Fully-assembled high-pile waterfront trestle

Through the full -assembly design and welding connection method, combined with the micro -expanded concrete filling core, the problem of long construction cycle in the construction of the waterfront trestle and bridge during the construction of the waterfront. Power and stability.

CN222390230UActive Publication Date: 2025-01-24CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420531787.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2025-01-24
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

When the existing waterfront trest bridge is built, the concrete structure has a long construction cycle, is of great importance, is inconvenient to construction, and is difficult to control quality. Traditional construction will produce waste stone and waste, affecting the ecological environment.

Method used

It adopts a fully assembled design, including prestressed concrete pipe piles, steel structural beams, steel keels, trestle boards and decorative railings. Rapid assembly is achieved through welding connections, and micro-expanded concrete core filling is used to improve structural strength and stability.

Benefits of technology

The improvement of construction speed has been achieved, the construction cost and environmental impact have been reduced, and the problem of self -weight and construction inconvenience of the traditional concrete structure is solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390230U_ABST
    Figure CN222390230U_ABST
Patent Text Reader

Abstract

The utility model relates to a full-assembly type high-pile waterfront trestle which comprises a prestressed concrete pipe pile column, a steel structure beam is horizontally arranged on the top of the prestressed concrete pipe pile column and comprises at least two longitudinal beams and a plurality of cross beams, all the longitudinal beams are longitudinally arranged, all the cross beams are transversely arranged, and the longitudinal beams and the cross beams are arranged in a staggered mode. The multiple cross beams and the at least two longitudinal beams are welded into a whole, the multiple prestressed concrete pipe pile columns are symmetrically arranged at the connecting positions of the bottoms of the steel structure beams in a pairwise mode, and the multiple steel keels are evenly distributed on the tops of the steel structure beams. The prestressed concrete pipe pile is used in waterfront engineering, the modes of a pile driving barge and the like are adopted, overwater operation can be achieved, prestressed concrete pipe pile columns are adopted underwater, steel structural members are adopted overwater, the problem that underwater corrosion resistance of a steel structure is difficult is solved, and the problems that a traditional concrete structure is large in dead weight, inconvenient to construct, capable of controlling quality and the like are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a fully assembled high-pile waterfront trestle. Background Art

[0002] The waterfront trestle is a common patrol and maintenance facility for rivers, lakes and other waters. It also has the functions of convenience, leisure, water-friendliness and landscape. It is not only practical, but also has a high ornamental value, lighting up the landscape of rivers, lakes and other waters. The waterfront trestle is usually located on the edge of a river, lake or ocean. It can effectively connect the traffic on both sides and facilitate people's travel. At the same time, it can also serve as an important channel for sightseeing and tourism, allowing tourists to enjoy the waterscape up close. The construction of the waterfront trestle can protect the ecological environment of rivers, lakes or oceans, prevent human activities from damaging them, and provide patrol and maintenance functions. In addition, some cities also hold various cultural activities on the trestle, such as concerts, art exhibitions, etc. The waterfront trestle is an important part of the urban landscape, and its existence can enhance the beauty and quality of the city. The design of the trestle usually incorporates local cultural and historical elements, making it a landmark building in the city.

[0003] Most existing waterfront trestles are built by pouring concrete. However, the construction period of cast-in-place concrete is long, and cast-in-place concrete requires multiple constructions and template making, which takes a long time and has poor crack resistance. During the construction process, concrete is prone to temperature stress and shrinkage stress, leading to cracks. In addition, traditional trestles will produce a lot of waste rock and waste materials, waste resources, and affect the ecological environment of the original river bank. Even improper construction will cause problems such as soil erosion. Summary of the invention

[0004] The utility model aims to provide a fully assembled high-pile waterfront trestle to solve the problems of long concrete structure construction period, heavy deadweight, inconvenient construction, and quality control when constructing waterfront trestle in the prior art.

