Waterproof floor structure for clean workshop
By designing the waterproof floor structure used for cleaning workshop, including multi -layer structure and waterproof layer, it solves the problem of non -waterproof and antibacterials of traditional flooring, realizes higher waterproof effects and crack resistance, and meets the needs of modern production. Essence
Patent Information
- Application Number
- CN202421135959.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-23
AI Technical Summary
The traditional floor structure does not have waterproofing, which is not conducive to achieving the antibacterial requirements of the workshop and cannot meet the needs of modern production. Moreover, the ground is prone to cracks. The cracks are easily expanded due to the crushing of vehicles coming and going, and the cracks are easily expanded and destroyed the entire ground.
Design a waterproof floor structure for cleaning workshops, including vegetarian soil tuning layers, concrete cushioning, concrete structure layers, finding slopes, two layers of waterproof layers, cracking grooves and support parts, through these levels and structures, Enhance the waterproof and cracking performance of the floor.
The waterproof floor structure enhances the waterproof effect by setting up two layers of waterproof layers, avoiding the soft collapse of ground base and thermal expansion and contraction and cracking of the concrete ground, prevent the expansion of cracks, and meet the needs of modern production.
Smart Images

Figure CN222413870U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of production workshops, in particular to a waterproof floor structure for a clean workshop. Background Art
[0002] A workshop, also known as a factory building, refers to a workshop where production machinery and equipment are located, and where products are produced. The production and use of a workshop has certain requirements for the floor. A solid and flat floor can facilitate the movement of transportation equipment and the workers' sanitation and cleaning.
[0003] The traditional floor structure is not waterproof, which is not conducive to achieving the antibacterial requirements of the workshop and cannot meet the needs of modern production. In addition, the floor is mostly paved with cement, which is easily cracked due to the influence of temperature. The floor is crushed by passing vehicles, which can easily cause the cracks in the floor to increase and extend, destroying the entire floor. Therefore, we propose a waterproof floor structure for clean workshops to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide a waterproof floor structure for a clean workshop to solve the problem that the current traditional floor structure mentioned in the above background technology does not have a waterproof effect, is not conducive to achieving the antibacterial requirements of the workshop, cannot meet the needs of modern production, and the ground is mostly paved with cement, which is easily cracked due to the influence of temperature, and the floor is crushed by passing vehicles, which easily causes the cracks in the floor to increase and extend, destroying the entire ground.
[0005] To achieve the above purpose, the utility model provides the following technical solution: a waterproof floor structure for a clean workshop, comprising:
[0006] A rammed earth layer, a concrete cushion layer is laid on the rammed earth layer, a concrete structural layer is laid on the concrete cushion layer, a slope leveling layer is arranged on the concrete structural layer, a first waterproof layer is evenly applied on the slope leveling layer, a protective layer is arranged on the first waterproof layer, a filling layer is laid on the protective layer, a leveling layer is arranged on the filling layer, and a second waterproof layer is arranged on the leveling layer;
[0007] An anti-crack groove is provided inside the concrete cushion layer, and a mounting hole is provided at the top of the anti-crack groove. A support member is provided inside the anti-crack groove, and a fastening nail is fixedly connected to the bottom of the support member. A fastening bolt is installed on the top of the support member, and a rubber pad is connected to the outer side of the top of the support member.
[0008] Preferably, the ratio of the height to the horizontal length of the slope leveling layer is 2:100.
[0009] Preferably, the first waterproof layer is a synthetic resin coating.
[0010] Preferably, the second waterproof layer is a polyurea waterproof coating layer.
[0011] Preferably, the cross-section of the anti-crack groove is an inverted "convex" structure, and mounting holes are symmetrically opened on the top of the anti-crack groove.
[0012] Preferably, the support member has an I-shaped structure, and the top length of the support member is greater than the bottom length of the support member.
[0013] Preferably, the top of the support member is fixedly connected to the mounting hole on the anti-crack groove by means of a fastening bolt, and fastening nails are arranged at equal intervals below the support member.
[0014] Preferably, rubber pads are symmetrically arranged on the left and right sides of the support member, and the outer sides of the rubber pads are in contact with the concrete cushion layer.
[0015] Preferably, a slope layer, a first waterproof layer, a protective layer, a filling layer, a leveling layer and a second waterproof layer are sequentially arranged above the support member from bottom to top.
