Cutting fluid blending and storing device
By designing a cutting fluid distribution and storage device including a thermostatic insulation box and a rack and rack mechanism, the problem of cutting fluid failure due to direct sunlight and the cumbersome installation and disassembly of the sealing cover in the prior art is solved, and efficient storage and rapid addition of the cutting fluid is achieved.
Patent Information
- Application Number
- CN202421335397.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-06-12
AI Technical Summary
The existing cutting fluid storage device is susceptible to direct sunlight when used outdoors, resulting in the emulsification failure of the cutting fluid. At the same time, the installation and disassembly of the sealing cover are complicated, which affects the rapid addition of the cutting fluid.
A cutting fluid distribution and storage device is designed, and a temperature insulation box is used to fix the liquid storage box, which can achieve rapid sealing of the liquid inlet pipe and rapid addition of the cutting fluid through the rack and rack mechanism and screw mechanism.
It effectively prevents the cutting fluid from emulsifying and failing due to direct sunlight, simplifies the installation and disassembly of the sealing cover, improves the efficiency of adding cutting fluid, and ensures sealing and safety.
Smart Images

Figure CN222572984U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cutting fluid, in particular to a cutting fluid mixing and storage device. Background Art
[0002] Cutting fluid is an industrial liquid used in the process of metal cutting and grinding to cool and lubricate tools and workpieces. Cutting fluid is scientifically compounded from a variety of super-functional additives. It has good cooling, lubrication, rust prevention, oil removal and cleaning, anti-corrosion, and easy dilution properties.
[0003] In the prior art, if the existing cutting fluid storage device is placed outdoors, direct sunlight from the outside can easily emulsify the cutting fluid in the barrel, thereby rendering the cutting fluid ineffective. In order to prevent water vapor from entering the storage device and causing the cutting fluid to fail, the existing cutting fluid storage device generally installs a sealing cover at the liquid inlet through multiple sets of bolts to enhance the sealing performance, which results in time-consuming and labor-intensive installation and removal of the sealing cover during the liquid adding process, making it inconvenient to add the cutting fluid. Utility Model Content
[0004] The purpose of the utility model is to provide a cutting fluid mixing and storage device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a cutting fluid mixing and storage device, comprising: a thermal insulation box, a locking clamp is provided on one side of the upper surface of the thermal insulation box, one side of the locking clamp is fixedly connected to a moving block, a lower screw is connected to the inner thread of the moving block, a gear is fixedly sleeved at one end of the lower screw, and a rack is meshed on one side of the gear.
[0006] A fixed plate is installed on one side of the rack, a liquid level gauge is arranged on one side of the fixed plate, a liquid storage tank is installed at the bottom of the liquid level gauge, and a liquid inlet pipe is installed on one side of the liquid storage tank.
[0007] Preferably, the temperature isolation box is fixedly connected to the fixed plate, a support seat is fixedly installed on one side of the fixed plate, a threaded sleeve is provided on the rotating sleeve inside the support seat, and a worm gear is provided on the fixed sleeve on the outer ring surface of the threaded sleeve.
[0008] Preferably, a worm is meshed on one side of the worm wheel, and both sides of the worm are rotatably sleeved in a fixed seat, one side of the fixed seat is fixedly connected to a fixed plate, one end of the worm is fixedly connected to an adjusting wheel, and an upper screw is sleeved in the threaded sleeve.
[0009] Preferably, one end of the upper screw is fixedly connected to the rack, the rack is slidably connected to the fixed plate, both sides of the lower screw are rotatably sleeved in the connecting seat, and the connecting seat is fixedly connected to the fixed plate.
[0010] Preferably, a slide is installed on one side of the connecting seat, the moving block is slidably connected to the slide, and one side of the slide is fixedly connected to the fixed plate.
[0011] Preferably, the liquid storage tank is fixedly installed in the insulation box, the four corners of the upper surface of the insulation box are fixedly connected with hanging ears, the liquid level meter is fixedly installed on the upper surface of the insulation box and the bottom of the liquid level meter is fixedly inserted in the liquid storage tank.
