Waterproof structure suitable for anti-floating anchor rod part
By combining single steel bar treatment and multi-layer waterproof structures in the anti-floating anchor rod part, the problem of insufficient combination of coils and anchor rod steel bars in the prior art and the difficulty in ensuring the compactness of sealing paste filling is solved, and better waterproofing effect and simplified construction process are achieved.
Patent Information
- Application Number
- CN202420436981.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-03-07
AI Technical Summary
The existing anti-floating anchor waterproof structure is difficult to ensure the tight integration of the coil material and the anchor steel bar during construction, resulting in hidden leakage risks, and the compactness of the sealing paste filling is difficult to ensure, which increases the construction difficulty.
The treatment method of single steel bars is adopted to add a multi-layer waterproof structure, including cement-based permeable crystalline coating waterproof layer, polymer cement mortar, LEAC acrylic polymer waterproof coating layer, flexible material waterproof layer and flexible material waterproof reinforcement layer, combined with a small water stop ring and waterproof sleeve to enhance the waterproof effect.
The leakage problem caused by concentrated steel bars is eliminated, and the leakage hazards in the wrapping positions of coils and anchor steel bars are eliminated. The overall waterproofing effect is better, reducing the difficulty of construction.
Smart Images

Figure CN222594824U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of construction engineering, in particular to a waterproof structure suitable for anti-floating anchor rod parts. Background Art
[0002] Anti-floating anchor rods are a kind of anti-floating measures for underground structures in construction projects. Anti-floating anchor rods refer to structural components set up to resist the upward displacement of the buildings above them. They are related to the height and changes of the groundwater level and are opposite to the force direction of the compression piles.
[0003] The existing patent number is CN205502001U, and the patent name is a utility model patent for an anti-floating anchor waterproof structure, which records that the patent includes an anchor, a water stop strip, asphalt paste, a concrete platform, a penetrating crystallization coating, a waterproof protective layer and a positioner; the concrete platform is arranged at one end of the anti-floating anchor device; the water stop strip is arranged just above the middle of the concrete platform; the asphalt paste is tightly attached to the middle of the water stop strip and the concrete platform; the penetrating crystallization coating is arranged under the concrete platform and is closely connected to the concrete platform; the waterproof protective layer is arranged at the lower end of the penetrating crystallization coating and is close to the penetrating crystallization coating; the anchor is arranged in the middle of the entire device and is placed vertically to penetrate the entire device; the positioner is arranged at the lower end of the anchor and is embedded in the anchor; the anti-floating anchor waterproof structure shortens the construction period, saves construction costs, waterproofs the anchor nodes, effectively solves the leakage problem of the anti-floating anchor, and is suitable for popularization and use.
[0004] When the above-mentioned device is used, the waterproof treatment of the anti-floating anchor reinforcement is mostly carried out with coiled material + water-expandable water stop ring + waterproof sealant. This method cannot ensure the tightness of the coiled material and the anchor reinforcement, the density of the sealant filling, and the construction is difficult. Once the anti-floating anchor leakage is improperly handled, on the one hand, the leakage at the root of the anchor cannot be cured, and on the other hand, since the waterproofing coiled material is not tightly combined with the raft, there is a risk of water leakage, and the specific leakage point cannot be found, and the subsequent treatment is very troublesome;
[0005] In summary, the existing waterproof structure suitable for the anti-floating anchor rod part has certain drawbacks when used and does not meet people's use requirements. Therefore, we propose a waterproof structure suitable for the anti-floating anchor rod part. Summary of the invention
[0006] In order to overcome the shortcomings of the prior art, the embodiment of the present application provides a waterproof structure suitable for the anti-floating anchor rod part, and modifies the existing collective treatment method of adding a waterproof structure on the outside of the anti-floating anchor rod into a single steel bar treatment method, thereby eliminating the leakage caused by the inadequate treatment of the steel bar thread gaps caused by the concentrated steel bars, eliminating the hidden danger of leakage at the wrapping position of the coil and the anchor rod steel bar, and achieving a better overall waterproof effect.