[0016] Compared with the prior art, the utility model has the following beneficial effects: the waterproof floor structure for clean workshop is provided with two waterproof layers, which increases the waterproof effect, avoids the collapse of the soft foundation, avoids the cracking of the concrete floor due to thermal expansion and contraction, and avoids the expansion of cracks;
[0017] 1. The first waterproof layer and the second waterproof layer are set. The second waterproof layer is set on the top of the floor to facilitate waterproofing and cleaning. The first waterproof layer is set in the middle of the floor to prevent leakage when the second waterproof layer is damaged and leaks. The slope layer under the first waterproof layer is convenient for the discharge of leakage.
[0018] 2. Anti-crack grooves and mounting holes are set. The anti-crack grooves are set in the concrete structure layer, which is convenient for disconnecting the concrete structure layer, thereby avoiding cracking due to thermal expansion and contraction of the concrete structure layer, and avoiding the spread of cracks in the concrete structure layer itself. The mounting holes facilitate the fixation of the support;
[0019] 3. A support is set up, and the top of the support is connected to the concrete structure layer by fastening bolts, and a rubber pad is provided at the connection to facilitate the thermal expansion and contraction of the concrete structure layer. The fastening nails under the support are convenient to increase the stability of the support, thereby ensuring the stability of the floor surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 This is a schematic diagram of the front view cutaway structure of the concrete structure layer of the utility model;
[0022] Figure 3 This is a schematic diagram of the overall structure of the concrete structure layer and the slope leveling layer connected to the utility model;
[0023] Figure 4 It is a schematic diagram of the overall structure of the support member of the utility model.
[0024] In the figure: 1. Rammed earth layer; 2. Concrete cushion layer; 3. Concrete structural layer; 4. Slope layer; 5. First waterproof layer; 6. Protective layer; 7. Filling layer; 8. Leveling layer; 9. Second waterproof layer; 10. Anti-crack groove; 11. Mounting hole; 12. Support member; 13. Fastening bolts; 14. Fastening nails; 15. Rubber pad. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] See also Figure 1-4 The utility model provides a technical solution: a waterproof floor structure for a clean workshop, comprising: a soil ramming layer 1, a concrete cushion layer 2, a concrete structure layer 3, a slope layer 4, a first waterproof layer 5, a protective layer 6, a filling layer 7, a leveling layer 8, a second waterproof layer 9, an anti-crack groove 10, a mounting hole 11, a support 12, a fastening bolt 13, a fastening nail 14 and a rubber pad 15;
[0027] A rammed earth layer 1, a concrete cushion layer 2 is laid on the rammed earth layer 1, a concrete structural layer 3 is laid on the concrete cushion layer 2, a slope layer 4 is arranged on the concrete structural layer 3, a first waterproof layer 5 is evenly applied on the slope layer 4, a protective layer 6 is arranged on the first waterproof layer 5, a filling layer 7 is laid on the protective layer 6, a leveling layer 8 is arranged on the filling layer 7, and a second waterproof layer 9 is arranged on the leveling layer 8;
[0028] An anti-crack groove 10 is provided inside the concrete cushion layer 2, and a mounting hole 11 is provided at the top of the anti-crack groove 10, a support member 12 is provided inside the anti-crack groove 10, and a fastening nail 14 is fixedly connected to the bottom of the support member 12, a fastening bolt 13 is installed on the top of the support member 12, and a rubber pad 15 is connected to the outer side of the top of the support member 12.
[0029] like Figure 1 , Figure 2 and Figure 3The ratio of the height to the horizontal length of the middle slope layer 4 is 2:100, which is convenient for the drainage of water on the slope layer 4. The first waterproof layer 5 is a synthetic resin coating to avoid water leakage. The second waterproof layer 9 is a polyurea waterproof coating layer, which is convenient for waterproofing and cleaning. The cross-section of the anti-crack groove 10 is an inverted "convex" structure, and the top of the anti-crack groove 10 is symmetrically provided with mounting holes 11, which is convenient for the thermal expansion and contraction of the concrete structure layer 3 and avoids the expansion of cracks.
[0030] like Figure 1 , Figure 2 and Figure 3 The middle support member 12 is in an "I"-shaped structure, and the top length of the support member 12 is greater than the bottom length of the support member 12, which is convenient for connecting the broken part. The top of the support member 12 is fixedly connected to the mounting hole 11 on the anti-crack groove 10 by a fastening bolt 13, and fastening nails 14 are arranged at equal intervals below the support member 12 to facilitate the fixation of the support member 12. Rubber pads 15 are symmetrically arranged on the left and right sides of the support member 12, and the outer side of the rubber pad 15 is in contact with the concrete cushion layer 2 to facilitate increasing the connection stability between the concrete structure layer 3 and the support member 12. A slope layer 4, a first waterproof layer 5, a protective layer 6, a filling layer 7, a leveling layer 8 and a second waterproof layer 9 are arranged from bottom to top above the support member 12 to facilitate the flatness of the floor surface.
