Through the combination of the rotary grille machine and the overcurrent sink in the sewage improvement equipment, the automatic residue and slag delivery of the sewage are realized, and the coordination of the lift and the residue box can be automated. The problem of processing equipment in dregs treatment has improved the automation and safety of the equipment.

CN222413394UActive Publication Date: 2025-01-28SHANGHAI YIKE GREEN ENG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421203143.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-01-28
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The existing integrated prefabricated pump stations are difficult to effectively isolate and deliver slag when pretreatment and lifting of sewage, resulting in easy blockage of lifting pumps, and operation and maintenance personnel face safety risks and high manual consumption.

Method used

设计了一种一体式污水提升设备,采用回转式格栅机与过流水槽结合,通过回转式格栅机的底部与入水管口连接,实现污水的自动隔渣和送渣,并通过升降机和 The cooperation of the slag boxes can be cleaned up to automate the residue.

Benefits of technology

Effectively solve the problem of residual cutting and cleaning up, reduce the manual consumption of operation and maintenance, reduce the safety risk of operation, ensure that the pump is not easy to stain, and improves the automation level of sewage treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413394U_ABST
    Figure CN222413394U_ABST
Patent Text Reader

Abstract

The utility model relates to integrated sewage lifting equipment which comprises an equipment main body, and a water inlet pipe opening and a water outlet pipe opening are respectively formed in the equipment main body; comprising a water-proof baffle, and an overflow water groove is formed between the water-proof baffle and the side wall of main equipment; comprising a rotary grillage machine, a part of the rotary grillage machine is arranged in an overflow water tank, and the bottom of the rotary grillage machine is connected with a water inlet pipe opening; a slag discharging opening is formed in the top of the rotary grillage machine, an opening of the slag discharging opening faces downwards, a slag receiving box is arranged at the bottom of the slag discharging opening, and the slag receiving box is used for receiving slag discharged from the slag discharging opening. According to the utility model, the slag can be separated and extracted through the rotary grillage machine, and the slag can be discharged from the slag discharge port. Due to the fact that the rotary grillage machine is a low-speed operation device, the working state of the rotary grillage machine is stable, the slag intercepting effect is far better than that of a manual grillage and a smashing type grillage, and the rotary grillage machine has the automatic slag lifting function, the situation that follow-up equipment is polluted and blocked due to too much slag can be perfectly solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage lifting equipment, in particular to an integrated sewage lifting equipment. Background Art

[0002] The integrated prefabricated pump station commonly seen on the market is an underground integrated equipment used to lift sewage, rainwater and wastewater. The main structure is a cylindrical barrel (for example, CN 110565789 A), and the outer shell is mostly made of fiberglass. A manual grille (or electric crushing grille), sewage lifting pump, pipe valve, ladder, grille maintenance platform, etc. are installed inside, and a barrel cover and an electric control cabinet are installed outside.

[0003] The biggest difficulty of common integrated prefabricated pump stations when used for sewage pretreatment and lifting is the slag removal problem. Due to the structure of the equipment itself, when sewage enters the pump station barrel through the buried sewage pipe, the slag in the sewage can only be intercepted by a small manual screen (or electric crushing screen). When using a manual screen, the slag box will be filled with slag quickly, and it needs to be manually lifted to the outside of the barrel, and then manually removed from the slag box. When manually pulling up the slag box, there is inevitably a safety risk of working on the edge. When the manual slag removal is not timely, the slag will be washed into the pump station by the water from the larger gap in the slag box, which can easily cause the lifting pump to be blocked.

[0004] When using an electric crushing screen, although most of the soft impurities will be crushed, the crushed granular residue will still block the lift pump or enter the subsequent sewage treatment facilities, causing cumulative pollution blockage to subsequent equipment. Once encountering hard residue, the blades of the crushing screen are easily damaged, and because the screen is installed deep below the ground (usually the lowest point of the sewage pipe network in the area), it brings great difficulties to equipment maintenance.

[0005] Since the above-mentioned two types of grilles have their own problems, it is very easy for debris to accumulate in the barrel of a conventional integrated pump station, and ultimately manual cleaning is required. The cleaning operation will inevitably involve dangerous operations such as climbing, temporary use of electricity, and toxic and harmful spaces, which poses certain risks to the personal safety and occupational health of the operation and maintenance personnel.

