Lining steel pipe diversion tunnel curve section installation system

By using horizontal assembled tire frames, prefabricated internal braces, transport trolleys and fast-stopping nets during the processing, transportation and assembly of inner lined steel pipes, the slow construction speed in the existing technology is solved. The problems of low accuracy and difficult handling of curve segment nodes have achieved efficient and accurate installation of lined steel pipes.

CN222472329UActive Publication Date: 2025-02-14ANHUI WATER CONSERVANCY DEV CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202421265018.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-02-14
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

In the processing, transportation and assembly of inner lined steel pipes, the problems of slow construction speed, low accuracy, high cost, and difficult to handle curve segments and variable diameter segment nodes.

Method used

The horizontal assembled tire frame is used to synchronously rotate and flip the inner lined steel pipe, which strengthens the loading and unloading efficiency; the on-site construction efficiency is improved through the assembled inner support steel combination adjustable strut structure; the curve segment is achieved by using the transport trolley and hydraulic vertical pole The assembly gap adjustment and position adjustment of the inner lined steel pipes are used; the quick-easy closing net is used as the partition formwork and the inner support steel pipe is prevented from floating up through the heavy-pressure trolley, and the concrete quality is controlled.

Benefits of technology

The construction speed and accuracy of the inner lined steel pipes are improved, the cost is reduced, the problem of processing nodes in curve segments and variable diameter segments is solved, and the overall construction efficiency is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222472329U_ABST
    Figure CN222472329U_ABST
Patent Text Reader

Abstract

The utility model relates to a lining steel pipe diversion tunnel curve section installation system which comprises a lining steel pipe, a horizontal assembling jig frame used for turning over a lining steel pipe welding stiffening ring and a moving trolley used for climbing pipes in a tunnel and assisting in butt joint of the lining steel pipe. The horizontal assembling jig frame has the advantages that the driving machine is arranged in the horizontal assembling jig frame to achieve synchronous rotation of the lining steel pipes, the limiting arms capable of being elastically opened and closed are arranged, the assembling and disassembling efficiency of the lining steel pipes is improved, the horizontal assembling jig frame can flexibly control the distance based on the rails, the overall installation effect is higher, consumed time is shorter, and the assembling and disassembling efficiency is improved. The traditional vertical assembling mode that the steel pipes are externally provided with stiffening rings is changed, and the practical value is high; a structural system of assembling type inner support section steel combined adjustable support rods is adopted to replace a traditional fixed welding umbrella-shaped inner support, and the field construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of water conservancy projects, and in particular comprises a curved section installation system for a lined steel pipe water diversion tunnel. Background Art

[0002] In recent years, with the improvement of my country's industrial and agricultural production level and the development of the national economy, water conservancy project construction has made great achievements. At the same time, with the application of shield construction technology in long-distance water pipelines, the processing, transportation technology and assembly construction technology of large-diameter lining steel pipes in tunnels have become particularly critical.

[0003] In terms of the processing and manufacturing of lining steel pipes, the traditional process adopts a stiffened ring vertical construction method for production, which has slow work efficiency and high cost, and is prone to welding quality problems, seriously affecting the construction period. In recent years, relevant scholars have also proposed a process for horizontal processing of steel pipes, but the overall horizontal tire frame is obviously insufficient in stability, flexibility and maneuverability; in addition, in terms of the transportation of lining steel pipes, the existing technology usually uses fixed umbrella-shaped steel inner supports to solve the problem of steel pipe deformation during transportation. On-site length measurement, structural welding and subsequent cutting seriously affect the overall construction efficiency; finally, in terms of the assembly of lining steel pipes, especially for lining steel pipes with larger diameters and when the gap between the tunnel and the lining steel pipe is small, the transportation and assembly technology of lining steel pipes in long-distance tunnels is more difficult and risky. There is currently no better construction technology for the node processing of curved sections and variable diameter sections.

[0004] In view of this, there is an urgent need for an installation system for a lined steel pipe diversion tunnel with fast construction speed, high construction accuracy, and outstanding economic and technical benefits. Utility Model Content

[0005] The utility model aims to overcome the deficiencies in the prior art and provide a curved section installation system for a lined steel pipe water diversion tunnel.

