Aerogel coating device
By designing a gas gel coating device including transportation, upper gel, coating, and collecting devices, the problem of falling in the process of coating is solved, and the rapid production and production of gas gel insulation sheets are realized Convenient operation.
Patent Information
- Application Number
- CN202420240216.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-01-31
AI Technical Summary
During the aerogel coating process, the liquid aerogel is prone to move to both sides of the coating device, causing the aerogel to move out of the polyester film and fall off, contaminating the working environment.
A gas gel coating device is designed, including transport devices, gel components, coating components and collecting devices. The transportation device sends the polyester film to the position of the upper gel component, spray the gas gel through the upper glue component, and the coating component is paved with the gas gel, and the excess gas gel is collected by the collecting device to prevent it from falling.
This device can effectively prevent the airgel from falling during the coating process, improve the convenience of operation and the cleanliness of the working environment, and realize the rapid production and manufacturing of airgel insulation sheets.
Smart Images

Figure CN222385080U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of aerogel film production equipment, and in particular to an aerogel coating device. Background Art
[0002] Aerogel is the best thermal insulation material in the world. By utilizing the thermal insulation properties of aerogel, a new type of aerogel high-efficiency thermal insulation composite material can be produced, which is applied in the field of energy-saving buildings and has good thermal insulation, fire retardant, sound insulation, light transmission and other properties.
[0003] In the manufacturing process of aerogel thermal insulation sheets, liquid aerogel is usually coated on a polyester film by brushing, and the aerogel is solidified to form an aerogel thermal insulation sheet. However, during the aerogel coating process, since the aerogel is in a liquid state, the liquid aerogel will move to both sides of the coating device during brushing, causing the aerogel to move out of the polyester film and fall into the working environment, thereby polluting the working environment. Utility Model Content
[0004] In order to improve the convenience of an aerogel coating device during operation, the present application provides an aerogel coating device.
[0005] The present application provides an aerogel coating device, which adopts the following technical solution:
[0006] An aerogel coating device comprises a mounting platform, on which a transport device for transporting a polyester film is mounted, on which a gluing component for spraying aerogel on the polyester film is arranged, on which a coating component for spreading aerogel on the polyester film is mounted, the coating component comprises a fourth support frame, the fourth support frame is mounted on the mounting platform, and a collecting device for collecting excess aerogel is mounted on the fourth support frame.
[0007] By adopting the above technical scheme, the transportation device sends the polyester film to the gluing component position, the aerogel is sprayed onto the polyester film through the gluing component, and after the spraying is completed, the aerogel is spread on the polyester film through the coating component, and the excess aerogel when the coating component is spread is collected by the collecting device. After the aerogel is dried, the polyester film with solidified aerogel is rolled up by the transportation device, and finally the rapid production of the aerogel insulation sheet is completed, which is conducive to improving the convenience of the aerogel coating device during operation.
[0008] In a specific feasible implementation scheme, the collecting device includes a fourth guide rod, which is mounted on the fourth support frame, and a second slider and a third slider are mounted on the fourth guide rod, a first collecting plate is mounted on the second slider, and a second collecting plate is mounted on the third slider, baffles are mounted on the first collecting plate and the second collecting plate, and a guide tube for transporting aerogel is connected to the baffle.
[0009] By adopting the above technical solution, the first collecting plate and the second collecting plate receive the excess aerogel on both sides of the polyester film and block the aerogel flow through the baffle plate to guide the flow of the aerogel, and the excess aerogel is sent away from the scraper through the guide pipe to prevent the excess aerogel from staying on the first collecting plate and the second collecting plate. The baffle plate is used to block the movement of the aerogel to prevent the aerogel on the first collecting plate and the second collecting plate from falling onto the mounting table and polluting the working environment.
[0010] In a specific possible implementation manner, the baffle is an arc-shaped curved plate.
[0011] By adopting the above technical solution, the arc-shaped curved plate can drain the aerogel, so that the scraped aerogel is gathered to the same point in the center of the arc, so that the aerogel can quickly flow into the guide tube.
[0012] In a specific feasible implementation scheme, a second adjustment component for adjusting the positions of the first collection plate and the second collection plate is installed on the fourth support frame, and the second adjustment component includes a second mounting plate, and the second mounting plate is mounted on the fourth support frame, and a second screw rod is threadedly connected to the second mounting plate, and a lifting plate is rotatably connected to the second screw rod, and a first connecting rod is hinged on the lifting plate, and the first connecting rod is hinged to the second slider at one end away from the lifting plate, and a second connecting rod is hinged to the lifting plate, and the second connecting rod is hinged to the third slider at one end away from the lifting plate.
