Hydrogen production catalyst preparation tank
By setting up a crimping cutter head in the hydrogen production catalyst preparation tank and using a combination of heating wire and bellows, the problem of low efficiency when traditional devices deal with solid raw materials is solved, rapid mixing and efficient melting of raw materials are achieved, and the efficiency of catalyst preparation is improved.
Patent Information
- Application Number
- CN202420630227.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-03-29
AI Technical Summary
When traditional preparation devices process solid raw materials, it is difficult to quickly mix high temperatures, which affects the efficiency of catalyst preparation.
A hydrogen production catalyst preparation tank was designed to crush the solid raw materials by setting up a crimping cutter head, and heating and ventilation of the raw materials were controlled by using heating wires and bellows to ensure high reaction efficiency.
Through grinding and heating treatment, the raw materials can be quickly mixed and melted effectively, improving the efficiency and stability of catalyst preparation.
Smart Images

Figure CN222567566U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of catalyst preparation, in particular to a hydrogen production catalyst preparation tank. Background Art
[0002] A catalyst is a substance that can change the chemical reaction rate of the reactants in a chemical reaction without changing the chemical equilibrium, and whose own mass and chemical properties do not change before and after the chemical reaction. A solid catalyst is also called a catalyst. In the preparation process of hydrogen production catalysts, most of them are made through special preparation equipment and utilize processes such as high-temperature fusion, drying and roasting.
[0003] According to patent number CN 214598956 U, a new type of hydrogen production catalyst preparation device is disclosed, the new type of hydrogen production catalyst preparation device includes: a reaction tank body and a wide mouth mask, a feed pipe and a discharge pipe arranged on the reaction tank body, the wide mouth mask is fixedly connected to the feed pipe; a support column, the support column is arranged on one side of the reaction tank body; a crossbeam, the crossbeam is fixedly installed on the top of the support column; a threaded sleeve, the threaded sleeve is rotatably installed on the crossbeam; an adjusting screw, the adjusting screw is threadedly installed on the threaded sleeve, and both ends of the adjusting screw extend outside the threaded sleeve; a frame, the frame is fixedly installed at the bottom end of the adjusting screw. The new type of hydrogen production catalyst preparation device provided by the utility model has the advantages of being able to timely dredge the raw materials, improve the smoothness of material discharge, and be able to seal the discharge pipe, and convenient operation.
[0004] However, when using traditional preparation devices including the above-mentioned device, it was found that since some of the required production raw materials are in a fixed state, when these raw materials are poured into the reaction tank through the top feed hopper, the basic raw materials cannot be quickly mixed at high temperature to obtain the catalyst, which directly affects the subsequent catalyst preparation work. Therefore, a hydrogen production catalyst preparation tank is now needed. Utility Model Content
[0005] The purpose of the utility model is to provide a hydrogen production catalyst preparation tank, which grinds solid raw materials by means of a grinder head, and controls the heating and ventilation of the raw materials by means of a heating wire and a bellows to ensure the high efficiency of the reaction, so as to solve the technical problems mentioned in the background technology.
[0006] To achieve the above object, the utility model provides the following technical solution: a hydrogen production catalyst preparation tank, comprising a bottom plate, an electric slide is arranged on the upper part of the bottom plate, a connecting plate is bolted to the upper output end of the electric slide, and two groups of placement furnaces are bolted to the upper surface of the connecting plate symmetrically;
[0007] A group of heating tanks are movably installed at the center of the upper part of the bottom plate, and two groups of placement furnaces are alternately inserted into the heating tanks for plugging and installation. A heating wire is arranged inside the heating tank, a bellows is arranged outside the heating tank, and a sealing cover is arranged on the upper part of the heating tank;
[0008] A mincing blade is rotatably mounted inside the sealing cover, and a funnel is clamped and mounted at the bottom of the sealing cover.
[0009] Preferably, the outer surface of the connecting plate is slidably mounted in contact with the upper slideway of the electric slide, two groups of heat insulation plates are symmetrically bolted to the upper surface of the connecting plate, and several groups of support bolts are bolted to the upper surface of the heat insulation plates with equal arcs, and the two groups of heat insulation plates corresponding to each group of heat insulation plates of the placement furnace are bolted to the top of the corresponding side support bolts.
