Foundation pit settlement monitoring equipment

By designing a foundation pit settlement monitoring equipment including crossbars, support rods, guide rods, sliding frames and benchmarks, the problems of difficulty in installing and disassemblying the foundation pit settlement monitoring device and long point transfer time in the prior art are solved, and the problem of difficulty in installing and disassemblying the foundation pit settlement monitoring device in the prior art is realized. The rapid transfer of monitoring points and the acceleration of construction progress are achieved.

CN222477563UActive Publication Date: 2025-02-14BEIJING ZHONGJIAN CONSTR RES INST CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421007269.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2025-02-14
Estimated Expiration
2034-05-10

AI Technical Summary

Technical Problem

The existing foundation pit settlement monitoring device is difficult to install and disassemble, and the point transfer time is long, resulting in delay in the construction process.

Method used

A foundation pit settlement monitoring device is designed, including cross bars, support bars, guide bars, sliding frames and benchmarks. Through the combination of sliding frames and guide bars, the benchmarks can be quickly adjusted and the monitoring point transfer are achieved.

Benefits of technology

This equipment allows the transfer of monitoring points to be reinstalled and disassembled, and is simple and convenient to operate, significantly speeds up construction progress and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222477563U_ABST
    Figure CN222477563U_ABST
Patent Text Reader

Abstract

The utility model discloses foundation pit settlement monitoring equipment, which relates to the technical field of settlement monitoring and comprises a cross rod, supporting rods are symmetrically and fixedly connected to the side wall of the cross rod, a first fixing cone is fixedly connected to one end, far away from the cross rod, of each supporting rod and is inserted into the side wall of a foundation pit, and the top of the cross rod is slidably connected with a guide rod. Sliding frames are slidably connected into the guide rods, marker posts are detachably connected into the sliding frames, scales are written on the side walls of the marker posts, and the bottoms of the marker posts make contact with the bottom face of the foundation pit. The device is simple in structure and convenient to use, facilitates the transfer of monitoring sites, and improves the working efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of settlement monitoring, in particular to a foundation pit settlement monitoring device. Background Art

[0002] Nowadays, various large-scale engineering buildings are increasing day by day, which has changed the original state of the ground and exerted a certain amount of pressure on the foundation of the building, which will cause deformation of the foundation and surrounding strata. In order to ensure the safety of the building, the settlement monitoring of the foundation pit before construction is an important part of the foundation pit construction. It refers to the observation and analysis of the rock and soil properties of the foundation pit, the displacement of the support structure and the changes in the surrounding environmental conditions during the foundation pit excavation and underground engineering construction process, and timely feedback of the monitoring results to predict the deformation and stable state development caused by further construction, and to guide the design and construction based on the prediction of the degree of impact of the construction on the surrounding environment.

[0003] Existing monitoring devices are difficult to install and dismantle, and it takes a long time to move from one point to the next, thus delaying the overall construction process.

[0004] Therefore, there is an urgent need for a foundation pit settlement monitoring device to solve the above problems. Utility Model Content

[0005] The utility model aims to provide a foundation pit settlement monitoring device to solve the problems existing in the prior art.

[0006] To achieve the above-mentioned purpose, the utility model provides the following solution: the utility model provides a foundation pit settlement monitoring device, including a cross bar, the side wall of the cross bar is symmetrically fixed with a support rod, the end of the support rod away from the cross bar is fixed with a first fixed cone, the first fixed cone is inserted into the side wall of the foundation pit, the top of the cross bar is slidably connected to a guide rod, the guide rod and the cross bar are staggered in the horizontal direction, a sliding frame is slidably connected to the guide rod, a benchmark is detachably connected to the sliding frame, the side wall of the benchmark is written with scales, and the bottom of the benchmark is in contact with the bottom surface of the foundation pit.

[0007] Preferably, a first through slot is formed on the cross bar, a slider is slidably connected in the first through slot, a top of the slider extends out of the first through slot and fits against a top surface of the cross bar, and a top surface of the slider is fixedly connected to the guide rod.

