Auxiliary device for conveniently erecting and disassembling steel pipe scaffold

By designing a steel pipe scaffolding auxiliary device including a fixed rod, steering lever, and U -shaped card hoop, it solves the problem of high difficulty, slow speed, and high danger of disassembly and demolition. Installation process.

CN222390967UActive Publication Date: 2025-01-24GUANGZHOU MUNICIPAL ENG MASCH CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421053430.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-01-24
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

During construction, the installation and demolition of steel pipe scaffolding is difficult, slow and dangerous, especially in high altitude operations.

Method used

Design a convenient disassembly auxiliary device including fixed rods, steering rods, and U -shaped card holes. By cooperating with the swinging and turning parts, the horizontal steering and vertical opposite of the steel pipe are achieved, and the installation process of the steel pipe is simplified.

Benefits of technology

The difficulty of installation is reduced, the installation efficiency and safety are improved, the processing process of the scaffold is simplified, and the risk of high -altitude operations is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390967U_ABST
    Figure CN222390967U_ABST
Patent Text Reader

Abstract

The utility model relates to a convenient auxiliary device for erecting and disassembling a steel pipe scaffold. The convenient auxiliary device comprises a fixed rod, a steering rod and a U-shaped hoop, the steering rod comprises a rotating rod and a middle rod which are sequentially arranged in the length direction. The fixing rod is arranged in the vertical direction, the middle rod is located behind the fixing rod and connected with the fixing rod through a swing part, and therefore the steering rod swings in a plane limited in the vertical direction and the left-right direction. The rotating rod and the middle rod are connected through a rotating part, and when the middle rod rotates to be overlapped with the fixed rod, the rotating rod rotates in a plane limited by front, back, left and right, so that the at least two U-shaped hoops mounted on the rotating rod rotate to be over against the at least two U-shaped hoops mounted on the front side of the fixed rod up and down. The utility model can reduce the installation difficulty, is easy to operate, improves the installation efficiency, improves the safety, and belongs to the technical field of building construction auxiliary equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to building construction auxiliary equipment, in particular to a convenient erection and dismantling auxiliary device for a steel pipe scaffold, which is especially suitable for erection and dismantling of scaffolding projects in the field of construction. Background Art

[0002] During the construction of scaffolding projects, the difficulty of erection and the high risk of high-altitude operations have been listed as key control sources of danger for the project. Its operators need to be trained and assessed by professional institutions and hold special operation certificates before they can take up their posts.

[0003] At present, the steel pipes used to erect steel pipe scaffolding are generally 48mm in diameter, with a wall thickness of 2.7mm to 3.5mm. The vertical poles used for erection are generally 6m long and weigh about 30kg. Due to the linear structure of the steel pipe, the scaffolder holds the horizontal steel pipe in the middle of the work area with both hands and lifts it up, rotates it 90 degrees and stands it upright. Generally, the steel pipe is moved up by clever force until the part near the lower end is held with both hands, and then it is overlapped on the installed vertical pole. The installation process is difficult, slow and dangerous in high-altitude operations.

[0004] Therefore, a structure for assisting the erection of steel pipes is needed to reduce the construction difficulty, increase the construction speed and improve the safety. Utility Model Content

[0005] In view of the technical problems existing in the prior art, the purpose of the utility model is to provide a convenient erection and dismantling auxiliary device for a steel pipe scaffolding, which assists in erecting or laying down steel pipes to ensure construction safety.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A convenient erection and dismantling auxiliary device for a steel pipe scaffold comprises a fixed rod, a steering rod and a U-shaped clamp; the steering rod comprises a rotating rod and an intermediate rod sequentially arranged along the length direction; the fixed rod is arranged along the up-down direction, the intermediate rod is located behind the fixed rod and connected to the fixed rod through a swinging part, so that the steering rod swings within a plane defined in the up-down, left-right and right directions; the rotating rod and the intermediate rod are connected through the rotating part, and when the intermediate rod rotates to overlap with the fixed rod, the rotating rod rotates within a plane defined in the front, back, left and right directions, so that at least two U-shaped clamps installed on the rotating rod rotate to be vertically opposite to at least two U-shaped clamps installed on the front side of the fixed rod.

[0008] As a preference, the swinging portion is located at the lower end of the fixed rod and also at the end of the middle rod.

[0009] As a preferred embodiment, the middle rod is a rod with a rectangular cross-section, and a rectangular notch is provided on the front side of one end of the middle rod. When the middle rod is rotated to overlap with the fixed rod, the fixed rod is located in the rectangular notch; the rotating rod is a rod with a rectangular cross-section; the fixed rod is a rod with a rectangular cross-section.

[0010] As a preference, the swinging portion is a hinged structure.