[0010] Preferably, a group of electric push rods are installed on both sides of the electric slide in the middle of the upper surface of the base plate, and two groups of positioning blocks are installed at the symmetrical electric push rod positions on both sides of the outer arc surface of the heating tank. The telescopic top end of the electric push rod is bolted to the corresponding side positioning block.
[0011] Preferably, a connecting sealing tube is welded and installed on the top end of the heating tank, and a socket is penetrated through the bottom end of the heating tank.
[0012] Preferably, a controller is mounted on one side of the outer arc surface of the heating tank, the heating wire is electrically connected to the controller, the placement furnace is inserted into the inner circle of the heating wire, and the outer arc surface of the placement furnace is not in contact with the inner circle of the heating wire.
[0013] Preferably, an air outlet pipe is provided at the bottom end of the bellows, and an air supply pipe is provided at the top end of the bellows, and the air outlet pipe and the air supply pipe are connected and installed with the heating tank respectively.
[0014] Preferably, the top of the sealing cover is connected to a feed port, the bottom of the sealing cover is installed with a reinforcement tube, the top of the feed port is covered with a baffle, a motor is installed on the top of the baffle, a stirring rod is key-connected to the output end of the motor, and the mincing blade head is welded and installed on the outside of the stirring rod.
[0015] Preferably, a limit plate is installed at the center of the funnel corresponding to the position of the stirring rod, a connecting seat is installed at the bottom of the funnel, the top of the placement furnace is inserted into the inside of the connecting seat, and the outer arc surface of the placement furnace is installed in contact with the inner wall of the connecting seat.
[0016] Compared with the prior art, the beneficial effects of the utility model are as follows: by putting the raw materials into the sealing cover and chopping the raw materials with the chopping knife head, the raw materials can leak out through the funnel, and the blocking cover can block the discharge port during the stirring process, and the connecting seat at the bottom of the funnel can be inserted into the top of the placing furnace during the overall descent of the placing furnace, ensuring that the material leaked from the funnel can stably enter the placing furnace for melting, thereby ensuring that the melting process is efficient and fast. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the installation structure of the heating tank of the utility model;
[0019] Figure 3 This is a schematic diagram of the split installation structure of the furnace placed in the utility model;
[0020] Figure 4 This is a schematic diagram of the disassembly of the sealing cover of the utility model;
[0021] Figure 5 This is a schematic diagram of the installation structure of the heating wire of the utility model;
[0022] Figure 6 This is a disassembled diagram of the funnel installation structure of the utility model.
[0023] In the figure: 1. bottom plate; 2. electric slide; 3. connecting plate; 4. heat insulation board; 5. supporting bolt; 6. placing furnace; 7. electric push rod; 8. heating tank; 9. positioning block; 10. connecting sealing tube; 11. controller; 12. heating wire; 13. bellows; 14. air outlet pipe; 15. air supply pipe; 16. sealing cover; 17. feeding port; 18. reinforcement pipe; 19. baffle cover; 20. motor; 21. mincing blade; 22. funnel; 23. limit plate; 24. connecting seat. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] The utility model provides: a hydrogen production catalyst preparation tank, such as Figure 1-Figure 6As shown, it includes a base plate 1, an electric slide 2 is arranged on the top of the base plate 1, a connecting plate 3 is bolted to the output end of the upper part of the electric slide 2, and two groups of placement furnaces 6 are bolted to the upper surface of the connecting plate 3 symmetrically; a group of heating tanks 8 are movably installed at the center position of the upper part of the base plate 1, and the two groups of placement furnaces 6 are alternately inserted into the heating tank 8 for plug-in installation, a heating wire 12 is arranged inside the heating tank 8, a bellows 13 is arranged on the outer side of the heating tank 8, and a sealing cover 16 is sealed on the upper part of the heating tank 8; a mincing knife head 21 is rotatably installed inside the sealing cover 16, and a funnel 22 is clamped and installed at the bottom of the sealing cover 16.