[0006] In summary, there is a need for an integrated equipment that can effectively and automatically separate and transport slag and ensure that the lifting pump is not easily blocked by dirt, so as to significantly reduce the consumption of operation and maintenance manpower and reduce operational safety risks. Utility Model Content

[0007] In view of the technical difficulties in the above-mentioned prior art of clothing washing wastewater treatment, the purpose of the utility model is to provide an integrated sewage lifting equipment, which can effectively and automatically separate and transport slag, and ensure that the lifting pump is not easily blocked by dirt, so as to greatly reduce the consumption of operation and maintenance manpower and reduce the safety risks of operations.

[0008] To achieve the above-mentioned purpose and other related purposes, the utility model provides an integrated sewage lifting equipment, including an equipment main body, on which a water inlet and a water outlet are respectively provided; including a water-blocking baffle, a water flow trough is formed between the water-blocking baffle and the side wall of the main equipment; including a rotary screen machine, a part of which is arranged in the water flow trough, and the bottom of the rotary screen machine is connected to the water inlet; a slag discharge port is provided on the top of the rotary screen machine, the opening of the slag discharge port faces downward, a slag receiving box is provided at the bottom of the slag discharge port, and a slag receiving box is also included for receiving slag discharged from the slag discharge port.

[0009] In some embodiments of the present invention, the height of the water-blocking baffle is higher than the height of the water inlet pipe.

[0010] In some embodiments of the present invention, a connecting plate is further included, and the bottom of the rotary grill machine and the water inlet are connected via the connecting plate.

[0011] In some embodiments of the utility model, a maintenance platform is further provided in the main body of the equipment, on which a slide rail is provided, and a lift is also included. The lift can slide toward or away from the rotary screen machine relative to the slide rail, and the slag box is arranged on the lift.

[0012] In some embodiments of the present invention, the size of the slag receiving box is larger than the size of the slag discharge port.

[0013] In some embodiments of the utility model, a lifting pump group is further included, wherein the lifting pump group is connected to the overflow water tank, and the water outlet is connected to the lifting pump group.

[0014] In some embodiments of the present invention, a maintenance ladder is also provided in the equipment body.

[0015] In some embodiments of the present invention, a device top cover is provided on the device body.

[0016] In some embodiments of the utility model, a side of the water-blocking baffle away from the water flow channel is provided with a plurality of internal reinforcing ribs; and a bottom of the equipment body is provided with a plurality of bottom reinforcing ribs.

[0017] In some embodiments of the present invention, an electric control box is also included, and the electric control box is electrically connected to the rotary grille machine and the elevator respectively.

[0018] The above technical solution has the following technical effects:

[0019] The integrated sewage lifting equipment provided by the utility model is a new type of underground automatic slag separation, slag delivery and sewage lifting integrated equipment. Different from the conventional integrated prefabricated pump station, it has obvious advantages in slag interception and cleaning. The bottom of the rotary screen machine is connected to the water inlet. After the water enters, the slag can be separated and lifted by the rotary screen machine, and the slag can be discharged from the slag outlet. Since the rotary screen machine is a slow-running device, its own working state is stable, the slag interception effect is far better than the manual screen and the crushing screen, and it has an automatic slag lifting function, so it can perfectly solve the problem of subsequent equipment being blocked due to too much slag. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a three-dimensional structural schematic diagram of the integrated sewage lifting equipment at one angle according to an embodiment of the utility model.

[0021] Figure 2 It is a three-dimensional structural schematic diagram of the integrated sewage lifting equipment of an embodiment of the utility model from another angle.

[0022] Figure 3 It is a three-dimensional structural schematic diagram of a local structure of the integrated sewage lifting equipment of an embodiment of the utility model at one angle.

[0023] Figure 4 It is a three-dimensional structural schematic diagram of the local structure of the integrated sewage lifting equipment of an embodiment of the utility model from another angle.

[0024] Figure 5 It is a three-dimensional structural schematic diagram of the local structure (excluding the water-blocking baffle) of the integrated sewage lifting equipment of the embodiment of the utility model.