[0007] The technical solution adopted by the embodiment of the present application to solve the technical problem is:
[0008] A waterproof structure suitable for anti-floating anchor rod parts, comprising a concrete cushion layer, a waterproof structure, a fine stone concrete protective layer and a reinforced concrete bottom plate:
[0009] A concrete pad is set on top of the foundation;
[0010] The waterproof structure is arranged at the upper end of the concrete cushion layer, and the waterproof structure is located outside the main reinforcement body of the anti-floating anchor rod;
[0011] A fine stone concrete protective layer is provided on the upper end of the waterproof structure;
[0012] The reinforced concrete bottom plate is arranged above the fine stone concrete protective layer, and the upper end of the main reinforcement body is located inside the reinforced concrete bottom plate;
[0013] Wherein, a primary protection structure is arranged inside the fine stone concrete protective layer on the outer side of the main reinforcement body, and a secondary protection structure is arranged inside the reinforced concrete bottom plate on the outer side of the main reinforcement body.
[0014] The utility model records a waterproof structure suitable for anti-floating anchor rod parts, which modifies the existing collective treatment method of adding a waterproof structure on the outside of the anti-floating anchor rod into a single steel bar treatment method, thereby eliminating the leakage caused by inadequate treatment of steel bar thread gaps caused by concentrated steel bars, eliminating the hidden danger of leakage at the wrapping position of the coil and the anchor rod steel bar, and achieving a better overall waterproof effect.
[0015] Preferably, the waterproof structure includes a cement-based penetrating crystallization coating waterproof layer, a polymer cement mortar, a LEAC acrylic polymer waterproof coating layer, a flexible material waterproof layer and a flexible material waterproof reinforcement layer, which are arranged in sequence from bottom to top.
[0016] A multi-layer waterproof structure is used, which cooperates with each other to increase the waterproof effect at the anchor rod.
[0017] Preferably, the flexible material waterproof layer protrudes upward near the anti-floating anchor position, the cement-based penetrating crystallization coating waterproof layer, polymer cement mortar, and LEAC acrylic polymer waterproof coating layer are located inside the protruding position, and the flexible material waterproof layer is arranged at the upper end of the protruding position.
[0018] The waterproof performance is locally enhanced around the anti-floating anchor rod, and the impact on the surrounding waterproofing can be effectively avoided.
[0019] Preferably, the number of the cement-based penetrating crystalline coating waterproof layers is two groups, and the two groups of the cement-based penetrating crystalline coating waterproof layers are applied in batches.
[0020] Apply in batches multiple times for better waterproofing effect.
[0021] Preferably, a reinforcing cloth is provided inside the LEAC acrylic polymer waterproof coating layer, and the thickness of the LEAC acrylic polymer waterproof coating layer is 1.5 mm.
[0022] Preferably, the primary protective structure comprises a LEAC acrylic polymer waterproof coating protective layer and a first water-swellable water-stop ring:
[0023] The LEAC acrylic polymer waterproof coating protective layer is wrapped around the outer surface of the main reinforcement body, and the upper end surface of the LEAC acrylic polymer waterproof coating layer is connected to the LEAC acrylic polymer waterproof coating protective layer;
[0024] The first water-swellable waterstop ring is fixedly installed on the outside of the main reinforcement body, and the first water-swellable waterstop ring is located at the upper end of the LEAC acrylic polymer waterproof coating protective layer.
[0025] The utility model records a waterproof structure suitable for anti-floating anchor rod parts, which changes the existing method of filling the water-swelling water-stop ring with sealing paste into a method of wrapping a small water-stop ring with LEAC acrylic polymer waterproof coating, thereby eliminating the problem of loose connection between the coil and the steel bar, and cancels the sealing of the waterproof sealing paste, reducing the construction difficulty of ensuring the sealing density of the waterproof sealing paste, and the construction is more convenient.
