Intelligent temperature control aquarium boiler
By adopting diversion components and filtration systems in intelligent temperature-controlled aquarium boilers, the problem that existing low-nitrogen condensation boilers cannot effectively handle flue gas and recover heat energy is solved, efficient heating and environmentally friendly purification are achieved, and the energy-saving and environmentally friendly performance of the equipment is improved.
Patent Information
- Application Number
- CN202420968333.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-05-07
AI Technical Summary
The existing low-nitrogen condensation boilers cannot effectively handle the flue gas generated after combustion, causing dust and harmful substances to pollute the environment, and cannot recover the heat energy in the hot flue gas, affecting energy conservation and environmental protection.
An intelligent temperature-controlled aquarium boiler is designed, using split-flow components and filtration systems to separate the liquid and heat and filter the liquid to improve the heating efficiency of the liquid. It also purifies the flue gas and liquid through activated carbon filters and condensation tubes and other devices to reduce impurities. accumulation.
The heating efficiency of the liquid is improved through the shunt heating technology, ensuring that the liquid reaches the required temperature in a short time; through the filtration and purification system, impurities in the flue gas and liquid are effectively removed, and the environmental protection and service life of the equipment are improved.
Smart Images

Figure CN222438175U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of boilers, in particular to an intelligent temperature-controlled aquarium boiler. Background Art
[0002] A condensing boiler utilizes an efficient condensing waste heat recovery device to absorb the sensible heat in the high-temperature flue gas discharged by the boiler and the latent heat released by the condensation of water vapor, so as to achieve the purpose of improving the thermal efficiency of the boiler. There are many types of boilers, of which the low-nitrogen condensing boiler is one type. The existing low-nitrogen condensing boiler does not have a device for treating the flue gas generated after combustion, so that the flue gas contains more dust and harmful substances, polluting the environment, and the heat energy of the hot flue gas cannot be recovered and reused, which is not energy-saving and environmentally friendly.
[0003] The patent name is "A steel low-nitrogen condensing boiler" with publication number "CN216694015U". The public document solves the above problems, but the device in the public document cannot separate the liquid for heating, which reduces the efficiency of liquid heating, that is, affects the temperature effect of the liquid after heating. Based on this, the utility model designs an intelligent temperature-controlled aquarium boiler to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide an intelligent temperature-controlled aquarium boiler to solve the problems raised by the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an intelligent temperature-controlled aquarium boiler, comprising a boiler body, a burner and a liquid inlet pipe, the burner being fixedly arranged at the inner bottom end of the boiler body, the liquid inlet pipe being fixedly penetrated through the upper left end of the outer side of the boiler body, a controller being fixedly arranged at the outer front end of the boiler body, a diversion component being arranged inside the boiler body, the diversion component comprising a first baffle fixedly arranged at the inner upper end of the boiler body, and the left end of the first baffle being fixedly sleeved on the outside of the liquid inlet pipe, a second baffle being fixedly arranged at the inner lower end of the boiler body, a plurality of guide plates being fixedly arranged between the first baffle and the second baffle from left to right, a first cavity being integrally arranged inside the first baffle, a second cavity being integrally arranged inside the second baffle, a plurality of connecting pipes being fixedly arranged inside the guide plate, and the top of the connecting pipe being penetrated through the bottom of the first baffle, and the bottom of the connecting pipe being penetrated through the top of the second baffle.
[0006] Furthermore, a clearance hole is integrally provided at the top end of the second partition from left to right, the clearance hole is a through hole design, and the clearance hole and the guide plate are in a mutually staggered design.
[0007] Furthermore, the first partition, the second partition, the guide plate and the connecting pipe are all made of heat-conducting materials, the boiler body is made of heat-insulating materials, the distance between the front and rear ends of the guide plate and the inner wall of the boiler body is five centimeters, and a one-way valve is fixed inside the liquid inlet pipe.
[0008] Furthermore, a bracket is provided on the right side of the outer wall of the boiler body, a shell made of heat-insulating material is fixed on the top of the bracket, a connecting head fixed on the left side inside the shell is fixedly passed through the middle end of the right side outside the boiler body, and a suction pump arranged on the left side of the connecting head is fixedly connected to the inner wall of the boiler body.
[0009] Furthermore, a first activated carbon filter is fixedly provided on the left side of the shell, a second activated carbon filter is fixedly provided on the right side of the shell, a condenser is fixedly penetrated on the right side of the shell, and a first valve is rotatably penetrated on the outside of the condenser.