[0008] Preferably, a motor is embedded in the cross bar, a lead screw is fixedly connected to the output shaft of the motor, one end of the lead screw away from the motor is rotatably connected to the cross bar, the lead screw is located in the first through groove, the slider passes through the lead screw, and the slider is threadedly connected to the lead screw.

[0009] Preferably, a second through slot is formed on the guide rod, the sliding frame is located in the second through slot and is slidably connected to the second through slot, a transmission assembly is installed in the guide rod, and the transmission assembly is transmission-connected to the sliding frame.

[0010] Preferably, the transmission assembly includes a transmission wheel rotatably connected to the four corners of the guide rod, the transmission wheel is located inside the guide rod, a driving motor is fixedly connected to the center of the transmission wheel, a plurality of the transmission wheels are connected by a belt, sliding grooves are symmetrically opened on both sides of the second through groove, the belt is located in the sliding grooves, a connecting block is slidably connected in any of the sliding grooves, the connecting block is fixedly connected to the sliding frame, and the belt passes through the connecting block and is fixedly connected to the connecting block.

[0011] Preferably, the side wall of the sliding frame is detachably connected to a connecting plate, a pointer is fixedly connected to the bottom of the connecting plate, and an end of the pointer away from the connecting plate faces the side of the pole where the scale is written.

[0012] Preferably, an oblique rod is symmetrically fixed to the top surface of the cross rod, a second fixed cone is fixed to the top of the oblique rod, and the second fixed cone is located above the first fixed cone.

[0013] Preferably, a level is fixedly mounted on the side wall of the support rod.

[0014] The utility model discloses the following technical effects: when in use, two first fixed cones are inserted into the side wall of the foundation pit, so that the crossbar remains stable, the cross tube is in a horizontal state, the guide rod slides on the crossbar, the sliding frame slides on the guide rod, and the sliding frame is adjusted to the monitoring point, and then the benchmark is inserted into the sliding frame, the benchmark is in a vertical state, and the bottom of the benchmark contacts the monitoring point. When the point moves down, the benchmark moves down accordingly, and the settlement change of this point can be known by observing the benchmark, so as to facilitate timely adjustment of the construction plan; after the monitoring of this point is completed, the benchmark is moved out, and the guide rod and the sliding frame are moved again to transfer it to the next point, without the need for reinstallation and disassembly, the operation is simpler and more convenient, and the progress of the project is accelerated. The utility model has a simple structure, is easy to use, is convenient for the transfer of monitoring points, and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a structural schematic diagram of the utility model;

[0017] Figure 2 It is a top cross-sectional view of the guide rod of the utility model;

[0018] Figure 3 This is a schematic diagram of the internal structure of the crossbar of the utility model;

[0019] Figure 4 It is a side view of the sliding frame of the utility model;

[0020] Among them, 1. cross bar; 2. support bar; 3. first fixed cone; 4. inclined bar; 5. second fixed cone; 6. level; 7. slider; 8. benchmark; 9. guide bar; 10. sliding frame; 11. first through slot; 12. second through slot; 13. motor; 14. lead screw; 15. slide slot; 16. belt; 17. connecting block; 18. transmission wheel; 19. connecting plate; 20. pointer. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0023] Reference Figure 1-Figure 4 The utility model provides a foundation pit settlement monitoring device, including a cross bar 1, a support rod 2 is symmetrically fixed to the side wall of the cross bar 1, a first fixed cone 3 is fixed to the end of the support rod 2 away from the cross bar 1, the first fixed cone 3 is inserted into the side wall of the foundation pit, the top of the cross bar 1 is slidably connected to the guide rod 9, the guide rod 9 and the cross bar 1 are staggered in the horizontal direction, a sliding frame 10 is slidably connected to the guide rod 9, a benchmark rod 8 is detachably connected to the sliding frame 10, the side wall of the benchmark rod 8 is written with scales, and the bottom of the benchmark rod 8 is in contact with the bottom surface of the foundation pit.