[0006] The curved section installation system of the lined steel pipe water diversion tunnel comprises: a lined steel pipe, a horizontal assembly frame for turning over the welded stiffening ring of the lined steel pipe, and a transfer trolley for climbing the pipe in the tunnel and assisting the lined steel pipe in docking;

[0007] Internal support steel is installed at both ends of the lining steel pipe through flanges, and the internal support steel abuts against the inner wall of the lining steel pipe through adjustable support rods;

[0008] A wheel set is provided at the bottom of the transfer trolley, and two front and rear transverse slide rails are provided on the surface of the transfer trolley. A hydraulic vertical rod is provided on the transverse slide rail to support the lining steel pipe. When the hydraulic vertical rod moves along the transverse slide rail, the lining steel pipe moves transversely.

[0009] The flanges fixed at both ends of the lining steel pipe are respectively installed with assembled limiting plates and assembled limiting blocks, and the adjacent lining steel pipes are connected by plugging the assembled limiting plates and assembled limiting blocks.

[0010] Preferably, a track is provided on the construction ground, and every two horizontal assembly tire frames are installed on the track as a group at intervals, which are used to adjust the spacing between two longitudinally adjacent groups of horizontal assembly tire frames to correspond to the length of the lining steel pipe; the horizontal assembly tire frame includes a built-in driving machine, a conveyor belt and a limit arm, the built-in driving machines on both sides are symmetrically arranged and connected through the conveyor belt, and a limit base and an elastic base are symmetrically arranged on the top of the horizontal assembly tire frame, the limit base is connected to the limit arm, the limit arm is provided with rollers and buckles, and the limit arm is connected to the elastic base through a connecting arm; the lining steel pipe is placed on the conveyor belt of the horizontal assembly tire frame, and an auxiliary limit rope is installed between the buckles, and the lining steel pipe flips when the conveyor belt rotates.

[0011] Preferably, the inner support steel is provided with two groups of strut supports symmetrically arranged up and down, the strut supports are connected with adjustable struts, rubber gaskets are arranged at the ends of the adjustable struts, all adjustable struts arranged on the inner support steel are in contact with the inner wall of the lining steel pipe, and the angles between all adjustable struts and the inner support steel are equal.

[0012] Preferably, the transfer trolley is symmetrically provided with four sets of wheels, the middle part of the transfer trolley is located in the inner lining steel pipe, and the front and rear parts extend from the two ends of the inner lining steel pipe. The front part of the transfer trolley is a set of guide wheel groups and a set of auxiliary wheel groups, and the rear part is two sets of auxiliary wheel groups. The surface of the transfer trolley is provided with front and rear transverse slide rails, and each transverse slide rail is symmetrically provided with hydraulic uprights, and a follower wheel group is provided on the top of the hydraulic upright. The follower wheel groups are connected by transverse connecting rods, and the follower wheel group abuts against the inner wall of the top of the inner lining steel pipe.

[0013] Preferably, two prefabricated limit plates are vertically welded to the limit plate base, the spacing between the two prefabricated limit plates is the same as the width of the prefabricated limit block, the limit plate base is fixed to the top of the built-in flange ring at the tail end of the installed lining steel pipe by anchor bolts, and the prefabricated limit block is fixed to the top of the built-in flange ring of the first section of the lining steel pipe to be installed by anchor bolts. After the two sections of the lining steel pipe are butt-jointed, the prefabricated limit block is inserted between the prefabricated limit plates.

[0014] Preferably, when the lining steel pipe is arranged in the variable diameter section, the lining steel pipe is divided into three segments, namely, the bottom lining segment, the upper left lining segment and the upper right lining segment. Anchor points are arranged on the top and both sides of the reinforced concrete segment of the variable diameter section tunnel. Electric hoists are installed on the top and both sides of the reinforced concrete segment through the anchor points. A temporary operating trolley is arranged in the reinforced concrete segment for performing circular assembly and welding operations of the bottom lining segment, the upper left lining segment and the upper right lining segment.

[0015] Preferably, the outer concrete of the lining steel pipe includes the first pouring of concrete, the second pouring of concrete and the third pouring of concrete from bottom to top. The length of the compartment during the pouring of the outer concrete is four to six sections of the lining steel pipe. Quick-closing nets are used as compartment pouring templates at both ends of the compartment. Grouting holes are opened on the top and waistline positions of the lining steel pipe. A ballast trolley is arranged inside the lining steel pipe, and a ballast water-filled bag is arranged on the ballast trolley.

[0016] The beneficial effects of the utility model are:

[0017] 1) The utility model realizes synchronous rotation of the lining steel pipe through the built-in driving machine of the horizontal assembly frame, and sets a limit arm with elastic opening and closing to improve the loading and unloading efficiency of the lining steel pipe. The horizontal assembly frame can flexibly control the spacing based on the track, and the overall installation efficiency is higher and less time-consuming. It changes the traditional vertical assembly mode of the steel pipe with a stiffening ring, and has a strong practical value.

