Construction operation frame

By designing a construction work rack with a double-layer hook structure in high-altitude construction, the problems of complex, time-consuming and difficult height adjustment of the traditional working platform boards are solved, and the convenience and high flexibility of the construction process are achieved.

CN222576095UActive Publication Date: 2025-03-07CHENGDU NO 7 CONSTR ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420632750.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2025-03-07
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

The installation process of operating platform boards in traditional high-altitude construction is complicated and time-consuming, and the height is not easy to adjust, resulting in inconvenience in construction.

Method used

A construction work rack is designed, adopting a double-layer hooking structure, which is set in the same plane in the vertical direction and is hung on the horizontal pipe of the scaffolding to facilitate height adjustment.

Benefits of technology

The construction personnel have flexibly adjusted the frame height according to needs, avoiding the inconvenience caused by the fixing of the traditional plate height to construction, and providing construction personnel with a relatively wide construction space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222576095U_ABST
    Figure CN222576095U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction operation frame, which is characterized in that the construction operation frame comprises an operation platform and a double-layer hanging structure, the double-layer hanging structure is arranged in the same plane in the vertical direction, and the construction operation frame is hung on a transverse pipe of the scaffold through the double-layer hanging structure. According to the construction operation frame, through the arrangement of the double-layer hanging structure in the construction operation frame, constructors can flexibly adjust the height of the frame body according to needs during specific construction, and inconvenience brought to construction due to the fact that the height of a traditional bridging piece is fixed is avoided. In addition, the vertical plane where the first hanging pieces and the second hanging pieces are located intersects with the edge of the operation platform. Therefore, the situation that the corresponding hooking structures occupy the operation space above the operation platform is avoided, and a wide construction space is provided for constructors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a construction work frame. Background Art

[0002] When carrying out high-altitude building construction, scaffolding is usually set up, and then cantilevers are built inside the scaffolding to form a working platform.

[0003] The process of erecting the cantilever in traditional work platforms is relatively complicated and time-consuming, and the height of the cantilever is not easy to adjust secondary according to the height of the construction object.

[0004] Therefore, there is an urgent need for an operating platform that is easy to build and easy to adjust in height. Utility Model Content

[0005] The purpose of the utility model is to overcome the problems of the prior art and disclose a construction work frame. Through the structural setting of the construction work frame, a platform with convenient construction and convenient height adjustment is provided for high-altitude construction.

[0006] The purpose of the utility model is achieved through the following technical solutions:

[0007] A construction work frame comprises a work platform and a double-layer hanging structure; the double-layer hanging structure is arranged in the same plane in the vertical direction, and the construction work frame is hung on the horizontal pipe of a scaffold through the double-layer hanging structure.

[0008] According to a preferred embodiment, the double-layer hanging structure includes: a plurality of first hanging members arranged on the top side of the working platform, and a plurality of second hanging members arranged on the top side of the working platform.

[0009] According to a preferred embodiment, the vertical plane where each of the first hanging member and the second hanging member is located intersects with the edge of the working platform.

[0010] According to a preferred embodiment, the first hanging member and the second hanging member are hooks.

[0011] According to a preferred embodiment, a fence is provided at the edge of the working platform.

[0012] According to a preferred embodiment, the construction work frame further includes a first ladder, the bottom end of which is arranged on the supporting surface, and the top end of which is connected to the working platform.

[0013] According to a preferred embodiment, the first ladder is a telescopic ladder.

[0014] According to a preferred embodiment, the construction work frame further includes a second ladder, the bottom end of which is arranged on the working platform, and the top end of which is connected to the structure to be constructed.

[0015] According to a preferred embodiment, the second ladder is a telescopic ladder.

[0016] The above-mentioned main scheme of the utility model and its further optional schemes can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection by the utility model. After understanding the scheme of the utility model, those skilled in the art can understand that there are many combinations based on the existing technology and common knowledge, all of which are technical schemes to be protected by the utility model, and they are not exhaustively listed here.

[0017] Beneficial effects of the utility model:

[0018] The utility model discloses a construction work frame, through the double-layer hanging structure setting inside, so that the construction personnel can flexibly adjust the frame height according to the actual construction needs, thus avoiding the inconvenience caused by the traditional height fixing of the cantilever board.