[0025] Component numbers in the drawings of this utility model:

[0026] 1. Equipment body

[0027] 11 Water inlet port

[0028] 12 Water outlet

[0029] 13 Waterproof baffle

[0030] 14 Water flow channel

[0031] 15 Connecting plate

[0032] 2 Rotary screen machine

[0033] 21 Slag discharge port

[0034] 3 Slag box

[0035] 4 Maintenance platform

[0036] 41 Slide rail

[0037] 42 Elevator

[0038] 5 Lifting pump set

[0039] 6 Maintenance ladder

[0040] 7 Equipment cover

[0041] 8 Internal reinforcement

[0042] 9 Bottom reinforcement ribs

[0043] 10 Electric control box DETAILED DESCRIPTION

[0044] In the description of the utility model, it should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of the specification are only used to match the contents disclosed in the specification for people familiar with the technology to understand and read, and are not used to limit the limiting conditions that can be implemented in the utility model, so they have no technical substantive significance. Any modification of the structure, change of the proportion relationship or adjustment of the size, without affecting the effect that the utility model can produce and the purpose that can be achieved, should still fall within the scope of the technical content disclosed in the utility model. At the same time, the directions or positional relationships indicated by the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the directions or positional relationships shown in the drawings, which are only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation to the utility model. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance.

[0045] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In addition, in the description of the present invention, unless otherwise specified, “plurality” means two or more.

[0047] like Figures 1 to 5As shown, the utility model provides an integrated sewage lifting device, including a device body 1, combined with Figure 1 and 2 The equipment body 1 is provided with a water inlet 11 and a water outlet 12; Figure 3 and 4 , including a water-blocking baffle 13, wherein a water-flowing channel 14 (such as Figure 5 );like Figure 5 , also includes a rotary screen machine 2, a part of the rotary screen machine 2 is arranged in the flow trough 14, the bottom of the rotary screen machine 2 is connected to the water inlet pipe 11; the top of the rotary screen machine 2 is provided with a slag discharge port 21, the opening of the slag discharge port 21 faces downward, and also includes a slag receiving box 3 for receiving the slag discharged from the slag discharge port 21 (the slag box 3 in the figure can move along the slide rail with the elevator, so the position is not fixed). In a specific embodiment, the opening of the slag discharge port 21 faces downward, and the slag receiving box 3 is arranged at the bottom of the slag discharge port 21 to receive the slag isolated and lifted out by the rotary screen machine 2.

[0048] In the integrated sewage lifting equipment provided by the utility model, the equipment body 1 is made of SUS304 material or carbon steel + FRP anti-corrosion, and is overall in the shape of a rectangular parallelepiped. It adopts a fully buried or semi-buried installation form, and the equipment top plate is preferably 100mm-200mm above the ground.

[0049] In the integrated sewage lifting equipment provided by the utility model, the elevation of the water inlet 11 refers to the elevation of the end of the factory sewage pipe network, and a flexible joint is provided.

[0050] In the integrated sewage lifting equipment provided by the utility model, Figure 4 and 5 The rotary screen machine 2 is in the flow groove 14 formed between the side wall of the equipment body 1 and the partition water retaining plate 13, so that all the sewage passes through the flow surface of the rotary screen machine 2, ensuring that most of the slag in the sewage is intercepted and discharged from the slag discharge port 21. The sewage flows into the flow groove 14 through the rotary screen machine 2. In order to prevent water from overflowing, the height of the water-blocking baffle 13 is higher than the height of the water inlet pipe 11.

[0051] In the integrated sewage lifting equipment provided by the utility model, the bottom of the rotary screen machine 2 can be directly connected to the water inlet 11, or it can be connected to the water inlet 11. Figure 5 By setting a connecting plate 15, the bottom of the rotary screen machine 2 and the water inlet pipe 11 are connected through the connecting plate 15, so as to ensure that the water entering from the water inlet pipe 11 first reaches the rotary screen machine 2 and then flows into the water flow trough 14.

[0052] The rotary screen machine 2 in the utility model is designed and selected according to the elevation of the water inlet 11, the sewage flow rate, and the subsequent sewage treatment requirements. For example, it can be the model: XQ0.6 of Jiangsu Boyi Environmental Protection Technology Co., Ltd. The screen gap is 3mm, the installation angle is 75°, the net width of the equipment is 600mm (adjustable according to the use conditions), the channel depth is adjusted according to the elevation of the water inlet pipe, and the power is 0.55kw.

