Cooperative bridge temporary supporting system for soft soil foundation
By using a collaborative bridge temporary support system under weak foundation conditions, combined with the design of sliding components and prestressed steel beams, the problem of temporary supports being difficult to effectively support bridges on weak foundations is solved, and controllable settlement and construction of temporary supports are achieved. Improved security.
Patent Information
- Application Number
- CN202420822353.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-04-19
AI Technical Summary
Under weak foundation conditions, temporary support is difficult to effectively support the bridge structure, which poses safety risks.
A collaborative bridge temporary support system is adopted. By setting sliding components and prestressed steel tendons at the bottom of the temporary supports, and connecting both ends of the steel tendons to the permanent pier structure, the tensile force of the prestressed steel tendons is used to provide vertical upward support. , while using horizontal steel beams passing through the temporary support structure to balance the horizontal tension of the piers.
It effectively limits the settlement of the temporary supports, ensures construction quality, avoids damage to the cover beam or displacement of the bridge piers due to excessive unilateral tension, and improves construction safety.
Smart Images

Figure CN222375225U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, in particular to a cooperative bridge temporary support system for soft soil foundation. Background Art
[0002] Pushing construction is a process of pushing the bridge structure to a designated position through guide beams, jacks and sliding systems. It has the advantages of simple construction, high safety and little impact on existing traffic, and is widely used in bridge engineering construction.
[0003] The steps of jacking construction are as follows: Figure 1 As shown:
[0004] 1. Set up temporary supports and working platforms, and assemble beams and guide beams;
[0005] 2. Guide frame on guide beam;
[0006] 3. Push into place;
[0007] 4. Remove the guide beams, drop beams, and temporary facilities.
[0008] The jacking method requires the erection of temporary supports, but due to the varying geological conditions of the project, it is prone to encountering soft soil foundations. Soft soil foundations have a low bearing capacity, and if temporary supports are erected on soft soil foundations, they will be subjected to the upper load, causing significant settlement of the foundation and supports. In this case, the temporary supports are difficult to support the superstructure, which is a major construction problem.
[0009] If the settlement of temporary supports is to be controlled, the bearing capacity of soft soil foundation can be improved by ground treatment. However, this method requires a large investment, and the project cost is too high for temporary facilities such as construction supports.
[0010] For example, the support system device for a large cantilever cap beam on a soft foundation disclosed in the Chinese utility model patent application with an authorization announcement date of 2021.04.13 and an authorization announcement number of CN 212956140U includes a vertical support frame, two longitudinal steel beams and a number of longitudinally distributed steel pipe piles on both sides of the pier's base. A driving lane is provided between the two steel pipe piles on the same side of the pier. The steel pipe piles include two pairs of steel pipes inserted in the ground. The two steel pipes in the same pair of steel pipes are distributed transversely and connected together by the pile steel longitudinal beams. The pile steel longitudinal beams on the two pairs of steel pipes are connected together by a lower steel cross beam. A vertical support frame is provided on the lower steel cross beam. The longitudinal beam is supported on all the vertical support frames, and the two longitudinal steel beams are connected together by a number of longitudinally distributed connecting steel bars.
[0011] In the above-mentioned existing technologies, the large cantilever cap beam of the weak foundation is supported, but it is supported by non-elastic materials such as upper steel plates, lower steel plates, rigid rib plates, and inclined steel plates. For weak foundations that are prone to settlement, there are certain safety hazards.
[0012] Therefore, how to effectively support the bridge based on the characteristics of the soft foundation is a technical problem that needs to be solved urgently. Utility Model Content
[0013] In view of the deficiencies in the above-mentioned background technology, the present invention proposes a collaborative temporary bridge support system for soft soil foundations, which solves the problem of potential safety hazards in bridge support when encountering soft foundations that are prone to settlement.
