Steel crane beam and walkway plate connecting device

By using the detachable tract panel and locking mechanism, the problems of large labor intensity and safety hazards during the connection between the crane beam and the aisle board in the existing technology have achieved the convenience of fast and safe connection and secondary use.

CN222414256UActive Publication Date: 2025-01-28SHANDONG HUANNENG DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420900348.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-01-28
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

In the prior art, the connection method between the crane beam and the walkway plate mainly relies on welding or bolt connection, resulting in on-site operation required during the installation process, which has high labor intensity, low work efficiency, and safety hazards.

Method used

The detachable aisle panel and locking mechanism are adopted by a threaded thread, connecting nuts, and compacting components to achieve reliable clamping and fixing of the aisle board and crane beam, avoiding the on -site welding or multiple bolt connections.

Benefits of technology

The fast and safe connection between the aisle board and the crane beam, reducing the labor intensity and installation time of the construction staff, reducing hidden safety hazards, and supporting secondary use or replacement of the lane board.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414256U_ABST
    Figure CN222414256U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel crane beam and walkway plate connecting device which comprises a crane beam and a walkway plate, the crane beam is connected with one end of the walkway plate, the other end of the walkway plate is connected with a supporting structure, the supporting structure is connected with a supporting beam or a supporting column of a plant, and the crane beam and the supporting structure are clamped and fixed to the end of the walkway plate through a locking mechanism. According to the utility model, the connection and fixation are reliable, the walkway plate with a detachable structure and the locking mechanism adopt an independent detachable structure, the disassembly is convenient, the secondary use of the walkway plate and the locking mechanism is realized, or the walkway plate is convenient to replace when being worn or damaged, the labor intensity of constructors is low, the operation is safe, and the use, manufacture and maintenance costs are low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of crane beam equipment, in particular to a connecting device for a steel crane beam and a walkway plate. Background Art

[0002] In the industrial workshop of the factory, there are crane beams for lifting and hoisting equipment or goods. In order to allow people to access the crane, a walkway board for accessing the crane beam will be installed. The walkway board must be connected to the crane beam on site after the crane beam is installed. In the prior art, the connection between the walkway board and the crane beam is generally welding or bolting, and the installation process requires on-site operation. Since on-site operations are required and the factory building is relatively large, the operation time of personnel is relatively long. In order to ensure the reliability and safety of the connection and fixation of the walkway board; when using a welded structure, in order to ensure a good welding effect and ensure the safety and reliability of the welding part, the metal surface of the welding part needs to be cleaned before welding, and protective materials such as rust and coating need to be removed. Pretreatment work such as pretreatment to ensure that the welding area is dry and clean, and when welding, it is necessary to strictly control appropriate welding parameters and select appropriate welding materials. When bolted structures are used for connection, it is necessary to process the bolt connection holes in advance. Bolt connections are generally 200 or 300 mm per bolt, which requires a lot of bolts. A factory building of dozens or hundreds of meters requires a lot of bolts and the installation workload is large. The labor intensity of the operator is high and the work efficiency is low. In addition, there will be a protruding small nut in the bolt connection, which will cause unsafe factors that crane users are prone to tripping at high altitudes. High-altitude operations are inconvenient, the working hours are long, and there are more safety hazards. Utility Model Content

[0003] The utility model is to overcome the shortcomings of the above-mentioned prior art and provide a connection device for a steel crane beam and a walkway plate. The utility model has reliable connection and fixation, adopts a walkway plate with a detachable structure, and the locking mechanism adopts an independent detachable structure, which can be easily disassembled, so that the walkway plate and the locking mechanism can be used twice, or the walkway plate can be easily replaced when it is worn or damaged, the labor intensity of the construction personnel is low, the operation is safe, and the use, manufacturing and maintenance costs are low.

[0004] The technical solution adopted by the utility model to solve its technical problems is:

[0005] A device for connecting a steel crane beam and a walkway plate comprises a crane beam and a walkway plate, wherein the crane beam is connected to one end of the walkway plate, and the other end of the walkway plate is connected to a supporting structure, and the supporting structure is connected to a supporting beam or a supporting column of a factory building, and the crane beam and the supporting structure are clamped and fixed to the end of the walkway plate through a locking mechanism.