[0053] In the integrated sewage lifting equipment provided by the utility model, Figures 3 to 5 The equipment body 1 is also provided with a maintenance platform 4, on which a slide rail 41 is provided, and a lift 42 is also provided. The lift 42 can slide relative to the slide rail 41 toward or away from the rotary screen machine 2, and the slag receiving box 3 is provided on the lift 42. In specific application, the lift 42 is first used to slide along the slide rail 41 toward the rotary screen machine 2 until the slag receiving box 3 is located directly below the slag discharge port 21. In subsequent use, it can be judged based on experience how long it will take for the slag receiving box 3 to be full. If the slag receiving box 3 is full, the lift 42 can slide along the slide rail 41 away from the rotary screen machine 2 to a certain position, and then the lift 42 is used to lift the slag receiving box 3 to the top of the equipment body 1, and the operator can take the slag receiving box 3 away from the equipment.

[0054] Optionally, the maintenance platform 4 can be arranged between the water-blocking baffle 13 and the side wall of the main equipment, for example, the maintenance platform 4 is perpendicular to the water-blocking baffle 13 , and the height of the maintenance platform 4 is level with the top of the water-blocking baffle 13 .

[0055] In the integrated sewage lifting equipment provided by the utility model, the size of the slag receiving box 3 is larger than the size of the slag discharge port 21. Optionally, the size of the side opening of the slag receiving box 3 is preferably about 20-50 mm larger than the slag discharge port 21.

[0056] In the integrated sewage lifting equipment provided by the utility model, Figure 5 , and also includes a lifting pump group 5, the lifting pump group 5 is connected to the flow trough 14, the outlet pipe 12 is connected to the lifting pump group 5, and further, a drain pipe is provided between the outlet pipe 12 and the lifting pump group 5, and the outlet pipe 12 is connected to the lifting pump group 5 through the drain pipe. When used, after the sewage passes through the rotary screen machine 2 to remove most of the slag, the sewage flows into the flow trough 14 through the rotary screen machine 2, and the sewage is pumped to the drain pipe through the lifting pump group 5, and discharged into the subsequent treatment equipment through the outlet pipe 12. The outlet pipe 12 can set the pipe mouth elevation and position according to actual needs; the lifting water pump is controlled by a float liquid level switch and automatically starts and stops.

[0057] In the integrated sewage lifting equipment provided by the utility model, Figures 3 to 5A maintenance ladder 6 is also provided in the equipment body 1. The maintenance ladder 6 is located between the rotary grille machine 2, the small lift 42 and the lifting pump group 5, which brings certain convenience to the maintenance work of the above equipment.

[0058] In the integrated sewage lifting equipment provided by the utility model, an equipment top cover 7 is provided on the equipment body 1. The design of the top cover facilitates opening / closing of the equipment body 1. A gas spring (support rod) can be provided on a larger top cover.

[0059] In the integrated sewage lifting equipment provided by the utility model, Figure 3 and 4 , a plurality of internal reinforcing ribs 8 are provided on the side of the water-blocking baffle 13 away from the water flow trough 14. Bottom reinforcing ribs 9 are provided at the bottom of the equipment body 1. The internal reinforcing ribs 8 and the bottom reinforcing ribs 9 are designed to cope with the external pressure after the equipment is buried and installed. Furthermore, each internal reinforcing rib 8 is evenly distributed on the water-blocking baffle 13. Each bottom reinforcing rib 9 is evenly distributed at the bottom of the equipment body 1.

[0060] In the integrated sewage lifting equipment provided by the utility model, Figure 1 and 2 , and also includes an electric control box 10, which is electrically connected to the rotary grille machine 2, the lift 42, and the lifting pump group 5, respectively, and is used to control the rotary grille machine 2, the lifting pump group 5, and the lift 42. Specifically, the electric control box 10 is an IP56 waterproof electric control box. It is used to control the new equipment and can install a local or remote control system according to customer needs.

[0061] The working process of the integrated sewage lifting equipment of the utility model:

[0062] After the sewage enters the equipment body 1 from the water inlet pipe 11, it passes through a rotary screen machine 2, and all the sewage passes through the flow surface of the rotary screen machine 2 to ensure that most of the slag in the sewage is intercepted and discharged from the slag discharge port 21. The sewage passes through the rotary screen flow machine 2 to the flow trough 14, and is pumped to the drain pipe through the lifting pump group 5, and then discharged through the outlet pipe 12 into the subsequent treatment equipment.

