Environment-friendly road engineering prefabricated slab

By designing a detachable lifting ring structure on prefabricated boards of environmentally friendly road engineering, the problem of unstable buried in the lifting ring is solved, and the stable lifting and laying of the board is achieved, construction efficiency is improved and convenient disassembly and replacement is supported.

CN222525087UActive Publication Date: 2025-02-25XIAN MUNICIPAL DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421302149.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2025-02-25
Estimated Expiration
2034-06-07

AI Technical Summary

Technical Problem

During the lifting and laying process of existing environmentally friendly road engineering prefabricated boards, the internal burial of the hoisting ring is unstable, which makes the hoisting ring easily break away from the hoisting hole, affecting the normal lifting and laying of the board.

Method used

A detachable lifting ring structure is designed, including a combined sleeve, an embedded lifting ring body, a defined guide column and a sealed back cover. Through the connection and cooperation of the plastic inner liner, the stable connection of these components is achieved to achieve stable lifting of the plate and Layout.

Benefits of technology

This design avoids direct impact of the hook on the hoist hole, prevents the hoisting ring from falling off, supports convenient disassembly and replacement, promotes the recycling of the board, and improves the construction efficiency of road projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525087U_ABST
    Figure CN222525087U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of precast slabs, in particular to an environment-friendly road engineering precast slab which comprises a cement precast slab body, a hanging hole body is formed in the surface of the cement precast slab body, a plastic neck bush is arranged on the inner side of the hanging hole body, a combined sleeve is in threaded connection with the upper portion of the inner side of the plastic neck bush, and a plurality of hanging holes are formed in the combined sleeve. According to the environment-friendly road engineering prefabricated slab, through the arrangement of the combined sleeve, the embedded hanging ring body, the limiting guide column and the sealing bottom cover, the environment-friendly road engineering prefabricated slab can be conveniently spliced and laid in a hoisting mode, and therefore the environment-friendly road engineering prefabricated slab can be conveniently and rapidly spliced and laid; the stable connection of the detachable lifting ring structure and the lifting hook is used for being matched with a plate to achieve laying construction operation, the detachable lifting ring structure is different from an existing lifting ring which is of an integrated structure, the lifting hook can be prevented from directly impacting and damaging a lifting hole due to the arrangement of the detachable lifting ring structure, and the purpose of preventing the lifting ring from falling outwards is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated panels, in particular to an environmentally friendly prefabricated panel for road engineering. Background Art

[0002] When carrying out construction work on road projects, environmentally friendly prefabricated panels are a multi-purpose, environmentally friendly, high-quality building material. They are mainly made of cement materials and have the characteristics of being porous, corrosion-resistant and permeable. In addition, environmentally friendly prefabricated panels also have strong compressive strength and are gray in color, making them very suitable for urban road construction.

[0003] When environmentally friendly road engineering prefabricated panels are used for road paving operations in the prior art, it is generally necessary to lift the entire panel through the cooperation of lifting equipment and embedded lifting rings so that it can be accurately laid in place. However, since the lifting rings and reserved lifting holes are integrally formed, and the inner walls of the lifting holes are worn due to repeated impacts by the lifting hooks, the lifting rings become unstable when embedded. This situation will cause the lifting rings to easily detach from the lifting holes and also affect the subsequent normal lifting and paving operations of the entire panel. Therefore, an environmentally friendly road engineering prefabricated panel is proposed to address the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide an environmentally friendly prefabricated plate for road engineering, so as to solve the problem proposed in the above background technology that when environmentally friendly prefabricated plates for road engineering are used for road paving work in the prior art, the entire lifting and paving operation is affected due to the unstable internal embedding of the lifting ring.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] An environmentally friendly prefabricated board for road engineering comprises a cement prefabricated board body, a hanging hole body is provided on the surface of the cement prefabricated board body, and a plastic inner bushing is provided on the inner side of the hanging hole body, a combined sleeve is threadedly connected to the upper inner side of the plastic inner bushing, and a limiting guide column is fixedly connected to the bottom end of the combined sleeve, a sealing bottom cover is fixedly connected to the bottom end of the limiting guide column, side grooves are respectively provided on both sides of the combined sleeve, limiting blocks are respectively fixedly connected to the lower left and lower right inner sides of the plastic inner bushing, and an embedded hanging ring body is provided on the inner side of the combined sleeve.

[0007] Preferably, a card interface is respectively provided on one side and the front end of the cement precast board body, and a card connection block is respectively provided on the other side and the rear end of the cement precast board body.