[0013] By adopting the above technical solution, the second screw is rotated to control the up and down movement of the lifting plate, and the first connecting rod and the second connecting rod can be used to quickly adjust the distance between the first collecting plate and the second collecting plate, so that the first collecting plate and the second collecting plate can be adjusted according to the width of the aerogel coated on the polyester film, which is beneficial to improving the convenience of aerogel coating and loading during operation.
[0014] In a specific feasible implementation scheme, the transport device includes a first support frame, the first support frame is installed on the mounting platform, a first positioning groove is opened on the first support frame, a pressure block is detachably installed on the first support frame, a second positioning groove matching with the first positioning groove is opened on the pressure block, a first fixing rod is detachably installed on the first support frame through the pressure block, the first fixing rod is arranged in the first positioning groove, a first roller for loading polyester film is rotatably installed on the first fixing rod; a second support frame is installed on the mounting platform, a second roller for winding polyester film is rotatably installed on the second support frame, and a first motor for controlling the rotation of the second roller is installed on the second support frame.
[0015] By adopting the above technical solution, the first positioning groove can quickly position the first fixing rod, and the first fixing rod can be detachably installed through the pressure block, which is convenient for removing and replacing the polyester film, and the second roller is controlled to rotate by the first motor, so that the polyester film can be sent out and rolled up at the same time, thereby increasing work efficiency.
[0016] In a specific possible implementation manner, a third fixing rod is installed on the second support frame, and a fan is installed on the third fixing rod.
[0017] By adopting the above technical solution, a fan is used to blow air on the aerogel, thereby accelerating the solidification of the aerogel and facilitating the rapid collection of the polyester film.
[0018] In a specific feasible implementation scheme, the gluing assembly includes a third support frame, the third support frame is mounted on the mounting platform, a first support plate is mounted on the third support frame, a first guide rod is mounted on the third support frame, a first mounting plate is mounted on the third support frame, a nozzle is mounted on the first mounting plate, a gluing pipe for providing aerogel is connected to the first mounting plate, and the gluing pipe is connected to the nozzle.
[0019] By adopting the above technical solution, the polyester film passes through the first guide rod and the first support plate and comes smoothly to the bottom of the nozzle. The aerogel is introduced into the nozzle through the rubber inlet hose, and then the aerogel is dispersed and sprayed onto the polyester film through the nozzle, so that the subsequent coating component can smoothly coat the aerogel on the polyester film.
[0020] In a specific possible implementation scheme, the coating assembly also includes a second fixed rod, the second fixed rod is mounted on the fourth support frame, a third roller is mounted on the second fixed rod, the fourth support frame is mounted on the third fixed rod, the third fixed rod is mounted on the fourth roller for cooperating with the third roller to complete the coating action, and the fourth roller is provided with a scraper.
[0021] By adopting the above technical solution, the polyester film coated with aerogel passes between the third roller and the fourth roller, and the aerogel can be quickly scraped flat on the polyester film by using a scraper.
[0022] In a specific feasible implementation scheme, a first adjustment component for adjusting the fourth roller is installed on the fourth support frame, and the first adjustment component includes a first screw rod, which drives the first screw rod to rotate and is installed on the fourth support frame. The first screw rod is threaded with a first slider, and a second guide rod is installed on the fourth support frame. The second guide rod passes through the first slider and is slidably connected to the first slider, and the first slider is connected to the third fixed rod.
[0023] By adopting the above technical solution, the first screw is rotated to control the up and down movement of the first slider, and the distance between the scraper and the third roller is adjusted, so that the coating thickness of the aerogel on the polyester film can be adjusted. The coating thickness of the aerogel can be adjusted according to the required thickness of the thermal insulation sheet, which is beneficial to improving the convenience of the aerogel coating device during operation.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] 1. The transport device sends the polyester film to the gluing assembly position, and the aerogel is sprayed onto the polyester film through the gluing assembly. After the spraying is completed, the aerogel is spread on the polyester film through the coating assembly, and the excess aerogel is collected by the first collecting plate and the second collecting plate. After the aerogel is dried, the polyester film with the aerogel solidified is rolled up by the transport device, and finally the rapid production of the aerogel insulation sheet is completed, which is conducive to improving the convenience of the aerogel coating device during operation.