[0018] 2) The utility model adopts a structural system of assembled internal support steel combined with adjustable support rods to replace the traditional fixed welded umbrella-shaped internal support, thereby improving the on-site construction efficiency.

[0019] 3) The utility model adjusts the assembly gap of the steel pipe lined in the curved section by using the wheel set of the transport trolley and the hydraulic uprights, realizes pipe climbing and position adjustment, and solves the problem of installation efficiency of large-diameter steel pipes in curved tunnels.

[0020] 4) The utility model adopts a quick-closing net as a compartment template to pour concrete in batches, and effectively prevents the inner support steel pipe from floating up through a weighted trolley, thereby better controlling the quality of concrete and shortening the construction period of filling concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the horizontal assembled tire frame structure in the utility model;

[0022] Figure 2 This is a schematic diagram of the horizontal assembly tire frame structure after the inner lining steel pipe is hoisted in the utility model;

[0023] Figure 3 It is a top view of the horizontal assembled tire frame structure system in the utility model;

[0024] Figure 4 This is a schematic diagram of the inner support steel structure of the utility model;

[0025] Figure 5 This is a schematic diagram of the operation of the transfer trolley in the utility model;

[0026] Figure 6 This utility model Figure 5 AA section view;

[0027] Figure 7 This is a schematic diagram of the pipe climbing of the transfer trolley in the curved section of the tunnel in the utility model;

[0028] Figure 8 This is a schematic diagram of the butt joint of the inner lining steel pipes in the curved section of the tunnel in the utility model;

[0029] Fig. 9 This is a schematic diagram of the installation position of the assembled limit block in the utility model;

[0030] Fig.10 This is a schematic diagram of the installation position of the assembled limiting plate in the utility model;

[0031] Fig.11 This is a schematic diagram of the installation of the electric hoist at a special node in the utility model;

[0032] Fig.12 This is a schematic diagram of the operation of the medium-pressure heavy-duty trolley of the utility model;

[0033] Fig.13 It is a schematic diagram of the installation position of the quick and easy closing net in the utility model.

[0034] In the figure: 1- buckle; 2- roller; 3- limit base; 4- limit arm; 5- transfer arm; 6- elastic base; 7- horizontal assembly tire frame; 8- built-in drive machine; 9- conveyor belt; 10- track; 11- lined steel pipe; 12- auxiliary limit rope; 13- connection bolt hole; 14- inner support steel; 15- anchor bolt; 16- support rod support; 17- adjustable support rod; 18- rubber gasket; 19- assembled limit block; 20- transfer trolley; 21- guide wheel group; 22- auxiliary wheel group; 23- hydraulic Vertical pole; 24-follow-up wheel set; 25-lateral slide rail; 26-lateral connecting rod; 27-assembled limit plate; 28-installed lining steel pipe; 29-limit plate base; 30-anchor point; 31-top electric hoist; 32-reinforced concrete segment; 33-side electric hoist; 34-temporary operating trolley; 35-first pouring of concrete; 36-second pouring of concrete; 37-third pouring of concrete; 38-grouting hole; 39-ballast trolley; 40-ballast water-filled bag; 41-quick and easy closing net. DETAILED DESCRIPTION

[0035] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

[0036] Embodiment 1

[0037] like Figures 3 to 13As shown, this lined steel pipe water diversion tunnel curved section installation system includes: a lined steel pipe 11, a transfer trolley 20 for climbing the pipe in the tunnel and assisting the lined steel pipe 11 to dock;

[0038] Internal support steels 14 are installed at both ends of the lining steel pipe 11 through flanges, and the internal support steels 14 abut against the inner wall of the lining steel pipe 11 through adjustable support rods 17; two groups of support rod supports 16 are symmetrically arranged on the internal support steel 14, and the support rod supports 16 are connected to adjustable support rods 17, and rubber gaskets 18 are arranged on the ends of the adjustable support rods 17. All adjustable support rods 17 arranged on the internal support steel 14 abut against the inner wall of the lining steel pipe 11, and the angles between all adjustable support rods 17 and the internal support steel 14 are equal.