[0010] Furthermore, a mounting hole is integrally provided at the top end of the shell from left to right, a first stop valve is fixedly provided inside the mounting hole, and a second stop valve is fixedly provided inside the connector.
[0011] Furthermore, a discharge pipe is fixedly penetrated from left to right at the bottom of the shell, a solenoid valve is fixedly arranged inside the discharge pipe, a box body is arranged inside the bracket, a waterproof and breathable membrane is fixedly arranged at the middle end of the shell, a return pipe is fixedly penetrated at the left side of the rear end outside the shell, and the other end of the return pipe is fixedly penetrated to the liquid inlet pipe, an installation pipe is fixedly penetrated at the right side of the bottom of the return pipe, a second valve is rotatably penetrated outside the installation pipe, and a third stop valve is fixedly arranged inside the return pipe.
[0012] Furthermore, a cover body is fixedly arranged on the top of the shell, an air pump is fixedly arranged on the top of the inner part of the cover body, and an exhaust hole is integrally arranged on the top of the inner part of the cover body in the form of a through hole.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. The utility model can heat the liquid in a diverted state through the design of the diversion function, so that the liquid can quickly reach the required heating temperature range, reducing the liquid heating time. It can be seen that by using the device in this application, the heating efficiency of the liquid is improved, ensuring that the liquid can reach the temperature range required by the staff in a short time.
[0015] 2. The utility model can filter out impurities in the liquid and impurities in the smoke through the design of the filtering function, and can extract impurities from the inside of the shell through the design of the blowing function, so as to avoid impurities clogging the first activated carbon filter and the second activated carbon filter, thereby ensuring the normal use of the filtering structure of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 This is a front perspective view of an intelligent temperature-controlled aquarium boiler according to the utility model;
[0018] Figure 2 This is a three-dimensional diagram of the internal structure of an intelligent temperature-controlled aquarium boiler of the utility model;
[0019] Figure 3 This is a rear perspective view of an intelligent temperature-controlled aquarium boiler of the utility model;
[0020] Figure 4 is a three-dimensional diagram of a flow distribution component;
[0021] Figure 5 This is a three-dimensional view of the interior of the return pipe.
[0022] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0023] 1- boiler body, 2- burner, 3- liquid inlet pipe, 4- controller, 5- diversion assembly, 501- first baffle, 502- second baffle, 503- guide plate, 504- first cavity, 505- second cavity, 506- connecting pipe, 6- clearance hole, 7- one-way valve, 8- bracket, 9- shell, 10- connector, 11- suction pump, 12- first activated carbon filter, 13- second activated carbon filter, 14- condenser, 15- first valve, 16- installation hole, 17- first stop valve, 18- second stop valve, 19- discharge pipe, 20- solenoid valve, 21- waterproof breathable membrane, 22- reflux pipe, 23- installation pipe, 24- second valve, 25- cover, 26- air pump, 27- exhaust hole, 28- box body, 29- third stop valve. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] Example 1
[0026] like Figure 1 , Figure 2 , Figure 4 As shown, the device includes a boiler body 1, a burner 2 and a liquid inlet pipe 3, the burner 2 is fixedly arranged at the inner bottom end of the boiler body 1, the liquid inlet pipe 3 is fixedly penetrated through the outer left upper end of the boiler body 1, a controller 4 is fixedly arranged at the outer front end of the boiler body 1, a flow splitter assembly 5 is arranged inside the boiler body 1, the flow splitter assembly 5 includes a first baffle 501 fixedly arranged at the inner upper end of the boiler body 1, and the left end of the first baffle 501 is fixedly sleeved on the outside of the liquid inlet pipe 3, a second baffle 502 is fixedly arranged at the inner lower end of the boiler body 1, a plurality of guide plates 503 are fixedly arranged between the first baffle 501 and the second baffle 502 from left to right, a first cavity 504 is integrally arranged inside the first baffle 501, a second cavity 505 is integrally arranged inside the second baffle 502, a plurality of connecting pipes 506 are fixedly arranged inside the guide plate 503, and the top of the connecting pipe 506 penetrates the bottom of the first baffle 501, and the bottom of the connecting pipe 506 penetrates the top of the second baffle 502.