[0014] The technical solution of this application is:
[0015] A collaborative temporary bridge support system for soft soil foundations includes a temporary support structure supported below a crossbeam, the temporary support structure including a sliding assembly disposed at the bottom of a temporary support, a steel bundle slidingly engaged with the sliding assembly, and the ends of the steel bundle respectively connected to a permanent pier structure. By applying prestressed steel bundles and horizontal steel beams passing through the temporary support structure, when the temporary support structure sinks, the prestressed steel bundles are stretched, providing the structure with a combined vertical support force. The greater the pressure on the support and the more pronounced the sinking trend, the greater the vertical support force provided by the prestressed steel bundles to the temporary support structure. At the same time, the stretching of the prestressed steel bundles will generate a horizontal force on the top of the permanent pier structure, which is detrimental to its stress. Using a horizontal steel beam passing through the temporary support structure to support the inner sides of two adjacent permanent pier structures can not only balance the horizontal tension on the left and right sides of a single pier, but also prevent damage to the cap beam or displacement of the pier due to excessive unilateral tension.
[0016] Furthermore, a steel beam is installed between the temporary support and the permanent pier structure. The steel bundle, horizontal steel beam, and temporary support structure work together to effectively limit the settlement of the temporary support structure, keeping it within a controllable range and ensuring construction quality.
[0017] Furthermore, the temporary support includes a vertical pillar 1 and a vertical pillar 2 arranged along the length direction of the steel bundle, a plurality of connecting rods 1 are arranged between the vertical pillar 1 and the vertical pillar 2, the bottom surfaces of the vertical pillar 1 and the vertical pillar 2 are both provided with the sliding assembly, and the steel bundle is slidably connected to the sliding assembly.
[0018] Furthermore, the sliding assembly includes a first and second fixed rods connected to the bottom surface, with a cylindrical connecting rod interposed between the first and second fixed rods. A hole for the cylindrical connecting rod is provided at the center of a fixed pulley, and the steel bundle surrounds the fixed pulley. A fixed pulley is provided at the bottom of the temporary support, and the prestressed steel bundle passes through the fixed pulley and exits the bottom of the support. Deformation caused by support settlement is transferred to the prestressed steel bundle via the fixed pulley. This prevents the prestressed steel bundle from direct contact with the temporary support, which could cause frictional damage to the prestressed steel bundle.
[0019] Furthermore, a circumferential surface of the fixed pulley is provided with a step for limiting the steel bundle.
[0020] Furthermore, the temporary support also includes vertical pillar three and vertical pillar four that form a quadrilateral with the vertical pillar one and the vertical pillar two, and a number of connecting rods two are arranged between the vertical pillar one, the vertical pillar two, the vertical pillar three, and the vertical pillar four. The bottom surfaces of the vertical pillar one, the vertical pillar two, the vertical pillar three, and the vertical pillar four are all provided with the sliding assembly, and two steel bundles are arranged in parallel.
[0021] Furthermore, the permanent pier structure includes a cap beam 1, an embedded part 1 is provided on the cap beam 1, and both ends of the steel bundle are connected to the embedded part 1 on both sides.
[0022] Furthermore, the permanent pier structure includes a cap beam 2, a pier column, and a pedestal 1 connected in sequence, a pad is provided between the cap beam 2 and the cross beam, an embedded part 2 is provided on the pedestal 1, and both ends of the steel bundle pass through the pad and are connected to the embedded part 2.
[0023] Furthermore, the permanent pier structure includes a second cap beam, a pier column, and a second pedestal connected in sequence, a pad is provided between the second cap beam and the cross beam, a rigging is provided on the second pedestal, and both ends of the steel bundle pass through the pad and are connected to the rigging.
[0024] Furthermore, a ballast block is provided on the outer side of the permanent pier structure, and a third embedded part is provided on the ballast block. Both ends of the steel bundle pass through the spacer block and are connected to the third embedded part.
[0025] The specific beneficial effects of the utility model include:
[0026] 1. By applying prestressed steel strands and horizontal steel beams passing through the temporary support structure, when the temporary support structure sinks, the prestressed steel strands are stretched, which will provide the structure with a net vertical support force. The greater the pressure on the support and the more obvious the sinking trend, the greater the vertical support force provided by the prestressed steel strands to the temporary support structure. At the same time, the stretching of the prestressed steel strands will generate horizontal forces on the top of the permanent pier structure, which is detrimental to its stress resistance. Using horizontal steel beams passing through the temporary support structure to support the inner sides of two adjacent permanent pier structures can not only balance the horizontal tension on the left and right sides of a single pier, but also prevent damage to the cap beam or displacement of the pier due to excessive tension on one side.
