Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

1205results about How to "Quick alignment" patented technology

Full-mechanical rapid sleeper replacement machine

InactiveCN104195902AQuick alignmentAutomatic separation and dischargeBallastwayRailway track constructionPush and pullEngineering
The invention discloses a full-mechanical rapid sleeper replacement machine which comprises a vibration rotary excavating and ballast removing device, a ballast collecting and discharging device, a vibration ballast pushing device, a four-nut synchronous assembly and disassembly device, a sleeper lifting and rotating device, a sleeper pushing and pulling device, a sleeper hoisting device, a rail car, a power generator, a hydraulic system box, a first camera assembly, a second camera assembly, a third camera assembly, a fourth camera assembly, a fifth camera assembly, a sixth camera assembly and a monitor. A plurality of casters and two longitudinal beams are arranged on the rail car, the vibration rotary excavating and ballast removing device, the ballast collecting and discharging device, the vibration ballast pushing device, the four-nut synchronous assembly and disassembly device, the sleeper lifting and rotating device, the sleeper pushing and pulling device, the sleeper hoisting device, the power generator and the hydraulic system box are arranged on the two longitudinal beams of the rail car, and the monitor is arranged in a cab of a tow tractor. The full-mechanical rapid sleeper replacement machine is suitable for rapid sleeper replacement on straight-line and curved rail rod segments, operating time in repairing skylight through limited line can be made full and reasonable use of, and full-mechanical sleeper replacement can be achieved.
Owner:KUNMING UNIV

Board splicing machine

The invention discloses a board splicing machine. The board splicing machine comprises a machine frame and a board conveying device installed on the machine frame, wherein the board conveying device comprises a bottom board conveying belt for conveying bottom boards forwards, and a side board conveying groove formed in one side of the bottom board conveying belt, and one side, close to the bottom board conveying belt, of the front end of the side board conveying groove is provided with a side board outlet; a gluing device is arranged beside the inlet end of the bottom board conveying belt; an aligning device corresponding to the side board outlet is arranged in front of the side board outlet, and an induction device corresponding to the aligning device and inducting the positions of the bottom boards is further installed on the portion, beside the bottom board conveying belt, of the machine frame; a nail gun is arranged between the side board outlet and the aligning device; the board conveying device, the aligning device and the nail gun are further connected with a control device, and the input end of the control device is connected with the induction device; a pressing and connecting device for pressing and airing the bottom boards and side boards is arranged in front of the outlet end of the bottom board conveying belt. The board splicing machine is reasonable in structure and convenient to use, the machining efficiency can be substantially improved, consumption of wood can be reduced, and cost can be saved.
Owner:河北简工科技有限公司

Space division and time division intersatellite link rapid building method based on space-time prior link building information

A space division and time division intersatellite link rapid building method based on space-time prior link building information includes the steps that TOA of a next effective measurement communication time slot is calculated; the position vector and the speed vector from a satellite A to a satellite B in the next effective measurement communication time slot are calculated, and the speed vector is projected to the position vector direction to obtain Doppler information FOA; ephemeris parameters are forecasted by the satellite A and the satellite B, the position of the satellite A relative to an earth core inertial coordinate system and the position of the satellite B relative to the earth core inertial coordinate system in the next measurement communication time slot are calculated respectively, and the center of mass direction vector from the center of mass of the satellite A to the center of mass of the satellite B in the next measurement communication time slot is calculated; an antenna pointing Euler angle of the satellite A under a satellite A antenna coordinate system is obtained through conversion, and then an intersatellite link between the satellite A and the satellite B is built. By the adoption of the method, rapid alignment of scanning beam antennas and low-cost capture of spread spectrum signals of the intersatellite link can be achieved, intersatellite link satellite load link building time and complexity are reduced, and reliability is improved.
Owner:NAT UNIV OF DEFENSE TECH

Floating arch cofferdam and construction method

The invention provides a float arch cofferdam which can float and submerge in water as well as is convenient for being dragged and can be used for a plurality of times. The invention also provides the construction method of the float arch cofferdam. The float arch cofferdam is mainly used for maintaining and rebuilding various large dams and water conservancy projects, which can be utilized to surround the upstream face of the large dam, keeps off the water in a reservoir and discharge the downstream water of a cofferdam; dry operating environment is created on the upstream face of the large dam; the cofferdam is made by adopting steel plates and reinforced concrete material, the shape of the circle arch cofferdam lead the outer wall to bear upstream water pressure, but the outer wall does not need to be too thick, and due to the design of more than two cabins on the transverse surface, the posture of the cofferdam in the water can be more flexibly adjusted by controlling the water injection and water draining in all the cabins when in floating. The construction of the cofferdam can be carried out on the water, but a foundation bed is sealed with the main body of the cofferdam to stop water so as to collect the sewage generated in the construction; after the construction, the sewage is discharged after being purified and treated, thus reducing pollution to water quality. In addition, when in construction, the reservoir does not need emptying and only needs to lower the water level properly, thereby avoiding the loss caused by emptying the reservoir.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products