Water conservancy construction piling equipment

By using motor-driven threaded rods in water conservancy construction pile driving equipment to insert fixed piles into the ground, the deviation problem caused by vibration during pile driving is solved, and the accuracy and stability of pile driving is improved.

CN222594833UActive Publication Date: 2025-03-11LINYI DONGMENG WATER CONSERVANCY CONSTRUCTION & INSTALLATION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420538135.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2025-03-11
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

When the existing water conservancy construction pile driving equipment is in use, the drop and knocking of the pile hammer will cause vibration, which can easily cause the position of the pile driving equipment to shift and affect the pile driving effect.

Method used

A water conservancy construction pile driving equipment is designed, which drives the threaded rod to rotate through the motor power output end, inserts the fixed pile into the ground, provides support for the base and avoids equipment deviation caused by vibration.

Benefits of technology

It effectively avoids vibration caused by the knocking of the pile hammer, makes the base fixed, improves the accuracy of the pile driving position, and improves the stability and use effect of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222594833U_ABST
    Figure CN222594833U_ABST
Patent Text Reader

Abstract

The utility model discloses water conservancy construction piling equipment which comprises a piling assembly and a base, a first motor is arranged on the upper side of the base, a support is arranged on the upper side of the base, a plurality of guide wheels are arranged on the upper side of the support, and a take-up wheel is arranged at the power output end of the first motor. The power output end of a second motor on the upper side of the mounting frame drives a first threaded rod and a second threaded rod at one end of the first threaded rod to rotate, a moving plate is arranged on the outer side of the second threaded rod, so that the first moving plate starts to move, fixing piles are arranged on the lower sides of the two ends of the first moving plate, and the lower ends of the fixing piles are sharp ends. And a limiting block arranged on the rear side of the first moving plate is arranged in a limiting groove of the mounting frame to limit the first moving plate, and under rotation of a second threaded rod, the first moving plate drives the fixing pile to move downwards, so that the fixing pile and the tip end of the fixing pile are inserted into the ground, and the base is fixed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of piling equipment, in particular to a piling equipment for water conservancy construction. Background Art

[0002] When constructing water conservancy projects, piling work is required to make the foundation of the building more solid and less likely to collapse. When the existing water conservancy construction piling equipment is in use, the falling and striking of the pile hammer will generate vibrations, which can easily cause the position of the piling equipment to shift. Fixing the equipment can prevent the equipment from shifting and affecting the piling effect. Utility Model Content

[0003] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model of this application to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.

[0004] In view of the above problems and / or the problems existing in the existing water conservancy construction piling equipment, the present utility model is proposed.

[0005] Therefore, the purpose of the utility model is to provide a water conservancy construction piling equipment. When carrying out water conservancy construction piling, the power output end of the motor drives the threaded rod to rotate, inserts the fixed pile downward, and provides support for the base of the piling equipment, so as to avoid the vibration generated by the hitting of the pile hammer during piling, causing the base to shift and affecting the accuracy of the piling position.

[0006] In order to solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:

[0007] A water conservancy construction piling equipment, comprising:

[0008] The piling assembly comprises a base, a first motor is arranged on the upper side of the base, a bracket is arranged on the upper side of the base, a plurality of guide wheels are arranged on the upper side of the bracket, a take-up wheel is arranged at the power output end of the first motor, a rope is arranged on the take-up wheel, the rope passes around the plurality of guide wheels, the rope passes through the empty slot at the upper end of the bracket to connect with the piling hammer, and a limit rod is arranged at the upper end of the piling hammer;

[0009] The fixing assembly includes a mounting frame arranged on the upper side of the base, a second motor is arranged on the upper side of the mounting frame, the second motor passes through the mounting frame and is fixedly connected to the first threaded rod, a second threaded rod is arranged on the lower side of the first threaded rod, a first movable plate is arranged on the outer side of the second threaded rod, fixing piles are arranged at the lower ends of both sides of the first movable plate, a pointed end is arranged at the lower end of the fixing pile, a limiting groove is arranged on the inner side of the mounting frame, a limiting block is arranged on the rear side of the first movable plate, and the limiting block is arranged in the limiting groove.