[0019] In addition, the vertical planes where the first and second hanging parts of the construction work frame of the utility model are located intersect with the edge of the work platform, thereby avoiding the corresponding hanging structure occupying the work space above the work platform, and providing a wider construction space for construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the utility model construction work frame;

[0021] Figure 2 It is a side view structural diagram of the construction work frame of the utility model;

[0022] Among them, 10-construction work frame, 100-work platform, 101-first ladder, 102-second ladder, 103-fence, 104-first hanging piece, 105-second hanging piece, 20-support surface, 30-structure to be constructed, 40-scaffolding. DETAILED DESCRIPTION

[0023] The following describes the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0024] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0025] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0026] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0027] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0028] In addition, the present utility model should point out that, in the present utility model, if the specific structure, connection relationship, position relationship, power source relationship, etc. are not specifically written out, the structure, connection relationship, position relationship, power source relationship, etc. involved in the present utility model are all known by technical personnel in this field on the basis of existing technology without creative work.

[0029] Embodiment 1:

[0030] refer to Figure 1 As shown, the figure shows a construction work frame, the construction work frame 10 includes a work platform 100 and a double-layer hanging structure; the double-layer hanging structure is arranged in the same plane in the vertical direction, and the construction work frame 10 is hung on the horizontal pipe of the scaffolding 40 through the double-layer hanging structure.

[0031] The utility model discloses a construction work frame, through the double-layer hanging structure setting inside, so that the construction personnel can flexibly adjust the frame height according to the actual construction needs, thus avoiding the inconvenience caused by the traditional height fixing of the cantilever board.

[0032] Preferably, the double-layer hanging structure includes: a plurality of first hanging members 104 arranged on the top side of the working platform 100, and a plurality of second hanging members 105 arranged on the top side of the working platform 100. In this embodiment, the first hanging member 104 and the second hanging member 105 are hooks. The setting of multiple hanging members is conducive to ensuring the hanging stability of the working frame.

[0033] Furthermore, the vertical planes where the first and second hanging members 104 and 105 are located intersect with the edge of the working platform 100. This avoids the corresponding hanging structures from occupying the working space above the working platform 100, and provides a wider construction space for construction workers.

[0034] Preferably, a fence 103 is provided at the edge of the work platform 100. The fence 103 is provided at the edge of the work platform 100 to help protect the lives of construction workers.

[0035] Preferably, the construction work frame 10 further includes a first ladder 101, the bottom end of the first ladder 101 is arranged on the support surface 20, and the top end is connected to the work platform 100. Further, the first ladder 101 is a telescopic ladder. Through the structural setting of the first ladder 101, construction workers can smoothly go back and forth between work platforms 100 at different heights.

[0036] Preferably, the construction work frame 10 further includes a second ladder 102, the bottom end of which is arranged on the work platform 100, and the top end is connected to the structure 30 to be constructed. Further, the second ladder 102 is a telescopic ladder. Through the structural arrangement of the second ladder 102, construction workers can approach the structure 30 to be constructed at different heights.

[0037] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction work frame, characterized in that: The construction work frame comprises a work platform (100) and a double-layer hanging structure; The double-layer hanging structure is arranged in the same plane in the vertical direction, and the construction work frame is hung on the horizontal pipe of the scaffold (40) via the double-layer hanging structure.

2. The construction work stand according to claim 1, characterized in that: The double-layer hanging structure comprises: a plurality of first hanging members (104) arranged on the top side of the working platform (100), and a plurality of second hanging members (105) arranged on the top side of the working platform (100).

3. The construction work stand according to claim 2, characterized in that: The vertical planes on which the first hanging parts (104) and the second hanging parts (105) are located intersect with the edge of the working platform (100).

4. The construction work stand according to claim 2, characterized in that: The first hanging member (104) and the second hanging member (105) are hooks.

5. The construction work stand according to claim 1, characterized in that: The edge of the working platform (100) is also provided with a fence (103).

6. The construction work stand according to claim 1, characterized in that: The construction work frame also includes a first ladder (101), the bottom end of the first ladder (101) is arranged on the support surface (20), and the top end is connected to the work platform (100).

7. The construction work stand according to claim 6, characterized in that: The first ladder (101) is a telescopic ladder.

8. The construction work stand according to claim 1, characterized in that: The construction work frame also includes a second ladder (102), the bottom end of which is arranged on the working platform (100) and the top end is connected to the structure (30) to be constructed.

9. The construction work stand according to claim 8, characterized in that: The second ladder (102) is a telescopic ladder.