Passing culvert structure
By setting up rubber rings and concrete filling layers at the connections of the culvert structures, the problems of unstable and easy leakage of water canals and pipelines in the prior art are solved, and a more stable connection effect is achieved.
Patent Information
- Application Number
- CN202421138965.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-05-23
AI Technical Summary
The existing culvert structure is unstable at the connection between the canal and pipeline and is prone to leakage.
A culvert structure including two channels, multiple pipes, several connecting sections, a plurality of first concrete pieces and two second concrete pieces is designed. A stable connection is formed by providing a first and a second rubber ring between the connecting section and the pipe and filling the connection with concrete.
Improve the stability of the connection between the canal and the pipeline and the connection between the pipeline, avoiding leakage problems.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to farmland reconstruction, in particular to a road culvert structure. Background Art
[0002] There are usually canals on both sides of the farmland, which makes it convenient for the pump station to pump water into the canal. After opening the gate on the canal, the water can be introduced into the farmland for irrigation. The canal is generally composed of multiple sections of canals connected, with a U-shaped or U-shaped cross-section and an open top surface, so that the situation in the canal can be seen intuitively. In addition, it is necessary to consider the entry of agricultural machinery into the farmland. Therefore, some of the canals need to be set up with a downhill slope. The canals on both sides of the downhill slope are connected by setting up a culvert structure. The culvert structure generally uses pipes and prefabricated concrete parts, and backfills the soil above the pipe as a road surface. The existing culvert structure still has problems: due to the different shapes of the cross-sections of the canal and the pipe, the connection between the two is unstable and prone to leakage. Utility Model Content
[0003] The present application provides a road culvert structure, which can solve the problems raised in the background technology.
[0004] In the present application, a culvert structure is provided, comprising:
[0005] Both channels are U-shaped in cross section;
[0006] A plurality of pipes, the inner diameters of which are matched to the arc-shaped sections of the channels, are arranged between two of the channels;
[0007] A plurality of connecting sections, both ends of which are in the shape of sockets matching the pipes, and are sequentially connected between two adjacent pipes;
[0008] A plurality of first concrete members, cushioned below the plurality of pipes and the plurality of connecting sections;
[0009] Two second concrete members are respectively stacked above the pipes on both sides. The second concrete members overlap with the end faces of the pipes close to the channel and can cover the end faces of the channel.
[0010] Furthermore, there are a first rubber ring and a second rubber ring between the connecting section and the pipe, the first rubber ring is arranged between the connecting section and the end face of the pipe, and the second rubber ring is arranged between the inner wall of the connecting section and the outer wall of the pipe; the area between the connecting section and the pipe between the first rubber ring and the second rubber ring is a first concrete filling layer.
[0011] Furthermore, the cross section of the first rubber ring is T-shaped, and the end surfaces of the connecting section and the pipe are provided with a first groove for the first rubber ring to be embedded.
[0012] Furthermore, triangular plasters are provided on the end surfaces at both ends of the connecting section for connecting to the pipeline.
[0013] Furthermore, there are fasteners between the two second concrete members and the corresponding first concrete members for fixing the two.
[0014] Furthermore, the first concrete members on both sides are partially placed under the corresponding channels.
[0015] In summary, in the present application, a culvert structure includes two channels, a plurality of pipes, a plurality of connecting sections, a plurality of first concrete members and two second concrete members. The two second concrete members are respectively stacked on top of the pipes on both sides, and have arc grooves at the bottom. The second concrete member overlaps with the end face of the pipe close to the channel and can cover the end face of the channel. The end face of the channel may have a groove, and a sealing belt is placed in the groove, which cooperates with the second concrete member and the end face of the pipe close to the channel, and a second concrete filling layer covering the sealing belt in the groove. Accordingly, a space for backfilling soil to cover the pipe and the connecting section is formed between the two second concrete members, the outer wall of the pipe and the outer wall of the connecting section. Beneficial effects: the connection between the canal and the pipe and the connection between the pipes are more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the background technology, the drawings required for use in the embodiments of the present application or the background technology will be described below.
[0017] Figure 1 A cross-sectional view of the present application;
[0018] Figure 2 for Figure 1 A magnified schematic diagram of part A;
[0019] Figure 3 for Figure 1 A magnified schematic diagram of part B;
[0020] Figure 4 The diagram is a schematic diagram of the arrangement of the second concrete member and the first concrete member at the connection position of the channel and the pipeline.
[0021] In the figure,
[0022] 1. Channel; 1a. Sealing strip; 1b. Second concrete filling layer;
[0023] 2. Pipeline; 2a. First rubber ring; 2b. Second rubber ring; 2c. First concrete filling layer; 2d. Triangular plastering;
[0024] 3. Connecting section;
[0025] 4. The first concrete piece;
[0026] 5. Second concrete member; 5a. Fastener. DETAILED DESCRIPTION
[0027] The following is further explained in conjunction with the accompanying drawings. Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0028] See also Figure 1 A culvert structure includes two channels 1, a plurality of pipes 2, a plurality of connecting sections 3, a plurality of first concrete members 4 and two second concrete members 5.
[0029] The cross-sections of the two channels 1 are U-shaped. The channel 1 is composed of multiple prefabricated channel 1 sections installed in the corresponding pits, and the space between the two channels 1 is left empty to design a slope for agricultural machinery to pass through.
[0030] Each pipe 2 is also prefabricated with reinforced concrete. The length of one pipe 2 is fixed. The number of pipes 2 is determined according to the designed width of the road surface. Two pipes 2 are used as an example in the attached figure. The inner diameter of the pipe 2 matches the arc section of the channel 1, that is, it is equal to the inner diameter of the arc section of the channel 1. Multiple pipes 2 are arranged between two channels 1. That is, on the one hand, the two channels 1 are connected by the pipe 2, and on the other hand, the pipe 2 is closed compared to the channel 1, and soil can be backfilled on the top as the road surface.