[0006] The locking mechanism includes a stud with a thread at one end, a connecting nut, and a clamping plate. The other end of the stud is connected to the bottom of the walkway plate, such as by welding. The clamping plate is provided with a vertical through hole. The stud passes through the clamping plate, and the connecting nut is connected to the stud through an anti-loosening washer.

[0007] The locking mechanism adopts a detachable structure, and the locking mechanism of the detachable structure includes an upper horizontal connecting plate, a lower horizontal connecting plate, a vertical connecting plate, a locking stud, a connecting nut, and a clamping plate. The upper end of the vertical connecting plate is connected to one end of the upper horizontal connecting plate, and the lower end of the vertical connecting plate is connected to one end of the lower horizontal connecting plate. The lower horizontal connecting plate is provided with a vertical through hole, and the inner end surface of the vertical through hole is provided with a connecting nut, and a locking stud is provided on the connecting nut. The upper end of the locking stud is provided with a clamping plate, and the upper part of the clamping plate cooperates with the lower end surface of the crane beam, and the lower end surface of the upper horizontal connecting plate cooperates with the upper end surface of the walkway plate.

[0008] A connecting block is provided at the upper end of the locking stud, a bearing mounting hole is provided on the connecting block, a bearing is provided in the bearing mounting hole, a connecting shaft is provided at the lower end of the clamping plate, and the lower part of the connecting shaft cooperates with the inner hole of the bearing.

[0009] The bearing is an axial thrust bearing.

[0010] The lower end of the locking stud is connected with a tightening section, and the cross section of the tightening section is a polygon.

[0011] A locking nut is provided at the lower end of the locking stud.

[0012] A buffer pad is provided at the matching position between the lower end surface of the walkway plate and the upper end surface of the crane beam.

[0013] The walkway board is provided with safety rope connection holes or connection hooks near the four corners; and a shock-absorbing and anti-skid mat is laid on the walkway board.

[0014] An auxiliary support member is provided between the lower part of the walkway plate and the crane beam.

[0015] The beneficial effects of the utility model are:

[0016] 1. The utility model has a simple structure and reliable connection and fixation. In particular, the walkway plate with a detachable structure and the locking mechanism with an independent detachable structure can be easily disassembled to realize the secondary use of the walkway plate and the locking mechanism, or the walkway plate can be easily replaced when it is worn or damaged without affecting the crane beam.

[0017] 2. The utility model does not have protruding nuts on the upper surface of the walkway board when there is no bolt connection, which will not cause safety accidents such as tripping of workers when using it at high altitude. In addition, the walkway board does not require a lot of bolt connections or welding during installation, and the walkway board can be fixed on the end face or from the bottom, which takes less time to install and use, reduces the labor intensity of construction workers, and ensures safe operation.

[0018] 3. The multiple parts of the utility model are made of standardized materials, such as channel steel, angle steel, bearings, etc. The structure is simple, the materials are easily available, and the manufacturing and maintenance costs are low.

[0019] 4. Since the clamping plate is connected to the connecting block through the bearing, the clamping plate and the crane beam only bear axial force when they are in contact with each other, thus avoiding the wear of the contact surface caused by the friction of relative movement and relative rotation between the clamping plate and the crane beam, increasing the service life of the equipment and reducing the maintenance cost. The bearing is an axial thrust bearing. By adopting an axial thrust bearing, it can withstand a large axial force, ensuring that the clamping plate and the crane beam maintain a reliable working position after the interaction and force, and ensuring the reliable clamping of the walkway plate and the crane beam.

[0020] 5. The lower end of the locking stud is connected with a tightening section, and the cross section of the tightening section is a polygon. The stud can be tightened conveniently and labor-savingly by using a wrench or other tools to make the clamping plate move along the axial direction of the stud, so as to facilitate the clamping plate and the lower end surface of the crane beam to cooperate with each other to bear force, thereby clamping the walkway plate and the crane beam, or loosening the clamping plate.

[0021] 6. A locking nut is provided at the lower end of the locking stud. When the clamping plate reliably clamps the walkway plate and the crane beam, the locking nut can be used to effectively prevent the loosening of the connection nut and the stud due to various factors during long-term use of the equipment, resulting in loosening of the walkway plate or the crane beam and unreliable connection.

