Temporary plugging structure for reserved sleeve at outlet of comprehensive pipe rack

By installing a temporary sealing structure of rigid waterproof casing, waterproof rubber gasket, casing seal plate and fastening screw at the reserved casing outlet of the integrated pipe corridor, the water seepage caused by the inability to be closed in time is solved. Problem, efficient waterproofing effect and rapid construction have been achieved.

CN222500328UActive Publication Date: 2025-02-18MCC SOUTHERN CITY CONSTR ENG TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421264473.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-02-18
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

The reserved casing of the comprehensive pipeline corridor lead-out outlet cannot be closed in time, resulting in groundwater seepage, causing damage to electrical components in the pipeline corridor, moisture reflux of the decorative layer, and corrosion of metal support hangers.

Method used

Provided is a temporary sealing structure including a rigid waterproof casing, a waterproof rubber gasket, a casing sealing plate and a fastening screw that penetrates the concrete of the pipe corridor lead-out structure. The two ends of the rigid waterproof casing press against the waterproof rubber gasket. The sleeve sealing plate presses against the rubber gasket away from the concrete side. The screw connecting the sealing plate and the cap is tightened and filled with a waterproof filling layer to achieve multiple waterproofing.

Benefits of technology

It achieves good waterproofing effect, convenient and fast loading and unloading on site, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary plugging structure for a reserved sleeve at an outlet of a utility tunnel, and relates to the field of utility tunnel construction. The temporary plugging structure for the reserved sleeve of the comprehensive pipe gallery outlet comprises a rigid waterproof sleeve penetrating through structural concrete of the pipe gallery outlet, two waterproof rubber gaskets attached to the two sides of the structural concrete of the pipe gallery outlet, two sleeve sealing plates abutting against the two waterproof rubber gaskets correspondingly and a fastening screw. The two ends of the rigid waterproof sleeve abut against the two waterproof rubber gaskets respectively, and the fastening screw penetrates through the central axis of the rigid waterproof sleeve, the two waterproof rubber gaskets and the two sleeve sealing plates and then is connected with the rod cap and the fastening nut. A first filling hole and a second filling hole which are communicated with the interior of the rigid waterproof sleeve are formed in one sleeve sealing plate and the corresponding waterproof rubber gasket respectively, and the rigid waterproof sleeve is filled with a waterproof filling layer. The temporary plugging structure for the reserved sleeve at the outlet of the utility tunnel has the advantages of good waterproof effect, convenience and quickness in field assembly and disassembly and high construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of integrated pipe gallery construction, and in particular to a temporary plugging structure of a reserved casing at an outlet of an integrated pipe gallery. Background Art

[0002] The integrated pipe gallery is an underground pipeline integrated corridor that integrates various engineering pipelines such as electricity, communications, gas, heating, water supply and drainage. The integrated pipe gallery is equipped with outlet nodes at intersections or as needed. Pipeline casings need to be reserved at the outlet nodes. Pipe groups or trenches are generally set from the outlet nodes to both sides of the road to ensure that the pipelines inside the corridor are led to both sides of the road and then reach the users. However, due to the construction period, uncertainty of the time for pipelines to enter the corridor, and long-term planning of reserved channels, the reserved casings at the outlet of the integrated pipe gallery cannot be closed in time or fully utilized. If the redundant holes are not closed, groundwater will penetrate into the interior of the pipe gallery, which will easily cause damage to the electrical components in the distribution box in the pipe gallery, moisture in the decorative layer of the wall of the pipe gallery, and corrosion of metal supports and hangers for a long time.

[0003] At present, the temporary plugging methods of integrated pipe corridors can be roughly summarized as follows: fine stone concrete plugging and rubber airbag plugging. Fine stone concrete plugging is extremely difficult to clean and remove as a temporary plugging filler, and the plugging process is cumbersome. Although rubber airbag plugging is simple to operate, the air pressure of the airbag needs to be checked regularly, and the rubber is prone to aging and loses its plugging effect. Utility Model Content

[0004] The purpose of the present application is to provide a temporary plugging structure of a reserved casing for an integrated pipe gallery outlet, which has the advantages of good waterproofing effect, convenient and quick on-site loading and unloading, and high construction efficiency.