[0008] Preferably, the hanging hole bodies are provided with 2 groups in total, and the plastic inner bushings are integrally cast and formed by the hanging hole bodies and the cement precast board bodies.

[0009] Preferably, the inner diameter of the limiting guide column is smaller than the inner diameter of the sealing bottom cover, and the sealing bottom cover and the plastic inner sleeve are matched in size, the sealing bottom cover and the limiting block are adjacent to each other in upper and lower positions, the internal space of the side groove and the outer end of the limiting block are matched in shape, the internal space of the plastic inner sleeve is thin at the top and thick at the bottom, and the interior of the plastic inner sleeve and the interior of the combined sleeve are connected.

[0010] Preferably, the limiting block is slidably connected to an elastic block at one side thereof close to the limiting guide column, and a spring is provided at one side inside the limiting block, the spring and the elastic block are fixedly connected, and the outer surface of the limiting guide column is provided with a slot which is engaged with the elastic block.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] In the utility model, by providing a combined sleeve, an embedded lifting ring body, a limiting guide column and a sealed bottom cover, it is convenient for the environmentally friendly road engineering prefabricated plate to be able to realize the paving construction operation in the process of splicing and paving operation by hoisting. Under the connection cooperation of the plastic inner liner, the detachable lifting ring structure composed of the combined sleeve, the embedded lifting ring body, the limiting guide column and the sealed bottom cover is stably connected with the hook to cooperate with the plate. Different from the previous lifting ring using an integrated structure, the detachable lifting ring structure is set by assembling the inner and outer sleeve structures, which can avoid direct impact damage to the lifting hole by the hook, thereby preventing the lifting ring from falling off. At the same time, its overall support for convenient disassembly can be beneficial to the subsequent replacement of damaged lifting ring components, and indirectly also facilitates the recycling of the entire plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 This is a schematic diagram of the internal cutaway structure of the plastic inner liner of the utility model;

[0015] Figure 3 This is a schematic diagram of the main structure of the combined sleeve of the utility model;

[0016] Figure 4 For this utility model Figure 3 Schematic diagram of the structure at point A.

[0017] In the figure: 1. Cement precast board body; 2. Hanging hole body; 3. Plastic inner bushing; 4. Combined sleeve; 5. Embedded lifting ring body; 6. Limiting guide column; 7. Sealing bottom cover; 8. Side slot; 9. Limiting block; 10. Card interface; 11. Card block; 12. Elastic card block; 13. Spring. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-4 , the utility model provides a technical solution:

[0020] An environmentally friendly prefabricated board for road engineering comprises a cement prefabricated board body 1, a hanging hole body 2 is provided on the surface of the cement prefabricated board body 1, and a plastic inner bushing 3 is provided on the inner side of the hanging hole body 2, a combined sleeve 4 is threadedly connected to the upper inner side of the plastic inner bushing 3, and a limiting guide column 6 is fixedly connected to the bottom end of the combined sleeve 4, and a sealing bottom cover 7 is fixedly connected to the bottom end of the limiting guide column 6, side grooves 8 are respectively provided on both sides of the plastic inner bushing 3, limiting blocks 9 are respectively fixedly connected to the lower left and lower right inner sides of the plastic inner bushing 3, and an embedded hanging ring body 5 is provided on the inner side of the combined sleeve 4.

[0021] like Figure 1 As shown, one side and the front end of the cement precast board body 1 are respectively provided with a card interface 10, and the other side and the rear end of the cement precast board body 1 are respectively provided with a card block 11. By respectively providing the card block 11 and the card interface 10, the settings of the two will facilitate the convenient splicing operation of the entire board with an adjacent group of boards; there are a total of 2 groups of lifting hole bodies 2, and the plastic inner lining 3 is integrally cast and formed by the lifting hole body 2 and the cement precast board body 1. Since there are a total of 2 groups of lifting hole bodies 2, this setting will facilitate the entire board to be connected to 4 hooks at the same time, so that the lifting equipment can stably lift the entire board.