[0022] 7. A buffer pad is provided at the matching position between the lower end surface of the walkway plate and the upper end surface of the crane beam. By providing the buffer pad, when the walkway plate is subjected to force vibration or impact, the relative friction and wear between the walkway plate and the crane beam can be reduced, the use and maintenance costs can be reduced, and the impact on the crane beam can also be reduced.

[0023] 8. The walkway board is provided with safety rope connection holes or connection hooks near the four corners; one end of the safety rope is connected to the safety rope connection hole 6 or the connection hook, and the other end is connected to the safety rope connector at a high place, so as to avoid the hidden danger of the walkway board 2 falling due to loose connection with the crane beam 1, thereby ensuring the safety of personnel and equipment.

[0024] Lay shock-absorbing and anti-skid mats on the walkway to ensure the safety of personnel and other equipment when moving on the walkway.

[0025] 9. An auxiliary support is provided between the lower part of the walkway plate and the crane beam. The auxiliary support can be made of angle steel, channel steel and round steel structure. The two ends are detachably connected to the lower part of the walkway plate and the crane beam or the supporting structure, such as through connecting holes and bolt and nut structures. It is particularly suitable for walkway plates with long lengths and poor rigidity, which are prone to bending and deforming downward when subjected to greater force in the middle of the walkway plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0027] Figure 1 It is a schematic diagram of the structure of Embodiment 1 and Embodiment 2 of the present utility model;

[0028] Figure 2 for Figure 1 A partial enlarged view of I;

[0029] Figure 3 This is a schematic diagram of the structure of Example 3 of the present utility model;

[0030] Figure 4 for Figure 3 Partial enlarged view of II;

[0031] Figure 5 for Figure 4 Schematic diagram of the partially cutaway structure. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0033] Example 1

[0034] Combination Figure 1 A steel crane beam and walkway plate connection device comprises a crane beam 1 and a walkway plate 2. The crane beam 1 is connected to one end of the walkway plate 2, and the other end of the walkway plate 2 is connected to a supporting structure. The supporting structure 7 is connected to a supporting beam or a supporting column 8 of a factory building. The supporting structure can be made of channel steel. The crane beam 1 and the supporting structure are clamped and fixed to the end of the walkway plate 2 through a locking mechanism. Similarly, the other end of the walkway plate 2 can also be connected to the supporting structure through a locking mechanism to achieve a reliable connection between the walkway plate 2 and the supporting beam, supporting column and other structures of the factory building.

[0035] Example 2

[0036] Combination Figure 1 , Figure 2In the figure, crane beam 1, walkway plate 2, stud 3, clamping plate 4, connecting nut 5, anti-loosening washer 6, support structure 7, support column 8, the locking mechanism includes a stud 3 with thread at one end, a connecting nut 5, and a clamping plate 4, the other end of the stud 3 is connected to the bottom of the walkway plate 2, such as by welding, the clamping plate 4 is provided with a vertical through hole, the stud 3 passes through the clamping plate 4, and the connecting nut 5 is connected to the stud 3 through the anti-loosening washer 6. The vertical movement of the clamping plate 4 is achieved by the axial movement of the connecting nut 5 on the stud 3 to achieve the clamping and loosening of the walkway plate 2 and the crane beam 1. The stud 3 is welded to the bottom of the walkway plate 2 before installation.

[0037] Example 3

[0038] Different from the second embodiment, the locking mechanism 3 adopts an independent detachable structure, and the locking mechanism of the detachable structure is used to achieve the clamping and loosening of the walkway plate 2 and the crane beam 1.

[0039] Combination Figure 3 , Figure 4 , Figure 5 In the figure, auxiliary support member 9, tightening section 30, upper horizontal connecting plate 31, lower horizontal connecting plate 32, vertical connecting plate 33, connecting nut 34, locking stud 35, clamping plate 36, connecting block 37, bearing 38, connecting shaft 39.

