Geological hammer for geological mineral exploration

Through the designable connection rod and installation barrel structure, the problem of inconvenience and storage space of existing geological hammer is solved, and the stability of the convenient storage and use of geological hammer is realized.

CN222405545UActive Publication Date: 2025-01-28青海省第一地质勘查院
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421162078.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-01-28
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

The hammer head and hammer handle of the existing geological hammer are integrally forged, and the hammer handle is fixed in length, which makes it occupy a large storage space when carrying and is inconvenient for storage.

Method used

The geological hammer of the geological mineral survey is designed. By installing the combined structure of the bucket and the connecting rod, the connector can be stored in the installation barrel to reduce the overall length, and the design of the threaded pole and the anti -pine ring can ensure that the connector rod is used when used in use. Stability.

Benefits of technology

The convenient storage and storage of geological hammer is realized, reducing the storage space requirements during carrying, and at the same time, the reliability of use is increased by anti -pine design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222405545U_ABST
    Figure CN222405545U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of geological exploration, and particularly relates to a geological hammer for geological mineral exploration. Comprising a mounting barrel, a connecting rod is slidably assembled in the mounting barrel, a hammer head body is fixedly mounted at the upper end of the connecting rod, a threaded hole is formed in the lower portion of the front side of the connecting rod, and a threaded through hole matched with the threaded hole in position is formed in the upper portion of the front side of the mounting barrel; a round screwing block is fixedly mounted at the front end of the threaded rod, an anti-loosening ring matched with the threaded through hole in position is fixedly mounted on the upper portion of the front side of the mounting barrel, a plurality of triangular grooves are formed in the periphery of the anti-loosening ring in a surrounding mode, and a connecting mechanism connected with the anti-loosening ring is arranged on the side, close to the mounting barrel, of the round screwing block. The geological hammer is simple in structure and reasonable in design, the overall length of the geological hammer can be reduced when the geological hammer is used, the required storage space is reduced, and the geological hammer is more convenient to carry and store.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of geological exploration, and in particular relates to a geological hammer for geological and mineral exploration. Background Art

[0002] Geology mainly refers to the composition, structure and construction of the earth's materials, while geological exploration is an investigation activity that uses various means and methods to survey and detect the geology to determine the appropriate bearing layer, determine the foundation type according to the bearing capacity of the bearing layer foundation, and calculate the foundation parameters. This can help develop minerals and determine the quality and quantity of minerals. A geological hammer is used in geological and mineral exploration. The geological hammer mainly consists of a hammer head and a hammer handle. One end of the hammer head is a blunt surface for striking rocks, and the other end is a blade surface for cutting rocks. In the prior art, the hammer head and the hammer handle of a geological hammer are often forged as one piece, and the length of the hammer handle is fixed and cannot be retracted and stored. Therefore, when carried out, it takes up more storage space. For this reason, we propose a geological hammer for geological and mineral exploration to solve the above problems. Utility Model Content

[0003] The utility model aims to provide a geological hammer for geological and mineral exploration, which can reduce the overall length of the geological hammer when in use, reduce the required storage space, and is more convenient to carry and store.

[0004] In order to achieve the above technical purpose, the technical solution adopted by the utility model is as follows:

[0005] A geological hammer for geological and mineral exploration comprises a mounting barrel, a connecting rod is slidably mounted inside the mounting barrel, a hammer body is fixedly mounted on the upper end of the connecting rod, one end of the hammer body is a blunt surface for hammering, and the other end is a blade surface for cutting, a threaded hole is provided at the lower front part of the connecting rod, a threaded through hole matching the position of the threaded hole is provided at the upper front part of the mounting barrel, a threaded rod is threadedly connected inside the threaded through hole, one end of the threaded rod is threadedly connected to the threaded hole, the threaded rod can lock and limit the position of the connecting rod, a circular twisting block is fixedly mounted at the front end of the threaded rod, the circular twisting block can drive the threaded rod to rotate in the forward and reverse directions, an anti-loosening ring matching the position of the threaded through hole is fixedly mounted on the upper front part of the mounting barrel, a plurality of triangular grooves are arranged around the anti-loosening ring, a connecting mechanism connected to the anti-loosening ring is provided on the side of the circular twisting block close to the mounting barrel, the connecting mechanism can be connected to the anti-loosening ring, so as to prevent the threaded rod from loosening.

[0006] As a preferred technical solution, the connecting mechanism includes a connecting block, a circular twisting block is eccentrically provided with a mounting groove on the side close to the mounting barrel, the connecting block is slidably assembled inside the mounting groove, a bevel is provided on the side close to the anti-loosening ring of the connecting block, one end of the connecting block is inserted into one of the triangular grooves, two springs are fixedly installed on the front side of the connecting block, one end of the two springs are fixedly connected to the inner wall of the mounting groove, and a driving component connected to the connecting block is provided on the front side of the circular twisting block.

