Air conditioner and fresh air pipe assembly thereof

By designing a new air duct assembly with adjustable distance and angle, the problem that the existing air conditioner fresh air duct cannot adapt to different installation needs is solved, improving the user experience and reducing wall damage.

CN222514072UActive Publication Date: 2025-02-21QINGDAO HAIER AIR CONDITIONER GENERAL CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421126963.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2025-02-21
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

The fresh air duct of the existing air conditioner cannot adapt to the size, distance and angle of the installation space between the two walls between different users, resulting in a decrease in user experience.

Method used

A new air duct assembly is designed, including a first wall through pipe, a second wall through pipe and a first telescopic bent pipe. The first telescopic bent pipe can adjust the distance and angle between the wall through pipes to meet different installation needs.

Benefits of technology

The new air duct assembly can be penetrated on at least two walls, adapting to different installation spaces and angles, improving user experience, and reducing damage to the wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222514072U_ABST
    Figure CN222514072U_ABST
Patent Text Reader

Abstract

The utility model provides an air conditioner and a fresh air pipe assembly thereof, the air conditioner comprises an indoor unit used for being arranged in an indoor space, and the fresh air pipe assembly comprises a first through-wall pipe used for being connected to the indoor unit and being arranged on a first through-wall hole of a first wall in a penetrating mode, and a second through-wall pipe used for being arranged on a second through-wall hole of a second wall in a penetrating mode; the through-wall component comprises a second through-wall pipe used for being arranged on a second through-wall hole of a second wall in a penetrating mode. The first telescopic bent pipe is connected between the first through-wall pipe and the second through-wall pipe and used for allowing the distance between the first through-wall pipe and the second through-wall pipe to be adjusted and the mutual arrangement angle to be adjusted. The fresh air pipe assembly can be arranged on at least two walls in a penetrating mode and can adapt to the installation space size or the installation distance between the at least two walls and the angle between the two walls, so that the installation requirement of a user of the air conditioner is met, and the user experience is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of air conditioners, in particular to an air conditioner and a new air duct component thereof. Background Art

[0002] As an electrical appliance for keeping cool in summer and heating in winter, air conditioners have become indispensable in people's lives, production and entertainment. Moreover, with the development of science and technology, people's needs are constantly changing, and the functions of air conditioners are becoming more and more diverse, such as the fresh air function.

[0003] At present, in the prior art, the air conditioner connects a fresh air duct connected to the outdoor space on the indoor unit, and then the air conditioner can transport the fresh air flow from the outdoor space to the indoor space through the fresh air duct to achieve the fresh air function. In addition, the installation of the fresh air duct will drill a through hole connected to the outdoor space on the wall to install the fresh air duct on the through hole. However, the installation location, wall or installation scheme of the user's air conditioner is diverse, and the fresh air duct will pass through at least two walls. Especially in rural areas, the demand for such installation scenarios of indoor units is very frequent. Moreover, the size of the space between the two walls and the angle between the walls are different for different users. The existing fresh air duct cannot meet such installation requirements, resulting in a reduced user experience. Utility Model Content

[0004] An object of the utility model is to provide an air conditioner and a fresh air duct assembly thereof which can solve at least one technical defect in the above-mentioned prior art.

[0005] A further purpose of the utility model is to enable the fresh air duct assembly of the air conditioner to be installed on at least two walls, and to be able to adapt to the installation space size or installation distance between at least two walls and the angle between the two walls, so as to meet the user's installation requirements and enhance the user experience.

[0006] In particular, the utility model provides a fresh air duct assembly of an air conditioner, the air conditioner comprising an indoor unit for being arranged in an indoor space, the fresh air duct assembly comprising:

[0007] A first wall-penetrating pipe is used to be connected to the indoor unit and is used to be passed through a first wall-penetrating hole of the first wall;

[0008] Through-wall components, including:

[0009] A second wall-penetrating pipe is used to be penetrated through a second wall-penetrating hole of a second wall;

[0010] The first telescopic bending tube is connected between the first wall-penetrating tube and the second wall-penetrating tube, and is used to allow the distance between the first wall-penetrating tube and the second wall-penetrating tube to be adjusted and the angle between them to be adjusted.

[0011] Furthermore, the air conditioner further comprises an outdoor unit for being arranged in an outdoor space, the indoor unit and the outdoor unit being connected via an online pipe; and,

[0012] The cross sections of the first wall-penetrating tube and the second wall-penetrating tube are both semicircular, so as to allow the first wall-penetrating tube and the connecting tube to pass through the first wall-penetrating hole together, and the second wall-penetrating tube and the connecting tube to pass through the second wall-penetrating hole together.