[0026] Preferably, the secondary protection structure includes a waterproof sleeve and a second water-swellable water-stop ring:
[0027] The number of waterproof sleeves is several groups, and the waterproof sleeves are arranged on the outside of the main reinforcement body;
[0028] The upper end and the lower end of the waterproof sleeve are fixedly connected to the main reinforcement body through a second water-swellable water-stop ring;
[0029] Wherein, waterproof coating is filled between the waterproof sleeve and the main reinforcement body.
[0030] The waterproof cover is sealed at the top and bottom by a second water-swellable water-stop ring, and the waterproof coating is directly poured into the waterproof cover, which can ensure the density and greatly improve the waterproof effect of this position.
[0031] Preferably, a limit frame is fixedly installed inside the anchor rod near the upper end, the limit frame includes two groups of circular rings of different sizes and a plurality of groups of oblique rods welded together, and the main reinforcement body passes through the limit frame and is clamped between circular rings of different sizes.
[0032] The utility model records a waterproof structure suitable for anti-floating anchor rods, which adds waterproof structure on the outer side of the main reinforcement body and the inner side of the reinforced concrete bottom plate, which can further improve the waterproof effect of the anti-floating anchor rod and effectively prevent groundwater from leaking from the periphery of the main reinforcement body. Moreover, a limit frame structure is added in the anchor rod, which can ensure the accurate position of the main reinforcement body during construction and avoid deviation, thereby facilitating the laying of the waterproof structure around the main reinforcement body, and has a good prospect of use.
[0033] In summary, the present invention includes at least one of the following beneficial technical effects:
[0034] First, the utility model records a waterproof structure suitable for anti-floating anchor rods, which modifies the existing collective treatment method of adding a waterproof structure on the outside of the anti-floating anchor rod into a single steel bar treatment method, thereby eliminating the leakage caused by inadequate treatment of steel bar thread gaps caused by concentrated steel bars, eliminating the risk of leakage at the wrapping position of the coil and the anchor rod steel bar, and achieving a better overall waterproof effect.
[0035] Secondly, the utility model records a waterproof structure suitable for anti-floating anchor rod parts, which changes the existing method of filling the water-swelling water-stop ring with sealing paste into a method of wrapping a small water-stop ring with LEAC acrylic polymer waterproof coating, thereby eliminating the problem of loose connection between the coil and the steel bar, and eliminating the sealing of the waterproof sealing paste, thereby reducing the construction difficulty of ensuring the sealing density of the waterproof sealing paste, and the construction is more convenient.
[0036] Third, the utility model records a waterproof structure suitable for anti-floating anchor rods, which adds waterproof structure on the outer side of the main reinforcement body and the inner side of the reinforced concrete base plate, which can further improve the waterproof effect of the anti-floating anchor rod and effectively prevent groundwater from leaking from the periphery of the main reinforcement body. In addition, adding a limit frame structure in the anchor rod can ensure the accurate position of the main reinforcement body during construction and avoid deviation, thereby facilitating the laying of the waterproof structure around the main reinforcement body, and has good use prospects.
[0037] Fourth, the utility model records a waterproof structure suitable for anti-floating anchor parts, and its waterproof treatment measures have the advantages of simple operation, good anti-leakage effect and reduced engineering maintenance costs. It can be applied on a large scale and has good prospects for use. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a usage state diagram of the utility model;
[0039] Figure 2 This utility model Figure 1 A magnified view of the structure at center A;
[0040] Figure 3It is a structural diagram of the secondary protection structure in the utility model;
[0041] Figure 4 It is a partial structural diagram of the limiting frame in the utility model.