[0027] The top of the second partition 502 is provided with a clearance hole 6 from left to right. The clearance hole 6 is a through hole design, and the clearance hole 6 and the guide plate 503 are designed to be mutually displaced. The staff first turns on the burner 2 by using the controller 4, so that the burner 2 heats the first partition 501, the second partition 502, the guide plate 503 and the connecting pipe 506. When the temperature of the burner 2 reaches the temperature value set by the controller 4, the burner 2 stops running, and then the liquid is injected into the first cavity 504 from the liquid inlet pipe 3. At this time, the liquid passes through the second cavity 505 through the plurality of connecting pipes 506 and then is discharged from the clearance hole 6 into the position between the first partition 501 and the second partition 502. In the above manner, the liquid is in a diverted state for rapid heating treatment.
[0028] Example 2
[0029] like Figure 2 , Figure 3 , Figure 5As shown, the first baffle 501, the second baffle 502, the guide plate 503 and the connecting pipe 506 are all made of heat-conducting materials, the boiler body 1 is made of heat-insulating material, the distance between the front and rear ends of the guide plate 503 and the inner wall of the boiler body 1 is five centimeters, a one-way valve 7 is fixedly arranged inside the liquid inlet pipe 3, a bracket 8 is arranged on the right side of the outer wall of the boiler body 1, a shell 9 made of heat-insulating material is fixedly arranged on the top of the bracket 8, a connector 10 fixedly arranged on the left side of the shell 9 is fixedly penetrated through the middle end of the right side of the outer side of the boiler body 1, a suction pump 11 arranged on the left side of the connector 10 is fixedly connected to the inner wall of the boiler body 1, a first activated carbon filter 12 is fixedly arranged on the left side of the shell 9, a second activated carbon filter 13 is fixedly arranged on the right side of the shell 9, a condenser 14 is fixedly penetrated on the right side of the outer side of the shell 9, and a first valve 15 is rotatably penetrated on the outside of the condenser 14, and a first valve 15 is rotatably penetrated on the outside of the shell 9. A mounting hole 16 is integrally provided at the top of the housing 9 from left to right, a first stop valve 17 is fixedly provided inside the mounting hole 16, a second stop valve 18 is fixedly provided inside the connector 10, a discharge pipe 19 is fixedly penetrated from left to right at the bottom of the housing 9, a solenoid valve 20 is fixedly provided inside the discharge pipe 19, a box body 28 is provided inside the bracket 8, a waterproof and breathable membrane 21 is fixedly provided at the middle end of the housing 9, a return pipe 22 is fixedly penetrated at the left side of the rear end of the housing 9, and the other end of the return pipe 22 is fixedly penetrated through the liquid inlet pipe 3, a mounting pipe 23 is fixedly penetrated at the right side of the bottom of the return pipe 22, a second valve 24 is rotatably penetrated outside the mounting pipe 23, a third stop valve 29 is fixedly provided inside the return pipe 22, a cover body 25 is fixedly provided at the top of the housing 9, an air pump 26 is fixedly provided at the top of the cover body 25, and an exhaust hole 27 is integrally provided at the top of the cover body 25 as a through hole design.
[0030] According to the operation method in Example 1, when the heated liquid is between the first partition 501 and the second partition 502, the staff turns on the suction pump 11, and the suction pump 11 discharges the liquid and the steam and smoke after the liquid is heated into the shell 9 through the connector 10. At this time, the first activated carbon filter 12 purifies and filters the impurities in the liquid, smoke and steam. Through the blocking effect of the waterproof and breathable membrane 21, the purified and filtered liquid is discharged from the reflux pipe 22 through the liquid inlet pipe 3 into the first cavity 504 again for heating. At the same time, the smoke and steam pass through the waterproof and breathable membrane 21 and are purified and filtered again by the second activated carbon filter 13 and then discharged from the condenser 14. According to actual usage, the staff can close the suction pump 11 and the first valve 15, and then open the solenoid valve 20 and the air pump 26. The air pump 26 discharges the external gas into the shell 9 through the exhaust hole 27, and then blows the impurities filtered inside the shell 9 into the box body 28 through the discharge pipe 19, so as to collect the impurities. In addition, the second stop valve 18 can prevent impurities in the housing 9 from being discharged into the connector 10, the first stop valve 17 can prevent liquid, smoke and steam from being discharged into the housing 25 through the mounting hole 16, and the one-way valve 7 can prevent the liquid in the reflux pipe 22 from being discharged to the outside through the liquid inlet pipe 3. In addition, the staff can open the second valve 24 to discharge the purified and filtered liquid to the outside through the mounting pipe 23. The third stop valve 29 can prevent the liquid in the liquid inlet pipe 3 from being discharged into the housing 9 through the reflux pipe 22.