[0024] When in use, two first fixed cones 3 are inserted into the side wall of the foundation pit, so that the crossbar 1 remains stable, the cross tube is in a horizontal state, the guide rod 9 slides on the crossbar 1, and the sliding frame 10 slides on the guide rod 9, so that the sliding frame 10 is adjusted to the monitoring point, and then the benchmark 8 is inserted into the sliding frame 10, the benchmark 8 is in a vertical state, and the bottom of the benchmark 8 contacts the monitoring point. When the point moves down, the benchmark 8 moves down accordingly. By observing the benchmark 8, the settlement change of this point can be known, so as to facilitate timely adjustment of the construction plan; after the monitoring of this point is completed, the benchmark 8 is moved out, and the guide rod 9 and the sliding frame 10 are moved again to transfer it to the next point, without reinstallation and disassembly, the operation is simpler and more convenient, and the progress of the project is accelerated. The utility model has a simple structure, is easy to use, is convenient for the transfer of monitoring points, and improves work efficiency.

[0025] Further optimizing the scheme, a first through slot 11 is provided on the cross bar 1, a slider 7 is slidably connected in the first through slot 11, the top of the slider 7 extends out of the first through slot 11 and fits with the top surface of the cross bar 1, and the top surface of the slider 7 is fixedly connected to the guide rod 9. The slider 7 slides in the first through slot 11 on the cross bar 1, driving the guide rod 9 to move along the cross tube, facilitating the adjustment of the position and improving the working efficiency.

[0026] According to a further optimized solution, a motor 13 is embedded in the cross bar 1, and a lead screw 14 is fixedly connected to the output shaft of the motor 13. The end of the lead screw 14 away from the motor 13 is rotatably connected to the cross bar 1. The lead screw 14 is located in the first through slot 11, and the slider 7 passes through the lead screw 14, and the slider 7 is threadedly connected to the lead screw 14. The motor 13 drives the lead screw 14 to rotate, and the slider 7 is adapted to the first through slot 11 and cannot rotate relative to it. The rotation of the lead screw 14 causes the slider 7 to horizontally displace, thereby driving the guide rod 9 to move. The operation is simple and convenient, saving time.

[0027] Further optimization scheme, the guide rod 9 is provided with a second through slot 12, the sliding frame 10 is located in the second through slot 12 and is slidably connected to the second through slot 12, and a transmission assembly is installed in the guide rod 9, and the transmission assembly is transmission-connected to the sliding frame 10. The transmission assembly drives the sliding frame 10 to slide in the second through slot 12 of the guide rod 9, and can be transferred to the next point without complete disassembly, which greatly improves the progress of the project.

[0028] Further optimized solution, the transmission assembly includes a transmission wheel 18 rotatably connected to the four corners of the guide rod 9, the transmission wheel 18 is located in the guide rod 9, the center of the transmission wheel 18 is fixedly connected to the driving motor, a plurality of transmission wheels 18 are connected by winding belts 16, the second through slot 12 is symmetrically provided with slide slots 15 on both sides, the belt 16 is located in the slide slots 15, a connecting block 17 is slidably connected in any slide slot 15, the connecting block 17 is fixedly connected to the sliding frame 10, and the belt 16 passes through the connecting block 17 and is fixedly connected to the connecting block 17. The driving motor drives the transmission wheel 18 to rotate, the transmission wheel 18 drives the belt 16 to rotate, and when the belt 16 rotates, it drives the connecting block 17 to slide in the slide slot 15, and the connecting block 17 drives the sliding frame 10 to slide along the second through slot 12, thereby realizing the adjustment of the position of the sliding frame 10, saving time and being highly efficient.

[0029] In a further optimized solution, the side wall of the sliding frame 10 is detachably connected to a connecting plate 19, and a pointer 20 is fixedly connected to the bottom of the connecting plate 19. The end of the pointer 20 away from the connecting plate 19 faces the side with scales written on the benchmark 8. When the benchmark 8 is installed, the scale pointed by the pointer 20 is recorded. When the monitoring is completed, the scale pointed by the pointer 20 is recorded again. The difference between the two scales is the settlement amount, which is convenient for construction personnel to refer to.