[0026] Preferably, the outer surface of the connecting plate 3 is fitted into and slidably installed on the upper slide of the electric slide 2, and two groups of heat insulation plates 4 are bolted and installed symmetrically on the upper surface of the connecting plate 3. Several groups of support bolts 5 are bolted and installed with equal arcs on the upper surface of the heat insulation plates 4. Two groups of placement furnaces 6 are bolted to the top of the corresponding side support bolts 5 corresponding to the positions of each group of heat insulation plates 4. The base plate 1 as the base plate can ensure the overall stability of the device. The electric slide 2 on the top of the base plate 1 can control the sliding of the connecting plate 3 as a whole to control the use of a specific group of placement furnaces 6. At the same time, the heat insulation plates 4 bolted and installed on the upper surface of the connecting plate 3 cooperate with the support bolts 5 to limit the placement furnace 6, and at the same time, it can prevent the overall temperature of the placement furnace 6 from being too high during the processing, which will affect the use of the electric slide 2.
[0027] Furthermore, a group of electric push rods 7 are installed on both sides of the electric slide 2 in the middle of the upper surface of the base plate 1, and two groups of positioning blocks 9 are installed at the positions of the electric push rods 7 symmetrically on both sides of the outer arc surface of the heating tank 8. The telescopic top end of the electric push rod 7 is bolted to the corresponding side positioning block 9, and the electric push rod 7 installed on the outside of the electric slide 2 is connected to the positioning block 9, which can control the use height of the heating tank 8, and can ensure the stable and rapid conversion of the placement furnace 6, making the preparation process more efficient and rapid.
[0028] Furthermore, a connecting sealing tube 10 is welded and installed on the top of the heating tank 8, and a socket is opened through the bottom of the heating tank 8. The connecting sealing tube 10 installed on the top of the heating tank 8 and the reinforcing tube 18 at the bottom of the sealing cover 16 are plugged and installed together to ensure that the raw materials can leak out stably, and the socket opened at the bottom of the heating tank 8 can ensure that the placement furnace 6 is stably inserted, thereby improving the overall preparation efficiency of the device.
[0029] It is worth mentioning that a controller 11 is installed on one side of the outer arc surface of the heating tank 8, the heating wire 12 is electrically connected to the controller 11, the placement furnace 6 is inserted into the inner circle of the heating wire 12, and the outer arc surface of the placement furnace 6 is not in contact with the inner circle of the heating wire 12. A resistance control component for the heating wire 12 is provided inside the controller 11. The placement furnace 6 is heated by the heating wire 12 to ensure efficient melting of the material inside the placement furnace 6. At the same time, since the placement furnace 6 does not contact the heating wire 12, the heating wire 12 will not affect the movement of the placement furnace 6.
[0030] Specifically, an air outlet pipe 14 is provided at the bottom end of the bellows 13, and an air supply pipe 15 is provided at the top end of the bellows 13. The air outlet pipe 14 and the air supply pipe 15 are respectively connected and installed with the heating tank 8. When the bellows 13 works, cold air can be sent from the inside of the air supply pipe 15 into the heating tank 8, and the excessive temperature inside the heating tank 8 can be sent out from the inside of the air outlet pipe 14 to ensure the internal temperature of the heating tank 8.
[0031] In addition, a feed port 17 is connected to the top of the sealing cover 16, a reinforcement tube 18 is installed at the bottom of the sealing cover 16, a baffle 19 is covered on the top of the feed port 17, a motor 20 is installed on the upper part of the baffle 19, a stirring rod is key-connected to the output end of the motor 20, a mincing blade 21 is welded and installed on the outside of the stirring rod, the baffle 19 can cover the feed port 17 and protect the motor 20 at the same time, and the motor 20 drives the mincing blade 21 to rotate, so that the raw materials put into the sealing cover 16 are minced, making the device more efficient in melting the raw materials.