[0042] Figure numerals: 1. Concrete cushion layer; 2. Main reinforcement body; 3. Fine stone concrete protective layer; 4. Reinforced concrete base plate; 5. Cement-based penetrating crystallization coating waterproof layer; 6. Polymer cement mortar; 7. LEAC acrylic polymer waterproof coating layer; 8. Flexible material waterproof layer; 9. Flexible material waterproof reinforcement layer; 10. LEAC acrylic polymer waterproof coating protective layer; 11. First water-swellable waterstop ring; 12. Waterproof sleeve; 13. Second water-swellable waterstop ring; 14. Limit frame. DETAILED DESCRIPTION
[0043] The embodiment of the present application solves the problem that in the prior art, waterproofing of anti-floating anchor reinforcement bars is mostly carried out using a roll material + a water-expandable water-stop ring + a waterproof sealant, by providing a waterproof structure suitable for anti-floating anchor rods. This method cannot ensure the tightness of the wrapping of the roll material and the anchor reinforcement bars, the density of the filling of the sealant, and is difficult to construct. Once improperly handled, there will be local leakage of the anti-floating anchor rod. On the one hand, the leakage at the root of the anchor rod cannot be cured. On the other hand, since the waterproofing roll material is not tightly combined with the raft plate, there is a risk of water leakage, and the specific leakage point cannot be found, making subsequent treatment very troublesome.
[0044] Embodiment 1:
[0045] A waterproof structure suitable for anti-floating anchor parts, such as Figure 1-Figure 2 As shown, it includes a concrete cushion layer 1, a waterproof structure, a fine stone concrete protective layer 3 and a reinforced concrete bottom plate 4:
[0046] A concrete cushion layer 1 is arranged above the foundation; a waterproof structure is arranged at the upper end of the concrete cushion layer 1, and the waterproof structure is located outside the main reinforcement body 2 in the anti-floating anchor rod; a fine stone concrete protective layer 3 is arranged at the upper end of the waterproof structure; a reinforced concrete bottom plate 4 is arranged above the fine stone concrete protective layer 3, and the upper end of the main reinforcement body 2 is located inside the reinforced concrete bottom plate 4;
[0047] Among them, a primary protection structure is arranged on the outside of the main reinforcement body 2, which is located inside the fine stone concrete protective layer 3; a secondary protection structure is arranged on the outside of the main reinforcement body 2, which is located inside the reinforced concrete base plate 4; a primary protection structure and a secondary protection structure are arranged on the outside of the main reinforcement body 2; the primary protection structure and the secondary protection structure cooperate with each other to perform secondary protection, and the waterproof performance is greatly enhanced.
[0048] The utility model records a waterproof structure suitable for anti-floating anchor rod parts, which modifies the existing collective treatment method of adding a waterproof structure on the outside of the anti-floating anchor rod into a single steel bar treatment method, thereby eliminating the leakage caused by inadequate treatment of steel bar thread gaps caused by concentrated steel bars, eliminating the hidden danger of leakage at the wrapping position of the coil and the anchor rod steel bar, and achieving a better overall waterproof effect.
[0049] The waterproof structure comprises a cement-based penetrating crystallization coating waterproof layer 5, a polymer cement mortar 6, a LEAC acrylic polymer waterproof coating layer 7, a flexible material waterproof layer 8 and a flexible material waterproof reinforcement layer 9 which are arranged in sequence from bottom to top.
[0050] The cement-based penetrating crystalline coating waterproof layer 5 and the polymer cement mortar 6 are constructed according to the conventional construction process, and the thickness of the polymer cement mortar 6 is 20 mm.
[0051] A multi-layer waterproof structure is used, which cooperates with each other to increase the waterproof effect at the anchor rod.
[0052] The flexible material waterproof layer 8 protrudes upward near the anti-floating anchor rod, the cement-based penetrating crystalline coating waterproof layer 5, the polymer cement mortar 6, and the LEAC acrylic polymer waterproof coating layer 7 are located inside the protruding position, and the flexible material waterproof layer 8 is arranged at the upper end of the protruding position.
[0053] The flexible material waterproof layer 8 can also be recessed downward near the anti-floating anchor rod.
[0054] The waterproof performance is locally enhanced around the anti-floating anchor rod, and the impact on the surrounding waterproofing can be effectively avoided.
[0055] The number of cement-based penetrating crystalline coating waterproof layers 5 is two groups, and the two groups of cement-based penetrating crystalline coating waterproof layers 5 are applied in batches.