[0039] A wheel group is provided at the bottom of the transfer trolley 20, and two front and rear transverse slide rails 25 are provided on the surface of the transfer trolley 20. A hydraulic upright 23 is provided on the transverse slide rail 25, which is used to prop up the lining steel pipe 11. When the hydraulic upright 23 moves along the transverse slide rail 25, the lining steel pipe 11 moves laterally; specifically, the transfer trolley 20 is symmetrically provided with four sets of wheel groups, the middle part of the transfer trolley 20 is located in the lining steel pipe 11, and the front and rear parts extend from the two ends of the lining steel pipe 11. The front part of the transfer trolley 20 is a set of guide wheel groups 21 and a set of auxiliary wheel groups 22, and the rear part is two sets of auxiliary wheel groups 22. Two front and rear transverse slide rails 25 are provided on the surface of the transfer trolley 20, and a hydraulic upright 23 is symmetrically provided on each transverse slide rail 25. A follower wheel group 24 is provided on the top of the hydraulic upright 23, and the follower wheel groups 24 are connected by a transverse connecting rod 26, and the follower wheel group 24 abuts against the inner wall of the top of the lining steel pipe 11.

[0040] The flanges fixed at both ends of the lining steel pipe 11 are respectively installed with assembled limiting plates 27 and assembled limiting blocks 19 , and the adjacent lining steel pipes 11 are connected by plugging the assembled limiting plates 27 and the assembled limiting blocks 19 .

[0041] Two assembled limit plates 27 are vertically welded to the limit plate base 29. The spacing between the two assembled limit plates 27 is the same as the width of the assembled limit block 19. The limit plate base 29 is fixed to the top of the built-in flange ring at the tail end of the installed lining steel pipe 28 by anchor bolts 15. The assembled limit block 19 is fixed to the top of the built-in flange ring of the first section of the lining steel pipe 11 to be installed by anchor bolts 15. After the two sections of the lining steel pipe 11 are butt-jointed, the assembled limit block 19 is inserted between the assembled limit plates 27.

[0042] Embodiment 2

[0043] As another embodiment, this embodiment 2 proposes, on the basis of embodiment 1, a more specific installation system for curved sections of lined steel pipe water diversion tunnels, which also includes a horizontal assembly frame 7 for flipping the lined steel pipe 11 to weld stiffening rings.

[0044] like Figure 1 and Figure 2 As shown, a track 10 is provided on the construction ground, and every two horizontal assembly tire frames 7 are installed on the track 10 at intervals as a group, which are used to adjust the spacing between two longitudinally adjacent groups of horizontal assembly tire frames 7 and the length of the lining steel pipe 11; the horizontal assembly tire frame 7 includes a built-in driving machine 8, a conveyor belt 9 and a limiting arm 4, and the built-in driving machines 8 on both sides are symmetrically arranged and connected through the conveyor belt 9. The top of the horizontal assembly tire frame 7 is symmetrically arranged with a limiting base 3 and an elastic base 6, and the limiting base 3 is connected to the limiting arm 4. The limiting arm 4 is provided with a roller 2 and a buckle 1, and the limiting arm 4 is connected to the elastic base 6 through a transfer arm 5; the lining steel pipe 11 is placed on the conveyor belt 9 of the horizontal assembly tire frame 7, and an auxiliary limiting rope 12 is installed between the buckles 1. When the conveyor belt 9 rotates, the lining steel pipe 11 flips over.

[0045] like Figures 9 to 13 As shown, when the lining steel pipe 11 is arranged in the variable diameter section, the lining steel pipe 11 is divided into three segments, namely, the bottom lining segment, the upper left lining segment and the upper right lining segment. Anchor points 30 are arranged on the top and both sides of the reinforced concrete segment 32 of the variable diameter section tunnel. Electric hoists are respectively installed on the top and both sides of the reinforced concrete segment 32 through the anchor points 30. A temporary operating trolley 34 is arranged in the reinforced concrete segment 32 for performing the assembly and welding operation of the bottom lining segment, the upper left lining segment and the upper right lining segment.

[0046] The outer concrete of the lining steel pipe 11 includes the first pouring of concrete 35, the second pouring of concrete 36 and the third pouring of concrete 37 from bottom to top. The length of the compartment during the pouring of the outer concrete is four to six sections of the lining steel pipe 11. Quick-closing nets 41 are used as compartment pouring templates at both ends of the compartment. Grouting holes 38 are opened at the top and waistlines of the lining steel pipe 11 on both sides; a ballast trolley 39 is arranged in the lining steel pipe 11, and a ballast water-filled bag 40 is arranged on the ballast trolley 39 to prevent the lining steel pipe 11 from floating up.