[0012] Preferably, the liquid inlet pipe is fixedly sleeved on one side of the upper surface of the liquid storage tank and passes through the thermal insulation box, a sealing sleeve is sleeved on the top of the liquid inlet pipe, a solenoid valve is fixedly installed on the lower surface of the thermal insulation box, and the input end of the solenoid valve is fixedly sleeved in the liquid storage tank.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. The liquid storage tank is fixedly installed in the temperature-insulating box. In daily use, the temperature-insulating box can isolate direct sunlight, which can greatly reduce the water vapor generated in the barrel due to high temperature, and also avoid the failure of cutting fluid to a great extent. At the same time, the temperature-insulating box can protect the liquid storage tank from impact and damage, and avoid the leakage of cutting fluid inside the liquid storage tank. The liquid level meter is convenient for the filling amount of cutting fluid in the liquid storage tank, so that it can be filled according to the prescribed capacity standard.
[0015] 2. Insert the sealing sleeve into the liquid inlet pipe, and rotate the adjusting wheel to drive the meshing transmission between the worm and the worm wheel, so that the worm wheel drives the threaded sleeve set inside it to rotate in the support seat. Under the rotation of the threaded sleeve, the threaded sleeve drives the upper screw to move, and the upper screw will drive the rack fixed at one end to move. When the rack moves downward, the rack meshes with the gear, and the gear will drive the lower screw fixed inside it to rotate. The lower screw drives the moving blocks to move toward each other, so that the locking clamps move toward each other, and then the locking clamps clamp the sealing sleeve set on the liquid inlet pipe, thereby completing the rapid tightening of the liquid inlet pipe. The seal avoids the trouble of installing and removing the sealing cover fixed by multiple sets of bolts during the liquid adding process, which is conducive to the rapid addition of cutting fluid. When cutting fluid needs to be added to the liquid storage tank, only the adjusting wheel needs to be rotated in the reverse direction to make the rack move upward, thereby indirectly making the locking clamps move back to back, which is convenient for removing the sealing sleeve. At the same time, self-locking is generated when the worm wheel and the worm are engaged, thereby indirectly avoiding the reversal of the lower screw, ensuring the tightness of the locking clamp, and improving the sealing of the sealing sleeve. Multiple sets of solenoid valves are arranged at the bottom of the temperature insulation box, which is convenient for the rapid discharge of cutting fluid and subsequent use. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is a side view schematic diagram of the overall structure of the utility model;
[0018] Figure 3 It is a top view schematic diagram of the overall structure of the utility model;
[0019] Figure 4 It is a bottom view schematic diagram of the internal structure of the utility model.
[0020] In the figure: 1. Insulation box; 2. Locking clamp; 3. Moving block; 4. Lower screw; 5. Gear; 6. Rack;
[0021] 7. Fixed plate; 8. Liquid level gauge; 9. Liquid storage tank; 10. Liquid inlet pipe; 11. Support seat; 12. Threaded sleeve; 13. Worm gear; 14. Worm; 15. Fixed seat; 16. Adjusting wheel; 17. Upper screw; 18. Connecting seat; 19. Slide; 20. Sealing sleeve; 21. Solenoid valve; 22. Hanging ear. DETAILED DESCRIPTION
[0022] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Embodiment 1
[0024] See also Figure 1-Figure 4 The utility model provides a technical solution: a cutting fluid mixing and storage device, comprising: an insulation box 1, a locking clamp 2 is arranged on one side of the upper surface of the insulation box 1, one side of the locking clamp 2 is fixedly connected to a moving block 3, the moving block 3 is internally threaded with a lower screw 4, one end of the lower screw 4 is fixedly sleeved with a gear 5, one side of the gear 5 is meshed with a rack 6, one side of the rack 6 is installed with a fixing plate 7, one side of the fixing plate 7 is provided with a liquid level gauge 8, a liquid storage tank 9 is installed at the bottom of the liquid level gauge 8, and a liquid inlet pipe 10 is installed on one side of the liquid storage tank 9.