[0027] 2. The steel bundles, horizontal steel beams and temporary support structures work together to effectively limit the settlement of the temporary support structure, keeping the settlement within a controllable range and ensuring construction quality;
[0028] 3. Install a fixed pulley at the bottom of the temporary support. The prestressed steel strands pass through the fixed pulley and exit from the bottom of the support. The deformation caused by the support settlement is transferred to the deformation of the prestressed steel strands through the fixed pulley. This prevents the prestressed steel strands from direct contact with the temporary support, which could cause friction damage to the prestressed steel strands. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0030] Figure 1 This is a schematic diagram of the steps of jacking construction in the background technology of the present utility model;
[0031] Figure 2 This is a schematic diagram of Example 1 of the present utility model;
[0032] Figure 3 This is a schematic diagram of a temporary bracket in Example 1 of the present utility model;
[0033] Figure 4 for Figure 3 Enlarged view of point A in the middle;
[0034] Figure 5 This is a schematic diagram of a temporary bracket in Example 2 of the present utility model;
[0035] Figure 6 for Figure 5 Enlarged view of point B in the middle;
[0036] Figure 7 This is a schematic diagram of Example 3 of the present utility model;
[0037] Figure 8 for Figure 7 Enlarged view of point C in the middle;
[0038] Figure 9 for Figure 7 Enlarged view of point D in the middle;
[0039] Figure 10 This is a schematic diagram of Example 4 of the present utility model;
[0040] Figure 11 This is a schematic diagram of Example 5 of the present utility model;
[0041] Figure 12 This is a schematic diagram of Example 6 of the present utility model.
[0042] Description of Figure Numbers:
[0043] 1. Beam; 2. Temporary support; 3. Sliding assembly;
[0044] 4. Steel bundle; 5. Permanent pier structure;
[0045] 6. Ballast block; 7. Steel beam;
[0046] 21. Vertical support 1; 22. Vertical support 2; 23. Connecting rod 1;
[0047] 25. Vertical support three; 26. Vertical support four; 27. Connecting rod two;
[0048] 31. Fixed rod 1; 32. Fixed rod 2; 33. Cylindrical connecting rod;
[0049] 34. Fixed pulley; 35. Steps;
[0050] 51. Cap beam one; 52. Embedded part one;
[0051] 53. Cap beam 2; 54. Pier column; 55. Cap platform 1;
[0052] 56. Spacer; 57. Embedded part 2;
[0053] 58. Platform 2; 59. Rigging;
[0054] 61. Embedded part three. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] Example 1, a collaborative bridge temporary support system for soft soil foundation, such as Figure 2 As shown, it includes a temporary support structure supported under the beam 1, and the temporary support structure includes a sliding component 3 arranged at the bottom of the temporary bracket 2. The steel bundle 4 slides with the sliding component 3, and the two ends of the steel bundle 4 are respectively connected to the permanent pier structure 5.
[0057] In order to avoid the need for foundation treatment, a set of prestressed steel strands 4 can be passed through the temporary support 2 and then anchored to the adjacent two permanent piers 5 and supported on the inner side of the adjacent two permanent piers 5 by a steel beam 7 passing through the temporary support 2. If the site conditions of the beam 1 are only poor in a certain span in the middle, the temporary support 2 of the span can be used. Figure 2 Single span V-shaped tendon arrangement shown.
[0058] Specifically, after the cross beam 1, temporary support 2, and steel bundle 4 are successfully installed, the beam body is pushed to make it slide along the top of the cross beam 1, and the cross beam 1 serves as a sliding track for the beam body.
[0059] On the basis of the above embodiment, a steel beam 7 is provided between the temporary support 2 and the permanent pier structure 5. Without the combined effect of this group of prestressed steel bundles 4 and the steel beam 7 passing through the temporary support 2, as the construction of the upper bridge progresses and the weight of the upper beam increases, the pressure on the temporary support 2 will continue to increase. Since the soft soil foundation below has a low stiffness, this will cause the temporary support 2 to sink significantly, and eventually cause the upper beam to sag, making it impossible to meet the construction requirements.
