c, and the rack 305 is arranged to drive the second gear 302c to rotate.

[0040] Further, a preheating assembly 2 is provided at the lower part of the preheating box 1. The preheating assembly 2 includes a mounting plate 201 fixedly connected to the inner bottom of the preheating box 1. An air inlet pipe 202 is penetrated through the center of the surface of the mounting plate 201. One end of the air inlet pipe 202 away from the mounting plate 201 penetrates the rear end surface of the preheating box 1 and extends to the rear of the outer side of the preheating box 1. A rotating plate 203 is sleeved on the outer side of the mounting plate 201. A placement plate 204 is clamped on the top of the mounting plate 201. An outer side of the bottom of the rotating plate 203 is welded with an outer gear ring 203a. Both sides of the rear end of the outer gear ring 203a are meshed with first gears 205.

[0041] A convex block 203b is welded to the rear end of the top of the rotating disk 203, a positioning hole 203c is opened on the front end surface of the convex block 203b, a positioning column 204a is matched with the internal gap of the positioning hole 203c, and the front end of the positioning column 204a is welded to the rear end surface of the placement disk 204, and the front end surface and the outer walls on both sides of the placement disk 204 are fixedly connected with a heat-insulating handle 204b, and a plurality of through holes 204c are evenly opened on the inner bottom of the placement disk 204;

[0042] The lower part of the inner wall on both sides of the preheating box 1 is rotatably connected with a rotating shaft 205b through a mounting seat 205a, the first gear 205 is sleeved on the center position of the outer wall of the rotating shaft 205b, and the outer wall on both sides of the preheating box 1 is fixedly connected with a first driving motor 206 through a first motor frame 206a, and the output shaft of the first driving motor 206 and the bottom end of the rotating shaft 205b are sleeved with a bevel gear 206b, and the bevel gears 206b are meshed with each other;

[0043] The air supply housing 304 is fixedly connected to the upper rear end surface of the preheating box 1, the interior of the air supply housing 304 is fixedly connected to a blower 304a, and the air inlet of the air supply housing 304 is fixedly connected to a filter screen 304b;

[0044] A first hydraulic cylinder 305a is fixedly connected to the top of the preheating box 1, and limit seats 305e are fixedly connected to the upper parts of the inner walls on both sides of the preheating box 1. The piston shaft of the first hydraulic cylinder 305a passes through the top of the preheating box 1 and is fixedly connected to a lifting plate 305b. Movable rods 305c are welded to both sides of the lower surface of the lifting plate 305b. The bottom end of the movable rod 305c movably passes through the limit seat 305e and is fixedly connected to a mounting block 305d. The rack 305 is fixedly connected to the outer wall of one side of the mounting block 305d in the vertical direction.

[0045] The operation process of this embodiment is as follows: first, the waste copper is placed in the placement tray 204, and the water supply pipe 303b is connected to an external water source, so as to provide clean water to the rotating tube 302, and the clean water in the rotating tube 302 is sprayed on the waste copper in the placement tray 204 through the nozzle 302a, so as to achieve the cleaning of the waste copper, and then the air supply fan 304a is used to provide fresh air to the rotating tube 302, so as to achieve the air drying of the cleaned waste copper, and at the same time, the first hydraulic cylinder 305a is started, and the piston rod of the first hydraulic cylinder 305a is The rack 305 is driven to reciprocate in a straight line by the lifting plate 305b and the movable rod 305c, and the second gear 302c is meshed with the rack 305 to drive the rotating tube 302 to rotate back and forth, so that the clean water and fresh air can be evenly dispersed on the scrap copper. Finally, the air inlet pipe 202 is connected to the flue gas treatment device of the copper smelting furnace, and the flue gas containing waste heat is introduced through the flue gas treatment device, so that the scrap copper is preheated by the flue gas containing waste heat. Example 2

[0046] See also Figure 1 , Fig. 9 , Fig.10 and Fig.11As shown, it is the second embodiment of the utility model, which is based on the previous embodiment, but is different from the previous embodiment in that: a crushing assembly 4 is also arranged on the top of the preheating box 1, and the crushing assembly 4 includes a feed hopper 401, a crushing roller 402, a telescopic tube 403 and a discharge cover 404. The waste copper to be preheated is crushed by the crushing roller 402, and the crushed waste copper is introduced into the preheating box 1 through the telescopic tube 403 and the discharge cover 404 for preheating treatment, which solves the problem of poor preheating effect.