[0025] The cutting fluid is poured into the interior of the liquid storage tank 9 from the liquid inlet pipe 10, and the filling is carried out according to the specified capacity standard based on the display of the liquid level meter 8. After the filling is completed, the sealing sleeve 20 is inserted into the liquid inlet pipe 10. At this time, the gear 5 is driven to rotate by the rack 6, so that the gear 5 drives the lower screw 4 to move. The lower screw 4 causes the moving block 3 with which it is sleeved to move toward each other, driving the locking clamp 2 to move toward each other, and then the locking clamp 2 clamps the sealing sleeve 20, thereby improving the sealing performance and avoiding the need to install and disassemble the sealing cover fixed by multiple sets of bolts during the liquid addition process, which is conducive to the rapid addition of cutting fluid. During daily use, the temperature isolation box 1 can isolate direct sunlight and can greatly reduce the water vapor generated in the barrel due to high temperature, so that the failure of the cutting fluid can be avoided to a large extent. When taking liquid, the solenoid valve 21 is opened to allow the cutting fluid to flow out.
[0026] Embodiment 2
[0027] On the basis of the first embodiment, the thermal insulation box 1 is fixedly connected with the fixed plate 7, a support seat 11 is fixedly installed on one side of the fixed plate 7, a threaded sleeve 12 is rotatably sleeved in the support seat 11, a worm gear 13 is fixedly sleeved on the outer ring surface of the threaded sleeve 12, the fixed plate 7 is fixedly installed on the upper surface of the thermal insulation box 1 to support the upper components, the support seat 11 supports the threaded sleeve 12, so as to facilitate the rotation of the threaded sleeve 12, a threaded sleeve 12 is fixedly sleeved in the worm gear 13, so that the worm gear 13 drives the threaded sleeve 12 to rotate, a worm 14 is meshed on one side of the worm gear 13, and both sides of the worm gear 14 are rotatably sleeved in the fixed seat 15, one side of the fixed seat 15 is fixedly connected to the fixed plate 7, one end of the worm 14 is fixedly connected to the adjusting wheel 16, and the threaded sleeve 12 is sleeved with an upper The screw 17 drives the worm 14 to rotate by rotating the adjusting wheel 16, and the fixed seat 15 stably supports the worm 14. One end of the upper screw 17 is fixedly connected to the rack 6, and the rack 6 is slidably connected to the fixed plate 7. The rotating sleeves on both sides of the lower screw 4 are arranged in the connecting seat 18, and the connecting seat 18 is fixedly connected to the fixed plate 7. The upper screw 17 is driven to move by the rotation of the threaded sleeve 12, so that the upper screw 17 drives the rack 6 to move, and the rack 6 drives the lower screw 4 to rotate. The connecting seat 18 stably supports the lower screw 4, and a slide 19 is installed on one side of the connecting seat 18. The moving block 3 is slidably connected to the slide 19, and one side of the slide 19 is fixedly connected to the fixed plate 7. The slide 19 facilitates the sliding of the moving block 3 and also limits the moving block 3.
[0028] The worm 14 is driven to mesh with the worm wheel 13 by rotating the adjusting wheel 16, so that the worm wheel 13 drives the threaded sleeve 12 set therein to rotate in the support seat 11. Under the rotation of the threaded sleeve 12, the threaded sleeve 12 drives the upper screw 17 to move, and the upper screw 17 drives the rack 6 fixed at one end thereof to move. When the rack 6 moves downward, the rack 6 meshes with the gear 5, and the gear 5 drives the lower screw 4 fixed therein to rotate. The lower screw 4 drives the moving block 3 to move toward each other, so that the locking clamp 2 moves toward each other, and then the locking clamp 2 is set on the liquid inlet pipe 10. The sealing sleeve 20 on is clamped, thereby completing the rapid sealing of the liquid inlet pipe 10, avoiding the trouble of installing and disassembling the sealing cover fixed by multiple sets of bolts during the liquid adding process, which is conducive to the rapid addition of cutting fluid. When cutting fluid needs to be added to the liquid storage tank 9, it is only necessary to reversely rotate the adjusting wheel 16 to make the rack 6 move upward, and then indirectly make the locking clamps 2 move back to back, which is convenient for removing the sealing sleeve 20. At the same time, self-locking is generated when the worm wheel 13 and the worm 14 are engaged, thereby indirectly avoiding the reversal of the lower screw 4, ensuring the tightness of the locking clamp 2, and improving the sealing performance of the sealing sleeve 20.
