Formwork for preparing precast concrete anchor block of farmland irrigation hydrant

By using precast concrete pier formwork in farmland irrigation construction, the problem of material transportation and pouring difficulties in complex landform construction is solved, construction efficiency and continuity are improved, and rapid backfill after pouring of piers is achieved.

CN222450786UActive Publication Date: 2025-02-11CHINA CONSTR FIRST BUILDING (GRP) CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421088886.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-11
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In the irrigation construction of farmland with complex landforms, material transportation is inconvenient and concrete mixing and pouring are difficult, resulting in low construction efficiency and inability to backfille immediately after pouring of the piers, which affects the construction progress.

Method used

The precast concrete piers are used to form the formwork of the steel plate side form, the steel plate bottom form, the embedded water supply bolt pipe and the embedded PVC pipe. The steel formwork is uniformly produced through the factory and combined into a built-in pipeline in the mold for easy installation and hoisting.

Benefits of technology

It improves construction efficiency, reduces pollution during material transportation and pouring, and realizes that the trench can be quickly backfilled after pouring of the piers, improving the continuity and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222450786U_ABST
    Figure CN222450786U_ABST
Patent Text Reader

Abstract

The utility model provides a precast concrete anchor block template for preparing farmland irrigation hydrant, including steel plate side die, steel plate bottom die, pre-buried hydrant pipe and pre-buried PVC pipe, the four sides of steel plate bottom die are respectively and detachably connected with one steel plate side die, the adjacent steel plate side dies are connected through a positioning piece, the pre-buried hydrant pipe is connected with the steel plate side die through the positioning piece, and the pre-buried PVC pipe is connected with the steel plate side die through the positioning piece. The embedded hydrant pipe is arranged between the two oppositely-arranged steel plate side molds, and the embedded PVC pipe is arranged between the other two oppositely-arranged steel plate side molds. The prefabricated concrete anchor block is formed through unified pouring of steel formworks manufactured in a factory, the steel plate bottom die is a square steel plate, the steel plate side dies and the steel plate bottom die are detachably connected and are convenient to assemble, disassemble and use, and the embedded hydrant pipe is arranged in a die formed by combining the steel plate side dies and the steel plate bottom die and used for being connected with a water supply pipeline. And the pre-buried PVC pipe is arranged in the mold, so that hoisting during mounting is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of agricultural irrigation equipment, in particular to a template for preparing a prefabricated concrete anchor pier for a farmland irrigation water supply hydrant. Background Art

[0002] With the construction and improvement of farmland irrigation facilities, the installation of facilities such as water hydrants has become increasingly important. In farmland, the installation of water hydrants can effectively provide water for crops and promote their growth. After the traditional irrigation pipeline is laid and installed, a wooden formwork is set up at the water hydrant location and fixed, and the concrete is mixed on site and poured directly. This method of mixing concrete on site is likely to pollute farmland soil, and the on-site pouring points are scattered and it is difficult to determine the appropriate mixing points. After installing the water hydrant, the entire formwork cannot be installed, and the two sides need to be assembled in pieces. It is easy to leak during pouring, and the molding quality is poor. At the same time, the concrete of the town pier cannot be backfilled immediately after pouring, and continuous construction is required. The distance between the town piers is far, and the construction is carried out in two times, which affects the construction efficiency.

[0003] For some farmland irrigation pipelines located in mountainous areas, due to the complex terrain and large construction scope, it is difficult for vehicles to reach the designated construction area during the construction process. The transportation of materials and the construction process all rely on manual labor, which is inefficient. A new anchor pier is urgently needed to improve construction efficiency. Utility Model Content

[0004] The purpose of the utility model is to provide a template for preparing prefabricated concrete piers for farmland irrigation water hydrants, which is used to solve the problems of inconvenient transportation of materials in farmland with complex terrain, inconvenient concrete mixing and pouring and pollution of farmland, and failure to immediately backfill the trench after pouring the pier, resulting in low construction efficiency.

[0005] According to the purpose of the utility model, the utility model provides a template for preparing precast concrete piers for farmland irrigation water hydrants, including a steel plate side template, a steel plate bottom template, a pre-buried water hydrant pipe and a pre-buried PVC pipe, the four sides of the steel plate bottom template are respectively detachably connected to one of the steel plate side templates, the adjacent steel plate side templates are connected by positioning pieces, the pre-buried water hydrant pipe is provided between two oppositely arranged steel plate side templates, and the pre-buried PVC pipe is provided between the other two oppositely arranged steel plate side templates.