[0005] This application is implemented as follows:

[0006] The present application provides a temporary plugging structure for a reserved casing of an integrated pipe gallery outlet, which includes a rigid waterproof casing penetrating the concrete of the pipe gallery outlet structure, two waterproof rubber gaskets respectively fitted on both sides of the concrete of the pipe gallery outlet structure, two casing sealing plates and a fastening screw. The two ends of the rigid waterproof casing respectively press against the two waterproof rubber gaskets, and the two casing sealing plates respectively press against the two waterproof rubber gaskets on one side away from the concrete of the pipe gallery outlet structure. After the fastening screw passes through the central axis of the rigid waterproof casing, the two ends respectively pass through the two waterproof rubber gaskets and the two casing sealing plates, and then a connecting rod cap and a fastening nut are provided. A casing sealing plate and a corresponding waterproof rubber gasket are respectively provided with a first filling hole and a second filling hole connected to the inside of the rigid waterproof casing, and the rigid waterproof casing is filled with a waterproof filling layer.

[0007] In some optional embodiments, the two casing sealing plates and the two waterproof rubber gaskets are both circular, and the diameters of the two casing sealing plates are both larger than the corresponding waterproof rubber gaskets.

[0008] In some optional embodiments, two sealing covers are further included which can be respectively installed through threads and connected to the two casing sealing plates. When the sealing covers are connected to the corresponding casing sealing plates, the two are enclosed to form a protective cavity for receiving the rod cap or the fastening nut. The two sealing covers are configured to press or stop pressing the concrete of the pipeline gallery outlet structure when rotating.

[0009] In some optional embodiments, a sealing cavity is formed between the sealing cover, the corresponding casing sealing plate and the waterproof rubber gasket and the tunnel outlet structural concrete. The outer wall of the sealing cover at one end close to the tunnel outlet structural concrete is provided with a glue injection hole connected to the sealing cavity, and the sealing cavity is filled with a sealant layer.

[0010] In some optional embodiments, the rigid waterproof casing is provided with an intermediate fixing plate which is threadedly mounted on the fastening screw. The intermediate fixing plate is threadedly connected to at least one axial pressure rod passing through it, and the two ends of the axial pressure rod respectively press against two waterproof rubber gaskets.

[0011] In some optional embodiments, the outer peripheral wall of the middle fixing disk is threadedly connected with at least one radial pressing rod, and the radial pressing rod is configured to move radially to press against the inner wall of the rigid waterproof casing when rotating.

[0012] In some optional embodiments, an elastic pressing head is provided at one end of the radial pressing rod away from the middle fixing disk.

[0013] In some optional embodiments, the waterproof filling layer is a foamed rubber layer or an expanded cement mortar layer.

[0014] The beneficial effects of the present application are as follows: the temporary plugging structure of the reserved casing for the outlet of the integrated pipe gallery provided by the present application comprises a rigid waterproof casing that penetrates the concrete of the outlet structure of the pipe gallery, two waterproof rubber gaskets that respectively fit the two sides of the concrete of the outlet structure of the pipe gallery, two casing sealing plates and a fastening screw, the two ends of the rigid waterproof casing respectively press against the two waterproof rubber gaskets, the two casing sealing plates respectively press against the two waterproof rubber gaskets on the side away from the concrete of the outlet structure of the pipe gallery, after the fastening screw passes through the central axis of the rigid waterproof casing, the two ends respectively penetrate the two waterproof rubber gaskets and the two casing sealing plates, and then the connecting rod cap and the fastening nut, a casing sealing plate and the corresponding waterproof rubber gasket are respectively provided with a first filling hole and a second filling hole that are connected to the inside of the rigid waterproof casing, and the rigid waterproof casing is filled with a waterproof filling layer. The temporary plugging structure of the reserved casing for the outlet of the integrated pipe gallery provided by the present application has the advantages of good waterproof effect, convenient and quick on-site loading and unloading, and high construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 A schematic diagram of a partial cross-sectional structure of a temporary plugging structure of a reserved casing at an outlet of a comprehensive pipe gallery provided in Example 1 of the present application;