[0060] On the basis of the above implementation mode, Figure 3 As shown, one steel bundle 4 is provided, and the temporary support 2 includes a vertical pillar 1 21 and a vertical pillar 2 22 arranged along the length direction of the steel bundle 4. A plurality of connecting rods 1 23 are provided between the vertical pillar 1 21 and the vertical pillar 2 22. The bottom surfaces of the vertical pillar 1 21 and the vertical pillar 2 22 are provided with the sliding assembly 3. The steel bundle 4 is slidably connected to the sliding assembly 3, and the two ends of the steel bundle 4 are respectively connected to the permanent pier structure 5.
[0061] On the basis of the above embodiment, the sliding assembly 3 includes a fixed rod 1 31 and a fixed rod 2 32 connected to the bottom surface, a cylindrical connecting rod 33 is provided between the fixed rod 1 31 and the fixed rod 2 32, a hole for the cylindrical connecting rod 33 to pass through is provided at the center of the fixed pulley 34, and the steel bundle 4 surrounds the circumference of the fixed pulley 34, as shown in FIG. Figure 4 As shown, the circumference of the fixed pulley 34 is provided with steps 35 for limiting the position of the steel bundle 4. The steel bundle 4 is clamped between the steps 35 to prevent dislocation during stretching movement.
[0062] On the basis of the above implementation mode, Figure 2 As shown, the permanent pier structure 5 includes a cap beam 51, and an embedded part 52 is provided on the cap beam 51. Both ends of the steel bundle 4 are connected to the embedded part 52 on both sides.
[0063] Specifically, the embedded part 52 is a U-shaped steel bar, and an anchor plate is provided on the U-shaped steel bar to anchor the steel bundle 4 and improve the pull-out resistance, thereby avoiding local damage to the concrete of the cap beam 51.
[0064] Example 2, as a preferred embodiment of a collaborative bridge temporary support system for soft soil foundation, is different from Example 1 in that: Figure 2 As shown, it includes a temporary support structure supported under the beam 1, and the temporary support structure includes a sliding component 3 arranged at the bottom of the temporary bracket 2. The steel bundle 4 slides with the sliding component 3, and the two ends of the steel bundle 4 are respectively connected to the permanent pier structure 5.
[0065] On the basis of the above embodiment, a steel beam 7 is provided between the temporary support 2 and the permanent pier structure 5. Without the combined effect of this group of prestressed steel bundles 4 and the steel beam 7 passing through the temporary support 2, as the construction of the upper bridge progresses and the weight of the upper beam increases, the pressure on the temporary support 2 will continue to increase. Since the soft soil foundation below has a low stiffness, this will cause the temporary support to sink significantly, and eventually cause the upper beam to sag, making it impossible to meet the construction requirements.
[0066] On the basis of the above implementation mode, Figure 5 、 Figure 6 As shown, the temporary support 2 includes a vertical support 1 21 and a vertical support 2 22 arranged along the length direction of the steel bundle 4, and a plurality of connecting rods 1 23 are arranged between the vertical support 1 21 and the vertical support 2 22. The temporary support 2 also includes a vertical support 3 25 and a vertical support 4 26 forming a quadrilateral with the vertical support 1 21 and the vertical support 2 22. The vertical support 1 21, the vertical support 2 22, the vertical support 3 25, and the vertical support 4 26 are all connected. A plurality of connecting rods 27 are provided, and the bottom surfaces of the vertical pillar 1 21, the vertical pillar 2 22, the vertical pillar 3 25, and the vertical pillar 4 26 are all provided with the sliding assembly 3. Two steel bundles 4 are provided in parallel, one steel bundle 4 is wound around the fixed pulley 34 on the bottom surfaces of the vertical pillar 1 21 and the vertical pillar 2 22, and the other steel bundle 4 is wound around the fixed pulley 34 on the bottom surfaces of the vertical pillar 3 25 and the vertical pillar 4 26. Both ends of the steel bundle 4 are connected to the permanent pier structure 5.
[0067] On the basis of the above embodiment, the sliding assembly 3 includes a fixed rod 1 31 and a fixed rod 2 32 connected to the bottom surface, a cylindrical connecting rod 33 is arranged between the fixed rod 1 31 and the fixed rod 2 32, the center of the fixed pulley 34 is provided with a hole for the cylindrical connecting rod 33 to pass through, the steel bundle 4 surrounds the circumference of the fixed pulley 34, and the circumference of the fixed pulley 34 is provided with a step 35 for limiting the steel bundle 4, and the steel bundle 4 is stuck between the steps 35 to prevent dislocation during stretching movement.