[0007] As a preferred technical solution, the driving component includes a connecting rope, a circular groove is provided on the front side of the circular twisting block, a circular block is rotatably assembled inside the circular groove, a limit block is fixedly installed on the inner wall of the circular groove, a storage groove matching the position of the limit block is provided on the front side of the circular block, the connecting rope is fixedly installed on the front side of the connecting block, one end of the connecting rope is fixedly connected to the rear side of the circular block, and a twisting block is provided on the front side of the circular block.

[0008] As a preferred technical solution, an anti-slip sleeve is provided on the periphery of the installation barrel, and an anti-slip sleeve rope is provided on the lower side of the periphery of the installation barrel.

[0009] When the utility model is in use, the connecting rod can be stored, the overall length of the geological hammer can be reduced, and it is more convenient to store it. When the geological hammer needs to be used, after the threaded rod is connected to the threaded hole, it is connected to the anti-loosening ring through the connecting mechanism, which has the effect of preventing the threaded rod from loosening and increases the reliability of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The present invention can be further described by the non-limiting embodiments given in the accompanying drawings.

[0011] Figure 1 This is a schematic diagram of the structure of a geological hammer for geological and mineral exploration in this utility model. Figure 1 ;

[0012] Figure 2 This is a schematic diagram of the partial cross-section structure of a geological hammer for geological and mineral exploration according to the utility model;

[0013] Figure 3 for Figure 2 A schematic diagram of the enlarged structure at point A;

[0014] Figure 4 This is a schematic diagram of the structure of a geological hammer for geological and mineral exploration in this utility model. Figure 2 ;

[0015] Figure 5 This is a schematic diagram of the structure of a geological hammer for geological and mineral exploration in this utility model. Figure 3 .

[0016] The main component symbols are described as follows:

[0017] Install barrel 1, connecting rod 11, hammer body 12, threaded hole 13, threaded rod 14, circular twisting block 15, anti-loosening ring 16, triangular groove 17, connecting block 18, installation groove 19, inclined surface 20, spring 21, limit block 22, round block 23, storage groove 24, connecting rope 25, twisting block 26, anti-slip sleeve 27, anti-dropping sleeve rope 28. DETAILED DESCRIPTION

[0018] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0019] like Figure 1-5 As shown, a geological hammer for geological and mineral exploration of the utility model comprises a mounting barrel 1, a connecting rod 11 is slidably mounted inside the mounting barrel 1, a hammer head body 12 is fixedly mounted on the upper end of the connecting rod 11, a threaded hole 13 is opened at the lower front part of the connecting rod 11, a threaded through hole matching the position of the threaded hole 13 is opened at the upper front part of the mounting barrel 1, a threaded rod 14 is threadedly connected inside the threaded through hole, one end of the threaded rod 14 is threadedly connected to the threaded hole 13, a circular twisting block 15 is fixedly mounted at the front end of the threaded rod 14, an anti-loosening ring 16 matching the position of the threaded through hole is fixedly mounted on the upper front part of the mounting barrel 1, a plurality of triangular grooves 17 are opened around the anti-loosening ring 16, and a connecting mechanism connected to the anti-loosening ring 16 is provided on the side of the circular twisting block 15 close to the mounting barrel 1.

[0020] When the geological hammer is not needed, the connecting rod 11 is stored in the installation barrel 1, and the connecting rod 11 and the installation barrel 1 as a whole constitute the handle of the geological hammer. The stored connecting rod 11 can reduce the overall length of the geological hammer, making it more convenient to carry and store, and reducing the required storage space. The threaded rod 14 abuts against the front side of the connecting rod 11, and the connecting rod 11 is fixed by the abutting force to prevent the connecting rod 11 from extending out of the installation barrel 1. When the hammer head body 12 needs to be used, the staff rotates the circular twisting block 15 to cancel the abutment between the threaded rod 14 and the connecting rod 11, and pulls the rope connecting rod 11 upwards to make the threaded hole 13 opened in the connecting rod 11 and the connecting rod 11 engage with the threaded hole 13 opened in the connecting rod 11. The threaded through holes are aligned, and the staff rotates the circular twisting block 15 again. The circular twisting block 15 drives the threaded rod 14 to be threadedly connected with the threaded hole 13 opened by the connecting rod 11, so that the connecting rod 11 can be fixed. At the same time, the connecting mechanism will be connected to one of the triangular grooves 17 of the relaxation ring 16 to avoid the vibration caused by the geological hammer when hammering, which may cause the threaded connection between the threaded rod 14 and the connecting rod 11 to loosen, thereby increasing the reliability of use. When the geological hammer is not needed in the future, the connection of the connecting mechanism is preferentially released, and then the threaded rod 14 is rotated again to push out the connection with the threaded hole 13, which is convenient to operate.

[0021] The connecting mechanism includes a connecting block 18, and a mounting groove 19 is eccentrically provided on the side of the circular twisting block 15 close to the mounting barrel 1. The connecting block 18 is slidably assembled inside the mounting groove 19. A slope 20 is provided on the side of the connecting block 18 close to the anti-loosening ring 16. One end of the connecting block 18 is inserted into one of the triangular grooves 17. Two springs 21 are fixedly installed on the front side of the connecting block 18. One end of the two springs 21 is fixedly connected to the inner wall of the mounting groove 19. A driving component connected to the connecting block 18 is provided on the front side of the circular twisting block 15.