[0006] Furthermore, the four steel plate side molds are of the same shape, the steel plate bottom mold is a square steel plate, and the steel plate side molds are of a rectangular or trapezoidal shape.

[0007] Furthermore, two bottom mold pin holes are welded on the four sides of the steel plate bottom mold, and two side mold pin holes are welded on the bottom of the steel plate side mold. After the side mold pin holes and the bottom mold pin holes are aligned, they are connected using pin steel bars.

[0008] Furthermore, two oppositely disposed steel plate side molds are respectively provided with pipe holes for the pre-buried PVC pipe to pass through, and each of the steel plate side molds is provided with two pipe holes.

[0009] Furthermore, bolt holes for the pre-buried water faucet pipe to pass through are respectively opened on the other two oppositely arranged steel plate side molds.

[0010] Furthermore, the steel plate side mold is assembled from two side mold units, and the two side mold units have the same shape.

[0011] Furthermore, the positioning member includes a positioning pin hole and a positioning bow, and the positioning pin holes are respectively fixed at both ends of the top of each steel plate side mold. When the four steel plate side molds are in an upright state, the positioning pin holes on adjacent steel plate side molds are connected together through the positioning bow.

[0012] Furthermore, the positioning pin holes on the steel plate side mold are at the same distance from the edge of the steel plate side mold.

[0013] Furthermore, the pre-buried water faucet pipe includes a cross bar and a vertical pipe, and the vertical pipe and the cross bar are interconnected.

[0014] Furthermore, a fixing hook is provided in the middle of each of the steel plate side molds.

[0015] The technical solution of the utility model precast concrete pier is cast uniformly through factory-made steel formwork, the steel plate bottom formwork is a square steel plate, the steel plate side formwork and the steel plate bottom formwork are detachably connected, and are convenient for assembly and disassembly, and a pre-buried water faucet pipe is arranged in the mold formed by the steel plate side formwork and the steel plate bottom formwork for connection with the water supply pipeline, and the pre-buried PVC pipe arranged in the mold is convenient for lifting during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the structure of an embodiment of the utility model;

[0018] Figure 2 It is a schematic diagram of the internal perspective structure of an embodiment of the utility model;

[0019] Figure 3 This is a schematic structural diagram of a steel plate side mold according to an embodiment of the utility model;

[0020] Figure 4 This is a structural schematic diagram of another steel plate side mold according to an embodiment of the utility model;

[0021] Figure 5 It is a schematic diagram of the top view of the structure of the pre-buried water faucet pipe and the pre-buried PVC pipe arrangement according to the embodiment of the utility model;

[0022] Figure 6 It is a side view structural diagram of the arrangement of the pre-buried water faucet pipe and the pre-buried PVC pipe in the embodiment of the utility model;

[0023] Figure 7 Another side view of the structure of the pre-buried water faucet pipe and the pre-buried PVC pipe arrangement according to the embodiment of the utility model;

[0024] In the figure: 1. Steel plate side form; 2. Steel plate bottom form; 3. Pre-buried water hydrant pipe; 301. Cross bar; 302. Vertical pipe; 4. Pre-buried PVC pipe; 5. Bottom form pin hole; 6. Side form pin hole; 7. Pin steel bar; 8. Pipe hole; 9. Bolt hole; 10. Side form unit; 11. Connecting pin; 12. Positioning pin column; 13. Positioning pin hole; 14. Positioning bow; 15. Fixing hook; 16. Iron wire. DETAILED DESCRIPTION

[0025] The technical solution of the utility model will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0027] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0028] Example 1

[0029] like Figure 1-Figure 7 As shown,

[0030] A template for preparing a prefabricated concrete anchor pier for a farmland irrigation water hydrant, comprising a steel plate side form 1, a steel plate bottom form 2, a pre-buried water hydrant pipe 3 and a pre-buried PVC pipe 4. The number of the steel plate bottom form 2 is one, and the steel plate bottom form 2 is a square steel plate. The number of the steel plate side form 1 is four, and the four steel plate side form 1 are respectively used to connect with the steel plate bottom form 2 to form a complete casting template structure. The four steel plate side forms have the same shape, and the shape of the steel plate side form is rectangular or trapezoidal. The template structure formed by the combination of the steel plate side form and the steel plate bottom form is a rectangular block structure or a four-sided pyramid structure.