[0017] Figure 2 A schematic diagram of a partial structure from a first perspective of a temporary plugging structure of a reserved casing for an outlet of a comprehensive pipe gallery provided in Example 1 of the present application;

[0018] Figure 3 A schematic diagram of the partial structure of the second perspective of the temporary plugging structure of the reserved casing at the outlet of the integrated pipe gallery provided in Example 1 of the present application;

[0019] Figure 4 A schematic diagram of a partial cross-sectional structure of a temporary plugging structure of a reserved casing at an outlet of a comprehensive pipe gallery provided in Example 2 of the present application;

[0020] Figure 5 A schematic diagram of the partial cross-sectional structure of the temporary plugging structure of the reserved casing at the outlet of the integrated pipeline corridor provided in Example 3 of the present application.

[0021] In the figure: 100, tunnel outlet structural concrete; 110, rigid waterproof casing; 120, waterproof rubber gasket; 130, casing sealing plate; 140, fastening screw; 150, rod cap; 160, fastening nut; 170, first filling hole; 180, second filling hole; 190, waterproof filling layer; 200, sealing cover; 210, protection cavity; 220, sealing cavity; 230, glue injection hole; 240, sealing glue layer; 250, intermediate fixing plate; 260, axial pressure rod; 270, radial pressure rod; 280, pressure head; 290, water-stop steel plate; 300, nut gasket. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0023] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0024] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0025] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0026] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0027] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0028] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0029] The features and performance of the temporary plugging structure of the reserved casing at the outlet of the integrated pipe gallery of the present application are further described in detail below in conjunction with the embodiments.

[0030] Example 1

[0031] like Figure 1 , Figure 2 and Figure 3 As shown, an embodiment of the present application provides a temporary plugging structure of a reserved casing for an integrated pipe gallery outlet, which includes a rigid waterproof casing 110 that penetrates the pipe gallery outlet structural concrete 100, two circular waterproof rubber gaskets 120 that are respectively attached to both sides of the pipe gallery outlet structural concrete 100, two circular casing sealing plates 130 and a fastening screw 140, wherein the diameters of the two casing sealing plates 130 are both larger than the diameters of the waterproof rubber gaskets 120, the two ends of the rigid waterproof casing 110 respectively press against the adjacent sides of the two waterproof rubber gaskets 120, the two casing sealing plates 130 respectively press against the sides of the two waterproof rubber gaskets 120 that are away from the concrete 100 that penetrates the pipe gallery outlet structural concrete, and the fastening screws 140 pass through the rigid waterproof casing. The two ends behind the central axis of 110 respectively penetrate the center of two waterproof rubber gaskets 120 and the center of two casing sealing plates 130, and the connecting rod cap 150 and the fastening nut 160 are respectively provided on the fastening screw 140 with a nut gasket 300 located between the fastening nut 160 and the corresponding waterproof rubber gasket 120. A casing sealing plate 130 and the corresponding pressed waterproof rubber gasket 120 are respectively provided with a first filling hole 170 and a second filling hole 180 connected to the interior of the rigid waterproof casing 110. The rigid waterproof casing 110 is filled with a waterproof filling layer 190, and the waterproof filling layer 190 is a foam rubber layer; the rigid waterproof casing 110 is provided with an annular water-stopping steel plate 290 pre-buried in the concrete structure 100 of the corridor outlet.

[0032] The temporary plugging structure of the reserved casing of the integrated pipe gallery outlet provided in the embodiment of the present application first embeds the rigid waterproof casing 110 penetrating the concrete 100 of the pipe gallery outlet structure during the construction, and then sequentially passes the rod body of the fastening screw 140 through a casing sealing plate 130, a waterproof rubber gasket 120, the rigid waterproof casing 110, another waterproof rubber gasket 120 and another casing sealing plate 130, and then the connecting rod cap 150 presses against the side of another casing sealing plate 130, and then sequentially installs the nut gasket 300 and the fastening nut 160 on the fastening screw 140, so that the fastening nut 160 presses against the casing sealing plate 130 and the corresponding waterproof rubber gasket 120. The two casing sealing plates 130 are tightened by fastening screws 140 and the two waterproof rubber gaskets 120 are respectively pressed against the two sides of the tunnel outlet structural concrete 100, and the first filling hole 170 and the second filling hole 180 respectively provided on a casing sealing plate 130 and a corresponding waterproof rubber gasket 120 are aligned and connected to the interior of the rigid waterproof casing 110, and then the foam glue is sequentially passed into the interior of the rigid waterproof casing 110 through the first filling hole 170 and the second filling hole 180 until it is filled, and the foam glue inside the rigid waterproof casing 110 is solidified to form a foam glue layer, which is the waterproof filling layer 190.