[0063] The slag is discharged from the slag discharge port 21 into the slag receiving box 3. When the slag receiving box 3 is full, the elevator 42 can slide along the slide rail 41 away from the rotary screen machine 2 to a certain position, and then the elevator 42 can be used to transport the slag receiving box 3 to the top of the equipment body 1, and the operator can take the slag receiving box 3 away from the equipment. Then, the empty slag receiving box 3 is placed on the elevator 42, and after it is lowered to a certain height, the elevator 42 slides along the slide rail 41 toward the rotary screen machine 2 until the slag receiving box 3 is located directly below the slag discharge port 21 to continue receiving slag.

[0064] In summary, the integrated sewage lifting equipment provided by the utility model is a new type of underground integrated equipment for automatic slag separation, slag delivery and sewage lifting. Different from the conventional integrated prefabricated pump station, it has obvious advantages in slag interception and cleaning. By placing a part of the rotary screen machine 2 in the flow trough 14, the bottom of the rotary screen machine 2 is connected to the water inlet 11, and after water is introduced, the slag can be separated and lifted by the rotary screen machine 2, and the slag can be discharged from the slag discharge port 21. Since the rotary screen machine 2 is a slow-running device, its own working state is stable, the slag cutting effect is far better than the manual screen and the crushing screen, and it has an automatic slag lifting function, so it can perfectly solve the problem of subsequent equipment being blocked due to too much slag.

[0065] In summary, the utility model effectively overcomes various shortcomings of the prior art and has high industrial utilization value.

[0066] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. An integrated sewage lifting device, characterized in that: It comprises a device body (1), wherein the device body (1) is provided with a water inlet pipe (11) and a water outlet pipe (12); It comprises a water-blocking baffle (13), wherein a water flow channel (14) is formed between the water-blocking baffle (13) and the side wall of the main equipment; The invention comprises a rotary screen machine (2), a part of which is arranged in a water flow trough (14), and the bottom of the rotary screen machine (2) is connected to a water inlet pipe (11); a slag discharge port (21) is arranged at the top of the rotary screen machine (2), and a slag receiving box (3) is also provided for receiving slag discharged from the slag discharge port (21).

2. The integrated sewage lifting equipment according to claim 1, characterized in that: The height of the water-blocking baffle (13) is higher than the height of the water inlet pipe opening (11).

3. The integrated sewage lifting equipment according to claim 1, characterized in that: It also comprises a connecting plate (15), through which the bottom of the rotary screen machine (2) and the water inlet pipe (11) are connected.

4. The integrated sewage lifting equipment according to claim 1, characterized in that: A maintenance platform (4) is also provided in the equipment body (1), and a slide rail (41) is provided on the maintenance platform (4). The maintenance platform (4) also includes a lift (42). The lift (42) can slide relative to the slide rail (41) toward or away from the rotary screen machine (2), and the slag receiving box (3) is arranged on the lift (42).

5. The integrated sewage lifting equipment according to claim 1, characterized in that: The size of the slag receiving box (3) is larger than the size of the slag discharge port (21).

6. The integrated sewage lifting equipment according to claim 1, characterized in that: It also comprises a lifting pump group (5), wherein the lifting pump group (5) is connected to the water flow groove (14), and the water outlet pipe (12) is connected to the lifting pump group (5).

7. The integrated sewage lifting equipment according to claim 1, characterized in that: A maintenance ladder (6) is also provided in the equipment body (1).

8. The integrated sewage lifting equipment according to claim 4, characterized in that: The device body (1) is provided with a device top cover (7).

9. The integrated sewage lifting equipment according to claim 1, characterized in that: A plurality of internal reinforcing ribs (8) are provided on the side of the water-blocking baffle (13) away from the water flow channel (14); and a plurality of bottom reinforcing ribs (9) are provided on the bottom of the equipment body (1).

10. The integrated sewage lifting equipment according to claim 1, characterized in that: It also includes an electric control box (10), wherein the electric control box (10) is electrically connected to the rotary grille machine (2) and the elevator (42) respectively.

Citation Information

Patent Citations

  • Multifunctional integrated sewage lifting pump station

    CN110565789A