[0013] Further, the cross-sectional area of ​​the first telescopic bending tube is greater than the cross-sectional area of ​​the first wall-penetrating tube, and the cross-sectional area of ​​the first telescopic bending tube is greater than the cross-sectional area of ​​the second wall-penetrating tube; and,

[0014] The through-wall components also include:

[0015] The first transfer tube comprises a first telescopic connection section, a first contraction section and a first through-wall connection section, wherein the first telescopic connection section is connected to the first telescopic bending tube, the first through-wall connection section is connected to the first through-wall tube, the first contraction section is connected between the first telescopic connection section and the first through-wall connection section, the cross-sectional area of ​​the first telescopic connection section is greater than the cross-sectional area of ​​the first through-wall connection section, and the cross-sectional area of ​​the first contraction section decreases from the first telescopic connection section to the first through-wall connection section;

[0016] The second transfer tube includes a second telescopic connection section, a second contraction section and a second through-wall connection section, the second telescopic connection section is connected to the first telescopic bending tube, the second through-wall connection section is connected to the second through-wall tube, the second contraction section is connected between the second telescopic connection section and the second through-wall connection section, the cross-sectional area of ​​the second telescopic connection section is greater than the cross-sectional area of ​​the second through-wall connection section, and the cross-sectional area of ​​the second contraction section decreases from the second telescopic connection section to the second through-wall connection section.

[0017] Further, the first telescopic bending tube is a corrugated tube; and,

[0018] The shape of the cross section of the first telescopic bending tube is the same as the shape of the cross section of the first telescopic connecting section and the shape of the cross section of the second telescopic connecting section, and the cross-sectional area of ​​the first telescopic bending tube is less than or equal to the cross-sectional area of ​​the first telescopic connecting section, and the cross-sectional area of ​​the first telescopic bending tube is less than or equal to the cross-sectional area of ​​the second telescopic connecting section. The inner side walls of the first telescopic connecting section and the second telescopic connecting section are provided with thread grooves, which are matched and connected with the corrugated structure of the first telescopic bending tube to limit the axial movement of the first telescopic bending tube.

[0019] Further, the first adapter tube includes a first adapter shell and a second adapter shell that are radially buckled and connected to each other, a hook is provided on the inner side wall of the first adapter shell, a buckle is provided at a position corresponding to the hook, and the hook is buckled on the buckle; and,

[0020] The structure of the second transfer tube is the same as that of the first transfer tube.

[0021] Further, the cross-sectional shape of the first wall-penetrating tube is the same as the cross-sectional shape of the first wall-penetrating connecting section, and the cross-sectional area of ​​the first wall-penetrating tube is greater than or equal to the cross-sectional area of ​​the first wall-penetrating connecting section, and the first wall-penetrating connecting section is disposed in the first wall-penetrating tube; and,

[0022] The cross-sectional shape of the second wall-penetrating tube is the same as that of the second wall-penetrating connecting section, and the cross-sectional area of ​​the second wall-penetrating tube is greater than or equal to the cross-sectional area of ​​the second wall-penetrating connecting section, and the second wall-penetrating connecting section is arranged in the second wall-penetrating tube.

[0023] Furthermore, a first engaging protrusion is provided on the outer wall of the first through-wall connecting section, a first engaging hole is provided in the first through-wall tube at a position corresponding to the first engaging protrusion, and the first engaging protrusion is engaged in the first engaging hole; and,

[0024] A second engaging protrusion is arranged on the outer wall of the second through-wall connecting section, a second engaging hole is opened in the second through-wall tube at a position corresponding to the second engaging protrusion, and the second engaging protrusion is engaged in the second engaging hole.

[0025] Furthermore, both ends of the first wall-penetrating tube and both ends of the second wall-penetrating tube are respectively provided with retaining rings, and the retaining rings are used to be disposed on both sides of the first wall-penetrating hole and both sides of the second wall-penetrating hole.

[0026] Furthermore, the retaining ring includes at least two retaining segments connected end to end, one end of the retaining segment is provided with a claw extending from the end of the retaining segment, and the other end of the retaining segment is provided with a clamping column extending axially along the retaining ring, and the clamping claw is clamped on the clamping column.

[0027] Furthermore, the new air duct assembly also includes:

[0028] A second telescopic bending pipe, one end of which is connected to the indoor unit, and the other end of which is connected to the first wall-penetrating pipe;

[0029] A third transfer tube is connected between the second telescopic bending tube and the first wall-penetrating tube; and

[0030] The number of the through-wall components is set to be multiple, and the multiple through-wall components are connected end to end in sequence;

[0031] The end of the second wall-penetrating pipe located in the outdoor space is provided with a wind and rain proof structure.

[0032] In particular, the utility model also provides an air conditioner, which includes the above-mentioned fresh air duct assembly of the air conditioner.

[0033] The fresh air duct assembly of the utility model includes a first through-wall tube that can pass through the first wall and a second through-wall tube that can pass through the second wall, and a first telescopic bending tube is connected between the first through-wall tube and the second through-wall tube. The first telescopic bending tube can well adapt to the distance between the first through-wall tube and the second through-wall tube and the angle between the first through-wall tube and the second through-wall tube. Therefore, the fresh air duct assembly of the utility model can be installed on at least two walls, and can adapt to the installation space size or installation distance between at least two walls and the angle between the two walls, so as to meet the installation requirements of users and improve user experience.

[0034] The air conditioner of the present invention comprises the above-mentioned fresh air duct assembly, and thus the air conditioner of the present invention also has the beneficial technical effects possessed by the above-mentioned fresh air duct assembly.

