Hoop connecting structure for wall attaching of climbing frame
Use a hoop to connect the structure with a hug, including locking board, locking plate, connecting rod, pull rod, support rib and limited screw, solve the problem of connection between climbing and complex building structure, and achieve stability The simple connection method has improved construction efficiency.
Patent Information
- Application Number
- CN202421138771.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-23
AI Technical Summary
The prior art is difficult to effectively connect the climbing frame with the new building structure with complex appearance shapes, especially when there are difficulties in traditional pre-embedded forms and welding methods.
Use a hug connection structure with a climbing shelf, including locking board, locking plate, connecting rod, pull rod, support ribs and limited screws. Through the combination of these components Stable connection.
A stable attached wall connection between climbing racks and building structures, easy installation and disassembly, adapting to temporary steel beams of different heights and sizes, and improving construction efficiency and connection stability.
Smart Images

Figure CN222413992U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of wall attachment connection, and particularly relates to a hoop connection structure for a climbing frame attached to a wall. Background Art
[0002] The connection methods of the attached lifting scaffolding (hereinafter referred to as climbing frame) to the main structure of the construction usually include attachment to the side of the reinforced concrete wall and attachment to the top of the reinforced concrete beam and slab. According to the relevant specifications, the span of the attachment points arranged in a straight line on the plane shall not be greater than 7 meters, and the span of the attachment points arranged in a broken line or curve shall not be greater than 5.4 meters. When the structural form meets the above attachment conditions, conventional methods can be used for attachment.
[0003] However, with the rapid development of the construction industry in recent years, more and more buildings with complex and varied appearances have appeared in our field of vision. These changes have brought huge challenges to the climbing frame construction technology. It is difficult to connect the climbing frame with the building structure in the traditional embedded form, and the welding method is inconvenient for high-altitude operations, and it is difficult to disassemble the climbing frame when it is lifted. Utility Model Content
[0004] The utility model aims to provide a wall-attached clamp connection structure for a climbing frame, so as to solve the problem in the above-mentioned background technology that the climbing frame is difficult to be connected to the wall of a new building structure such as a steel structure.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A wall-attached clamp connection structure for a climbing frame, used for connecting the climbing frame and a temporary steel beam, comprises an upper locking plate, a lower locking plate, a connecting rod and a pulling rod; the upper locking plate and the lower locking plate are respectively arranged on the upper and lower sides of the temporary steel beam, and one end of the upper locking plate is connected to the climbing frame; the connecting rod is arranged on the left and right sides of the temporary steel beam, and the top and bottom ends thereof are respectively connected to the upper locking plate and the lower locking plate; the top end of the pulling rod is connected to the bottom of the lower locking plate, and the bottom end is connected to the climbing frame.
[0007] Furthermore, it also includes support ribs, which include upper support ribs and lower support ribs arranged vertically; the upper support ribs and lower support ribs are respectively arranged on the bottom surface of the upper locking plate and the top surface of the lower locking plate, and both are located on the left and right sides of the temporary steel beam.
[0008] Furthermore, it also includes a limiting screw, which is threadedly connected to the supporting rib plate and has an inner end abutting against the temporary steel beam.
[0009] Furthermore, a mounting plate is arranged below the upper locking plate of the climbing frame, and the mounting plate is connected to the upper locking plate by bolts.
[0010] Furthermore, mounting seats are provided on the bottom surface of the lower locking plate and the side surface of the climbing frame corresponding to the ends of the pull rods, and the two ends of the pull rods are respectively hingedly connected to the two mounting seats.
[0011] Furthermore, an end plate is arranged near the inner end of the temporary steel beam.
[0012] Furthermore, four upper supporting ribs and four lower supporting ribs are provided and are symmetrically distributed on the left and right sides of the temporary steel beam.
[0013] The utility model has the following beneficial effects:
[0014] 1. The utility model provides a wall-attached clamp connection structure for a climbing frame, in which an upper locking plate and a lower locking plate are connected by a connecting rod and fixed on a temporary steel beam in the form of a clamp, and the upper locking plate is connected to the climbing frame to realize the wall-attached connection between the climbing frame and the building structure, which is easy to install and disassemble, thereby improving the installation efficiency of the climbing frame.
[0015] 2. The utility model provides a clamp connection structure for a climbing frame attached to a wall, in which the bottom of the connecting rod is fixed on a lower locking plate, and the top is connected to an upper locking plate through a nut. By adjusting the position of the nut, it can adapt to temporary steel beams of different heights.
[0016] 3. The utility model provides a clamp connection structure for a climbing frame attached to a wall, in which the end of a limiting screw is pressed against a temporary steel beam and fixed by supporting ribs, thereby effectively preventing the connection structure from moving laterally on the temporary steel beam. At the same time, the position of the limiting screw is adjusted so that the connection structure can be installed on temporary steel beams of different cross-sections and sizes.
[0017] 4. The utility model provides a wall-attached clamp connection structure for a climbing frame, which increases the strength of the upper locking plate and the lower locking plate by arranging supporting ribs, thereby improving the connection stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the connection structure involved in the utility model;
[0019] Figure 2 It is a schematic diagram of the cooperation between the limiting screw and the supporting rib plate of the utility model.