[0022] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, the inner diameter of the limiting guide column 6 is smaller than the inner diameter of the sealing bottom cover 7, and the sizes of the sealing bottom cover 7 and the plastic inner bushing 3 are matched, the sealing bottom cover 7 and the limiting block 9 are adjacent to each other in upper and lower positions, the inner space of the side slot 8 and the outer end of the limiting block 9 are matched in shape, the inner space of the plastic inner bushing 3 is thin at the top and thick at the bottom, the interior of the plastic inner bushing 3 and the interior of the combined sleeve 4 are connected, and when the combined sleeve 4 is screwed from bottom to top and installed in the plastic inner bushing 3, the combined sleeve 4 will be installed in place against the upper half of the plastic inner bushing 3, and at this time, the inner space of the plastic inner bushing 3 is thin at the top and thick at the bottom. The arrangement can prevent the combined sleeve 4 from being screwed out of the interior of the plastic inner liner 3; an elastic card block 12 is slidably connected to one side of the limiting block 9 close to the limiting guide column 6, and a spring 13 is provided on one side of the inner side of the limiting block 9, and the spring 13 and the elastic card block 12 are fixedly connected. A card groove that is engaged with the elastic card block 12 is provided on the outer surface of the limiting guide column 6. After the combined sleeve 4 is screwed into place and abuts against the upper half of the plastic inner liner 3, a group of elastic card blocks 12 will pop out with the help of the rebound potential energy generated by the spring 13, and the installation of the combined sleeve 4 is limited by the engagement connection with the limiting guide column 6.

[0023] Workflow: Before using the environmentally friendly road engineering prefabricated board, as the cement prefabricated board body 1 and the plastic inner liner 3 are integrally cast and formed during the production and processing of the entire board, the side slot 8 can be aligned with the limiting block 9, and then the combined sleeve 4 can be pushed into the plastic inner liner 3 from bottom to top, and then the combined sleeve 4 can be screwed and installed into the inside of the plastic inner liner 3 by using the cooperation of the internal and external threads, and after being limited by the engagement of a group of elastic blocks 12 that pop outward and the limiting guide column 6, the combined sleeve 4, the embedded lifting ring body 5, and the limiting guide column 6 are connected. The detachable lifting ring structure composed of the fixed guide column 6 and the sealing bottom cover 7 can be quickly assembled into the interior of the plastic inner liner 3. During the construction of the road project using the environmentally friendly road engineering prefabricated panel, after the hook penetrates into the interior of the combined sleeve 4 through the interior of the plastic inner liner 3 and stably hooks and connects to the embedded lifting ring body 5, the lifting equipment can quickly lift the entire plate through the stable connection between the hook and the detachable lifting ring structure, and cooperate with the splicing of an adjacent group of plates through the card interface 10 and the card block 11 to complete the entire plate splicing and paving operation.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An environmentally friendly road engineering prefabricated board, comprising a cement prefabricated board body (1), characterized in that: The surface of the cement precast panel body (1) is provided with a hanging hole body (2), and the inner side of the hanging hole body (2) is provided with a plastic inner bushing (3), the upper inner side of the plastic inner bushing (3) is threadedly connected with a combination sleeve (4), and the bottom end of the combination sleeve (4) is fixedly connected with a limiting guide column (6), and the bottom end of the limiting guide column (6) is fixedly connected with a sealing bottom cover (7), and the two sides of the combination sleeve (4) are respectively provided with side grooves (8), and the lower left and lower right inner sides of the plastic inner bushing (3) are respectively fixedly connected with limiting blocks (9), and the inner side of the combination sleeve (4) is provided with an embedded hanging ring body (5).

2. The environmentally friendly road engineering prefabricated board according to claim 1 is characterized by: A card interface (10) is respectively provided on one side and the front end of the cement precast panel body (1), and a card connection block (11) is respectively provided on the other side and the rear end of the cement precast panel body (1).

3. The environmentally friendly prefabricated board for road engineering according to claim 1, characterized in that: The hanging hole body (2) is provided with two groups in total, and the plastic inner bushing (3) is formed and arranged by integrally casting the hanging hole body (2) and the cement precast board body (1).

4. The environmentally friendly prefabricated board for road engineering according to claim 1, characterized in that: The inner diameter of the limiting guide column (6) is smaller than the inner diameter of the sealing bottom cover (7), and the sizes of the sealing bottom cover (7) and the plastic inner bushing (3) are matched. The sealing bottom cover (7) and the limiting block (9) are arranged adjacent to each other in upper and lower positions. The inner space of the side slot (8) and the outer end of the limiting block (9) are matched in shape. The inner space of the plastic inner bushing (3) is arranged in a thin upper part and thick lower part structure. The interior of the plastic inner bushing (3) and the interior of the combined sleeve (4) are connected.

5. The environmentally friendly prefabricated board for road engineering according to claim 1, characterized in that: The limiting block (9) is slidably connected to an elastic block (12) at one side thereof close to the limiting guide column (6), and a spring (13) is provided at one side of the inner portion of the limiting block (9). The spring (13) and the elastic block (12) are fixedly connected, and a slot is provided on the outer surface of the limiting guide column (6) to be engaged with the elastic block (12).