[0035] Based on the detailed description of the specific embodiments of the present invention in combination with the accompanying drawings below, those skilled in the art will become more aware of the above and other purposes, advantages and features of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Hereinafter, some specific embodiments of the present invention will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:

[0037] Figure 1 It is a structural schematic diagram of an indoor unit of an air conditioner according to an embodiment of the utility model;

[0038] Figure 2 This is a schematic structural diagram of a fresh air assembly according to an embodiment of the utility model;

[0039] Figure 3 is a partial exploded schematic diagram of a fresh air assembly according to an embodiment of the utility model;

[0040] Figure 4 yes Figure 3 The enlarged schematic diagram of "A" in FIG.

[0041] Figure 5 yes Figure 3 The enlarged schematic diagram of "B" in FIG.

[0042] Figure 6 It is a structural schematic diagram of a first transfer tube, a second transfer tube or a third transfer tube in a fresh air assembly according to an embodiment of the utility model;

[0043] Figure 7 This is a schematic diagram of the structure of a retaining ring in a fresh air assembly according to an embodiment of the utility model;

[0044] Figure 8 It is an exploded schematic diagram of a retaining ring in a fresh air assembly according to an embodiment of the utility model. DETAILED DESCRIPTION

[0045] In the description of this embodiment, it is necessary to understand that the orientations or positional relationships indicated by the terms "upper", "inner", "outer", "axial", "radial", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0046] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features, that is, include one or more of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. When a feature "includes or contains" one or some of the features it covers, unless otherwise specifically described, this indicates that other features are not excluded and may further include other features.

[0047] Unless otherwise clearly defined and limited, the terms "installation", "setting", "connection", "fixation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. A person skilled in the art should be able to understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0048] In addition, in the description of this embodiment, the first feature being "above" or "below" the second feature may include the first and second features being in direct contact, or may include the first and second features not being in direct contact but being in contact through another feature between them. That is, in the description of this embodiment, the first feature being "above", "above", and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. The first feature being "below", "below", or "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0049] Unless otherwise defined, all terms (including technical terms and scientific terms) used in the description of this embodiment have the same meaning as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0050] In the description of the present embodiment, the description with reference to the terms "present embodiment", "some other embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0051] Combine the following Figure 1 An air conditioner according to the present embodiment will be described in detail. Figure 1 It is a structural schematic diagram of an indoor unit in an air conditioner according to an embodiment of the utility model.

[0052] Reference Figure 1 In the present embodiment, since the air conditioner includes the fresh air duct assembly 200 of the following embodiment, the beneficial technical effects of the fresh air duct assembly 200 in the following embodiment are also possessed by the air conditioner in the present embodiment.

[0053] Reference Figure 1 In this embodiment, the air conditioner includes an indoor unit 100 for being arranged in an indoor space.

[0054] In this embodiment, the air conditioner further includes an outdoor unit for being arranged in an outdoor space, and the indoor unit 100 and the outdoor unit are connected via a connecting pipe.

[0055] In this embodiment, the air conditioner may be a floor-standing air conditioner or a wall-mounted air conditioner.

[0056] Combine the following Figures 2 to 8 The fresh air duct assembly 200 of the air conditioner of this embodiment will be described in detail. Figure 2 This is a schematic structural diagram of a fresh air assembly according to an embodiment of the utility model; Figure 3 is a partial exploded schematic diagram of a fresh air assembly according to an embodiment of the utility model; Figure 4 yes Figure 3 The enlarged schematic diagram of "A" in FIG. Figure 5 yes Figure 3 The enlarged schematic diagram of "B" in FIG. Figure 6 It is a schematic diagram of the structure of the first transfer tube 223, the second transfer tube 224 or the third transfer tube 227 in the fresh air assembly according to an embodiment of the utility model; Figure 7 It is a structural schematic diagram of a retaining ring 225 in a fresh air assembly according to an embodiment of the utility model; Figure 8 It is an exploded schematic diagram of a retaining ring 225 in a fresh air assembly according to an embodiment of the utility model.

[0057] Reference Figure 2 In this embodiment, the fresh air duct assembly 200 includes a first wall-penetrating tube 210 and a wall-penetrating member 220. The first wall-penetrating tube 210 is used to be connected to the indoor unit 100, and the first wall-penetrating tube 210 is used to be penetrated through the first wall hole of the first wall; the wall-penetrating member 220 includes a second wall-penetrating tube 221 and a first telescopic bending tube 222, and the second wall-penetrating tube 221 is used to be penetrated through the second wall hole of the second wall; the first telescopic bending tube 222 is connected between the first wall-penetrating tube 210 and the second wall-penetrating tube 221, and the first telescopic bending tube 222 is used to allow the distance between the first wall-penetrating tube 210 and the second wall-penetrating tube 221 to be adjusted and the angle between them to be adjusted.

[0058] Since the fresh air duct assembly 200 of this embodiment includes a first through-wall tube 210 that can pass through the first wall and a second through-wall tube 221 that can pass through the second wall, and a first telescopic bending tube 222 is connected between the first through-wall tube 210 and the second through-wall tube 221, the first telescopic bending tube 222 can well adapt to the distance between the first through-wall tube 210 and the second through-wall tube 221 and the angle between the first through-wall tube 210 and the second through-wall tube 221. Therefore, the fresh air duct assembly 200 of this embodiment can be installed on at least two walls, and can adapt to the installation space size or installation distance between at least two walls and the angle between the two walls, so as to meet the installation requirements of users and improve user experience.