[0030] Further optimization scheme, the top surface of the cross bar 1 is symmetrically fixed with an inclined rod 4, the top of the inclined rod 4 is fixed with a second fixed cone 5, and the second fixed cone 5 is located above the first fixed cone 3. The setting of the inclined rod 4 and the second fixed cone 5 improves the overall stability and prevents interference from external factors that affect the monitoring effect.

[0031] To further optimize the solution, a level 6 is fixedly installed on the side wall of the support rod 2. The setting of the level 6 is used to level the crossbar 1, ensure its horizontal setting, and improve the monitoring accuracy.

[0032] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0033] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. A foundation pit settlement monitoring device, characterized in that: The invention comprises a cross bar (1), the side wall of the cross bar (1) is symmetrically fixed with a support bar (2), one end of the support bar (2) away from the cross bar (1) is fixed with a first fixed cone (3), the first fixed cone (3) is inserted into the side wall of the foundation pit, the top of the cross bar (1) is slidably connected to a guide rod (9), the guide rod (9) and the cross bar (1) are staggered in the horizontal direction, a sliding frame (10) is slidably connected inside the guide rod (9), a benchmark rod (8) is detachably connected inside the sliding frame (10), the side wall of the benchmark rod (8) is marked with scales, and the bottom of the benchmark rod (8) is in contact with the bottom surface of the foundation pit.

2. The foundation pit settlement monitoring device according to claim 1 is characterized in that: The cross bar (1) is provided with a first through slot (11), a slider (7) is slidably connected in the first through slot (11), the top of the slider (7) extends out of the first through slot (11) and fits with the top surface of the cross bar (1), and the top surface of the slider (7) is fixedly connected to the guide rod (9).

3. The foundation pit settlement monitoring device according to claim 2 is characterized in that: The cross bar (1) is embedded with a motor (13), the output shaft of the motor (13) is fixedly connected with a lead screw (14), one end of the lead screw (14) away from the motor (13) is rotatably connected to the cross bar (1), the lead screw (14) is located in the first through groove (11), the slider (7) passes through the lead screw (14), and the slider (7) is threadedly connected to the lead screw (14).

4. The foundation pit settlement monitoring device according to claim 1, characterized in that: The guide rod (9) is provided with a second through slot (12), the sliding frame (10) is located in the second through slot (12) and is slidably connected to the second through slot (12), and a transmission component is installed in the guide rod (9), and the transmission component is transmission-connected to the sliding frame (10).

5. The foundation pit settlement monitoring device according to claim 4 is characterized in that: The transmission assembly comprises a transmission wheel (18) rotatably connected to the four corners of the guide rod (9), the transmission wheel (18) is located in the guide rod (9), a driving motor is fixedly connected to the center of the transmission wheel (18), a plurality of the transmission wheels (18) are connected by a belt (16), sliding grooves (15) are symmetrically opened on both sides of the second through groove (12), the belt (16) is located in the sliding groove (15), a connecting block (17) is slidably connected in any of the sliding grooves (15), the connecting block (17) is fixedly connected to the sliding frame (10), and the belt (16) passes through the connecting block (17) and is fixedly connected to the connecting block (17).

6. The foundation pit settlement monitoring device according to claim 5, characterized in that: The side wall of the sliding frame (10) is detachably connected to a connecting plate (19), the bottom of the connecting plate (19) is fixedly connected to a pointer (20), and the end of the pointer (20) away from the connecting plate (19) faces the side of the pole (8) on which the scale is written.

7. The foundation pit settlement monitoring device according to claim 1, characterized in that: The top surface of the cross bar (1) is symmetrically fixed with an inclined bar (4), the top of the inclined bar (4) is fixed with a second fixed cone (5), and the second fixed cone (5) is located above the first fixed cone (3).

8. The foundation pit settlement monitoring device according to claim 1, characterized in that: A level (6) is fixedly mounted on the side wall of the support rod (2).