Engineering management safety monitoring device
By installing the internal installation fan and design ventilation of the case of engineering management safety monitoring device, the problem of limited heat dissipation effects of existing devices has been solved, and more efficient heat dissipation effects and convenient maintenance have been achieved.
Patent Information
- Application Number
- CN202421184469.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-28
AI Technical Summary
The existing engineering management safety monitoring devices have limited heat dissipation effects, which affects the long-term uninterrupted operation of the equipment.
Design a project management safety monitoring device. By installing a fan inside the case, the fan is used for mandatory circulation of internal and external air to form mandatory ventilation and heat dissipation, and installs a multi -rooted bar in the inner wall of the case and the bottom of the case to form a ventilated channel To enhance the heat dissipation effect.
Through the design of ventilation and heat dissipation and ventilation channels, the cooling effect of the monitoring device is significantly improved, ensuring the stable operation of the equipment, and the maintenance of the dust filter more conveniently.
Smart Images

Figure CN222423843U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of monitoring, in particular to a project management safety monitoring device. Background Art
[0002] Engineering management is an effective management method. It can ensure that the engineering construction is completed with high quality and high efficiency in accordance with the contract, design, environmental protection and safety requirements through planning, organization, command, coordination and control, and using management science and methods within a specific time, limited resources and budget conditions, and ensure safety, environmental protection and energy saving during the construction process. Engineering management can start from the feasibility study of the project and last until the end of the project, running through the entire process of the project.
[0003] In project management, the care of the project site and its construction assets is an indispensable item, which mainly reduces the occurrence of accidents of off-site personnel and protects project assets. At present, in addition to relying on manpower, the use of monitoring equipment is also indispensable for the care of the project site and its construction assets in project management. In order to ensure the long-term uninterrupted operation of the monitoring equipment, the heat dissipation of its working is one of the main ways. At present, the heat dissipation of the outdoor monitoring unit is mainly based on the heat dissipation of its own shell material and the natural ventilation heat dissipation of the bottom opening, and the heat dissipation effect is limited. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the utility model provides a project management safety monitoring device to solve the problems in the background technology.
[0006] (II) Technical solution
[0007] In order to solve the above problems, the utility model provides the following technical solutions:
[0008] A project management safety monitoring device comprises a casing, a casing bottom and a rear opening, a bottom casing is installed at the casing bottom opening position, a back cover is installed at the casing rear opening position, a heat dissipation port is opened on the back cover, a fan is installed at the position of the heat dissipation port on the rear side surface of the back cover, a plurality of inner support bars are installed on the casing and the inner wall of the bottom casing, a ventilation duct is formed between adjacent inner support bars, an air inlet is opened at the front position of the bottom of the bottom casing, a monitoring body is installed in the casing inside the inner support bar, a monitoring lens at the front end of the monitoring body is close to the front end of the casing, a transparent arrangement is arranged at the position corresponding to the monitoring lens at the front end of the casing, and a fixed base is installed on the bottom surface of the bottom casing.
[0009] Preferably, the bottom shell extends into the casing and abuts against the inner wall of the casing, a blocking bar is installed in the casing near the front end of the bottom shell, and the front end of the bottom shell tightly abuts against the blocking bar.
[0010] Preferably, dust filter cotton is installed on the bottom shell at the air inlet position to block the air inlet.
[0011] Preferably, a corner frame is installed at the bottom of the bottom shell at the air inlet position, and the dust filter cotton is installed in the corner frame of the air inlet.
[0012] Preferably, a protective cover is provided above the casing, and the two sides of the protective cover extend downward to cover the two sides of the casing. The length of the protective cover is greater than the length of the casing. A rack is installed on the top wall inside the protective cover, and openings corresponding to the position of the rack are opened on the casing and the back cover. A motor is installed in the casing through the motor seat, and a gear is installed on the shaft of the motor for transmission, and the gear is meshed with the rack.
[0013] Preferably, a fixing plate is provided at the rear side of the monitoring body in the casing, and a T-shaped block is installed at each of the four sides of the rear side of the fixing plate. The T-shaped block extends into the ventilation duct, and a baffle that abuts against the fixing plate is installed on the top surface of the T-shaped block. The T-shaped block is threadedly connected with fixing bolts that abut against the casing and the bottom shell at the ventilation duct position.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides a project management safety monitoring device, which has the following beneficial effects:
[0016] 1. The monitoring device installs a fan inside the casing to force the air inside and outside to circulate, thereby forming forced ventilation and heat dissipation. At the same time, the ventilation duct formed by the internal support bar can cover the four sides of the monitoring body. During ventilation, the air flow can stably pass through the surface of the monitoring body for heat exchange, thereby ensuring the heat dissipation effect.