[0059] In addition, compared to ordinary air conditioners, air conditioners with fresh air function not only need to drill a through hole on the wall for the online pipe, but also need to drill another hole for the fresh air duct to install the fresh air duct. However, drilling an extra hole on the wall will again damage the appearance of the wall, making the indoor space unsightly, and again reducing the user experience.

[0060] Reference Figure 2 and Figure 3 In this embodiment, the cross-sections of the first wall-penetrating tube 210 and the second wall-penetrating tube 221 are both semicircular, so as to allow the first wall-penetrating tube 210 and the online tube to pass through the first wall hole together, and the second wall-penetrating tube 221 and the online tube to pass through the second wall hole together.

[0061] It is understandable that by setting the cross-sections of the first through-wall tube 210 and the second through-wall tube 221 to be semicircular, a space for the online tube to pass through can be left in the first through-wall hole and the second through-wall hole, so that the first through-wall tube 210 and the online tube can pass through / or be installed in the first through-wall hole together, and the second through-wall tube 221 and the online tube can pass through / or be installed in the second through-wall hole together. Furthermore, when installing the air conditioner having the fresh air duct assembly 200 of this embodiment, only one through hole can be drilled in the wall to complete the installation. The degree of damage to the wall surface is reduced, the aesthetics of the indoor space is ensured, and the user experience is ensured.

[0062] Reference Figure 2 and Figure 3 In this embodiment, the cross-sectional area of ​​the first telescopic bending tube 222 is greater than the cross-sectional area of ​​the first wall-penetrating tube 210, and the cross-sectional area of ​​the first telescopic bending tube 222 is greater than the cross-sectional area of ​​the second wall-penetrating tube 221; and the wall-penetrating component 220 also includes a first transfer tube 223 and a second transfer tube 224.

[0063] Reference Figure 2 and Figure 3 In this embodiment, the first transfer tube 223 includes a first telescopic connection section 2231, a first contraction section 2232 and a first wall-penetrating connection section 2233. The first telescopic connection section 2231 is connected to the first telescopic bending tube 222, the first wall-penetrating connection section 2233 is connected to the first wall-penetrating tube 210, the first contraction section 2232 is connected between the first telescopic connection section 2231 and the first wall-penetrating connection section 2233, the cross-sectional area of ​​the first telescopic connection section 2231 is greater than the cross-sectional area of ​​the first wall-penetrating connection section 2233, and the cross-sectional area of ​​the first contraction section 2232 decreases from the first telescopic connection section 2231 to the first wall-penetrating connection section 2233.

[0064] Reference Figure 2 and Figure 3 In this embodiment, the second transfer tube 224 includes a second telescopic connection section 2241, a second contraction section 2242 and a second wall-penetrating connection section 2243. The second telescopic connection section 2241 is connected to the first telescopic bending tube 222, the second wall-penetrating connection section 2243 is connected to the second wall-penetrating tube 221, the second contraction section 2242 is connected between the second telescopic connection section 2241 and the second wall-penetrating connection section 2243, the cross-sectional area of ​​the second telescopic connection section 2241 is greater than the cross-sectional area of ​​the second wall-penetrating connection section 2243, and the cross-sectional area of ​​the second contraction section 2242 decreases from the second telescopic connection section 2241 to the second wall-penetrating connection section 2243.

[0065] It is understandable that in order to minimize the damage to the wall and ensure the intake of fresh air, the cross-sectional area of ​​the first telescopic curved tube 222 can be set to be larger than the cross-sectional area of ​​the first wall-penetrating tube 210, and the cross-sectional area of ​​the first telescopic curved tube 222 can be set to be larger than the cross-sectional area of ​​the second wall-penetrating tube 221. However, in this way, there will be a difference in the cross-sectional dimensions of the first telescopic curved tube 222 and the first wall-penetrating tube 210 and the second wall-penetrating tube 221, which will make it difficult to connect the first telescopic curved tube 222 and the first wall-penetrating tube 210 and the second wall-penetrating tube 221, and reduce the fluidity of the fresh air flow therein.

[0066] Furthermore, the first transfer tube 223 includes a first wall-penetrating connection section 2233 connected to the first wall-penetrating tube 210, a first telescopic connection section 2231 connected to the first telescopic bending tube 222, and a first contraction section 2232 connected between the first telescopic connection section 2231 and the first wall-penetrating connection section 2233, and the cross-sectional area of ​​the first contraction section 2232 decreases from the first telescopic connection section 2231 to the first wall-penetrating connection section 2233, so that the first transfer tube 223 can ensure the convenience of connection between the first telescopic bending tube 222 and the first wall-penetrating tube 210, and ensure the fluidity of the airflow when it flows from the first telescopic bending tube 222 to the first wall-penetrating tube 210.

[0067] Based on the same reason, the first transfer tube 223 can ensure the convenience of connection between the first telescopic tube and the second wall-penetrating tube 221 , and ensure the fluidity of the airflow when it flows from the second wall-penetrating tube 221 to the first telescopic tube.

[0068] Furthermore, by disposing the first contraction section 2232 and the second contraction section 2242 , the fluidity of the airflow in the first transfer tube 223 and the second transfer tube 224 can be ensured.