[0047] Specifically, the feed hopper 401 runs through the top of the preheating box 1, and the lower parts of both sides of the feed hopper 401 are rotatably connected with crushing rollers 402. The front end surface of the feed hopper 401 is fixedly connected to the second drive motor 402b through the second motor frame 402a. The output shaft of the second drive motor 402b is fixedly connected to the front end of the crushing roller 402. The bottom of the feed hopper 401 is fixedly connected with a telescopic tube 403, and the bottom end of the telescopic tube 403 is fixedly connected with a discharge cover 404. The discharge cover 404 is located at the preheating box 1. Above the interior of the box 1, the feed hopper 401 is configured to provide scrap copper into the preheating box 1, the crushing roller 402 is configured to crush the scrap copper, the second motor frame 402a is configured to install the second drive motor 402b, the second drive motor 402b is configured to drive the crushing roller 402 to rotate, the telescopic tube 403 is configured to connect the feed hopper 401 and the discharge cover 404, and the discharge cover 404 is configured to evenly disperse the crushed scrap copper in the preheating box 1.

[0048] Furthermore, guide plates 401a are fixedly connected to the upper part of the inner walls on both sides of the feed hopper 401, and one end of the guide plate 401a away from the inner wall of the feed hopper 401 extends to the upper part of the crushing roller 402;

[0049] Mounting plates 404 a are welded on both side outer walls of the discharge cover 404 , a second hydraulic cylinder 404 b is hinged on the upper surface of the mounting plate 404 a , and the top end of the second hydraulic cylinder 404 b is hinged on the inner top of the preheating box 1 .

[0050] The rest of the structure is the same as that of Example 1.

[0051] The operation process of this embodiment is as follows: first, the second hydraulic cylinder 404b is started, so that the telescopic amounts of the two second hydraulic cylinders 404b are the same, at which time the discharge cover 404 moves vertically downward, and the scrap copper is put into the feed hopper 401, and at the same time, the second drive motor 402b is started, and the output shaft of the second drive motor 402b drives the crushing roller 402 to rotate, and the scrap copper is crushed by the rotating crushing roller 402, and the crushed scrap copper enters the preheating box 1 through the telescopic tube 403 and the discharge cover 404, and then the telescopic amounts of the second hydraulic cylinder 404b are different, and at this time the discharge cover 404 rotates in the preheating box 1, so that the crushed scrap copper is evenly distributed in the preheating box 1.

[0052] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0053] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.

Claims

1. A waste copper preheating device based on waste heat from copper smelting flue gas, comprising a preheating box (1), characterized in that: A cleaning component (3) is arranged above the interior of the preheating box (1), and a crushing component (4) is also arranged on the top of the preheating box (1); The cleaning assembly (3) comprises a mounting frame (301) fixedly connected to the upper part of the preheating box (1), and a rotating tube (302) is rotatably penetrated on both sides of the mounting frame (301), a plurality of nozzles (302a) are fixedly connected to one side of the rotating tube (302) at equal intervals in the longitudinal direction, and the rear end of the rotating tube (302) is rotatably connected to a connecting tube (303) via a rotating joint (302b), one end of the connecting tube (303) away from the rotating tube (302) is fixedly connected to a water supply pipe (303b) and an air supply pipe (303c) via a four-way joint (303a), and one end of the air supply pipe (303c) away from the connecting tube (303) is fixedly connected to an air supply shell (304), and a second gear (302c) is sleeved on the front end of the rotating tube (302), and a rack (305) is meshed on one side of the second gear (302c); The crushing assembly (4) comprises a feed hopper (401) penetrating the top of the preheating box (1), and crushing rollers (402) are rotatably connected to the lower sides of both sides of the feed hopper (401), and both sides of the front end surface of the feed hopper (401) are fixedly connected to a second drive motor (402b) via a second motor frame (402a), and the output shaft of the second drive motor (402b) is fixedly connected to the front end of the crushing roller (402), and the bottom of the feed hopper (401) is fixedly connected to a telescopic tube (403), and the bottom end of the telescopic tube (403) is fixedly connected to a discharge hood (404), and the discharge hood (404) is located above the inside of the preheating box (1).

2. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 1 is characterized in that: The air supply housing (304) is fixedly connected above the rear end surface of the preheating box (1), and an air supply fan (304a) is fixedly connected inside the air supply housing (304), and a filter (304b) is fixedly connected to the air inlet of the air supply housing (304).

3. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 2 is characterized in that: A preheating assembly (2) is arranged at the lower part of the preheating box (1), and the preheating assembly (2) comprises a mounting plate (201) fixedly connected to the inner bottom of the preheating box (1), an air inlet pipe (202) penetrates the center position of the surface of the mounting plate (201), and an end of the air inlet pipe (202) away from the mounting plate (201) penetrates the rear end surface of the preheating box (1) and extends to the rear of the outer side of the preheating box (1), a rotating plate (203) is sleeved on the outer side of the mounting plate (201), and a placement plate (204) is clamped on the top of the mounting plate (201), an outer gear ring (203a) is welded on the outer side of the bottom of the rotating plate (203), and first gears (205) are meshed on both sides of the rear end of the outer gear ring (203a).

4. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 3 is characterized in that: A protrusion (203b) is welded to the rear end of the top of the rotating disk (203), and a positioning hole (203c) is provided on the front end surface of the protrusion (203b), a positioning column (204a) is matched in the internal gap of the positioning hole (203c), and the front end of the positioning column (204a) is welded to the rear end surface of the placement disk (204), a heat-insulating handle (204b) is fixedly connected to the front end surface and the outer walls on both sides of the placement disk (204), and a plurality of through holes (204c) are evenly provided on the inner bottom of the placement disk (204).

5. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 3 is characterized in that: A rotating shaft (205b) is rotatably connected to the lower part of the inner wall on both sides of the preheating box (1) via a mounting seat (205a), and a first gear (205) is sleeved on the center position of the outer wall of the rotating shaft (205b). A first driving motor (206) is fixedly connected to the outer wall on both sides of the preheating box (1) via a first motor frame (206a), and a bevel gear (206b) is sleeved on the output shaft of the first driving motor (206) and the bottom end of the rotating shaft (205b), and the bevel gears (206b) are meshed with each other.

6. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 1 is characterized in that: The top of the preheating box (1) is fixedly connected to a first hydraulic cylinder (305a), and the upper parts of the inner walls on both sides of the preheating box (1) are fixedly connected to limit seats (305e), the piston shaft of the first hydraulic cylinder (305a) passes through the top of the preheating box (1) and is fixedly connected to a lifting plate (305b), and movable rods (305c) are welded to both sides of the lower surface of the lifting plate (305b), the bottom end of the movable rod (305c) movably passes through the limit seat (305e) and is fixedly connected to a mounting block (305d), and the rack (305) is fixedly connected to an outer wall of one side of the mounting block (305d) in the vertical direction.

7. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 1 is characterized in that: A material guide plate (401a) is fixedly connected above the inner walls on both sides of the feed hopper (401), and one end of the material guide plate (401a) away from the inner wall of the feed hopper (401) extends to above the crushing roller (402).

8. The waste copper preheating device based on the waste heat of copper smelting flue gas according to claim 1 is characterized in that: Mounting plates (404a) are welded to both side outer walls of the discharge cover (404), and a second hydraulic cylinder (404b) is hingedly connected to the upper surface of the mounting plate (404a), and the top end of the second hydraulic cylinder (404b) is hingedly connected to the inner top of the preheating box (1).

Citation Information

Patent Citations

  • Raw material preheating device for copper purification

    CN218687524U