[0005] In order to solve the above technical problems, the utility model specifically provides the following technical solutions:

[0006] A fully assembled high-pile waterfront trestle comprises prestressed concrete pipe piles, wherein a steel structure beam is horizontally arranged on the top of the prestressed concrete pipe piles, wherein the steel structure beam comprises at least two longitudinal beams and a plurality of transverse beams, wherein all the longitudinal beams are arranged longitudinally, and all the transverse beams are arranged transversely, and the plurality of transverse beams are welded to the at least two longitudinal beams into a whole, wherein the prestressed concrete pipe piles are arranged in plurality, and all the prestressed concrete pipe piles are symmetrically arranged in pairs at the bottom connection of the steel structure beam, and a plurality of steel keels are evenly arranged on the top of the steel structure beam, and all the steel keels are welded and fixed to the steel structure beam.

[0007] As a preferred solution of the utility model, all the steel keel tops are paved with trestle boards, and the trestle boards are prefabricated with patterned steel plates, tempered laminated glass, and anti-corrosion wooden board materials, and the trestle boards are provided with decorative railings.

[0008] As a preferred solution of the utility model, the prestressed concrete pipe piles, steel structure beams, steel keels, trestle boards and decorative railings are all connected by welding.

[0009] As a preferred solution of the utility model, a steel skeleton is set up inside the prestressed concrete pipe pile column, and the steel skeleton includes multiple longitudinal bars and multiple stirrups, the multiple stirrups are evenly arranged vertically inside the prestressed concrete pipe pile column, and the multiple longitudinal bars are evenly arranged horizontally between two adjacent stirrups.

[0010] As a preferred solution of the utility model, the plurality of longitudinal bars and the two stirrups are arranged in an H shape, and the two ends of the plurality of longitudinal bars are connected to the two adjacent stirrups by binding.

[0011] As a preferred solution of the utility model, a micro-expansive concrete core is poured inside the steel frame.

[0012] As a preferred solution of the utility model, a connecting steel plate is welded to the top of the steel frame, and a steel supporting plate is welded to the bottom of the steel frame.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] The utility model is used in waterfront projects, and can realize water operations by means of pile-driving boats, etc., and eliminate construction measures such as cofferdam operations, construction diversion and interception, and drainage, and has no construction pollution and is low-carbon and environmentally friendly. It also combines the advantages of concrete structure, steel structure, and prefabricated components, using prestressed concrete pipe piles and columns underwater and steel structure components on the water, which not only solves the problem of difficulty in underwater corrosion resistance of steel structures, but also solves the problems of heavy weight, inconvenient construction, and quality control of traditional concrete structures. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0016] Figure 1 It is a side sectional view of a fully assembled high-pile waterfront trestle of the utility model.

[0017] Figure 2 This is a cross-sectional structural diagram of the top connection of the prestressed concrete pipe pile column of the utility model;

[0018] Figure 3 The utility model is a plan layout diagram of a fully assembled high-pile waterfront trestle.

[0019] The numbers in the figure represent the following: 1. Prestressed concrete pipe pile column; 2. Steel support plate; 3. Micro-expansive concrete core filling; 4. Connecting steel plate; 5. Steel structure beam; 6. Steel keel; 7. Pier board; 8. Decorative railing; 9. Steel skeleton; 10. Longitudinal reinforcement; 11. Stirrups. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] The following first describes the concepts involved in the present application in conjunction with the accompanying drawings. It should be noted that the following description of each concept is only to make the content of the present application easier to understand, and does not limit the scope of protection of the present application; at the same time, the embodiments and features in the embodiments of the present application can be combined with each other in the absence of conflict. The present application will be described in detail with reference to the accompanying drawings and in conjunction with the embodiments.