[0031] Specifically, in order to realize the connection between the steel plate side form 1 and the steel plate bottom form 2, two bottom form pin holes 5 made of circular steel pipes are welded on the four sides of the steel plate bottom form 2, and two side form pin holes 6 made of circular steel pipes are welded on the bottom of the steel plate side form 1. When the steel plate side form 1 and the steel plate bottom form 2 are combined, the bottom of the steel plate side form 1 and the side of the steel plate bottom form 2 are aligned, so that the side form pin holes 6 and the bottom form pin holes 5 are aligned. After the two pin holes are aligned, they are connected with the pin steel bars 7 to realize the combination of the steel plate side form 1 and the steel plate bottom form 2.

[0032] Two oppositely disposed steel plate side molds 1 are provided with pipe holes 8 for the pre-buried PVC pipes 4 to pass through, each steel plate side mold 1 is provided with two pipe holes 8, and the pipe holes 8 located on the two steel plate side molds 1 are symmetrically arranged with each other.

[0033] Bolt holes 9 for the pre-buried water faucet pipes 3 to pass through are respectively opened on the other two oppositely arranged steel plate side molds 1, and the bolt holes 9 on the two steel plate side molds 1 are symmetrically arranged with each other.

[0034] Specifically, in order to facilitate the installation of the pre-buried water faucet pipe 3, the steel plate side mold 1 is cut by laser cutting. The steel plate side mold 1 is assembled from side mold units 10 made of two steel plates. The two side mold units 10 have the same shape. A semicircular bolt hole 9 is opened on each side mold unit 10. A complete bolt hole 9 is formed by assembling the two side mold units 10.

[0035] Two connecting pins 11 are welded at adjacent positions of the two side mold units 10. The connecting pins 11 are L-shaped. After the two side mold units 10 are assembled, positioning pins 12 are placed on the two side mold units 10. The positioning pins 12 are continuously clamped in the four connecting pins 11 to assemble the two side mold units 10 together.

[0036] In order to ensure that the steel plate side form 1 and the steel plate bottom form 2 remain stable when combined, positioning pin holes 13 are respectively fixed at both ends of the top of each steel plate side form 1, and the positioning pin holes 13 on each steel plate side form 1 are at the same distance from the edge of the steel plate side form 1. When the four steel plate side forms 1 are respectively combined with the steel plate bottom form 2 through the pin holes at the bottom, the four steel plate side forms 1 are in an upright state. At this time, the positioning pin holes 13 on adjacent steel plate side forms 1 are connected together through the positioning bows 14, so that the steel plate side form 1 can be fixed, so that the steel plate side form 1 can remain in an upright state.

[0037] In this embodiment, the pre-buried water faucet pipe 3 is a three-way structure with a T-shaped structure, that is, the pre-buried water faucet pipe 3 includes a crossbar 301 and a vertical pipe 302, and the vertical pipe 302 and the crossbar 301 are interconnected. It will be troublesome to place the pre-buried water faucet pipe 3 in the assembled template combination. Therefore, by setting two oppositely arranged steel plate side molds 1 into two side mold units 10, when installing the pre-buried water faucet pipe 3, after assembling one steel plate side mold 1, first insert one end of the cross pipe of the pre-buried water faucet pipe 3 into the bolt hole 9 of the steel plate side mold 1, and then fix the other steel plate side mold 1 after assembling it, and then translate the crossbar 301 to pass through the bolt hole 9 of the steel plate side mold 1.

[0038] In order to keep the vertical pipe 302 of the pre-buried water faucet pipe 3 in an upright state and to keep the vertical pipe 302 in a centered state, a fixing hook 15 is provided in the middle of each steel plate side form 1. After the pre-buried water faucet pipe 3 is installed in the formwork assembly, the pre-buried water faucet pipe 3 is tied with the iron wire 16. When tying, the vertical pipe 302 is also tied. The front, back, left, right and four directions of the vertical pipe 302 are respectively fixed on the steel plate side form 1 in four directions by the iron wire 16 to keep the vertical pipe 302 upright and centered to avoid displacement during the pouring process.

[0039] The installation of the embedded PVC pipe 4 is relatively simple, and it can be directly passed through the corresponding pipe holes 8 on the two opposite steel plate side molds 1.

[0040] After the pre-buried water hydrant pipe 3 and the pre-buried PVC pipe 4 are installed, concrete can be poured and cured as required. After the precast concrete anchor pier is cured, the positioning pin 12 is pulled out. When removing the mold, the pins on the steel plate bottom mold 2 and the steel plate side mold 1 are pulled out to remove the mold.