[0033] The temporary sealing structure of the reserved casing at the outlet of the integrated pipe gallery provided in the embodiment of the present application uses a fastening screw 140 and a fastening nut 160 to tighten the two casing sealing plates 130 to press and fix the two waterproof rubber gaskets 120 on the two ends of the rigid waterproof casing 110 for sealing. At the same time, a first filling hole 170 and a second filling hole 180 are opened on the casing sealing plate 130 and a waterproof rubber gasket 120 to fill the rigid waterproof casing 110 with waterproof material to form a waterproof filling layer 190, thereby realizing a multi-layer waterproof structure and effectively improving the waterproof effect. At the same time, it has the advantages of simple, stable and reliable structure. The sealing structure can be loosened or tightened only by fastening the nut 160. On-site installation and removal are convenient and quick, and the construction efficiency is high.

[0034] Example 2

[0035] like Figure 4As shown, an embodiment of the present application provides a temporary plugging structure of reserved casing for an integrated pipe gallery outlet, which is substantially the same as the structure of the temporary plugging structure of reserved casing for an integrated pipe gallery outlet provided in Example 1, with the difference that, in the present embodiment, two sealing covers 200 are further included, and the two sealing covers 200 can be respectively threadedly mounted and connected to two casing sealing plates 130; when the two sealing covers 200 are connected to two corresponding casing sealing plates 130, the two sealing covers 200 and the corresponding casing sealing plates 130 respectively enclose a protective cavity 210 for receiving the rod cap 150 and the fastening nut 160; when the two sealing covers 200 rotate, they move axially to press against the two sides of the concrete 100 of the pipe gallery outlet structure. A sealing cavity 220 is formed between the sealing cover 200, the corresponding casing sealing plate 130 and the waterproof rubber gasket 120 and the tunnel outlet structural concrete 100. A glue injection hole 230 connected to the sealing cavity 220 is provided on the outer wall of one end of the sealing cover 200 close to the tunnel outlet structural concrete 100. The sealing cavity 220 is filled with a sealant layer 240.

[0036] The temporary plugging structure of the reserved casing at the outlet of the integrated pipe gallery provided in the embodiment of the present application is provided with two sealing covers 200 which are respectively threadedly sleeved and connected to the two casing sealing plates 130, and the two sealing covers 200 are moved axially to press against the two sides of the concrete 100 of the outlet structure of the pipe gallery when rotating to protect the rod caps 150 and the fastening nuts 160 at both ends of the fastening screw rod 140, so as to prevent the rod caps 150 and the fastening nuts 160 from being exposed to the outside and possibly damaged; at the same time, the sealing covers 200 and the corresponding A sealing cavity 220 is enclosed between the casing sealing plate 130 and the waterproof rubber gasket 120 and the tunnel outlet structural concrete 100. The outer wall of the sealing cover 200 is provided with a glue injection hole 230 connected to the sealing cavity 220, which can facilitate operators to pass sealant into the sealing cavity 220 through the glue injection hole 230 to form a sealant layer 240 to seal the outer peripheral wall of the waterproof rubber gasket 120, thereby preventing external moisture from penetrating through the gap between the waterproof rubber gasket 120 and the tunnel outlet structural concrete 100.