[0026] 2. Through the setting of the collecting device, the first collecting plate and the second collecting plate collect the excess aerogel on both sides of the polyester film, and send the scraped aerogel away from the scraper through the guide pipe to prevent the excess aerogel from staying on the first collecting plate and the second collecting plate. The arc-shaped baffle can drain the aerogel, so that the scraped aerogel gathers to the same point in the center of the arc, which is convenient for the aerogel to quickly flow into the guide pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 Schematic diagram of an aerogel coating device according to an embodiment of the present application.
[0028] Figure 2 yes Figure 1 A is an enlarged view of the middle image.
[0029] Figure 3 It is a schematic diagram of a fan according to an embodiment of the present application.
[0030] Figure 4 It is a schematic diagram of the gluing component of an embodiment of the present application.
[0031] Figure 5 It is a schematic diagram of the structure of the coating device of an embodiment of the present application.
[0032] Figure 6 It is a schematic diagram of the installation position relationship between the third roller and the fourth roller of the coating device of the embodiment of the present application.
[0033] Figure 7 It is a schematic diagram of a collection device according to an embodiment of the present application.
[0034] Figure 8It is a schematic diagram of the installation position relationship between the collecting device and the coating device of the embodiment of the present application.
[0035] Explanation of reference numerals: 1. mounting platform; 2. transport device; 21. first support frame; 211. first positioning groove; 22. hinge; 221. first hinge plate; 222. second hinge plate; 23. pressing block; 231. second positioning groove; 24. first fixing rod; 25. first roller; 26. second support frame; 27. second roller; 28. first motor; 291. second support plate; 292. third guide rod; 293. fourth fixing rod; 294. fan; 3. gluing assembly; 31. third support frame; 32. first support plate; 33. first guide rod; 34. first mounting plate; 35. nozzle; 36. rubber inlet hose; 4. coating assembly; 41. fourth support frame ; 42. Second fixed rod; 43. Third roller; 44. First adjusting assembly; 441. First screw rod; 442. First rotating handle; 443. First slider; 444. Second guide rod; 45. Third fixed rod; 46. Fourth roller; 461. Scraper; 5. Collecting device; 54. Fourth guide rod; 551. Second slider; 552. Third slider; 553. First collecting plate; 554. Second collecting plate; 555. Baffle; 5561. Guide tube; 5562. Storage box; 56. Second adjusting assembly; 561. Second mounting plate; 562. Second screw rod; 563. Second rotating handle; 564. Lifting plate; 565. First connecting rod; 566. Second connecting rod. DETAILED DESCRIPTION
[0036] The following is combined with Figure 1-8 This application is described in further detail.
[0037] Example:
[0038] The present application embodiment discloses an aerogel coating device, referring to Figure 1 , including a mounting platform 1, on which is mounted a transport device 2 for transporting a polyester film, on which is mounted a gluing component 3 for spraying aerogel on the polyester film, and on which is mounted a coating component 4 for spreading aerogel on the polyester film.
[0039] The transport device 2 delivers the polyester film to the gluing component 3, and the aerogel is sprayed onto the polyester film through the gluing component 3. After the spraying is completed, the aerogel is spread flat on the polyester film through the coating component 4, and then the transport device 2 rolls up the polyester film with the aerogel solidified thereon, thereby completing the rapid production of the aerogel thermal insulation sheet, which is beneficial to improving the convenience of the aerogel coating device during use.
[0040] Reference Figure 1 and Figure 2The transport device 2 includes a first support frame 21, which is fixedly mounted on the mounting platform 1. A hinge 22 is provided on the first support frame 21. The hinge 22 includes a first hinge piece 221 and a second hinge piece 222. The first hinge piece 221 is fixedly mounted on the first support frame 21. A pressing block 23 is fixedly mounted on the second hinge piece 222. The pressing block 23 is detachably mounted on the first support frame 21 through screws. A first positioning groove 211 is provided on the top surface of the first support frame 21. A second positioning groove 231 is provided on the pressing block 23 to match the first positioning groove 211 on the first support frame 21. A first fixing rod 24 is installed in the first positioning groove 211 on the first support frame 21. The first fixing rod 24 is detachably mounted on the first support frame 21 through the pressing block 23. A first roller 25 loaded with a polyester film is rotatably mounted on the first fixing rod 24. A second support frame 26 is fixedly mounted on the mounting platform 1 , a second roller 27 for winding the polyester film is rotatably mounted on the second support frame 26 , and a first motor 28 for controlling the rotation of the second roller 27 is fixedly mounted on the second support frame 26 .