[0047] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0048] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

Claims

1. A curved section installation system for a lined steel pipe water diversion tunnel, characterized in that: include: Lining steel pipes, horizontal assembly frames for turning over the welding stiffening rings of lining steel pipes, and transfer trolleys for climbing pipes in tunnels and assisting in the docking of lining steel pipes; Internal support steel is installed at both ends of the lining steel pipe through flanges, and the internal support steel abuts against the inner wall of the lining steel pipe through adjustable support rods; A wheel set is provided at the bottom of the transfer trolley, and two front and rear transverse slide rails are provided on the surface of the transfer trolley. A hydraulic vertical rod is provided on the transverse slide rail to support the lining steel pipe. When the hydraulic vertical rod moves along the transverse slide rail, the lining steel pipe moves transversely. The flanges fixed at both ends of the lining steel pipe are respectively installed with assembled limiting plates and assembled limiting blocks, and the adjacent lining steel pipes are connected by plugging the assembled limiting plates and assembled limiting blocks.

2. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: Tracks are provided on the construction ground. Every two horizontal assembly frames are installed on the tracks as a group, which are used to adjust the spacing between two longitudinally adjacent groups of horizontal assembly frames to correspond to the length of the lining steel pipe. The horizontal assembly frame includes a built-in driving machine, a conveyor belt and a limit arm. The built-in driving machines on both sides are symmetrically arranged and connected through the conveyor belt. A limit base and an elastic base are symmetrically arranged on the top of the horizontal assembly frame. The limit base is connected to the limit arm. Rollers and buckles are arranged on the limit arm. The limit arm is connected to the elastic base through a transfer arm. The lining steel pipe is placed on the conveyor belt of the horizontal assembly frame. Auxiliary limit ropes are installed between the buckles. The lining steel pipe flips over when the conveyor belt rotates.

3. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: The inner support steel is symmetrically provided with two groups of support rod supports, the support rod supports are connected with adjustable support rods, the ends of the adjustable support rods are provided with rubber gaskets, all the adjustable support rods arranged on the inner support steel are in contact with the inner wall of the lining steel pipe, and the angles between all the adjustable support rods and the inner support steel are equal.

4. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: The transfer trolley is symmetrically provided with four sets of wheels. The middle part of the transfer trolley is located in the inner lining steel pipe, and the front and rear parts extend from the two ends of the inner lining steel pipe. The front part of the transfer trolley is a set of guide wheel groups and a set of auxiliary wheel groups, and the rear part is two sets of auxiliary wheel groups. The surface of the transfer trolley is provided with front and rear transverse slide rails, and each transverse slide rail is symmetrically provided with hydraulic uprights. A follower wheel group is provided on the top of the hydraulic upright. The follower wheel groups are connected by transverse connecting rods, and the follower wheel group abuts against the inner wall of the top of the inner lining steel pipe.

5. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: Two assembled limit plates are vertically welded to the limit plate base, the spacing between the two assembled limit plates is the same as the width of the assembled limit block, the limit plate base is fixed to the top of the built-in flange ring at the tail end of the installed lining steel pipe by anchor bolts, and the assembled limit block is fixed to the top of the built-in flange ring of the first section of the lining steel pipe to be installed by anchor bolts. After the two sections of the lining steel pipe are butt-jointed, the assembled limit block is inserted between the assembled limit plates.

6. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: When the lining steel pipe is set in the variable diameter section, the lining steel pipe is divided into three segments: bottom lining segment, upper left lining segment and upper right lining segment. Anchor points are set on the top and both sides of the reinforced concrete segment of the variable diameter section tunnel. Electric hoists are installed on the top and both sides of the reinforced concrete segment through the anchor points. A temporary operating trolley is provided in the reinforced concrete segment for rounding and welding the bottom lining segment, upper left lining segment and upper right lining segment.

7. The curved section installation system of the lined steel pipe diversion tunnel according to claim 1 is characterized in that: The outer concrete of the lined steel pipe includes the first pouring of concrete, the second pouring of concrete and the third pouring of concrete from bottom to top. The length of the compartment during the pouring of the outer concrete is four to six sections of the lined steel pipe. Quick-closing nets are used as compartment pouring templates at both ends of the compartment. Grouting holes are opened on the top and waistlines of the lined steel pipe. A ballast trolley is installed inside the lined steel pipe, and a ballast water-filled bag is installed on the ballast trolley.

Citation Information

Cited By

  • Method for installing curve section of lining steel pipe diversion tunnel

    CN118456329A

  • Method for installing curved section of lining steel pipe water diversion tunnel

    CN118456329B

  • Splicing jig frame and method for space hyperbolic circular tube compression ring beam

    CN121251026A