[0029] Embodiment 3
[0030] On the basis of the second embodiment, the liquid storage tank 9 is fixedly installed in the insulation box 1, and the four corners of the upper surface of the insulation box 1 are fixedly connected with hanging ears 22. The liquid level meter 8 is fixedly installed on the upper surface of the insulation box 1 and the bottom of the liquid level meter 8 is fixedly inserted in the liquid storage tank 9. The insulation box 1 can block direct sunlight to prevent the cutting fluid in the liquid storage tank 9 from becoming ineffective. The hanging ears 22 can hang the device at high altitude for use, which is convenient for machines in higher positions. The liquid level meter 8 is convenient for calculating the capacity of the cutting fluid in the liquid storage tank 9. The liquid inlet pipe 10 is fixedly sleeved on one side of the upper surface of the liquid storage tank 9 and passes through the insulation box 1. The top of the liquid inlet pipe 10 is sleeved with a sealing sleeve 20. The lower surface of the insulation box 1 is fixedly installed with a solenoid valve 21. The input end of the solenoid valve 21 is fixedly sleeved in the liquid storage tank 9. The liquid inlet pipe 10 is convenient for adding cutting fluid. The sealing sleeve 20 is inserted into the liquid inlet pipe 10, thereby ensuring the sealing of the liquid inlet pipe 10 when no cutting fluid is added. The solenoid valve 21 is convenient for discharging and using the cutting fluid.
[0031] The liquid storage tank 9 is fixedly installed in the thermal insulation box 1. During daily use, the thermal insulation box 1 can block direct sunlight, which can greatly reduce the water vapor generated in the barrel due to high temperature and avoid the failure of the cutting fluid to a great extent. At the same time, the thermal insulation box 1 can protect the liquid storage tank 9 from impact and damage, and avoid the cutting fluid inside the liquid storage tank 9 from leaking. The liquid level meter 8 is convenient for the filling amount of the cutting fluid in the liquid storage tank 9. Since the filling is carried out according to the prescribed capacity standard, the hanging ear 22 can hang the device at high altitude for use, which is convenient for the use of machines in higher positions. A plurality of solenoid valves 21 are arranged at the bottom of the thermal insulation box 1, so as to facilitate the rapid discharge of the cutting fluid.
[0032] During actual use, the solenoid valve 21 and the liquid level gauge 8 are electrically connected to the external terminal control device, and the liquid storage tank 9 is fixedly installed in the temperature-isolating box 1. During daily use, the temperature-isolating box 1 can isolate direct sunlight, which can greatly reduce the water vapor generated in the barrel due to high temperature, and also avoid the failure of the cutting fluid to a great extent. At the same time, the temperature-isolating box 1 can protect the liquid storage tank 9 from impact and damage, and avoid the leakage of the cutting fluid inside the liquid storage tank 9. The liquid level gauge 8 is convenient for the filling amount of the cutting fluid in the liquid storage tank 9, so that the filling is carried out according to the prescribed capacity standard. After the filling is completed, the sealing sleeve 20 is inserted into the liquid inlet pipe 10, and the worm 14 and the worm wheel 13 are meshed by rotating the adjusting wheel 16, so that the worm wheel 13 drives the threaded sleeve 12 set therein to rotate in the support seat 11. Under the rotation of the threaded sleeve 12, the threaded sleeve 12 drives the upper screw 17 to move, and the upper screw 17 will drive the rack 6 fixed at one end thereof to move. When the rack 6 moves downward During movement, the rack 6 is meshed with the gear 5 for transmission, and the gear 5 will drive the lower screw 4 fixed inside it to rotate, and the lower screw 4 will drive the moving block 3 to move toward each other, so that the locking clamp 2 moves toward each other, and then the locking clamp 2 clamps the sealing sleeve 20 sleeved on the liquid inlet pipe 10, thereby completing the rapid sealing of the liquid inlet pipe 10, avoiding the trouble of installing and disassembling the sealing cover fixed by multiple sets of bolts during the liquid adding process, which is conducive to the rapid addition of cutting fluid. When cutting fluid needs to be added to the liquid storage tank 9, it is only necessary to rotate the adjusting wheel 16 in the opposite direction to make the rack 6 move upward, and then indirectly make the locking clamp 2 move back to back, which is convenient for removing the sealing sleeve 20. At the same time, the worm wheel 13 and the worm 14 are meshed when self-locking is generated, thereby indirectly avoiding the reversal of the lower screw 4, ensuring the tightness of the locking clamp 2, and improving the sealing of the sealing sleeve 20. A plurality of solenoid valves 21 are arranged at the bottom of the temperature insulation box 1, which is convenient for the rapid discharge of the cutting fluid, and then convenient for subsequent use.