[0068] On the basis of the above embodiment, the permanent pier structure 5 includes a cap beam 51 , and an embedded part 52 is provided on the cap beam 51 . Both ends of the steel bundle 4 are connected to the embedded part 52 on both sides.
[0069] Specifically, the embedded part 52 is a U-shaped steel bar, and an anchor plate is provided on the U-shaped steel bar to anchor the steel bundle 4 and improve the pull-out resistance, thereby avoiding local damage to the concrete of the cap beam 51.
[0070] Example 3, as a preferred embodiment of a collaborative bridge temporary support system for soft soil foundation, is different from Example 1 and Example 2 in that the permanent pier structure 5 includes a cap beam 2 53, a pier column 54, and a cap 1 55 connected in sequence, and a spacer 56 is provided between the cap beam 2 53 and the cross beam 1. Figure 8 As shown, the steel bundle 4 passes through the gap created by the spacer 56 , and the embedded part 2 57 is provided on the base 1 55 . Both ends of the steel bundle 4 pass through the spacer 56 and are connected to the embedded part 2 57 .
[0071] Specifically, the steel bundle 4 is wound around the fixed pulley 34 at the bottom of the temporary support 2, and its two ends pass through the pads 56 on the upper part of the permanent pier structure 5 on both sides of the temporary support 2, and then connected to the embedded parts 57 at the bottom of the outer permanent pier structure 5. Figure 7 shown.
[0072] Specifically, if Figure 9 As shown, the second embedded part 57 is a U-shaped steel bar, and an anchor plate is provided on the U-shaped steel bar to anchor the steel bundle 4 and improve the pull-out resistance to avoid local damage to the concrete of the base 1 55.
[0073] Example 4 is a preferred embodiment of a collaborative bridge temporary support system for soft soil foundation. The difference from Example 1, Example 2 and Example 3 is that the permanent pier structure 5 includes a second cap beam 53, a pier column 54 and a second pedestal 58 connected in sequence. A pad 56 is provided between the second cap beam 53 and the cross beam 1. A rigging 59 is provided on the second pedestal 58. Figure 10 As shown, both ends of the steel bundle 4 pass through the spacer 56 and are connected to the rigging 59 .
[0074] Example 5, as a preferred embodiment of a collaborative bridge temporary support system for soft soil foundations, is different from Example 1, Example 2, Example 3, and Example 4 in that a ballast block 6 is provided on the outer side of the permanent pier structure 5, and an embedded part three 61 is provided on the ballast block 6, and both ends of the steel bundle 4 pass through the pad 56 and are connected to the embedded part three 61.
[0075] Specifically, the ballast block 6 is a concrete block.
[0076] Specifically, if Figure 11 As shown, the embedded part three 61 is a U-shaped steel bar, and an anchor plate is provided on the U-shaped steel bar for anchoring the steel bundle 4 and improving the pull-out resistance to avoid local damage to the concrete of the weight block 6.
[0077] Example 6 is a preferred embodiment of a collaborative bridge temporary support system for soft soil foundation. The difference from Example 5 is that if the site conditions of multiple spans of the beam 1 are poor, a continuous steel bundle 4 can be used, such as Figure 12 As shown, first, the left end of the steel bundle 4 is connected to the embedded part three 61 on the outermost ballast block 6, and then passes through the pad 56 on the upper part of the permanent pier structure 5 on the right side of the ballast block 6, and then wraps around the fixed pulley 34 under the right temporary bracket 2, and then passes through the pad 56 on the upper part of the right permanent pier structure 5, and then wraps around the fixed pulley 34 under the right temporary bracket 2, and then passes through the pad 56 on the upper part of the right permanent pier structure 5, and then wraps around the fixed pulley 34 under the right temporary bracket 2, and then passes through the pad 56 on the upper part of the right permanent pier structure 5, and so on, the right end of the steel bundle 4 is connected to the embedded part three 61 on the rightmost ballast block 6.
[0078] The method of using the utility model is as follows:
[0079] 1. Install beam 1, temporary support structure, and steel bundle 4;
[0080] 2. Push the beam body to make it slide along the top of beam 1, with beam 1 serving as the sliding track for the beam body;
[0081] 3. After the beam is pushed into place, remove the beam 1, temporary support structure, and steel bundle 4.