[0020] In the figure: 1-climbing frame, 2-temporary steel beam, 3-upper locking plate, 4-lower locking plate, 5-connecting rod, 6-support rib plate, 7-limiting screw, 8-pull rod, 9-mounting plate, 10-mounting seat. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] like Figure 1 , 2 As shown, the utility model provides a wall-attached clamp connection structure for a climbing frame, which is used for connecting a climbing frame 1 and a temporary steel beam 2, and includes an upper locking plate 3, a lower locking plate 4, a connecting rod 5, a supporting rib plate 6, a limit screw 7 and a pull rod 8; the upper locking plate 3 and the lower locking plate 4 are respectively arranged on the upper and lower sides of the temporary steel beam 2, and one end of the upper locking plate 3 is connected to the climbing frame 1; the connecting rod 5 is arranged on the left and right sides of the temporary steel beam 2, and its top and bottom ends are respectively connected to the upper locking plate 3 and the lower locking plate 4; the top end of the pull rod 8 is connected to the bottom of the lower locking plate 4, and the bottom end is connected to the climbing frame 1, and the pull rod 8 is connected to the upper locking plate 3, the lower locking plate 4, the connecting rod 5 and the climbing frame. The frame 1 forms an overall structure that is approximately triangular, which increases the installation stability of the climbing frame 1; the supporting ribs 6 include upper supporting ribs and lower supporting ribs that are vertically arranged, and the upper supporting ribs and the lower supporting ribs are respectively arranged on the bottom surface of the upper locking plate 3 and the top surface of the lower locking plate 4, and both are located on the left and right sides of the temporary steel beam 2, thereby increasing the structural strength of the upper locking plate 3 and the lower locking plate 4; the limiting screw 7 is threadedly connected to the supporting ribs 6, and its inner end abuts against the temporary steel beam 2 to avoid lateral displacement between the upper locking plate 3 and the lower locking plate 4 and the temporary steel beam 2, so that the clamp connection structure can be installed on temporary steel beams 2 with different cross-sections and different sizes.
[0023] The temporary steel beam 2 may be an I-beam or a channel steel structure, and both ends thereof are connected to the structural columns of the building structure.
[0024] A mounting plate 9 is arranged on the guide rail of the climbing frame 1 corresponding to the lower side of the upper locking plate 3 , and the top surface of the mounting plate 9 contacts the bottom surface of the upper locking plate 3 and is connected by bolts.
[0025] The upper locking plate 3 and the lower locking plate 4 are both steel plate structures.
[0026] The bottom surface of the lower locking plate 4 and the side surface of the climbing frame 1 are both provided with mounting seats 10 corresponding to the ends of the pull rod 8, and the two ends of the pull rod 8 are respectively hingedly connected to the two mounting seats 10. Preferably, the mounting seats 10 are fork ears, that is, they include two parallel ear plates; the ear plates are fixed at both ends of the pull rod 8, and the ear plates and the fork ears are connected by a pin shaft.
[0027] The connecting rod 5 is a screw rod, the bottom of which is fixedly connected to the lower locking plate 4, and the top of which is connected to the upper locking plate 3 through a nut.
[0028] Four upper support ribs and four lower support ribs are provided and symmetrically distributed on the left and right sides of the temporary steel beam 2 . A limiting screw 7 is threadedly connected to the two support rib plates 6 to increase the positioning strength of the limiting screw 7 .
[0029] An end plate is arranged near the inner end of the limit screw 7 near the temporary steel beam 2, and the contact area between the limit screw 7 and the temporary steel beam 2 is increased by the end plate. Preferably, a reinforcing nut is arranged on the limit screw 7 corresponding to the side of the supporting rib 6.
[0030] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A hoop connection structure for a climbing frame attached to a wall, characterized in that: Used for connecting a climbing frame (1) and a temporary steel beam (2), comprising an upper locking plate (3), a lower locking plate (4), a connecting rod (5) and a pulling rod (8); the upper locking plate (3) and the lower locking plate (4) are respectively arranged on the upper and lower sides of the temporary steel beam (2), and one end of the upper locking plate (3) is connected to the climbing frame (1); the connecting rod (5) is arranged on the left and right sides of the temporary steel beam (2), and its top and bottom ends are respectively connected to the upper locking plate (3) and the lower locking plate (4); the top end of the pulling rod (8) is connected to the bottom of the lower locking plate (4), and the bottom end is connected to the climbing frame (1).
2. A wall-attaching clamp connection structure for a climbing frame according to claim 1, characterized in that: It also includes a supporting rib plate (6), the supporting rib plate (6) including an upper supporting rib and a lower supporting rib arranged vertically; the upper supporting rib and the lower supporting rib are respectively arranged on the bottom surface of the upper locking plate (3) and the top surface of the lower locking plate (4), and both are located on the left and right sides of the temporary steel beam (2).
3. A wall-attaching clamp connection structure for a climbing frame according to claim 2, characterized in that: It also comprises a limiting screw rod (7), wherein the limiting screw rod (7) is threadedly connected to the supporting rib plate (6), and the inner end of the limiting screw rod (7) abuts against the temporary steel beam (2).
4. A wall-attaching clamp connection structure for a climbing frame according to claim 1, characterized in that: The climbing frame (1) is provided with a mounting plate (9) below the upper locking plate (3), and the mounting plate (9) is connected to the upper locking plate (3) via bolts.
5. The wall-attaching clamp connection structure for a climbing frame according to claim 1, characterized in that: Mounting seats (10) are provided on the bottom surface of the lower locking plate (4) and the side surface of the climbing frame (1) corresponding to the ends of the pull rod (8), and the two ends of the pull rod (8) are respectively hingedly connected to the two mounting seats (10).
6. A wall-attaching clamp connection structure for a climbing frame according to claim 3, characterized in that: An end plate is provided near the inner end of the temporary steel beam (2) of the limiting screw rod (7).
7. A wall-attaching clamp connection structure for a climbing frame according to claim 2, characterized in that: Four upper supporting ribs and four lower supporting ribs are provided, and are symmetrically distributed on the left and right sides of the temporary steel beam (2).