[0056] Apply in batches multiple times for better waterproofing effect.
[0057] A reinforcing cloth is arranged inside the LEAC acrylic polymer waterproof coating layer 7, and the thickness of the LEAC acrylic polymer waterproof coating layer 7 is 1.5 mm.
[0058] The primary protection structure includes a LEAC acrylic polymer waterproof coating protection layer 10 and a first water-swellable water-stop ring 11:
[0059] The LEAC acrylic polymer waterproof coating protective layer 10 is wrapped around the outer surface of the main reinforcement body 2, and the upper end surface of the LEAC acrylic polymer waterproof coating layer 7 is connected to the LEAC acrylic polymer waterproof coating protective layer 10; the first water-swellable waterstop ring 11 is fixedly installed on the outer side of the main reinforcement body 2, and the first water-swellable waterstop ring 11 is located at the upper end of the LEAC acrylic polymer waterproof coating protective layer 10.
[0060] The utility model records a waterproof structure suitable for anti-floating anchor rod parts, which changes the existing method of filling the water-swelling water-stop ring with sealing paste into a method of wrapping a small water-stop ring with LEAC acrylic polymer waterproof coating, thereby eliminating the problem of loose connection between the coil and the steel bar, and cancels the sealing of the waterproof sealing paste, reducing the construction difficulty of ensuring the sealing density of the waterproof sealing paste, and the construction is more convenient.
[0061] Embodiment 2:
[0062] On the basis of Example 1, Figure 1-Figure 4 As shown, this embodiment also records the following structure:
[0063] The secondary protection structure includes a waterproof cover 12 and a second water-swellable water-stop ring 13:
[0064] The number of waterproof sleeves 12 is several groups, and the waterproof sleeves 12 are sleeved on the outside of the main reinforcement body 2; the upper end and the lower end of the waterproof sleeve 12 are fixedly connected to the main reinforcement body 2 through the second water-expandable water-stop ring 13;
[0065] Wherein, waterproof coating is filled between the waterproof cover 12 and the main reinforcement body 2.
[0066] The waterproof sleeve 12 is sealed at the top and bottom by a second water-swellable water-stop ring 13, and the waterproof coating is directly poured into the waterproof sleeve 12, which can ensure the density and greatly improve the waterproof effect of this position.
[0067] A limit frame 14 is fixedly installed near the upper end of the anchor rod. The limit frame 14 is welded from two groups of circular rings of different sizes and a plurality of groups of oblique rods. The main reinforcement body 2 passes through the limit frame 14 and is clamped between the circular rings of different sizes.
[0068] The utility model records a waterproof structure suitable for anti-floating anchor rod parts, which adds waterproof structure on the outer side of the main reinforcement body 2 and the inner side of the reinforced concrete bottom plate 4, which can further improve the waterproof effect of the anti-floating anchor rod, and can effectively prevent groundwater from leaking from the periphery of the main reinforcement body 2. In addition, a limit frame 14 structure is added to the anchor rod, which can ensure the accurate position of the main reinforcement body 2 during construction and avoid deviation, thereby facilitating the laying of the waterproof structure around the main reinforcement body 2, and has a good prospect of use.
[0069] Working principle: perform base treatment, install the limit frame 14 on the main reinforcement body 2, perform grouting to form a grouting body, and then construct the concrete cushion layer 1 normally;
[0070] Apply two layers of cement-based penetrating crystallization waterproofing layer 5 with a thickness of 1mm and a width of 250mm on all sides, lay polymer cement mortar 6, and then lay LEAC acrylic polymer waterproofing coating layer 7. When laying, use LEAC waterproofing to apply 250mm width on each side and wrap the main reinforcement 2 to 50mm from the top of the cushion layer.
[0071] The waterproof roll material is squeezed out of oil at the root of the steel bar to strengthen the middle part of the steel bar; the flexible material waterproof layer 8 and the flexible material waterproof reinforcement layer 9 are laid, the first water-swellable waterstop ring 11 is used to wrap the main reinforcement body 2, and the second water-swellable waterstop ring 13 and the waterproof sleeve 12 are installed, and the waterproof coating is injected into the waterproof sleeve 12, and finally the raft concrete construction is carried out.