[0031] A plurality of connecting sections 3 are sequentially connected between two adjacent pipes 2, that is, the number of connecting sections 3 is related to the number of pipes 2, more precisely, the number of connecting sections 3 is one less than the number of pipes 2. Both ends of the connecting section 3 are in the shape of a socket that matches the pipe 2. That is, the inner diameter of the middle part of the connecting section 3 is the same as the inner diameter of the pipe 2, and the inner diameter of the two end parts of the connecting section 3 becomes larger, so that the ends of the pipe 2 can be inserted and matched to the connection between the concrete and the rubber ring to connect and seal.
[0032] See also Figure 2Optionally, there are a first rubber ring 2a and a second rubber ring 2b between the connecting section 3 and the pipe 2. The first rubber ring 2a is arranged between the connecting section 3 and the end face of the pipe 2, and the second rubber ring 2b is arranged between the inner wall of the connecting section 3 and the outer wall of the pipe 2. The area between the connecting section 3 and the pipe 2 between the first rubber ring 2a and the second rubber ring 2b is a first concrete filling layer 2c. That is, in the process of connecting the connecting section 3 and the pipe 2, the first rubber ring 2a is installed first, and then concrete is filled in the connection between the two, and then the second rubber ring 2b is installed, and the first concrete filling layer 2c is formed after the filled concrete solidifies.
[0033] Furthermore, the cross section of the first rubber ring 2a is T-shaped, and the vertical portion is located between the connecting section 3 and the end surface of the pipe 2. In this way, the installation of the first rubber ring 2a between the connecting section 3 and the pipe 2 is convenient.
[0034] Furthermore, the end faces at both ends of the connecting section 3 are provided with triangular plastering 2d connected to the outer wall of the pipeline 2. In this way, the installation of the second rubber ring 2b is more stable, and the sealing of the connection between the connecting section 3 and the pipeline 2 is also better.
[0035] A plurality of first concrete members 4 are placed under a plurality of pipes 2 and a plurality of connecting sections 3. Specifically, the first concrete members 4 are also prefabricated members, with a circular arc groove on the top, and the outer diameter of the middle portion of the connecting section 3 can be the same as the outer diameter of the pipe 2. Specifically, the first concrete members 4 are first placed in the pit, and then the pipes 2 and connecting sections 3 are placed in the pit and stacked on the first concrete members 4.
[0036] See also Figure 3 , two second concrete members 5 are respectively stacked on top of the pipes 2 on both sides. Specifically, the second concrete members 5 are also prefabricated members with arc grooves at the bottom. The second concrete members 5 overlap with the end face of the pipe 2 close to the channel 1 and can cover the end face of the channel 1. In this way, the end face of the channel 1 can have a groove, and a sealing tape 1a is placed in the groove, which is matched to the second concrete member 5 and the end face of the pipe 2 close to the channel 1, and the second concrete filling layer covering the sealing tape 1a in the groove. Accordingly, a space for backfilling soil to cover the pipe 2 and the connecting section 3 is formed between the two second concrete members 5, the outer wall of the pipe 2, and the outer wall of the connecting section 3.
[0037] See also Figure 4 Optionally, there are fasteners 5a for fixing the two second concrete members 5 and the corresponding first concrete members 4. In this way, the position of the second concrete member 5 can be adjusted conveniently, and the second concrete member 5 and the end surface of the pipeline 2 close to the channel 1 can be overlapped.
[0038] Optionally, the first concrete members 4 on both sides are partially placed under the corresponding channels 1. That is, the outer diameter of the arc portion of the channel 1 is equal to the outer diameter of the pipe 2. When the pipe 2 is installed between the two channels 1, it is more convenient for the pipe 2 to be aligned with the arc portion of the channel 1.
Claims
1. A culvert structure, characterized in that: include: The two channels (1) are both U-shaped in cross section; A plurality of pipes (2) having inner diameters matching the arc-shaped sections of the channels (1) and arranged between two of the channels (1); A plurality of connecting sections (3), both ends of which are in the shape of sockets matching the pipes (2) and are sequentially connected between two adjacent pipes (2); A plurality of first concrete members (4) are placed under the plurality of pipes (2) and the plurality of connecting sections (3); Two second concrete members (5) are respectively stacked above the pipes (2) on both sides; the second concrete members (5) overlap with the end faces of the pipes (2) close to the channel (1) and can cover the end faces of the channel (1).
2. A culvert structure according to claim 1, characterized in that: A first rubber ring (2a) and a second rubber ring (2b) are provided between the connecting section (3) and the pipe (2); the first rubber ring (2a) is arranged between the connecting section (3) and the end surface of the pipe (2), and the second rubber ring (2b) is arranged between the inner wall of the connecting section (3) and the outer wall of the pipe (2); the area between the connecting section (3) and the pipe (2) between the first rubber ring (2a) and the second rubber ring (2b) is a first concrete filling layer (2c).
3. A culvert structure according to claim 2, characterized in that: The cross section of the first rubber ring (2a) is T-shaped, and the end surfaces of the connecting section (3) and the pipe (2) are provided with a first groove for the first rubber ring (2a) to be embedded.
4. A culvert structure according to claim 2, characterized in that: The end surfaces at both ends of the connecting section (3) are provided with triangular plastering (2d) connected to the pipeline (2).
5. The culvert structure according to claim 1, characterized in that: There are fasteners (5a) between the two second concrete members (5) and the corresponding first concrete members (4) for fixing the two.
6. The culvert structure according to claim 1, characterized in that: The first concrete members (4) on both sides are also partially placed under the corresponding channels (1).