Claims
1. An intelligent temperature-controlled aquarium boiler, comprising a boiler body (1), a burner (2) and a liquid inlet pipe (3), characterized in that: The burner (2) is fixedly mounted at the bottom end of the boiler body (1); the liquid inlet pipe (3) is fixedly mounted through the upper left end of the boiler body (1); a controller (4) is fixedly mounted at the front end of the boiler body (1); a flow divider assembly (5) is arranged inside the boiler body (1); the flow divider assembly (5) comprises a first baffle (501) fixedly mounted at the upper end of the boiler body (1); the left end of the first baffle (501) is fixedly mounted on the outside of the liquid inlet pipe (3); a second baffle (502) is fixedly mounted at the lower end of the boiler body (1). A plurality of guide plates (503) are fixedly arranged between the first partition plate (501) and the second partition plate (502) from left to right, a first cavity (504) is integrally arranged inside the first partition plate (501), a second cavity (505) is integrally arranged inside the second partition plate (502), a plurality of connecting tubes (506) are fixedly arranged inside the guide plate (503), and the top of the connecting tube (506) passes through the bottom of the first partition plate (501), and the bottom of the connecting tube (506) passes through the top of the second partition plate (502).
2. According to claim 1, the intelligent temperature-controlled aquarium boiler is characterized by: A clearance hole (6) is integrally provided at the top of the interior of the second partition plate (502) from left to right. The clearance hole (6) is a through hole, and the clearance hole (6) and the guide plate (503) are designed to be staggered with each other.
3. According to claim 1, the intelligent temperature-controlled aquarium boiler is characterized by: The first baffle (501), the second baffle (502), the guide plate (503) and the connecting pipe (506) are all made of heat-conducting materials, the boiler body (1) is made of heat-insulating material, the distance between the front and rear ends of the guide plate (503) and the inner wall of the boiler body (1) is five centimeters, and a one-way valve (7) is fixed inside the liquid inlet pipe (3).
4. According to claim 1, the intelligent temperature-controlled aquarium boiler is characterized by: A bracket (8) is arranged on the right side of the outer wall of the boiler body (1), a shell (9) made of a heat-insulating material is fixedly arranged on the top of the bracket (8), a connector (10) fixedly arranged on the left side inside the shell (9) is fixedly passed through the middle end of the right side of the outside of the boiler body (1), and a suction pump (11) arranged on the left side of the connector (10) is fixedly connected to the inner wall of the boiler body (1).
5. According to claim 4, the intelligent temperature-controlled aquarium boiler is characterized in that: A first activated carbon filter (12) is fixedly provided on the left side of the shell (9), a second activated carbon filter (13) is fixedly provided on the right side of the shell (9), a condenser (14) is fixedly passed through the right side of the shell (9), and a first valve (15) is rotatably passed through the outside of the condenser (14).
6. The intelligent temperature-controlled aquarium boiler according to claim 4, characterized in that: A mounting hole (16) is integrally provided at the top end of the housing (9) from left to right, a first stop valve (17) is fixedly provided inside the mounting hole (16), and a second stop valve (18) is fixedly provided inside the connector (10).
7. The intelligent temperature-controlled aquarium boiler according to claim 4, characterized in that: A discharge pipe (19) is fixedly passed through the bottom of the shell (9) from left to right, a solenoid valve (20) is fixedly arranged inside the discharge pipe (19), a box body (28) is arranged inside the bracket (8), a waterproof and breathable membrane (21) is fixedly arranged at the middle end of the shell (9), a return pipe (22) is fixedly passed through the left side of the rear end of the shell (9), and the other end of the return pipe (22) is fixedly passed through the liquid inlet pipe (3), a mounting pipe (23) is fixedly passed through the right side of the bottom of the return pipe (22), a second valve (24) is rotatably passed through the outside of the mounting pipe (23), and a third stop valve (29) is fixedly arranged inside the return pipe (22).
8. The intelligent temperature-controlled aquarium boiler according to claim 4, characterized in that: A cover body (25) is fixedly arranged on the top of the shell (9), an air pump (26) is fixedly arranged on the top of the interior of the cover body (25), and an exhaust hole (27) is integrally arranged on the top of the interior of the cover body (25) and is designed as a through hole.