[0022] like Figure 1 - Figure 3 As shown, the utility model provides a fully assembled high-pile waterfront trestle, including prestressed concrete pipe pile columns 1, a steel structure beam 5 is arranged on the top of the prestressed concrete pipe pile column 1, the steel structure beam 5 includes at least two longitudinal beams 51 and multiple cross beams 52, all longitudinal beams 51 are arranged longitudinally, all cross beams 52 are arranged transversely, and multiple cross beams 52 and at least two longitudinal beams 51 are welded into a whole, the prestressed concrete pipe pile columns 1 are arranged in plurality, all prestressed concrete pipe pile columns 1 are symmetrically arranged in pairs at the bottom connection of the steel structure beam 5, a plurality of steel keels 6 are evenly arranged on the top of the steel structure beam 5, and all steel keels 6 are welded and fixed to the steel structure beam 5.

[0023] All the steel keels 6 are paved with trestle boards 7 , and the trestle boards 7 are prefabricated with patterned steel plates, tempered laminated glass, and anti-corrosion wood board materials, and decorative railings 8 are arranged on the trestle boards 7 .

[0024] The prestressed concrete pipe pile column 1, steel structure beam 5, steel keel 6, trestle board 7 and decorative railing 8 are all connected by welding. The connection between each component and the prestressed concrete pipe pile column 1 adopts the mode of field production and on-site assembly, which has the characteristics of factory prefabrication of all components, full assembly implementation, simple and efficient construction, etc., which greatly speeds up the construction progress, improves the construction environment and reduces the construction cost.

[0025] A steel skeleton 9 is arranged inside the prestressed concrete pipe pile column 1 , and the steel skeleton 9 includes a plurality of longitudinal bars 10 and a plurality of stirrups 11 . The plurality of stirrups 11 are evenly arranged vertically inside the prestressed concrete pipe pile column 1 , and the plurality of longitudinal bars 10 are evenly arranged horizontally between two adjacent stirrups 11 .

[0026] The plurality of longitudinal bars 10 and the two stirrups 11 are arranged in an H shape, and the two ends of the plurality of longitudinal bars 10 are connected to the two adjacent stirrups 11 by binding. By combining and binding the plurality of longitudinal bars 10 and the plurality of stirrups 11 to form a "reinforcement cage", the bearing capacity of the prestressed concrete pipe pile column 1 is improved, thereby improving the overall strength of the prestressed concrete pipe pile column 1, and also improving the stability and safety of the prestressed concrete pipe pile column 1.

[0027] The micro-expansive concrete core 3 is poured in the steel skeleton 9. The concrete can expand to a certain extent during the hydration period by relying on the action of the expansion agent, thereby compensating for the shrinkage of the concrete, achieving the purpose of preventing concrete cracks and improving concrete performance. The present invention sets the steel skeleton 9 in the flood level area at the top of the prestressed concrete pipe pile column 1, and adopts the micro-expansive concrete core 3, which can enhance the flood resistance, impact resistance and shear resistance of the pile column, strengthen the integrity of the connection between the prestressed concrete pipe pile column 1 and the steel structure beam 5, and enhance the safety and stability of the structure.

[0028] Furthermore, a connecting steel plate 4 is welded on the top of the steel skeleton 9, and a steel support plate 2 is welded on the bottom of the steel skeleton 9. The arrangement of the connecting steel plate 4 and the steel support plate 2 can prevent the steel structure beam 5 and the inner bottom wall of the prestressed concrete pipe pile column 1 from being squeezed when the micro-expansion concrete expands.

[0029] When constructing the waterfront trestle of this embodiment, firstly, all the prestressed concrete pipe piles 1 are used as high piles and columns, and are embedded in the foundation soil layer by hammering, static pressure, vibration pile sinking, etc., then, the longitudinal reinforcement 10 and the stirrups 11 are combined and tied to form a "reinforcement cage"-shaped steel skeleton 9, and then the tied steel skeleton 9 is placed inside the prestressed concrete pipe piles 1, and then the micro-expansion concrete core filling 3 is poured, and then the fixing plate and the steel structure beam 5 are erected on the top of the prestressed concrete pipe piles 1 and welded and fixed, and the trestle board 7 prefabricated with patterned steel plate, tempered laminated glass, and anti-corrosion wood board material is laid on the top of the steel keel 6, and the decorative railing 8 is arranged on the top of the trestle board 7, thereby completing the assembly project of the entire high-pile waterfront trestle.