[0069] Reference Figure 2 and Figure 3 In this embodiment, the first telescopic bending tube 222 is a corrugated tube.

[0070] It is understandable that the first telescopic bending tube 222 can be a corrugated tube, thereby meeting the requirements of allowing the distance between the first wall-penetrating tube 210 and the second wall-penetrating tube 221 to be adjusted and the angle between the first wall-penetrating tube 210 and the second wall-penetrating tube 221 to be adjusted.

[0071] In some other embodiments, the first telescopic bending tube 222 may be a rubber tube, a metal hose, or an aluminum tube or a copper tube with good ductility, which can also meet the requirements of allowing the distance between the first wall-penetrating tube 210 and the second wall-penetrating tube 221 to be adjusted and the angle between the first wall-penetrating tube 210 and the second wall-penetrating tube 221 to be adjusted.

[0072] Reference Figure 2 , Figure 3 and Figure 6 In this embodiment, the shape of the cross section of the first telescopic bending tube 222 is the same as the shape of the cross section of the first telescopic connecting section 2231 and the shape of the cross section of the second telescopic connecting section 2241, and the cross-sectional area of ​​the first telescopic bending tube 222 is less than or equal to the cross-sectional area of ​​the first telescopic connecting section 2231, and the cross-sectional area of ​​the first telescopic bending tube 222 is less than or equal to the cross-sectional area of ​​the second telescopic connecting section 2241. The inner side walls of the first telescopic connecting section 2231 and the second telescopic connecting section 2241 are provided with a thread groove 2246, which is matched and connected with the corrugated structure of the first telescopic bending tube 222 to limit the axial movement of the first telescopic bending tube 222.

[0073] It should be understood that the connection between the first telescopic bending tube 222 and the first transfer tube 223 and the second transfer tube 224 is that one end of the first telescopic bending tube 222 can be directly extended into the first telescopic connecting section 2231 of the first transfer tube 223, and the other end of the first telescopic bending tube 222 can be directly extended into the second telescopic connecting section 2241 of the second transfer tube 224, so as to ensure the convenience of connection between the first telescopic bending tube 222 and the first transfer tube 223 and the second transfer tube 224.

[0074] At the same time, in order to fix the connection between the first telescopic bending tube 222 and the first transfer tube 223 and the second transfer tube 224, a threaded groove 2246 can be set on the inner wall of the first telescopic connecting section 2231 of the first transfer tube 223 and the inner wall of the second telescopic connecting section 2241 of the second transfer tube 224. The threaded groove 2246 is connected in coordination with the corrugated structure of the first telescopic bending tube 222, so that the connection stability of the first telescopic bending tube 222 and the first transfer tube 223 and the second transfer tube 224 can be ensured.

[0075] Reference Figure 6 In this embodiment, the first adapter tube 223 includes a first adapter shell 2234 and a second adapter shell 2235 which are radially interlocked with each other, a hook 2236 is provided on the inner side wall of the first adapter shell 2234, and a buckle 2237 is provided at the position of the second adapter shell 2235 corresponding to the hook 2236, and the hook 2236 is locked in the buckle 2237.

[0076] It can be understood that the first adapter tube 223 is a detachable structure of the first adapter shell 2234 and the second adapter shell 2235. Compared with an integrated structure, when the first telescopic tube is installed in the first adapter tube 223, the first adapter shell 2234 and the second adapter shell 2235 can be directly buckled on the first telescopic bending tube 222, ensuring the convenience of connecting the first telescopic bending tube 222 and the first adapter tube 223. Especially when the distance between the first wall and the second wall is short or the space is narrow, the detachable structure of the first adapter tube 223 can greatly reduce the difficulty of installing the first telescopic bending tube 222 and the first adapter tube 223.

[0077] In addition, the first adapter shell 2234 and the second adapter shell 2235 can be connected by a flexible rope to effectively reduce the probability of the first adapter shell 2234 or the second adapter shell 2235 falling when the detachable first adapter tube 223 is assembled and installed with the first telescopic bending tube 222. Especially when high-altitude installation is required, it greatly ensures that the installation of the new air duct assembly 200 can be carried out smoothly.

[0078] Reference Figure 6 In this embodiment, the structure of the second transfer tube 224 is the same as that of the first transfer tube 223 .

[0079] Specifically, the second transfer tube 224 can also be configured to include two transfer shells that are radially buckled and connected to each other, and further, hooks 2236 and buckles 2237 can be respectively provided on the two shells to achieve connection. Therefore, the connection convenience of the first telescopic bending tube 222 and the second transfer tube 224 can be ensured, and the installation difficulty of the first telescopic bending tube 222 and the first transfer tube 223 can be reduced. At the same time, a flexible rope can be connected between the two transfer shells to ensure that the installation of the new air duct assembly 200 can be carried out smoothly.

[0080] Reference Figure 2 and Figure 3 In this embodiment, the shape of the cross section of the first wall-penetrating tube 210 is the same as the shape of the cross section of the first wall-penetrating connecting section 2233, and the cross-sectional area of ​​the first wall-penetrating tube 210 is greater than or equal to the cross-sectional area of ​​the first wall-penetrating connecting section 2233, and the first wall-penetrating connecting section 2233 is arranged in the first wall-penetrating tube 210.