[0011] As a preferred embodiment, the rotating part includes a rotating rod rotating block, an intermediate rod rotating block, and a plug-in shaft; the rotating rod and the rotating rod rotating block are L-shaped, the intermediate rod and the intermediate rod rotating block are L-shaped, and the rotating rod rotating block and the intermediate rod rotating block are rotatably connected via the plug-in shaft.

[0012] As a preferred embodiment, a circular arc groove for accommodating the circular steel pipe is provided in the U-shaped clamp.

[0013] As a preference, there are two U-shaped clamps on the rotating rod, and there are two U-shaped clamps on the fixed rod.

[0014] As a preferred embodiment, the fixed rod, the intermediate rod, the rotating rod and the U-shaped clamp are all made of steel.

[0015] The principle of the utility model is to set a swing part and a rotating part, the swing part is used for turning the steel pipe, and the rotating part is used for aligning the steel pipe, thereby changing the horizontal steel pipe into a vertical one, and then aligning the vertical steel pipe with the installed vertical steel pipe up and down.

[0016] The utility model has the following advantages:

[0017] 1. Reduce the difficulty of installation, easy to operate, improve installation efficiency and safety. During the scaffolding process, in order to ensure the integrity and stability of the vertical pole (vertical steel pipe), the vertical pole is usually a 6m long steel pipe. The longer pole body and the larger linear weight distribution make it more difficult and dangerous for the scaffold workers to install the vertical pole extension. This auxiliary device can help avoid the above problems.

[0018] 2. Set up U-shaped clamps to ensure that the use requirements are met while improving assembly and disassembly efficiency.

[0019] 3. Two U-shaped clamps are set on both the rotating rod and the fixed rod to ensure a more reliable connection between the auxiliary device and the steel pipe, ensuring safety during operation.

[0020] 4. A multi-link system consisting of three rods, a swing part and a rotating part is used to achieve horizontal and vertical rotation, so that the horizontal steel pipe can be smoothly extended on the vertical pole. It has a simple structure and is easy to operate.

[0021] 5. The upper and lower sets of U-shaped clamps are facing each other, so the steel pipe to be installed can be adjusted to the same axis as the vertical pole, which is convenient for direct connection with fasteners. This ensures the convenience of installation.

[0022] 6. This device provides a better fixing method for scaffolders during the installation of steel pipe scaffolding, which can free up one hand for scaffolders to improve efficiency and safety.

[0023] 7. This device adopts a folding structure, is small in size and easy to carry. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the installation of the horizontal steel pipe of the auxiliary device.

[0025] Figure 2 It is a schematic diagram of the auxiliary device erecting the horizontal steel pipe.

[0026] Figure 3 It is a schematic diagram of the auxiliary device for vertically aligning the steel pipe.

[0027] Figure 4 It is a three-dimensional diagram of the auxiliary device.

[0028] Figure 5 It is a positive attempt of the assist device.

[0029] Figure 6 is a top view of the auxiliary device.

[0030] Figure 7 It is a left side view of the auxiliary device.

[0031] Among them, 1-rotating rod, 2-middle rod, 3-fixed rod, 4-swinging part, 5-rotating part, 6-U-shaped clamp, 7-vertical rod, 8-steel pipe to be installed, 9-rotating rod rotating block, 10-fixed rod rotating block, 11-plug-in shaft, 12 rectangular notch. DETAILED DESCRIPTION

[0032] The present invention will be further described in detail below in conjunction with specific implementation methods.

[0033] A convenient erection and dismantling auxiliary device for a steel pipe scaffold comprises a fixed rod, a steering rod and a U-shaped clamp; the steering rod comprises a rotating rod and an intermediate rod sequentially arranged along the length direction; the fixed rod is arranged along the up-down direction, the intermediate rod is located behind the fixed rod and connected to the fixed rod through a swinging part, so that the steering rod swings within a plane defined in the up-down, left-right and right directions; the rotating rod and the intermediate rod are connected through the rotating part, and when the intermediate rod rotates to overlap with the fixed rod, the rotating rod rotates within a plane defined in the front, back, left and right directions, so that at least two U-shaped clamps installed on the rotating rod rotate to be vertically opposite to at least two U-shaped clamps installed on the front side of the fixed rod.

[0034] The swinging part is located at the lower end of the fixed rod and also at the end of the intermediate rod.

[0035] The middle rod is a rod with a rectangular cross section. Figure 6 As shown, a rectangular notch is provided on the front side of one end of the middle rod. When the middle rod is rotated to overlap with the fixed rod, the fixed rod is located in the rectangular notch. The rotating rod is a rod with a rectangular cross section. The fixed rod is a rod with a rectangular cross section.

[0036] The swinging part is a hinged structure.