[0032] Furthermore, a limiting plate 23 is installed at the center of the funnel 22 corresponding to the position of the stirring rod, and a connecting seat 24 is installed at the bottom of the funnel 22. The top of the placing furnace 6 is inserted into the connecting seat 24, and the outer arc surface of the placing furnace 6 is installed in contact with the inner wall of the connecting seat 24. A plurality of groups of holes are opened on the bottom surface of the funnel 22 to ensure that the minced raw materials leak out, and the limiting plate 23 in the center of the funnel 22 can limit the stirring rod to prevent the stirring rod from affecting the funnel 22. At the same time, the connecting seat 24 at the bottom of the funnel 22 is plugged into the top of the placing furnace 6, so that the leaked material can stably fall into the placing furnace 6, so that no material will leak out of the heating tank 8.
[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A hydrogen production catalyst preparation tank, characterized in that: include: A bottom plate (1), an electric slide (2) is arranged on the top of the bottom plate (1), a connecting plate (3) is bolted to the output end of the top of the electric slide (2), and two groups of placement furnaces (6) are bolted to the top surface of the connecting plate (3) in a symmetrical manner. A group of heating tanks (8) are movably installed at the center position of the upper part of the bottom plate (1), and the two groups of placement furnaces (6) are alternately inserted into the heating tanks (8) for plug-in installation. A heating wire (12) is arranged inside the heating tank (8), a bellows (13) is arranged outside the heating tank (8), and a sealing cover (16) is provided on the upper part of the heating tank (8); A mincing blade (21) is rotatably mounted inside the sealing cover (16), and a funnel (22) is clamped and mounted on the bottom of the sealing cover (16).
2. A hydrogen production catalyst preparation tank according to claim 1, characterized in that: The outer surface of the connecting plate (3) is slidably mounted in contact with the upper slideway of the electric slide (2); two groups of heat insulation plates (4) are bolted symmetrically on the upper surface of the connecting plate (3); a plurality of groups of support bolts (5) are bolted in contact with the upper surface of the heat insulation plates (4) in equal arcs; the two groups of placement furnaces (6) are bolted to the top of the corresponding side support bolts (5) at the positions of the corresponding groups of heat insulation plates (4).
3. A hydrogen production catalyst preparation tank according to claim 2, characterized in that: A group of electric push rods (7) are respectively installed on both sides of the electric slide (2) in the middle of the upper surface of the base plate (1), and two groups of positioning blocks (9) are installed at the positions of the electric push rods (7) symmetrically on both sides of the outer arc surface of the heating tank (8). The telescopic top end of the electric push rod (7) is bolted to the corresponding side positioning block (9).
4. A hydrogen production catalyst preparation tank according to claim 3, characterized in that: A connecting sealing tube (10) is welded and installed on the top end of the heating tank (8), and a socket is penetrated and opened at the bottom end of the heating tank (8).
5. A hydrogen production catalyst preparation tank according to claim 4, characterized in that: A controller (11) is mounted on one side of the outer arc surface of the heating tank (8), the heating wire (12) is electrically connected to the controller (11), the placement furnace (6) is inserted into the inner circle of the heating wire (12), and the outer arc surface of the placement furnace (6) is not in contact with the inner circle of the heating wire (12).
6. A hydrogen production catalyst preparation tank according to claim 5, characterized in that: An air outlet pipe (14) is arranged at the bottom end of the bellows (13), and an air supply pipe (15) is arranged at the top end of the bellows (13). The air outlet pipe (14) and the air supply pipe (15) are respectively connected and installed with the heating tank (8).
7. A hydrogen production catalyst preparation tank according to claim 6, characterized in that: The top end of the sealing cover (16) is connected to a feed opening (17), the bottom of the sealing cover (16) is provided with a reinforcing tube (18), the top end of the feed opening (17) is covered with a blocking cover (19), a motor (20) is installed on the top of the blocking cover (19), a stirring rod is key-connected to the output end of the motor (20), and the mincing blade head (21) is welded and installed on the outside of the stirring rod.
8. A hydrogen production catalyst preparation tank according to claim 7, characterized in that: A limit plate (23) is installed at the center of the funnel (22) at a position corresponding to the stirring rod, a connecting seat (24) is installed at the bottom of the funnel (22), the top of the placement furnace (6) is inserted into the interior of the connecting seat (24), and the outer arc surface of the placement furnace (6) is installed in contact with the inner wall of the connecting seat (24).