[0017] 2. The monitoring device has a bottom opening and is provided with dust filter cotton. When the dust filter cotton is covered with a lot of dust after long-term use and affects the air intake, the dust filter cotton can be directly removed from the corner frame for replacement or cleaning, which is convenient for maintenance.
[0018] 3. The monitoring device utilizes the meshing transmission relationship between the gear and the rack, and the motor is used to control the protective cover on the housing to extend or retract, thereby forming different sunshade effects for the monitoring lens. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is the appearance diagram of the utility model;
[0020] Figure 2 It is a bottom view of the utility model;
[0021] Figure 3 It is a cross-sectional view of the utility model;
[0022] Figure 4 It is a schematic diagram of the interior of the casing of the utility model;
[0023] Figure 5 It is a schematic diagram of the arrangement of the inner support bar in the utility model;
[0024] Figure 6 This is a schematic diagram of the installation of the rack in the utility model;
[0025] Figure 7 It is a three-dimensional diagram of the T-block in the utility model.
[0026] In the figure: 1. Casing; 2. Bottom case; 3. Protective cover; 4. Monitoring body; 5. Monitoring lens; 6. Back cover; 7. Heat dissipation vent; 8. Fan; 9. Inner support bar; 10. Ventilation duct; 11. T-shaped block; 12. Baffle; 13. Fixing bolt; 14. Air inlet; 15. Corner frame; 16. Dust filter; 17. Baffle; 18. Rack; 19. Gear; 20. Motor; 21. Motor seat; 22. Fixing plate; 23. Fixing base; 24. Power cord through hole. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0028] See also Figure 1-7 , a project management safety monitoring device, comprising a casing 1, a bottom and a rear opening of the casing 1, a bottom casing 2 is arranged at the bottom opening position, the bottom casing 2 extends into the casing 1 and abuts against the inner wall of the casing 1, the bottom casing 2 and the casing 1 are fixed by screws at the same time, a rear cover 6 is screwed to the rear opening position of the casing 1, a heat dissipation port 7 is opened on the rear cover 6, a fan 8 is screwed to the rear side surface of the rear cover 6 corresponding to the heat dissipation port 7, and the fan 8 is arranged to blow air toward the heat dissipation port 7;
[0029] An air inlet 14 is provided at the front bottom of the bottom shell 2, and a corner frame 15 is welded and installed on the bottom of the bottom shell 2 at the position of the air inlet 14. The corner frame 15 is filled with dust filter cotton 16 that blocks the air inlet 14. A plurality of inner support bars 9 are welded and installed on the inner walls of the casing 1 and the bottom shell 2 at equal intervals, and a ventilation duct 10 is formed between adjacent inner support bars 9. A monitoring body 4 is installed in the casing 1 on the inner side of the inner support bars 9, and a monitoring lens 5 at the front end of the monitoring body 4 is close to the front end of the casing 1. The front end of the casing 1 is transparently arranged at a position corresponding to the monitoring lens 5. A fixed base 23 is welded and installed on the bottom surface of the bottom shell 2, and a power cord of the monitoring body 4 passes through a power cord through-hole 24 on the bottom surface of the bottom shell 2.
[0030] When in use, the monitoring is installed from the fixed base 23. When in use, the monitoring body 4 and the fan 8 are powered on. The monitoring body 4 uses the monitoring lens 5 to shoot the monitoring field of view to complete the monitoring purpose. At the same time, the fan 8 is working and rotating, and the internal air is first blown out through the heat dissipation port 7. Under the internal low-pressure state, the external air will be filtered by the dust filter cotton 16 to filter dust and other foreign matter, and then enter the interior through the air inlet 14, and then be discharged by the fan 8 along the ventilation duct 10, thereby completing the forced circulation of air. When the air circulates through the interior, heat exchange is generated with the internal heat, and then the internal heat is dissipated through the circulation. The inner support bar 9 surrounds the monitoring body 4 to form a ventilation duct 10. When the air flows through the ventilation duct 10, the heat dissipation effect of the monitoring body 4 can be ensured.
[0031] In this embodiment, a protective cover 3 is provided above the casing 1, and both sides of the protective cover 3 extend downward to cover both sides of the casing 1. The length of the protective cover 3 is greater than the length of the casing 1. A rack 18 is welded and installed on the inner top wall of the protective cover 3 close to the top surface of the casing 1. The casing 1 and the back cover 6 have openings corresponding to the position of the rack 18. A motor 20 is installed in the casing 1 through a motor seat 21. The motor seat 21 is fixed to the top wall of the casing 1 by screws. A gear 19 is installed on the shaft of the motor 20 for transmission, and the gear 19 is meshed with the rack 18. In this embodiment, the motor 20 is a dual-axis stepping motor, so two gears 19 are also provided, and two groups of racks 18 are also provided on the protective cover 3.