[0081] It is understandable that the first transfer tube 223 and the first wall-penetrating tube 210 may be connected in a manner that the first wall-penetrating connecting section 2233 of the first transfer tube 223 is extended into the first wall-penetrating tube 210 .

[0082] In this embodiment, in order to ensure the connection stability between the first adapter tube 223 and the first wall-penetrating tube 210, at least one screw hole can be opened on the wall of the first wall-penetrating tube 210, and after the first adapter tube 223 (first wall-penetrating connecting section 2233) and the first wall-penetrating tube 210 are connected in place, the screw is screwed into the screw hole to tighten and fix the first adapter tube 223 (first wall-penetrating connecting section 2233) and the first wall-penetrating tube 210.

[0083] Reference Figure 2 , Figure 3 and Figure 4 In some other embodiments, a first locking protrusion 2238 is provided on the outer wall of the first through-wall connecting section 2233, and a first locking hole 2239 is opened in the first through-wall tube 210 at a position corresponding to the first locking protrusion 2238, and the first locking protrusion 2238 is locked in the first locking hole 2239.

[0084] It is understandable that, by setting and matching the first engaging protrusion 2238 and the first engaging hole 2239, the connection stability between the first transfer tube 223 (first through-wall connection section 2233) and the first through-wall tube 210 can be ensured. At the same time, the installation of the first transfer tube 223 (first through-wall connection section 2233) and the first through-wall tube 210 is facilitated, and the installation difficulty of the fresh air duct assembly 200 is reduced.

[0085] Reference Figure 2 , Figure 3 In this embodiment, the shape of the cross section of the second wall-penetrating tube 221 is the same as the shape of the cross section of the second wall-penetrating connecting section 2243, and the cross-sectional area of ​​the second wall-penetrating tube 221 is greater than or equal to the cross-sectional area of ​​the second wall-penetrating connecting section 2243, and the second wall-penetrating connecting section 2243 is arranged in the second wall-penetrating tube 221.

[0086] It is understandable that the second adapter tube 224 and the second wall-penetrating tube 221 may be connected in such a way that the second wall-penetrating connecting section 2243 of the second adapter tube 224 is extended into the second wall-penetrating tube 221 .

[0087] In this embodiment, in order to ensure the connection stability between the second transfer tube 224 and the second wall-penetrating tube 221, at least one screw hole can be opened on the wall of the second wall-penetrating tube 221, and after the second transfer tube 224 (second wall-penetrating connecting section 2243) and the second wall-penetrating tube 221 are connected in place, the screw is screwed into the screw hole to tighten and fix the second transfer tube 224 (second wall-penetrating connecting section 2243) and the second wall-penetrating tube 221.

[0088] Reference Figure 2 , Figure 3 and Figure 5In some other embodiments, a second locking protrusion 2244 is provided on the outer wall of the second wall-penetrating connecting section 2243, and a second locking hole 2245 is opened in the second wall-penetrating tube 221 at a position corresponding to the second locking protrusion 2244, and the second locking protrusion 2244 is locked in the second locking hole 2245.

[0089] It is understandable that, by providing and matching the second engaging protrusion 2244 and the second engaging hole 2245, the connection stability between the second transfer tube 224 (the second through-wall connection section 2243) and the second through-wall tube 221 can be ensured. At the same time, the installation of the second transfer tube 224 (the first through-wall connection section 2233) and the second through-wall tube 221 is facilitated, and the installation difficulty of the fresh air duct assembly 200 is reduced.

[0090] Reference Figure 2 and Figure 3 In this embodiment, both ends of the first wall-penetrating tube 210 and both ends of the second wall-penetrating tube 221 are respectively provided with retaining rings 225, and the retaining rings 225 are used to be provided on both sides of the first wall-penetrating hole and both sides of the second wall-penetrating hole.

[0091] It can be understood that the setting of the protective ring 225 can ensure the aesthetics of the wall, and at the same time ensure the relative airtightness of the first wall hole and the second wall hole, so as to ensure the treatment effect (cooling effect, heating effect / fresh air effect) of the air conditioner on the air in the indoor space.

[0092] Reference Figure 7 and Figure 8 In this embodiment, the retaining ring 225 includes at least two retaining segments 2251 connected end to end to each other, one end of the retaining segment 2251 is provided with a claw 2252 extending from the end of the retaining segment 2251, and the other end of the retaining segment 2251 is provided with a clamping column 2253 extending along the axial direction of the retaining ring 225, and the clamping claw 2252 is clamped on the clamping column 2253.

[0093] It can be understood that by configuring the retaining ring 225 as a detachable structure, specifically, by configuring claws 2252 and clamping columns 2253 at the head and tail of the retaining section 2251, the retaining ring 225 can be installed on the new air duct assembly 200 after the new air duct assembly 200 is installed / assembled and passed through the first wall hole and the second wall hole.

[0094] The integrated structure needs to be put on the first wall-penetrating tube 210 and the second wall-penetrating tube 221 before installing the new air duct assembly 200 to the first wall-penetrating hole and the second wall-penetrating hole.