[0010] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a pressure block is arranged on the upper side of the base, and wheels are arranged on the lower side of the base.

[0011] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a moving block is arranged on the inner side of the bracket, a telescopic rod is arranged on the lower side of the moving block, and the lower end of the telescopic rod is arranged on the base.

[0012] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a support plate is arranged on the front side of the moving block, and a support ring is arranged on the front side of the support plate.

[0013] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a first spring is arranged on the inner side of the support ring, and a clamping plate is arranged on the other end of the first spring.

[0014] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a second movable plate is arranged on the outer side of the first threaded rod, and an insertion rod is arranged on the lower side of the second movable plate.

[0015] As a preferred solution of the water conservancy construction piling equipment described in the utility model, slots are provided on the inner sides of the fixed piles and the first movable plate.

[0016] As a preferred solution of the water conservancy construction piling equipment described in the utility model, a rotating shaft is arranged inside the fixed pile, a clamping plate is arranged inside the fixed pile, and the rotating shaft passes through the lower end of the clamping plate.

[0017] As a preferred solution of the water conservancy construction piling equipment described in the utility model, the interior of the clamping plate is opened as an arc-shaped plate surface, and a second spring is arranged between the clamping plates at both ends.

[0018] Compared with the prior art, the utility model has the following beneficial effects: when carrying out piling construction in water conservancy, the output end of the second motor power on the upper side of the mounting frame drives the first threaded rod and the second threaded rod at one end thereof to rotate, and a first movable plate is arranged on the outer side of the second threaded rod, so that the first movable plate starts to move, and fixed piles are arranged on the lower sides of both ends of the first movable plate, and the lower ends of the fixed piles are pointed, and the limiting blocks arranged on the rear side of the first movable plate are in the limiting groove of the mounting frame to limit the first movable plate, and under the rotation of the second threaded rod, the first movable plate drives the fixed pile to move downward, so that the fixed pile and its pointed end are inserted into the ground to fix the base, thereby avoiding the vibration caused by the impact of the pile hammer during piling, which causes the base to shift and affects the accuracy of the piling position. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solution of the implementation of the utility model, the utility model will be described in detail below in combination with the drawings and detailed implementation. Obviously, the drawings described below are only some implementations of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0020] Figure 1 This is a schematic diagram of the overall structure of a water conservancy construction piling device of the utility model;

[0021] Figure 2 It is a right side structural schematic diagram of a water conservancy construction piling device of the utility model;

[0022] Figure 3 This is a schematic diagram of the structure of a fixed component of a water conservancy construction piling device according to the utility model;

[0023] Figure 4 It is a structural schematic diagram of some components of a water conservancy construction piling equipment of the utility model;

[0024] Figure 5 The utility model is a schematic diagram of the internal structure of a fixed pile in a water conservancy construction piling device. DETAILED DESCRIPTION

[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.

[0026] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the implementation of the present invention, for the sake of convenience, the cross-sectional diagram showing the device structure will not be partially enlarged according to the general proportion, and the schematic diagram is only an example, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0027] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.

[0028] The utility model provides a water conservancy construction piling device. When the water conservancy construction piling is carried out, the power output end of the motor drives the threaded rod to rotate, and the fixed pile is inserted downward to provide support for the base of the piling device, so as to avoid the vibration caused by the hitting of the pile hammer during piling to cause the base to shift and affect the accuracy of the piling position.

[0029] Figure 1-Figure 5 The overall structure diagram of a water conservancy construction piling device of the utility model is shown. Figure 1-Figure 5 The present embodiment is a water conservancy construction piling equipment, the main part of which includes a piling assembly and a fixing assembly.