[0031] Working principle: When using the waterproof floor structure for clean workshops, Figure 1 As shown, the surface is compacted by a roller to form a rammed soil layer 1, as shown in FIG. Figure 1 As shown, a concrete cushion layer 2 is laid on the rammed soil layer 1 and compacted, and then a concrete structure layer 3 is laid. When the concrete structure layer 3 is laid, an anti-crack groove 10 of appropriate width is left, and a mounting hole 11 is left on the top outer side of the anti-crack groove 10;
[0032] The support member 12 is placed in the anti-crack groove 10, such as Figure 2 As shown, the fastening nails 14 under the support member 12 are inserted into the concrete cushion layer 2 and the rammed soil layer 1 by squeezing, and fixed, and the support member 12 is flush with the top of the concrete structure layer 3, and the rubber pad 15 on the outside of the support member 12 is fitted with the concrete structure layer 3, and the support member 12 is connected to the mounting hole 11 by the fastening bolts 13 and fixed on the concrete structure layer 3, and then the slope layer 4 is laid on the concrete structure layer 3 and the support member 12, as shown in FIG. Figure 3 As shown, the ratio of the height to the horizontal length of the slope layer 4 is 2:100, and then the first waterproof layer 5 is evenly applied on the slope layer 4, and then the protective layer 6, the filling layer 7 and the leveling layer 8 are laid on the first waterproof layer 5, and finally the second waterproof layer 9 is laid on the leveling layer 8. This is the entire working process of the waterproof floor structure for the clean workshop. The contents not described in detail in this specification belong to the existing technology known to professional and technical personnel in this field.
[0033] The standard parts used in the utility model can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt the conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.
[0034] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A waterproof floor structure for a clean workshop, characterized in that: include: A rammed earth layer (1), a concrete cushion layer (2) is laid on the top of the rammed earth layer (1), a concrete structural layer (3) is laid on the top of the concrete cushion layer (2), a slope leveling layer (4) is arranged on the top of the concrete structural layer (3), a first waterproof layer (5) is evenly applied on the top of the slope leveling layer (4), a protective layer (6) is arranged on the top of the first waterproof layer (5), a filling layer (7) is laid on the top of the protective layer (6), a leveling layer (8) is arranged on the top of the filling layer (7), and a second waterproof layer (9) is arranged on the leveling layer (8); An anti-crack groove (10) is provided inside a concrete cushion layer (2), and a mounting hole (11) is provided at the top of the anti-crack groove (10), a support member (12) is provided inside the anti-crack groove (10), and a fastening nail (14) is fixedly connected to the bottom of the support member (12), a fastening bolt (13) is installed at the top of the support member (12), and a rubber pad (15) is connected to the outer side of the top of the support member (12).
2. The waterproof floor structure for a clean room according to claim 1, characterized in that: The ratio of the height to the horizontal length of the slope finding layer (4) is 2:
100.
3. The waterproof floor structure for a clean room according to claim 1, characterized in that: The first waterproof layer (5) is a synthetic resin coating.
4. The waterproof floor structure for a clean room according to claim 1, characterized in that: The second waterproof layer (9) is a polyurea waterproof coating layer.
5. The waterproof floor structure for a clean room according to claim 1, characterized in that: The cross section of the anti-crack groove (10) is an inverted "convex" structure, and mounting holes (11) are symmetrically provided at the top of the anti-crack groove (10).
6. The waterproof floor structure for a clean room according to claim 1, characterized in that: The support member (12) has an I-shaped structure, and the top length of the support member (12) is greater than the bottom length of the support member (12).
7. The waterproof floor structure for a clean room according to claim 1, characterized in that: The top of the support member (12) is fixedly connected to the mounting hole (11) on the anti-crack groove (10) via a fastening bolt (13), and fastening nails (14) are arranged at equal intervals below the support member (12).
8. The waterproof floor structure for a clean room according to claim 1, characterized in that: Rubber pads (15) are symmetrically arranged on the left and right sides of the support member (12), and the outer sides of the rubber pads (15) are in contact with the concrete cushion layer (2).
9. The waterproof floor structure for a clean room according to claim 1, characterized in that: A slope layer (4), a first waterproof layer (5), a protective layer (6), a filling layer (7), a leveling layer (8) and a second waterproof layer (9) are sequentially arranged above the support member (12) from bottom to top.