[0022] like Figure 2 and Figure 3 As shown, when the staff rotates the threaded rod 14 to enter the threaded hole 13, due to the action of the spring 21, the connecting block 18 will always maintain contact with the loosening ring 16. At the same time, when the threaded rod 14 is rotated in the tightening direction, the inclined surface 20 provided by the connecting block 18 will continue to abut against the inclined surface of the triangular groove 17 as the circular screwing block 15 rotates. Therefore, the triangular groove 17 will not cause any obstacle to the circular screwing block 15 in the tightening direction. After the threaded rod 14 is tightened, one side of the connecting block 18 will abut against the vertical sides of one of the triangular grooves 17. Therefore, the threaded rod 14 cannot be directly loosened and can only rotate in one direction. Due to the setting of the spring 21, even if vibration occurs, the connecting block 18 will still always maintain contact with the triangular groove 17, thereby preventing the threaded rod 14 from loosening. When the lock is subsequently released, it is only necessary to use the driving assembly to pull the connecting block 18 back into the installation groove 19. It is convenient to use.

[0023] The driving component includes a connecting rope 25, a circular groove is provided on the front side of the circular twisting block 15, a circular block 23 is rotatably assembled inside the circular groove, a limit block 22 is fixedly installed on the inner wall of the circular groove, a storage groove 24 matching the position of the limit block 22 is provided on the front side of the circular block 23, the connecting rope 25 is fixedly installed on the front side of the connecting block 18, one end of the connecting rope 25 is fixedly connected to the rear side of the circular block 23, and a twisting block 26 is provided on the front side of the circular block 23.

[0024] When in use, the staff only needs to turn the twisting block 26, and the connecting rope 25 can pull the connecting block 18 to move, so that the connecting block 18 is stored in the installation groove 19 until the inner wall of one side of the storage groove 24 abuts against the limit block 22. The staff continues to twist the block 26 to drive the circular twisting block 15 to rotate in the loosening direction. No additional operation is required, and it is easy to use.

[0025] An anti-skid sleeve 27 is provided around the installation barrel 1, and an anti-slip rope 28 is provided on the lower side of the installation barrel 27; the anti-skid sleeve 27 is convenient for the staff to hold and has an anti-skid effect, and the anti-slip rope 28 can be put on the staff's hand to prevent the geological hammer from being thrown out.

[0026] According to the above overall description, the utility model can store the connecting rod 11 when in use, thereby reducing the overall length of the geological hammer and making it easier to store. When the geological hammer needs to be used, after the threaded rod 14 is connected to the threaded hole 13, it is connected to the anti-loosening ring 16 through the connecting mechanism, thereby preventing the threaded rod 14 from loosening and increasing the reliability of use.

[0027] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the relevant technical field without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. A geological hammer for geological and mineral exploration, including a mounting barrel, characterized in that: A connecting rod is slidably assembled inside the mounting barrel, a hammer head body is fixedly mounted on the upper end of the connecting rod, a threaded hole is provided at the lower front portion of the connecting rod, a threaded through hole matching the position of the threaded hole is provided at the upper front portion of the mounting barrel, a threaded rod is threadedly connected inside the threaded through hole, one end of the threaded rod is threadedly connected to the threaded hole, a circular twisting block is fixedly mounted at the front end of the threaded rod, an anti-loosening ring matching the position of the threaded through hole is fixedly mounted on the upper front portion of the mounting barrel, a plurality of triangular grooves are provided around the anti-loosening ring, and a connecting mechanism connected to the anti-loosening ring is provided on the side of the circular twisting block close to the mounting barrel.

2. A geological hammer for geological and mineral exploration according to claim 1, characterized in that: The connecting mechanism includes a connecting block, a mounting groove is eccentrically provided on the side of the circular twisting block close to the mounting barrel, the connecting block is slidably assembled inside the mounting groove, a slope is provided on the side of the connecting block close to the anti-loosening ring, one end of the connecting block is inserted into one of the triangular grooves, two springs are fixedly installed on the front side of the connecting block, one end of the two springs are fixedly connected to the inner wall of the mounting groove, and a driving component connected to the connecting block is provided on the front side of the circular twisting block.

3. A geological hammer for geological and mineral exploration according to claim 2, characterized in that: The driving component includes a connecting rope, a circular groove is provided on the front side of the circular twisting block, a circular block is rotatably assembled inside the circular groove, a limit block is fixedly installed on the inner wall of the circular groove, a storage groove matching the position of the limit block is provided on the front side of the circular block, the connecting rope is fixedly installed on the front side of the connecting block, one end of the connecting rope is fixedly connected to the rear side of the circular block, and a twisting block is provided on the front side of the circular block.

4. A geological hammer for geological and mineral exploration according to claim 1, characterized in that: The periphery of the installation barrel is provided with an anti-slip sleeve, and the lower side of the periphery of the installation barrel is provided with an anti-slip sleeve rope.