[0030] The piling assembly includes a base 1, a first motor 2 is arranged on the upper side of the base 1, a bracket 3 is arranged on the upper side of the base 1, a plurality of guide wheels 4 are arranged on the upper side of the bracket 3, a take-up wheel 8 is arranged at the power output end of the first motor 2, a rope 5 is arranged on the take-up wheel 8, the rope 5 passes around the plurality of guide wheels 4, the rope 5 passes through the empty slot at the upper end of the bracket 3 to connect with the pile hammer 6, a limit rod 7 is arranged at the upper end of the pile hammer 6, a pressure block 24 is arranged on the upper side of the base 1, a wheel 25 is arranged on the lower side of the base 1, a moving block 10 is arranged on the inner side of the bracket 3, a telescopic rod 9 is arranged on the lower side of the moving block 10, and the lower end of the telescopic rod 9 is arranged on the base 1, a support plate 11 is arranged on the front side of the moving block 10, a support ring 12 is arranged on the front side of the support plate 11, a first spring is arranged on the inner side of the support ring 12, and a clamping plate 13 is arranged on the other end of the first spring.

[0031] The fixing assembly includes a mounting frame 14 arranged on the upper side of the base 1, a second motor 15 is arranged on the upper side of the mounting frame 14, the second motor 15 passes through the mounting frame 14 and is fixedly connected to the first threaded rod 16, a second threaded rod 17 is arranged on the lower side of the first threaded rod 16, a first movable plate 18 is arranged on the outer side of the second threaded rod 17, fixing piles 19 are arranged on the lower ends of both sides of the first movable plate 18, a tip 21 is arranged on the lower end of the fixing pile 19, a limiting groove 22 is provided on the inner side of the mounting frame 14, a limiting block 23 is arranged on the rear side of the first movable plate 18, and the limiting block 23 is arranged in the limiting groove 22. Specifically, in the present embodiment, when piling is carried out in water conservancy construction, the output end of the power of the second motor 15 on the upper side of the mounting frame 14 drives the first threaded rod 16 and the second threaded rod 17 at one end thereof to rotate, and a first movable plate 18 is arranged on the outer side of the second threaded rod 17, so that the first movable plate 18 starts to move, and fixed piles 19 are arranged on the lower sides of both ends of the first movable plate 18, and the lower end of the fixed pile 19 is a tip 21, and the limiting block 23 arranged on the rear side of the first movable plate 18 is in the limiting groove 22 of the mounting frame 14 to limit the first movable plate 18, and under the rotation of the second threaded rod 17, the first movable plate 18 drives the fixed pile 19 to move downward, so that the fixed pile 19 and its tip 21 are inserted into the ground, fixing the base 1, and avoiding the vibration generated by the knocking of the pile hammer 6 during piling to cause the base 1 to deviate, thereby affecting the accuracy of the piling position.

[0032] Combination Figure 1-Figure 5 , a water conservancy construction piling equipment of this embodiment, the specific use process is as follows: after the fixing assembly completes the fixing of the base 1, the pile is placed in the clamping plate 13 with the first spring inside the support ring 12, the pile is supported by the clamping plate 13, and the support plate 11 on the rear side of the support ring 12 is connected with a moving block 10, the moving block 10 is arranged in the bracket 3, and the support height can be adjusted by the lifting rod 9 on the lower side of the moving block 10, the first motor 2 drives the take-up wheel 8 to retract the rope 5, the rope 5 is guided by a number of traction wheels 4 to pass through the empty groove on the upper side of the bracket 3 and connected to the pile hammer 6 on the lower side, when the take-up wheel 8 retracts the rope 5, the pile hammer 6 is lifted, and then the first motor 2 releases the take-up wheel 8 to make the pile hammer 6 fall to perform the pile driving operation, the pressure block 24 on the upper side of the base 1 is used to balance the weight on the upper side of the base 1 to avoid tilting.