[0041] Reference Figure 1 and Figure 3 A second support plate 291 is fixedly mounted on the second support frame 26, a fourth fixed rod 293 is fixedly mounted on the second support frame 26, three fans 294 are fixedly mounted on the fourth fixed rod 293, the three fans 294 are evenly distributed on the fourth fixed rod 293, the blowing directions of the three fans 294 are all set downward, a third guide rod 292 is fixedly mounted on the second support frame 26, the third guide rod 292 is located above the second support plate 291 and is close to the second support plate 291 to a distance just equal to the thickness of a layer of polyester film, the fourth fixed rod 293 is set above the second support plate 291, and the third guide rod 292 is set between the fourth fixed rod 293 and the second roller 27.
[0042] The polyester film is installed on the first roller 25, the screw is turned to open the pressure block 23, and the first fixing rod 24 is quickly positioned and installed on the first support frame 21 through the first positioning groove 211. The hinge 22 is used to make the pressure block 23 quickly cooperate with the first support frame 21 to press and fix the first fixing rod 24. At the same time, it is also convenient to disassemble the first fixing rod 24 to replace the polyester film. The first motor 28 controls the second roller 27 to rotate to roll up the polyester film coated with aerogel, and before rolling up, the aerogel is blown by the fan 294 to accelerate the curing of the aerogel. The polyester film is conveyed and rolled up at the same time, which can speed up the work efficiency and help improve the efficiency of the aerogel coating device during use.
[0043] Reference Figure 1 and Figure 4The gluing assembly 3 includes a third support frame 31, which is fixedly mounted on the mounting platform 1 and arranged between the first support frame 21 and the second support frame 26. A first support plate 32 is fixedly mounted on the third support frame 31, and the first support plate 32 is arranged horizontally. A first guide rod 33 is fixedly mounted on the third support frame 31, and the first guide rod 33 is located above the first support plate 32 and close to the first support plate 32 to a distance just thick enough for a layer of polyester film. A first mounting plate 34 is fixedly mounted on the third support frame 31, and the first mounting plate 34 is arranged above the first support plate 32. Seven nozzles 35 are fixedly mounted on the bottom surface of the first mounting plate 34 close to the first support plate 32, and the seven nozzles 35 are neatly arranged in a row along the length direction of the first mounting plate 34. A glue inlet pipe 36 is connected to the first mounting plate 34, and the glue inlet pipe 36 is connected to the seven nozzles 35 in the first mounting plate 34.
[0044] The polyester film passes between the first guide rod 33 and the first support plate 32. The first guide rod 33 enables the polyester film to be in a parallel state and pass under the first mounting plate 34. The aerogel is introduced into the rubber inlet pipe 36, and the aerogel is sprayed onto the entire polyester film surface passing under the first mounting plate 34 through seven nozzles 35, so that the subsequent coating component 4 can quickly flatten the aerogel and coat it on the polyester film.
[0045] Reference Figure 1 and Figure 5 The coating assembly 4 includes a fourth support frame 41, which is fixedly mounted on the mounting platform 1 and disposed between the third support frame 31 and the second support frame 26. Figure 5 and Figure 6 The fourth support frame 41 is fixedly mounted with a second fixed rod 42, and the third roller 43 is rotatably mounted on the second fixed rod 42. The fourth support frame 41 is provided with a first adjustment assembly 44, which includes a first screw rod 441, which is rotatably mounted on the fourth support frame 41, and the first screw rod 441 is vertically arranged, and a first rotating handle 442 is fixedly mounted on one end of the first screw rod 441 away from the third roller 43, and a first slider 443 is threadedly connected to the first screw rod 441, and second guide rods 444 are arranged on both sides of the first screw rod 441, and the two second guide rods 444 are parallel to the first screw rod 441, and the first slider 443 passes through the two second guide rods 444 at the same time and is slidably connected with the second guide rods 444. A third fixing rod 45 is fixedly mounted on the first slider 443 , and a fourth roller 46 is fixedly mounted on the third fixing rod 45 . In this embodiment, the fourth roller 46 is located directly above the third roller 43 , and a scraper 461 is disposed on the fourth roller 46 for coating the aerogel on the polyester film.