[0041] When the strength of the formed anchor pier meets the requirements, the redundant water hydrant pipe and PVC pipe on the side of the steel plate side mold 1 can be cut off. When installing the precast concrete anchor pier, the steel wire rope used for hoisting can be passed through the pre-buried PVC pipe 4 for on-site installation. When installing on-site, the installation site uses an excavator to dig trenches to complete the installation of the anchor pier. After the anchor pier is installed in place, the water supply pipeline laid in advance is connected to the pre-buried water hydrant pipe 3 in the anchor pier by hot-melt welding, and then backfilling can be carried out.

[0042] The template for preparing the prefabricated concrete anchor pier for farmland irrigation water supply hydrant of the utility model is used to solve the problems of inconvenient transportation of materials in farmland with complex terrain, inconvenient concrete mixing and pouring and pollution of farmland, and inability to backfill the trench immediately after pouring the anchor pier, resulting in low construction efficiency. The prefabricated concrete anchor pier of the utility model for farmland irrigation water supply hydrant is manufactured by factory-based unified processing. The template adopts a combined steel template. The steel plate bottom template 2 and the steel plate side template 1 are connected and fixed by a pin type. The water supply pipeline is pre-buried in advance, and the PVC pipe 4 is pre-buried before concrete pouring. During installation, it is hoisted by inserting a steel wire rope.

[0043] The utility model discloses a precast concrete anchor pier which is cast uniformly by means of factory-made steel formwork. The steel plate bottom formwork 2 is a square steel plate. The steel plate side formwork 1 and the steel plate bottom formwork 2 are connected by means of latch holes. A pre-buried water faucet pipe 3 is arranged in the mold formed by the steel plate side formwork 1 and the steel plate bottom formwork 2 for connection with the water supply pipeline. The pre-buried PVC pipe 4 arranged in the mold facilitates lifting during installation.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.

Claims

1. A template for preparing prefabricated concrete anchor piers for farmland irrigation water hydrants, characterized in that: It includes a steel plate side mold, a steel plate bottom mold, a pre-buried water hydrant pipe and a pre-buried PVC pipe. The four sides of the steel plate bottom mold are respectively detachably connected to a steel plate side mold. Adjacent steel plate side molds are connected by positioning parts. The pre-buried water hydrant pipe is arranged between two oppositely arranged steel plate side molds, and the pre-buried PVC pipe is arranged between the other two oppositely arranged steel plate side molds.

2. The template for preparing the prefabricated concrete anchor pier for the farmland irrigation water hydrant according to claim 1, characterized in that: The four steel plate side molds have the same shape, the steel plate bottom mold is a square steel plate, and the steel plate side molds have a rectangular or trapezoidal shape.

3. The template for preparing the prefabricated concrete anchor pier for the farmland irrigation water hydrant according to claim 1, characterized in that: Two bottom mold pin holes are welded on the four sides of the steel plate bottom mold, and two side mold pin holes are welded on the bottom of the steel plate side mold. The side mold pin holes and the bottom mold pin holes are aligned and connected by pin steel bars.

4. The template for preparing a prefabricated concrete anchor pier for a farmland irrigation water hydrant according to claim 1, characterized in that: Two oppositely arranged steel plate side molds are respectively provided with pipe holes for the pre-buried PVC pipe to pass through, and each of the steel plate side molds is provided with two pipe holes.

5. The template for preparing the prefabricated concrete anchor pier for the farmland irrigation water hydrant according to claim 4, characterized in that: The other two oppositely arranged steel plate side molds are respectively provided with bolt holes for the pre-buried water supply faucet pipe to pass through.

6. The template for preparing prefabricated concrete anchor piers for farmland irrigation water hydrants according to claim 1, characterized in that: The steel plate side mold is assembled from two side mold units, and the two side mold units have the same shape.

7. The template for preparing a prefabricated concrete anchor pier for a farmland irrigation water hydrant according to claim 1, characterized in that: The positioning member includes a positioning pin hole and a positioning bow. The positioning pin holes are respectively fixed at both ends of the top of each steel plate side mold. When the four steel plate side molds are in an upright state, the positioning pin holes on adjacent steel plate side molds are connected together by the positioning bow.

8. The template for preparing the prefabricated concrete anchor pier for the farmland irrigation water hydrant according to claim 7, characterized in that: The positioning pin holes on the steel plate side mold are at the same distance from the edge of the steel plate side mold.

9. The template for preparing a prefabricated concrete anchor pier for a farmland irrigation water hydrant according to claim 1, characterized in that: The pre-buried water faucet pipe comprises a cross bar and a vertical pipe, and the vertical pipe and the cross bar are interconnected.

10. The template for preparing prefabricated concrete anchor piers for farmland irrigation water hydrants according to claim 9, characterized in that: A fixing hook is respectively provided in the middle of each of the steel plate side molds.