[0037] Example 3

[0038] like Figure 5As shown, the embodiment of the present application provides a temporary plugging structure of a reserved sleeve for an integrated pipe gallery outlet, which is substantially the same as the structure of the temporary plugging structure of a reserved sleeve for an integrated pipe gallery outlet provided in Example 1, except that, in the present embodiment, an intermediate fixing disk 250 is provided inside the rigid waterproof sleeve 110 and is sleeved on the fastening screw 140 by threads, and the top and bottom of the intermediate fixing disk 250 are respectively connected by threads with two axial pressing rods 260 passing through it, and the two ends of the axial pressing rod 260 respectively press two waterproof rubber gaskets 120. The outer peripheral wall of the intermediate fixing disk 250 is connected by threads with four radial pressing rods 270 arranged at intervals along its circumference, and the radial pressing rods 270 move radially to press the inner wall of the rigid waterproof sleeve 110 when rotating, and an elastic pressing head 280 is provided at one end of the radial pressing rod 270 away from the intermediate fixing disk 250.

[0039] The embodiment of the present application provides a temporary plugging structure for a reserved sleeve at an integrated pipe gallery outlet, in which an intermediate fixing disk 250 threadedly sleeved on a fastening screw 140 is provided in a rigid waterproof sleeve 110, and an axial pressure rod 260 threadedly connected and passing through the intermediate fixing disk 250, and the two ends of the axial pressure rod 260 respectively press against two waterproof rubber gaskets 120, and the intermediate fixing disk 250 and the axial pressure rod 260 can be used to improve the supporting effect on the waterproof rubber gasket 120, and the outer peripheral wall of the intermediate fixing disk 250 is further used to press against the inner wall of the rigid waterproof sleeve 110 for support through the radial pressure rod 270 threadedly connected thereto, thereby effectively improving the overall structural strength and stability of the temporary plugging structure for the reserved sleeve at the integrated pipe gallery outlet.

[0040] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

Claims

1. A temporary plugging structure of reserved casing at the outlet of a comprehensive pipe gallery, characterized in that: It includes a rigid waterproof casing that penetrates the concrete of the tunnel outlet structure, two waterproof rubber gaskets respectively attached to the two sides of the concrete of the tunnel outlet structure, two casing sealing plates and a fastening screw. The two ends of the rigid waterproof casing respectively press against the two waterproof rubber gaskets, and the two casing sealing plates respectively press against the two waterproof rubber gaskets on the side away from the concrete of the tunnel outlet structure. After the fastening screw passes through the central axis of the rigid waterproof casing, the two ends respectively penetrate the two waterproof rubber gaskets and the two casing sealing plates, and then connect the rod cap and the fastening nut. A casing sealing plate and the corresponding waterproof rubber gasket are respectively provided with a first filling hole and a second filling hole that are connected to the inside of the rigid waterproof casing, and the rigid waterproof casing is filled with a waterproof filling layer.

2. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 1 is characterized in that: The two casing sealing plates and the two waterproof rubber gaskets are both circular, and the diameters of the two casing sealing plates are both larger than the corresponding waterproof rubber gaskets.

3. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 2 is characterized in that: It also includes two sealing covers which can be respectively installed through threads and connected to the two casing sealing plates. When the sealing covers are connected to the corresponding casing sealing plates, the two are enclosed to form a protective cavity for accommodating the rod cap or the fastening nut. The two sealing covers are configured to press or stop pressing the concrete of the corridor outlet structure when rotating.

4. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 3 is characterized in that: A sealing cavity is formed between the sealing cover, the corresponding casing sealing plate, the waterproof rubber gasket and the tunnel outlet structural concrete. A glue injection hole connected to the sealing cavity is provided on the outer wall of one end of the sealing cover close to the tunnel outlet structural concrete. The sealing cavity is filled with a sealing glue layer.

5. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 1 is characterized in that: The rigid waterproof casing is provided with an intermediate fixing plate which is threadedly sleeved on the fastening screw. The intermediate fixing plate is threadedly connected with at least one axial pressing rod passing through it, and the two ends of the axial pressing rod respectively press the two waterproof rubber gaskets.

6. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 5 is characterized in that: The outer peripheral wall of the intermediate fixing plate is connected with at least one radial pressing rod through threads, and the radial pressing rod is configured to move radially and press against the inner wall of the rigid waterproof sleeve when rotating.

7. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 6 is characterized in that: An elastic pressing head is provided at one end of the radial pressing rod away from the middle fixed disk.

8. The temporary plugging structure of reserved casing for the outlet of the integrated pipe gallery according to claim 1 is characterized in that: The waterproof filling layer is a foamed rubber layer or an expanded cement mortar layer.