[0030] Among them, the prestressed concrete pipe pile column 1 has the advantages of good mechanical properties, good anti-corrosion performance, high durability, high pile body quality, and high degree of standardization, and effectively solves the problems of large scouring depth of river foundation, scouring foundation, soft soil foundation, etc.

[0031] The pile top steel structure beam 5 is light and simple, has a strong bearing capacity, and is highly plastic, and can adapt to the setting of a trestle with a large span, multiple shapes, and multiple curves.

[0032] The utility model is used in waterfront projects, and can realize water operations by means of pile-driving boats, etc., and eliminate construction measures such as cofferdam operations, diversion and interception, and drainage, and has no construction pollution and is low-carbon and environmentally friendly. It also combines the advantages of concrete structure, steel structure, and prefabricated components, and uses prestressed concrete pipe piles 1 underwater and steel structure components on the water, which not only solves the problem of difficulty in underwater corrosion resistance of steel structures, but also solves the problems of heavy weight, inconvenient construction, and quality control of traditional concrete structures.

[0033] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and its core ideas of this application. The above is only the preferred implementation method of this application. It should be pointed out that due to the limitations of textual expression and the objective existence of infinite specific structures, ordinary technicians in this technical field can make several improvements, modifications or changes without departing from the principles of this application, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the concept and technical solution of the invention to other occasions without improvement, should be regarded as the scope of protection of this application.

Claims

1. A fully assembled high-pile waterfront trestle, comprising prestressed concrete pipe piles (1), characterized in that: A steel structure beam (5) is arranged on the top of the prestressed concrete pipe pile column (1), the steel structure beam (5) comprising at least two longitudinal beams (51) and a plurality of transverse beams (52), all of the longitudinal beams (51) are arranged longitudinally, all of the transverse beams (52) are arranged transversely, and the plurality of transverse beams (52) and at least two longitudinal beams (51) are welded to form a whole, the prestressed concrete pipe pile column (1) is arranged in plurality, all of the prestressed concrete pipe pile columns (1) are symmetrically arranged in pairs at the bottom connection of the steel structure beam (5), a plurality of steel keels (6) are evenly arranged on the top of the steel structure beam (5), and all of the steel keels (6) are welded and fixed to the steel structure beam (5).

2. A fully assembled high-pile waterfront trestle according to claim 1, characterized in that: All the steel keels (6) are paved with trestle boards (7), and the trestle boards (7) are prefabricated from patterned steel plates, tempered laminated glass, and anti-corrosion wood boards. Decorative railings (8) are provided on the trestle boards (7).

3. A fully assembled high-pile waterfront trestle according to claim 1, characterized in that: The prestressed concrete pipe pile column (1), the steel structure beam (5), the steel keel (6), the trestle board (7) and the decorative railing (8) are all connected by welding.

4. A fully assembled high-pile waterfront trestle according to claim 1, characterized in that: A steel frame (9) is arranged inside the prestressed concrete pipe pile column (1), the steel frame (9) comprising a plurality of longitudinal bars (10) and a plurality of stirrups (11), the plurality of stirrups (11) being evenly arranged vertically inside the prestressed concrete pipe pile column (1), and the plurality of longitudinal bars (10) being evenly arranged horizontally between two adjacent stirrups (11).

5. A fully assembled high-pile waterfront trestle according to claim 4, characterized in that: The plurality of longitudinal bars (10) and the two stirrups (11) are arranged in an H shape, and the two ends of the plurality of longitudinal bars (10) are connected to the two adjacent stirrups (11) by binding.

6. A fully assembled high-pile waterfront trestle according to claim 4, characterized in that: A micro-expansive concrete core (3) is poured inside the steel frame (9).

7. A fully assembled high-pile waterfront trestle according to claim 4, characterized in that: A connecting steel plate (4) is welded to the top of the steel reinforcement frame (9), and a steel support plate (2) is welded to the bottom of the steel reinforcement frame (9).