[0095] Furthermore, compared to the integrated retaining ring 225, the detachable retaining ring 225 can be easily installed without interfering with the assembly and installation of other components of the fresh air duct assembly 200 (for example, the first telescopic bending tube 222, the first wall-penetrating tube 210, the second wall-penetrating tube 221, the first transfer tube 223 and / or the second transfer tube 224), thereby reducing the difficulty of installing the fresh air duct assembly 200.

[0096] In addition, a locking baffle 2254 is provided at the free end of the locking column 2253 , and the locking claw 2252 is locked between the retaining ring 225 and the locking baffle 2254 to ensure the connection stability between the plurality of retaining segments 2251 .

[0097] Reference Figure 2 , Figure 3 In this embodiment, the fresh air duct assembly 200 also includes a second telescopic bending tube 226 , one end of the second telescopic bending tube 226 is connected to the indoor unit 100 , and the other end of the second telescopic bending tube 226 is connected to the first wall-penetrating tube 210 .

[0098] It should be noted that the second telescopic bending tube 226 can be made of a corrugated tube, a rubber tube, a metal hose, an aluminum tube, a copper tube, etc., just like the first telescopic bending tube 222.

[0099] It can be understood that since the distance and installation angle between the indoor unit 100 of the air conditioner and the first wall hole need to be set according to the needs of the user, and then the indoor unit 100 and the first wall pipe 210 are connected by a retractable and bendable second telescopic pipe, the fresh air duct assembly 200 can adapt to different distances and different installation angles between the indoor unit 100 and the first wall hole, so that the installation of the air conditioner can meet the diverse installation plans of users / different users, thereby ensuring user experience.

[0100] Reference Figure 2 , Figure 3 and Figure 6 In this embodiment, the fresh air duct assembly 200 also includes a third transfer tube 227 , and the third transfer tube 227 is connected between the second telescopic bending tube 226 and the first wall-penetrating tube 210 .

[0101] It is understandable that the structure of the third adapter tube 227 can be completely the same as the second adapter tube 224 / first adapter tube 223. For example, the third connecting tube can be a structure of a telescopic connection section, a contraction section and a wall-penetrating connection section, and a split structure in which two adapter shells are interlocked, and the two adapter shells are also connected with a flexible rope, and the threaded groove 2246 and the locking protrusion are set. Furthermore, the third adapter tube 227 ensures the convenience of connection between the second telescopic bending tube 226 and the first wall-penetrating tube 210, reduces the difficulty of installation between the second telescopic bending tube 226 and the first wall-penetrating tube 210, and ensures the smooth installation of the new air duct assembly 200.

[0102] In this embodiment, the number of the wall-penetrating components 220 is set to be multiple, and the multiple wall-penetrating components 220 are connected end to end in sequence.

[0103] It should be understood that when installing the air conditioner, if the fresh air duct assembly 200 needs to pass through more than three walls, the number of the wall-penetrating components 220 can be set to multiple. For example, when the fresh air duct assembly 200 needs to pass through four walls, the number of the wall-penetrating components 220 can be set to three, and on the basis of the first wall-penetrating pipe 210 passing through the first wall, the three wall-penetrating components 220 are respectively set on the remaining three walls, and the three wall-penetrating components 220 are connected in sequence and connected to the first wall-penetrating pipe 210. This allows the air conditioner to have more installation schemes, meet more installation requirements of users, and ensure user experience.

[0104] Reference Figure 2 , Figure 3 In this embodiment, a wind and rain proof structure 228 is provided at the end of the second wall-penetrating pipe 221 located in the outdoor space.

[0105] It can be understood that, by providing the wind and rainproof structure 228, it is possible to effectively prevent rainwater and airflow that is not required by the user from flowing back into the new air duct assembly 200, thereby ensuring the user experience.

[0106] Specifically, the air inlet 2281 of the second wall-penetrating pipe 221 at the end of the outdoor space is arranged downward to form a wind and rain proof structure 228 .

[0107] At this point, those skilled in the art should recognize that, although multiple exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications that conform to the principles of the present invention can still be directly determined or derived from the contents disclosed in the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all such other variations or modifications.

Claims

1. A fresh air duct assembly for an air conditioner, characterized in that: The air conditioner comprises an indoor unit for being arranged in an indoor space, and the fresh air duct assembly comprises: A first wall-penetrating pipe, used to be connected to the indoor unit and to be passed through a first wall-penetrating hole of the first wall; Through-wall components, including: A second wall-penetrating pipe is used to be penetrated through a second wall-penetrating hole of a second wall; The first telescopic bending tube is connected between the first wall-penetrating tube and the second wall-penetrating tube, and is used to allow the distance between the first wall-penetrating tube and the second wall-penetrating tube to be adjusted and the angle between them to be adjusted.

2. The fresh air duct assembly of the air conditioner according to claim 1, characterized in that: The air conditioner further comprises an outdoor unit for being arranged in an outdoor space, wherein the indoor unit and the outdoor unit are connected via a connection pipe; and The cross-sections of the first wall-penetrating tube and the second wall-penetrating tube are both semicircular, so as to allow the first wall-penetrating tube and the connecting tube to pass through the first wall-penetrating hole together, and the second wall-penetrating tube and the connecting tube to pass through the second wall-penetrating hole together.