[0072] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A waterproof structure suitable for anti-floating anchor rod parts, characterized in that: include: A concrete cushion layer (1) is arranged above the foundation; A waterproof structure, which is arranged at the upper end of the concrete cushion layer (1) and is located outside the main reinforcement body (2) of the anti-floating anchor rod; A fine stone concrete protective layer (3) is arranged on the upper end of the waterproof structure; A reinforced concrete bottom plate (4) is arranged above the fine stone concrete protective layer (3), and the upper end of the main reinforcement body (2) is located inside the reinforced concrete bottom plate (4); The outer side of the main reinforcement body (2) is located inside the fine stone concrete protective layer (3) and a primary protective structure is provided, and the outer side of the main reinforcement body (2) is located inside the reinforced concrete bottom plate (4) and a secondary protective structure is provided.
2. A waterproof structure suitable for anti-floating anchor rods as claimed in claim 1, characterized in that: The waterproof structure comprises a cement-based permeable crystallization coating waterproof layer (5), a polymer cement mortar (6), a LEAC acrylic polymer waterproof coating layer (7), a flexible material waterproof layer (8) and a flexible material waterproof reinforcement layer (9) which are arranged in sequence from bottom to top.
3. A waterproof structure suitable for anti-floating anchor rod parts as claimed in claim 2, characterized in that: The flexible material waterproof layer (8) protrudes upward near the anti-floating anchor rod position, the cement-based permeable crystallization coating waterproof layer (5), polymer cement mortar (6) and LEAC acrylic polymer waterproof coating layer (7) are located inside the protruding position, and the flexible material waterproof layer (8) is arranged at the upper end of the protruding position.
4. A waterproof structure suitable for anti-floating anchor rod parts as claimed in claim 2, characterized in that: The number of the cement-based penetrating crystalline coating waterproof layers (5) is two groups, and the two groups of the cement-based penetrating crystalline coating waterproof layers (5) are applied in batches.
5. A waterproof structure suitable for anti-floating anchor rods as claimed in claim 2, characterized in that: A reinforcing cloth is arranged inside the LEAC acrylic polymer waterproof coating layer (7), and the thickness of the LEAC acrylic polymer waterproof coating layer (7) is 1.5 mm.
6. A waterproof structure suitable for anti-floating anchor rods as claimed in claim 5, characterized in that: The primary protection structure comprises: A LEAC acrylic polymer waterproof coating protective layer (10) is wrapped around the outer surface of the main reinforcement body (2), and the upper end surface of the LEAC acrylic polymer waterproof coating layer (7) is connected to the LEAC acrylic polymer waterproof coating protective layer (10); The first water-swellable water-stop ring (11) is fixedly mounted on the outside of the main reinforcement body (2) and is located at the upper end of the LEAC acrylic polymer waterproof coating protective layer (10).
7. A waterproof structure suitable for anti-floating anchor rods as claimed in claim 6, characterized in that: The secondary protection structure comprises: Waterproof sleeves (12), which are provided in several groups and are arranged on the outside of the main reinforcement body (2); A second water-swellable water-stop ring (13), wherein the upper end and the lower end of the waterproof sleeve (12) are fixedly connected to the main reinforcement body (2) via the second water-swellable water-stop ring (13); Wherein, waterproof coating is filled between the waterproof sleeve (12) and the main reinforcement body (2).
8. A waterproof structure suitable for anti-floating anchor rods as claimed in claim 7, characterized in that: A limiting frame (14) is fixedly installed inside the anchor rod near the upper end, and the limiting frame (14) comprises two groups of circular rings of different sizes and a plurality of groups of oblique rods welded together, and the main reinforcement body (2) passes through the limiting frame (14) and is clamped between the circular rings of different sizes.
Citation Information
Patent Citations
Anti -floating anchor rod waterproof construction
CN205502001U