[0040] The locking mechanism 3 of the detachable structure includes an upper horizontal connecting plate 31, a lower horizontal connecting plate 32, a vertical connecting plate 33, a locking stud 35, a connecting nut 34, and a clamping plate 36. The upper end of the vertical connecting plate 33 is connected to one end of the upper horizontal connecting plate 31, and the lower end of the vertical connecting plate 33 is connected to one end of the lower horizontal connecting plate 32. The lower horizontal connecting plate 32 is provided with a vertical through hole, and the inner end surface of the vertical through hole is provided with a connecting nut 34. A locking stud 35 is provided on the connecting nut. The upper end of the locking stud 35 is provided with a clamping plate 36. The upper part of the clamping plate 36 cooperates with the lower end surface of the crane beam 1, and the lower end surface of the upper horizontal connecting plate 31 cooperates with the upper end surface of the walkway plate 2.

[0041] The upper end of the locking stud 35 is provided with a connecting block 37, and a bearing mounting hole is provided on the connecting block 37. A bearing 38 is provided in the bearing mounting hole. The lower end of the clamping plate 36 is provided with a connecting shaft 39, and the lower part of the connecting shaft cooperates with the inner hole of the bearing. Since the clamping plate is connected to the connecting block 37 through the bearing, the clamping plate and the crane beam 1 only bear axial force when in contact with the force, avoiding the wear of the contact surface caused by the friction force of relative movement and relative rotation between the clamping plate and the crane beam 1, increasing the service life of the equipment and reducing the maintenance cost.

[0042] The bearing 38 is an axial thrust bearing. By adopting the axial thrust bearing, it can withstand a large axial force, ensure that the clamping plate 36 and the crane beam 1 interact with each other to maintain a reliable working position, and ensure reliable clamping of the walkway plate 2 and the crane beam 1.

[0043] The lower end of the locking stud 35 is connected with a tightening section 30, and the cross section of the tightening section 30 is a polygon, such as a square, a regular pentagon, or a regular hexagon. The locking stud 35 can be conveniently and labor-savingly tightened by a tool such as a wrench to make the clamping plate 36 move along the axial direction of the stud, so that the clamping plate 36 and the lower end surface of the crane beam 1 cooperate to bear force, thereby clamping the walkway plate 2 and the crane beam 1, or loosening the clamping plate 36.

[0044] The lower end of the locking stud 35 is provided with a locking nut 4. When the pressing plate 36 reliably clamps the walkway plate 2 and the crane beam 1, the locking of the locking nut 4 can effectively avoid the loosening of the connection nut 34 and the locking stud 35 due to various factors during long-term use of the equipment, resulting in loosening of the walkway plate 2 or the crane beam 1 and unreliable connection.

[0045] A buffer pad 5 is provided at the matching position between the lower end surface of the walkway plate 2 and the upper end surface of the crane beam 1. By providing the buffer pad 5, when the walkway plate 2 is subjected to force vibration or impact, the relative friction and wear between the walkway plate 2 and the crane beam 1 can be reduced, the use and maintenance cost can be reduced, and the impact on the crane beam 1 can also be reduced.

[0046] The walkway board 2 is provided with safety rope connection holes 6 or connection hooks near the four corners. One end of the safety rope is connected to the safety rope connection hole 6 or the connection hook, and the other end is connected to the safety rope connector at a high position. This avoids the hidden danger of the walkway board 2 falling due to loose connection with the crane beam 1, thereby ensuring the safety of personnel and equipment.

[0047] Shock-absorbing and anti-slip mats are laid on the walkway boards to ensure the safety of personnel and other equipment when moving on the walkway boards.

[0048] An auxiliary support member 9 is provided between the lower part of the walkway plate and the crane beam 1. The auxiliary support member 9 can be made of angle steel, channel steel and round steel structure. Both ends are detachably connected to the lower part of the walkway plate and the crane beam 1 or the supporting structure 7, such as by connecting holes and bolt and nut structures. It is particularly suitable for walkway plates with long lengths and poor rigidity, which are prone to bending and deforming downward when subjected to greater force in the middle of the walkway plate.

[0049] The utility model has a simple structure and adopts standardized materials such as channel steel, angle steel, etc. It is easy to process and has low manufacturing cost. When installing, the walkway plate does not need many bolt connections or welding to fix the walkway plate at the end face or from the bottom. The installation time is short, the labor intensity of the construction personnel is low, and the operation is safe.