[0033] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A cutting fluid preparation and storage device, comprising a temperature-isolating box (1), characterized in that: A locking clamp (2) is provided on one side of the upper surface of the temperature isolation box (1); one side of the locking clamp (2) is fixedly connected to a moving block (3); the moving block (3) is internally threadedly connected to a lower screw rod (4); one end of the lower screw rod (4) is fixedly sleeved with a gear (5); one side of the gear (5) is meshed with a rack (6); A fixed plate (7) is installed on one side of the rack (6), a liquid level meter (8) is arranged on one side of the fixed plate (7), a liquid storage tank (9) is installed at the bottom of the liquid level meter (8), and a liquid inlet pipe (10) is installed on one side of the liquid storage tank (9).
2. A cutting fluid preparation and storage device according to claim 1, characterized in that: The temperature isolation box (1) is fixedly connected to the fixed plate (7); a support seat (11) is fixedly installed on one side of the fixed plate (7); a threaded sleeve (12) is rotatably sleeved inside the support seat (11); and a worm gear (13) is fixedly sleeved on the outer ring surface of the threaded sleeve (12).
3. A cutting fluid preparation and storage device according to claim 2, characterized in that: A worm (14) is meshed with one side of the worm wheel (13), and two sides of the worm (14) are rotatably sleeved in a fixed seat (15), one side of the fixed seat (15) is fixedly connected to a fixed plate (7), one end of the worm (14) is fixedly connected to an adjusting wheel (16), and an upper screw (17) is sleeved in the threaded sleeve (12).
4. A cutting fluid preparation and storage device according to claim 3, characterized in that: One end of the upper screw rod (17) is fixedly connected to the rack (6), the rack (6) is slidably connected to the fixed plate (7), and both sides of the lower screw rod (4) are rotatably sleeved in the connecting seat (18), and the connecting seat (18) is fixedly connected to the fixed plate (7).
5. A cutting fluid preparation and storage device according to claim 4, characterized in that: A slide table (19) is installed on one side of the connecting seat (18), the moving block (3) is slidably connected to the slide table (19), and one side of the slide table (19) is fixedly connected to the fixed plate (7).
6. A cutting fluid preparation and storage device according to claim 5, characterized in that: The liquid storage tank (9) is fixedly installed in the thermal insulation box (1), and the four corners of the upper surface of the thermal insulation box (1) are fixedly connected with hanging ears (22), and the liquid level meter (8) is fixedly installed on the upper surface of the thermal insulation box (1) and the bottom of the liquid level meter (8) is fixedly inserted in the liquid storage tank (9).
7. A cutting fluid preparation and storage device according to claim 6, characterized in that: The liquid inlet pipe (10) is fixedly sleeved on one side of the upper surface of the liquid storage box (9) and passes through the thermal insulation box (1); a sealing sleeve (20) is sleeved on the top of the liquid inlet pipe (10); a solenoid valve (21) is fixedly installed on the lower surface of the thermal insulation box (1); and an input end of the solenoid valve (21) is fixedly sleeved in the liquid storage box (9).