[0032] The protective cover 3 provides top-to-bottom protection for the entire monitoring, and can also provide a sunshade effect for the monitoring lens 5. When the control motor 20 works and utilizes the meshing transmission relationship between the gear 19 and the rack 18 to push the protective cover 3 to extend toward the front side of the casing 1, the shielding surface above the field of view of the monitoring lens 5 is increased to enhance the sunshade effect. Conversely, when the protective cover 3 moves toward the rear side of the casing 1, the field of view of the monitoring lens 5 is restored, but the sunshade effect is reduced, and light is more likely to be obliquely projected onto the monitoring lens 5. The specific control is autonomously controlled according to the specific conditions on site.
[0033] In this embodiment, a fixing plate 22 is provided at the rear side of the monitoring body 4 in the casing 1, and a T-shaped block 11 is installed at each of the four sides of the rear side of the fixing plate 22. The T-shaped block 11 extends into the ventilation duct 10, and a baffle 12 is integrally formed on the top surface of the T-shaped block 11 and is installed to abut against the fixing plate 22. The T-shaped block 11 is threadedly connected with fixing bolts 13 that abut against the casing 1 and the bottom shell 2 at the position of the ventilation duct 10. A baffle bar 17 is installed in the casing 1 near the front end of the bottom shell 2, and the front end of the bottom shell 2 is tightly sealed against the baffle bar 17, and the baffle bar 17 is made of rubber.
[0034] The fixing plate 22 fixes the monitoring body 4 and also provides protection, while the blocking bar 17 increases the sealing of the connection between the bottom shell 2 and the bottom of the casing 1, reduces the possibility of rainwater infiltration through the gap, and improves the rainproof performance.
Claims
1. A project management safety monitoring device, comprising a housing (1), characterized in that: The casing (1) has openings at the bottom and rear side, a bottom casing (2) is installed at the opening position of the bottom casing (1), a rear cover (6) is installed at the opening position of the rear side casing (1), a heat dissipation port (7) is opened on the rear cover (6), a fan (8) is installed at a position corresponding to the heat dissipation port (7) on the rear side surface of the rear cover (6), the casing (1) and the inner wall of the bottom casing (2) are both installed with a plurality of inner support bars (9), a ventilation duct (10) is formed between adjacent inner support bars (9), an air inlet (14) is opened at a front position of the bottom of the bottom casing (2), a monitoring body (4) is installed in the casing (1) inside the inner support bar (9), a monitoring lens (5) at the front end of the monitoring body (4) is close to the front end of the casing (1), the front end of the casing (1) is transparently arranged at a position corresponding to the monitoring lens (5), and a fixed base (23) is installed on the bottom surface of the bottom casing (2).
2. A project management safety monitoring device according to claim 1, characterized in that: The bottom shell (2) extends into the casing (1) and abuts against the inner wall of the casing (1); a stop bar (17) is installed in the casing (1) near the front end of the bottom shell (2), and the front end of the bottom shell (2) is tightly against the stop bar (17).
3. The engineering management safety monitoring device according to claim 1, characterized in that: A dust filter cotton (16) is installed on the bottom shell (2) at the position of the air inlet (14) to block the air inlet (14).
4. A project management safety monitoring device according to claim 3, characterized in that: A corner frame (15) is installed at the bottom of the bottom shell (2) at the position of the air inlet (14), and the dust filter cotton (16) is installed in the corner frame (15) of the air inlet (14).
5. The engineering management safety monitoring device according to claim 1, characterized in that: A protective cover (3) is provided above the casing (1), and both sides of the protective cover (3) extend downward to cover both sides of the casing (1), the length of the protective cover (3) is greater than the length of the casing (1), a rack (18) is installed on the top wall of the protective cover (3), the casing (1) and the rear cover (6) have openings corresponding to the position of the rack (18), a motor (20) is installed in the casing (1) through a motor seat (21), a gear (19) is installed on the shaft of the motor (20), and the gear (19) is meshed with the rack (18).
6. A project management safety monitoring device according to claim 5, characterized in that: A fixing plate (22) is provided at the rear side of the monitoring body (4) in the housing (1), and a T-shaped block (11) is installed at each of the four sides of the rear side of the fixing plate (22). The T-shaped block (11) extends into the ventilation duct (10), and a baffle (12) is installed on the top surface of the T-shaped block (11) to abut against the fixing plate (22). The T-shaped block (11) is threadedly connected with fixing bolts (13) that abut against the housing (1) and the bottom shell (2) at the ventilation duct (10).