[0033] In this embodiment, when fixing the base 1, the fixing effect of the fixing pile 19 can be further improved. For this purpose, please refer to Figure 1-Figure 5In this embodiment, a second movable plate 26 is provided on the outer side of the first threaded rod 16, an insertion rod 27 is provided on the lower side of the second movable plate 26, slots 20 are provided on the inner sides of the fixed pile 19 and the first movable plate 18, a rotating shaft 28 is provided on the inner side of the fixed pile 19, a clamping plate 29 is provided on the inner side of the fixed pile 19, the rotating shaft 28 passes through the lower end of the clamping plate 29, an arc-shaped plate surface 30 is provided inside the clamping plate 29, and a second spring 31 is provided between the clamping plates 29 at both ends. In this embodiment, in order to better fix the fixing pile 19, during fixation, the thread density on the first threaded rod 16 and the second threaded rod 17 is different, so that the second movable plate 26 on the first threaded rod 16 moves faster than the first movable plate 18. After the fixing pile 19 is inserted into the ground, the insertion rod 27 on the lower side of the second movable plate 26 is inserted into the slot 20 inside the fixing pile 19. The insertion rod 27 will squeeze the arc-shaped plate surface 30 of the clamping plate 29 inside the fixing pile 19 during the insertion process of the slot 20, so that the clamping plate 29 rotates under the fixation of the rotating shaft 28, and the upper end of the clamping plate 29 is screwed out of the fixing pile 19. The clamping plate 29 will be stuck in the ground like a barb, further improving the fixing effect of the base 1. When recovering, after the insertion rod 27 moves up, the clamping plates 29 on both sides will be retracted under the tension of the second spring 31, which is convenient for the recovery of the fixing pile 19.

[0034] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A piling equipment for water conservancy construction, characterized in that: include: A pile driving assembly comprises a base (1), a first motor (2) is arranged on the upper side of the base (1), a bracket (3) is arranged on the upper side of the base (1), a plurality of guide wheels (4) are arranged on the upper side of the bracket (3), a take-up wheel (8) is arranged at the power output end of the first motor (2), a rope (5) is arranged on the take-up wheel (8), the rope (5) passes around the plurality of guide wheels (4), the rope (5) passes through a hollow slot at the upper end of the bracket (3) and is connected to a pile driving hammer (6), and a limit rod (7) is arranged at the upper end of the pile driving hammer (6); A fixing assembly comprises a mounting frame (14) arranged on the upper side of the base (1), a second motor (15) being arranged on the upper side of the mounting frame (14), the second motor (15) passing through the mounting frame (14) and being fixedly connected to a first threaded rod (16), a second threaded rod (17) being arranged on the lower side of the first threaded rod (16), a first movable plate (18) being arranged on the outer side of the second threaded rod (17), fixing piles (19) being arranged on the lower ends of both sides of the first movable plate (18), a tip (21) being arranged on the lower end of the fixing pile (19), a limiting groove (22) being arranged on the inner side of the mounting frame (14), a limiting block (23) being arranged on the rear side of the first movable plate (18), and the limiting block (23) being arranged in the limiting groove (22).

2. A water conservancy construction piling equipment according to claim 1, characterized in that: A pressing block (24) is arranged on the upper side of the base (1), and a wheel (25) is arranged on the lower side of the base (1).

3. A water conservancy construction piling equipment according to claim 2, characterized in that: A moving block (10) is arranged inside the bracket (3), a telescopic rod (9) is arranged below the moving block (10), and the lower end of the telescopic rod (9) is arranged on the base (1).

4. A water conservancy construction piling equipment according to claim 3, characterized in that: A support plate (11) is arranged on the front side of the moving block (10), and a support ring (12) is arranged on the front side of the support plate (11).

5. A water conservancy construction piling equipment according to claim 4, characterized in that: A first spring is arranged inside the support ring (12), and a clamping plate (13) is arranged at the other end of the first spring.

6. A water conservancy construction piling equipment according to claim 5, characterized in that: A second movable plate (26) is arranged on the outer side of the first threaded rod (16), and an insertion rod (27) is arranged on the lower side of the second movable plate (26).

7. A water conservancy construction piling equipment according to claim 6, characterized in that: Slot holes (20) are formed inside the fixing pile (19) and the first movable plate (18).

8. A water conservancy construction piling equipment according to claim 7, characterized in that: A rotating shaft (28) is arranged inside the fixing pile (19), a clamping plate (29) is arranged inside the fixing pile (19), and the rotating shaft (28) passes through the lower end of the clamping plate (29).

9. A water conservancy construction piling equipment according to claim 8, characterized in that: The interior of the clamping plate (29) is provided with an arc-shaped plate surface (30), and a second spring (31) is arranged between the clamping plates (29) at both ends.