[0037] The rotating part includes a rotating rod rotating block, an intermediate rod rotating block, and a plug-in shaft; the rotating rod and the rotating rod rotating block are L-shaped, the intermediate rod and the intermediate rod rotating block are L-shaped, and the rotating rod rotating block and the intermediate rod rotating block are rotatably connected through the plug-in shaft. Figure 5 In the embodiment, the rotating block of the rotating rod is located at a side where the rotating rod rotates clockwise, and the rotating block of the intermediate rod is located at a side where the intermediate rod rotates clockwise.

[0038] An arc-shaped groove for accommodating a circular steel pipe is arranged in the U-shaped clamp, and gripping parts are formed at both ends of the U-shaped clamp. The steel pipe is clamped into the arc-shaped groove to complete the connection between the steel pipe and the device. Figure 5 In the embodiment of the present invention, the U-shaped clamp is located on the side where the rotating rod rotates counterclockwise.

[0039] Figure 4 As shown, preferably, the number of U-shaped clamps on the rotating rod is two, and the number of U-shaped clamps on the fixed rod is two, which are used to ensure the reliability of the connection between the auxiliary device and the steel pipe and prevent instability.

[0040] The fixed rod, the intermediate rod, the rotating rod and the U-shaped clamp are all made of steel.

[0041] The installation method is as follows:

[0042] The fixed rod is connected to the vertical pole of the scaffolding system (the installed vertical steel pipe), and the rotating rod is connected to the horizontal steel pipe to be installed. Manually rotate the steel pipe to be installed and the turning rod, and use the swing part to turn the steel pipe to vertical. Rotate the steel pipe and the rotating rod, and use the rotating part to make the steel pipe and the vertical pole on the same vertical line, adjust the up and down position of the steel pipe, and use the through-length fastener to fix the steel pipe and the vertical pole. After the fixation is completed, remove the auxiliary device and proceed to the next vertical pole extension installation.

[0043] The utility model is used for assisting the installation of upright poles during the erection of steel pipe scaffolding, and can assist in erecting heavier steel pipes more quickly. It is applicable to the erection of external scaffolding work platforms in housing construction, municipal administration, etc., and is particularly applicable to the erection of external scaffolding in high-rise housing construction projects, especially the erection and connection of vertical steel pipes, thereby improving the erection speed and safety.

[0044] The utility model has high efficiency and good safety. It can be standardized and industrialized and put into the scaffolding construction and dismantling construction at the construction site. It can effectively avoid safety problems such as people and materials falling from high altitude. It has good functionality and safety, is designed from the perspective of "people-oriented", and is easy to operate. It can be standardized and industrialized and put into on-site use.

[0045] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited by the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principle of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. A convenient erection and dismantling auxiliary device for steel pipe scaffolding, characterized in that: It includes a fixed rod, a steering rod and a U-shaped clamp; the steering rod includes a rotating rod and an intermediate rod arranged in sequence along the length direction; the fixed rod is arranged along the up-down direction, the intermediate rod is located behind the fixed rod and connected to the fixed rod through a swinging part, so that the steering rod swings in a plane defined in the up-down, left-right and right directions; the rotating rod and the intermediate rod are connected through the rotating part, when the intermediate rod rotates to overlap with the fixed rod, the rotating rod rotates in a plane defined in the front, back, left and right directions, so that at least two U-shaped clamps installed on the rotating rod rotate to be directly opposite to at least two U-shaped clamps installed on the front side of the fixed rod.

2. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: The swinging part is located at the lower end of the fixed rod and also at the end of the intermediate rod.

3. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 2, characterized in that: The middle rod is a rod with a rectangular cross section, and a rectangular notch is provided on the front side of one end of the middle rod. When the middle rod is rotated to overlap with the fixed rod, the fixed rod is located in the rectangular notch; the rotating rod is a rod with a rectangular cross section; the fixed rod is a rod with a rectangular cross section.

4. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: The swinging part is a hinged structure.

5. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: The rotating part includes a rotating rod rotating block, an intermediate rod rotating block, and a plug-in shaft; the rotating rod and the rotating rod rotating block are L-shaped, the intermediate rod and the intermediate rod rotating block are L-shaped, and the rotating rod rotating block and the intermediate rod rotating block are rotatably connected through the plug-in shaft.

6. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: An arc-shaped groove for accommodating the round steel pipe is arranged inside the U-shaped clamp.

7. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: The number of U-shaped clamps on the rotating rod is two, and the number of U-shaped clamps on the fixed rod is two.

8. A convenient steel pipe scaffolding erection and dismantling auxiliary device according to claim 1, characterized in that: The fixed rod, the intermediate rod, the rotating rod and the U-shaped clamp are all made of steel.