[0046] The first handle 442 is rotated to control the rotation of the first screw rod 441. The first screw rod 441 makes the first slider 443 slide up and down along the second guide rod 444, thereby driving the fourth roller 46 to slide up and down, and adjusting the distance between the fourth roller 46 and the third roller 43, so as to facilitate the adjustment of the scraper 461 to control the scraper 461 to scrape the aerogel flat on the polyester film.
[0047] Reference Figure 7 and Figure 8 The fourth support frame 41 is provided with a collecting device 5 for collecting excess aerogel on both sides of the polyester film. The collecting device 5 includes a fourth guide rod 54, which is fixedly mounted on the fourth support frame 41. The fourth guide rod 54 is provided with a second slider 551 and a third slider 552. The second slider 551 is fixedly mounted with a first collecting plate 553, and the third slider 552 is mounted with a second collecting plate 554. In this embodiment, referring to Figure 6 , Figure 7 and Figure 8 The first collecting plate 553 and the second collecting plate 554 are respectively arranged on both sides of the scraper 461, and baffles 555 are fixedly installed on the first collecting plate 553 and the second collecting plate 554. The baffles 555 are arc-shaped curved plates, and the baffles 555 are connected with guide tubes 5561. Two storage boxes 5562 for receiving aerogel are arranged on the mounting platform 1, and the two storage boxes 5562 are respectively arranged below the first collecting plate 553 and the second collecting plate 554, and the ends of the guide tubes 5561 away from the first collecting plate 553 and the second collecting plate 554 are respectively connected to the corresponding storage boxes 5562 below.
[0048] Reference Figure 7 and Figure 8 A second adjusting assembly 56 for adjusting the position of the first collecting plate 553 and the second collecting plate 554 is provided on the fourth supporting frame 41. The second adjusting assembly 56 includes a second mounting plate 561, which is fixedly mounted on the fourth supporting frame 41. The second mounting plate 561 is arranged directly above the fourth guide rod 54. A second screw rod 562 is threadedly connected to the second mounting plate 561. The second screw rod 562 is vertically arranged. A second rotating handle 563 is fixedly mounted on the end of the second screw rod 562 away from the fourth guide rod 54. The end of the second screw rod 562 close to the fourth guide rod 54 is rotatably connected to a lifting plate 564. A first connecting rod 565 is hinged on the bottom surface of the lifting plate 564. The end of the first connecting rod 565 away from the lifting plate 564 is hinged to the second slider 551 at the same time. A second connecting rod 566 is hinged on the bottom surface of the lifting plate 564. The end of the second connecting rod 566 away from the lifting plate 564 is hinged to the third slider 552 at the same time.
[0049] The second rotating handle 563 is operated to rotate the second screw rod 562, and the second screw rod 562 drives the lifting plate 564 to move up and down. The lifting plate 564 moves downward and pushes the second slider 551 through the first connecting rod 565, and the second connecting rod 566 pushes the third slider 552 to increase the distance between the first collecting plate 553 and the second collecting plate 554; when the lifting plate 564 moves upward, the second slider 551 is pulled by the first connecting rod 565, and the second connecting rod 566 pulls the third slider 552 to move in opposite directions to reduce the distance between the first collecting plate 553 and the second collecting plate 554. Therefore, when manufacturing aerogel thermal insulation sheets of different widths, the distance between the first collecting plate 553 and the second collecting plate 554 can be adjusted according to the aerogels of different widths to coat, so as to facilitate the collection of excess aerogel and improve the convenience of the aerogel coating device during operation.
[0050] The implementation principle of the embodiment of the present application is as follows: the first roller 25 delivers a polyester film, and the second roller 27 rolls up the polyester film. During this period, the polyester film passes through the position of the gluing component 3, and the aerogel is sprayed onto the polyester film through the nozzle 35. After the spraying is completed, the aerogel is scraped flat and spread on the polyester film by the scraper 461 of the coating component 4. After the spreading is completed, the second adjustment component 56 adjusts the first collection plate 553 and the second collection plate 554 to collect the excess aerogel. After the collection is completed, the fan 294 is used to accelerate the curing of the aerogel, and finally the rapid production of the aerogel insulation sheet is completed, which is conducive to improving the convenience of the aerogel coating device during operation.