[0082] Anything not described in detail in the present invention is a conventional technical means known to those skilled in the art.
[0083] The above content shows and describes the basic principles, main features and beneficial effects of the present invention. The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of protection of the present invention.
Claims
1. A collaborative bridge temporary support system for soft soil foundation, characterized by: It comprises a temporary support structure supported below a crossbeam (1), the temporary support structure comprising a sliding assembly (3) arranged at the bottom of a temporary support (2), a steel bundle (4) slidingly matched with the sliding assembly (3), and two ends of the steel bundle (4) are respectively connected to a permanent pier structure (5).
2. The collaborative bridge temporary support system for soft soil foundation according to claim 1, characterized in that: A steel beam (7) is provided between the temporary support (2) and the permanent pier structure (5).
3. The collaborative bridge temporary support system for soft soil foundation according to claim 1 or 2, characterized in that: The temporary support (2) comprises a vertical support 1 (21) and a vertical support 2 (22) arranged along the length direction of the steel bundle (4), a plurality of connecting rods 1 (23) are arranged between the vertical support 1 (21) and the vertical support 2 (22), the bottom surfaces of the vertical support 1 (21) and the vertical support 2 (22) are both provided with the sliding assembly (3), and the steel bundle (4) and the sliding assembly (3) are both slidably connected.
4. The collaborative bridge temporary support system for soft soil foundation according to claim 3 is characterized in that: The sliding assembly (3) comprises a first fixing rod (31) and a second fixing rod (32) connected to the bottom surface, a cylindrical connecting rod (33) is arranged between the first fixing rod (31) and the second fixing rod (32), a hole for the cylindrical connecting rod (33) to pass through is arranged at the center of the fixed pulley (34), and the steel bundle (4) surrounds the circumference of the fixed pulley (34).
5. The collaborative bridge temporary support system for soft soil foundation according to claim 4, characterized in that: The circumferential surface of the fixed pulley (34) is provided with a step (35) for limiting the position of the steel bundle (4).
6. The collaborative bridge temporary support system for soft soil foundation according to claim 3, characterized in that: The temporary support (2) further comprises a vertical support three (25) and a vertical support four (26) which form a quadrilateral with the vertical support one (21) and the vertical support two (22); a plurality of connecting rods two (27) are arranged between the vertical support one (21), the vertical support two (22), the vertical support three (25) and the vertical support four (26); the bottom surfaces of the vertical support one (21), the vertical support two (22), the vertical support three (25) and the vertical support four (26) are all provided with the sliding assembly (3); and two of the steel bundles (4) are arranged in parallel.
7. The collaborative bridge temporary support system for soft soil foundation according to any one of claims 1-2 and 4-6, characterized in that: The permanent pier structure (5) comprises a cap beam (51), on which an embedded part (52) is arranged, and both ends of the steel bundle (4) are connected to the embedded part (52) on both sides.
8. The collaborative bridge temporary support system for soft soil foundation according to any one of claims 1-2 and 4-6, characterized in that: The permanent pier structure (5) comprises a second cap beam (53), a pier column (54), and a first pedestal (55) which are connected in sequence, a cushion block (56) is arranged between the second cap beam (53) and the cross beam (1), and a second embedded part (57) is arranged on the first pedestal (55), and both ends of the steel bundle (4) pass through the cushion block (56) and are connected to the second embedded part (57).
9. The collaborative bridge temporary support system for soft soil foundation according to any one of claims 1-2 and 4-6, characterized in that: The permanent pier structure (5) comprises a second cap beam (53), a pier column (54), and a second pedestal (58) which are connected in sequence, a cushion block (56) is arranged between the second cap beam (53) and the cross beam (1), a rigging (59) is arranged on the second pedestal (58), and both ends of the steel bundle (4) pass through the cushion block (56) and are connected to the rigging (59).
10. The collaborative bridge temporary support system for soft soil foundation according to claim 9, characterized in that: The outer side of the permanent pier structure (5) is provided with a ballast block (6), and the ballast block (6) is provided with an embedded part three (61). Both ends of the steel bundle (4) pass through the cushion block (56) and are connected to the embedded part three (61).