[0050] The walkway plate with a detachable structure of the utility model can be easily disassembled to realize secondary use, or the walkway plate can be easily replaced when it is worn or damaged, without affecting the crane beam.

[0051] In addition, the protruding nuts on the upper surface of the walkway board of the utility model when there are no bolts connected will not cause safety accidents such as workers tripping when using it at high altitude.

[0052] In the description of the present invention, the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the purpose of describing the present invention rather than requiring the present invention to be constructed or operated in a specific position, and therefore cannot be understood as a limitation on the present invention. The terms "connected" and "connected" in the present invention should be understood in a broad sense, for example, it can be a connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component. For those of ordinary skill in the art, the specific meanings of the above terms can be understood according to specific circumstances.

[0053] The above is a preferred embodiment of the present invention, and the description of the specific embodiment is only used to better understand the concept of the present invention. For ordinary technicians in this technical field, several improvements or equivalent substitutions can be made according to the principle of the present invention, and these improvements or equivalent substitutions are also considered to fall within the protection scope of the present invention.

Claims

1. A steel crane beam and walkway plate connecting device, comprising a crane beam and a walkway plate, wherein the crane beam is connected to one end of the walkway plate, and the other end of the walkway plate is connected to a supporting structure, characterized in that: The supporting structure is connected to the supporting beam or supporting column of the factory building, and the crane beam and the supporting structure are clamped and fixed to the end of the walkway plate through a locking mechanism.

2. The steel crane beam and walkway plate connection device according to claim 1, characterized in that: The locking mechanism includes a stud with a thread at one end, a connecting nut, and a clamping plate. The other end of the stud is connected to the bottom of the walkway plate, such as by welding. The clamping plate is provided with a vertical through hole. The stud passes through the clamping plate, and the connecting nut is connected to the stud through an anti-loosening washer.

3. The steel crane beam and walkway slab connection device according to claim 1, characterized in that: The locking mechanism adopts a detachable structure, and the locking mechanism of the detachable structure includes an upper horizontal connecting plate, a lower horizontal connecting plate, a vertical connecting plate, a locking stud, a connecting nut, and a clamping plate. The upper end of the vertical connecting plate is connected to one end of the upper horizontal connecting plate, and the lower end of the vertical connecting plate is connected to one end of the lower horizontal connecting plate. The lower horizontal connecting plate is provided with a vertical through hole, and the inner end surface of the vertical through hole is provided with a connecting nut, and a locking stud is provided on the connecting nut. The upper end of the locking stud is provided with a clamping plate, and the upper part of the clamping plate cooperates with the lower end surface of the crane beam, and the lower end surface of the upper horizontal connecting plate cooperates with the upper end surface of the walkway plate.

4. The steel crane beam and walkway plate connection device according to claim 3, characterized in that: A connecting block is provided at the upper end of the locking stud, a bearing mounting hole is provided on the connecting block, a bearing is provided in the bearing mounting hole, a connecting shaft is provided at the lower end of the clamping plate, and the lower part of the connecting shaft cooperates with the inner hole of the bearing.

5. The steel crane beam and walkway slab connection device according to claim 4, characterized in that: The bearing is an axial thrust bearing.

6. The steel crane beam and walkway slab connection device according to claim 3, characterized in that: The lower end of the locking stud is connected with a tightening section, and the cross section of the tightening section is a polygon.

7. The steel crane beam and walkway slab connection device according to claim 3, characterized in that: A locking nut is provided at the lower end of the locking stud.

8. The steel crane beam and walkway slab connection device according to claim 1, characterized in that: A buffer pad is provided at the matching position between the lower end surface of the walkway plate and the upper end surface of the crane beam.

9. The steel crane beam and walkway plate connection device according to claim 1, characterized in that: The walkway board is provided with safety rope connection holes or connection hooks near the four corners; and a shock-absorbing and anti-skid mat is laid on the walkway board.

10. The steel crane beam and walkway slab connection device according to claim 1, characterized in that: An auxiliary support member is provided between the lower part of the walkway plate and the crane beam.