[0051] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An aerogel coating device, characterized in that: The invention comprises a mounting platform (1), on which a transport device (2) for transporting a polyester film is mounted, on which a gluing component (3) for spraying aerogel on the polyester film is arranged, on which a coating component (4) for spreading aerogel on the polyester film is mounted, and on which a fourth support frame (41) is mounted. The fourth support frame (41) is mounted on the mounting platform (1), and on which a collection device (5) for collecting excess aerogel is mounted.
2. An aerogel coating device according to claim 1, characterized in that: The collecting device (5) comprises a fourth guide rod (54), the fourth guide rod (54) is mounted on the fourth support frame (41), a second slider (551) and a third slider (552) are mounted on the fourth guide rod (54), a first collecting plate (553) is mounted on the second slider (551), a second collecting plate (554) is mounted on the third slider (552), baffles (555) are mounted on the first collecting plate (553) and the second collecting plate (554), and a guide tube (5561) for transporting aerogel is connected to the baffle (555).
3. An aerogel coating device according to claim 2, characterized in that: The baffle (555) is an arc-shaped curved plate.
4. An aerogel coating device according to claim 2, characterized in that: A second adjustment component (56) for adjusting the positions of the first collecting plate (553) and the second collecting plate (554) is installed on the fourth support frame (41). The second adjustment component (56) includes a second mounting plate (561). The second mounting plate (561) is mounted on the fourth support frame (41). A second screw rod (562) is threadedly connected to the second mounting plate (561). A lifting plate (564) is rotatably connected to the second screw rod (562). A first connecting rod (565) is hinged on the lifting plate (564). An end of the first connecting rod (565) away from the lifting plate (564) is hinged to the second slider (551). A second connecting rod (566) is hinged on the lifting plate (564). An end of the second connecting rod (566) away from the lifting plate (564) is hinged to the third slider (552).
5. The aerogel coating device according to claim 1, characterized in that: The transport device (2) comprises a first support frame (21), the first support frame (21) is mounted on the mounting platform (1), a first positioning groove (211) is provided on the first support frame (21), a pressure block (23) is detachably mounted on the first support frame (21), a second positioning groove (231) cooperating with the first positioning groove (211) is provided on the pressure block (23), a first fixing rod (24) is detachably mounted on the first support frame (21) through the pressure block (23), the first fixing rod (24) is arranged in the first positioning groove (211), a first roller (25) for loading polyester film is rotatably mounted on the first fixing rod (24); a second support frame (26) is rotatably mounted on the mounting platform (1), a second roller (27) for winding polyester film is rotatably mounted on the second support frame (26), and a first motor (28) for controlling the rotation of the second roller (27) is mounted on the second support frame (26).
6. An aerogel coating device according to claim 5, characterized in that: A fourth fixing rod (293) is installed on the second support frame (26), and a fan (294) is installed on the fourth fixing rod (293).
7. The aerogel coating device according to claim 1, characterized in that: The gluing assembly (3) comprises a third support frame (31), the third support frame (31) is mounted on the mounting platform (1), a first support plate (32) is mounted on the third support frame (31), a first guide rod (33) is mounted on the third support frame (31), a first mounting plate (34) is mounted on the third support frame (31), a nozzle (35) is mounted on the first mounting plate (34), a glue inlet pipe (36) for providing aerogel is connected to the first mounting plate (34), and the glue inlet pipe (36) is connected to the nozzle (35).
8. The aerogel coating device according to claim 1, characterized in that: The coating assembly (4) further comprises a second fixed rod (42), wherein the second fixed rod (42) is mounted on the fourth support frame (41), a third roller (43) is mounted on the second fixed rod (42), a third fixed rod (45) is mounted on the fourth support frame (41), a fourth roller (46) is mounted on the third fixed rod (45) and cooperates with the third roller (43) to complete the coating action, and a scraper (461) is arranged on the fourth roller (46).
9. An aerogel coating device according to claim 8, characterized in that: The fourth support frame (41) is provided with a first adjustment component (44) for adjusting the fourth roller (46), the first adjustment component (44) comprising a first screw rod (441), driving the first screw rod (441) to be rotatably installed on the fourth support frame (41), a first slider (443) being threaded on the first screw rod (441), a second guide rod (444) being provided on the fourth support frame (41), the second guide rod (444) passing through the first slider (443) and being slidably connected to the first slider (443), the first slider (443) being connected to the third fixing rod (45).