3. The fresh air duct assembly of the air conditioner according to claim 2, characterized in that: The cross-sectional area of ​​the first telescopic bending tube is greater than the cross-sectional area of ​​the first wall-penetrating tube, and the cross-sectional area of ​​the first telescopic bending tube is greater than the cross-sectional area of ​​the second wall-penetrating tube; as well as, The wall-penetrating component further comprises: A first transfer tube, comprising a first telescopic connection section, a first contraction section and a first wall-penetrating connection section, wherein the first telescopic connection section is connected to the first telescopic bending tube, the first wall-penetrating connection section is connected to the first wall-penetrating tube, the first contraction section is connected between the first telescopic connection section and the first wall-penetrating connection section, the cross-sectional area of ​​the first telescopic connection section is greater than the cross-sectional area of ​​the first wall-penetrating connection section, and the cross-sectional area of ​​the first contraction section decreases from the first telescopic connection section to the first wall-penetrating connection section; The second transfer tube includes a second telescopic connection section, a second contraction section and a second wall-penetrating connection section, wherein the second telescopic connection section is connected to the first telescopic bending tube, the second wall-penetrating connection section is connected to the second wall-penetrating tube, the second contraction section is connected between the second telescopic connection section and the second wall-penetrating connection section, the cross-sectional area of ​​the second telescopic connection section is larger than the cross-sectional area of ​​the second wall-penetrating connection section, and the cross-sectional area of ​​the second contraction section decreases from the second telescopic connection section to the second wall-penetrating connection section.

4. The fresh air duct assembly of the air conditioner according to claim 3, characterized in that: The first telescopic bending tube is a corrugated tube; and, The shape of the cross section of the first telescopic bending tube is the same as the shape of the cross section of the first telescopic connecting section and the shape of the cross section of the second telescopic connecting section, and the cross-sectional area of ​​the first telescopic bending tube is less than or equal to the cross-sectional area of ​​the first telescopic connecting section, and the cross-sectional area of ​​the first telescopic bending tube is less than or equal to the cross-sectional area of ​​the second telescopic connecting section. The inner side walls of the first telescopic connecting section and the second telescopic connecting section are provided with thread grooves, and the thread grooves are matched and connected with the corrugated structure of the first telescopic bending tube to limit the axial movement of the first telescopic bending tube.

5. The fresh air duct assembly of the air conditioner according to claim 3, characterized in that: The first adapter tube comprises a first adapter shell and a second adapter shell which are buckled and connected to each other in a radial direction, a hook is arranged on the inner side wall of the first adapter shell, a buckle is arranged at a position corresponding to the hook, and the hook is buckled on the buckle; and The structure of the second transfer tube is the same as that of the first transfer tube.

6. The fresh air duct assembly of the air conditioner according to claim 3, characterized in that: The cross-section of the first wall-penetrating tube is the same as that of the first wall-penetrating connecting section, and the cross-section area of ​​the first wall-penetrating tube is greater than or equal to the cross-section area of ​​the first wall-penetrating connecting section, and the first wall-penetrating connecting section is disposed in the first wall-penetrating tube; and The cross-sectional shape of the second wall-penetrating tube is the same as that of the second wall-penetrating connecting section, and the cross-sectional area of ​​the second wall-penetrating tube is greater than or equal to the cross-sectional area of ​​the second wall-penetrating connecting section, and the second wall-penetrating connecting section is arranged in the second wall-penetrating tube.

7. The fresh air duct assembly of the air conditioner according to claim 6, characterized in that: A first engaging protrusion is arranged on the outer wall of the first through-wall connecting section, a first engaging hole is opened in the first through-wall tube at a position corresponding to the first engaging protrusion, and the first engaging protrusion is engaged in the first engaging hole; and, A second engaging protrusion is arranged on the outer wall of the second through-wall connecting section, a second engaging hole is opened in the second through-wall tube at a position corresponding to the second engaging protrusion, and the second engaging protrusion is engaged in the second engaging hole.

8. The fresh air duct assembly of the air conditioner according to claim 1, characterized in that: Both ends of the first wall-penetrating tube and both ends of the second wall-penetrating tube are respectively provided with retaining rings, and the retaining rings are used to be disposed on both sides of the first wall-penetrating hole and both sides of the second wall-penetrating hole.

9. The fresh air duct assembly of the air conditioner according to claim 8, characterized in that: The retaining ring includes at least two retaining segments connected end to end, one end of the retaining segment is provided with a claw extending from the end of the retaining segment, and the other end of the retaining segment is provided with a clamping column extending axially along the retaining ring, and the clamping claw is clamped on the clamping column.

10. The fresh air duct assembly of the air conditioner according to claim 1, characterized in that: Also includes: A second telescopic bending tube, one end of which is connected to the indoor unit, and the other end of which is connected to the first wall-penetrating tube; A third transfer tube, connected between the second telescopic bending tube and the first wall-penetrating tube; as well as, The number of the wall-penetrating components is set to be multiple, and the multiple wall-penetrating components are sequentially connected end to end; The end of the second wall-penetrating pipe located in the outdoor space is provided with a wind and rain proof structure.

11. An air conditioner, characterized in that: It comprises a fresh air duct assembly of an air conditioner according to any one of claims 1 to 10.