Construction engineering building climbing frame
By setting external threads and torsion discs on the building climbing frame, it can adapt to uneven ground, and through the design of limit sleeves and placement boxes, the problems of climbing frame stability and moving space are solved, achieving higher stability and larger moving space.
Patent Information
- Application Number
- CN202421254004.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-06-04
AI Technical Summary
Building climbing frames have poor stability when used on uneven grounds and limited space for staff to move, which can easily lead to tools falling.
A building climbing frame was designed, by setting external threads and torsion discs on the surface of the frame to move the movable disc, connecting plate and bottom plate to adapt to uneven ground; at the same time, the design of the limit sleeve and placement box improves the stability of the climbing frame and the storage space of tools.
It improves the stability of building climbing frames on uneven grounds, expands the activity space of staff, and reduces the risk of tool drop.
Smart Images

Figure CN222595455U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building climbing frames, in particular to a building climbing frame for construction engineering. Background Art
[0002] Building climbing frame is a new type of scaffolding. The scaffolding is a working platform set up to ensure the smooth progress of each construction process. It can be divided into external scaffolding and internal scaffolding according to the location of the scaffolding; it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding according to different materials; it can be divided into pole scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, and climbing scaffolding according to the structural form.
[0003] During the use of the building climbing frame, it needs to be moved to the construction location, and then the workers climb to the top to facilitate subsequent construction. Since the ground of some placement areas is uneven, in order to maintain stability, the workers need to find relatively flat bricks around to pad the bottom of the climbing frame, which will affect the stability of the climbing frame over time. During construction, the workers like to place commonly used tools on the surface of the pedals, which results in less activity area for the workers and makes it easy for them to accidentally drop the tools when walking. Utility Model Content
[0004] The purpose of the utility model is to provide a construction engineering building climbing frame to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering building climbing frame, comprising a climbing frame composed of a frame body, a cross rod and a pedal, and also comprising:
[0006] An external thread is provided at the bottom of the frame surface, the frame surface is threadedly connected with a torsion disc, the bottom of the torsion disc is rotatably connected with a movable disc, and the inside of the movable disc is movably connected with the frame surface;
[0007] A connecting plate fixed at both ends of the movable disk, a bottom plate fixed at the other end of the connecting plate, a movable column fixedly connected to the top of the bottom plate, and a surface of the movable column movably connected to the inside of the bottom end of the frame body;
[0008] A limiting sleeve is sleeved on the top of the left and right frames, and a movable rod is fixedly connected to the upper and lower parts between the left and right limiting sleeves. A movable plate is movably connected to the surface of the movable rod, and a placement box is fixed to the surface of the movable plate.
[0009] Preferably, a movable sleeve is movably connected to the surface of the inner support rod of the frame body, and a fixing plate for being sleeved on the surface of another frame support rod is fixedly connected to the bottom end of the movable sleeve.
[0010] Preferably, the other end of the fixing plate is arranged in an arc shape, and the internal thread of the other end of the fixing plate is connected with a fixing bolt.
[0011] Preferably, both the front and rear sides of the movable column are fixedly connected with sliders, and the surface of the slider is movably connected to the inside of the frame.
[0012] Preferably, a limiting plate is fixedly connected to the surface of the frame, and the limiting plate is located below the limiting sleeve.
[0013] Preferably, a vertical rod is fixedly connected to the middle position of the inner side of the frame body, and a plurality of fixing rods are fixedly connected between one side of the vertical rod and the inner side of the frame body.
[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0015] When the climbing frame of the utility model is placed on an uneven ground, the threaded connection between the inside of the torsion plate and the surface of the frame can drive the movable plate, the connecting plate and the bottom plate to move downward, so that the bottom plate contacts the concave ground, thereby improving the stability of the climbing frame when it is subsequently placed. At the same time, the limiting sleeve can be used on the top surface of the frame, which not only makes it convenient to disassemble and take it out, but also allows the tools to be placed inside the placement box, thereby increasing the space for the staff to move on the top of the pedal and avoiding the phenomenon of tools falling. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the structure after three-dimensional separation in the utility model;
[0018] Figure 3 It is a rear view structural schematic diagram of the utility model;
[0019] Figure 4 It is a partial bottom view structural schematic diagram of the present invention.
[0020] In the figure: 1, frame; 2, cross rod; 3, pedal; 4, twist plate; 5, movable plate; 6, connecting plate; 7, bottom plate; 8, movable column; 9, slider; 10, fixed rod; 11, movable sleeve; 12, fixed plate; 13, fixing bolt; 14, limiting sleeve; 15, movable rod; 16, movable plate; 17, placement box; 18, limiting plate; 19, vertical rod. DETAILED DESCRIPTION
[0021] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose of the utility model, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0022] See also Figure 1-4 As shown, a construction engineering building climbing frame includes a climbing frame consisting of a frame body 1, a cross rod 2 and a pedal 3. The bottom of the frame body 1 is provided with an external thread, and the surface of the frame body 1 is threadedly connected with a torsion disk 4, and the bottom of the torsion disk 4 is rotatably connected with a movable disk 5, and the interior of the movable disk 5 is movably connected to the surface of the frame body 1, and both ends of the movable disk 5 are fixedly connected with a connecting plate 6, and the other end of the connecting plate 6 is fixed with a bottom plate 7, and the top of the bottom plate 7 is fixedly connected with a movable column 8, and the surface of the movable column 8 is movably connected to the inside of the bottom end of the frame body 1, and the tops of the left and right frame bodies 1 are provided with a limiting sleeve 14, and the upper and lower parts between the left and right limiting sleeves 14 are fixedly connected with a movable rod 15, and the surface of the movable rod 15 is movably connected with a movable plate 16, and the surface of the movable plate 16 is fixed with a placement box 17.
[0023] A movable sleeve 11 is movably connected to the surface of the inner support rod of the frame body 1, and a fixed plate 12 for being sleeved on the surface of the support rod of another frame body 1 is fixedly connected to the bottom end of the movable sleeve 11. In this way, when another climbing frame is placed on one side of the climbing frame, the movable sleeve 11 can be rotated so that the fixed plate 12 is clamped on the surface of the support rod in the other climbing frame, thereby improving the stability between adjacent climbing frames.
[0024] The other end of the fixing plate 12 is arranged in an arc shape, and the internal thread of the other end of the fixing plate 12 is connected with a fixing bolt 13, so that after the fixing plate 12 is clamped on the surface of the support rod of another climbing frame, the fixing bolt 13 can be rotated, thereby improving the stability of the fixing plate 12 when clamped.
[0025] The front and rear sides of the movable column 8 are fixedly connected with sliders 9, and the surface of the slider 9 is movably connected to the inside of the frame 1, so that the bottom plate 7 can be auxiliary limited to facilitate its stable up and down movement.
[0026] The surface of the frame 1 is fixedly connected with a limit plate 18 , and the limit plate 18 is located below the limit sleeve 14 , so that the position of the limit sleeve 14 can be supported to prevent it from excessively moving downward.
[0027] A vertical rod 19 is fixedly connected to the middle position of the inner side of the frame 1, and a plurality of fixed rods 10 are fixedly connected between one side of the vertical rod 19 and the inner side of the frame 1, so that the staff has a force point for climbing, so that the staff can climb to the top of the pedal 3 by stepping on the surface of the fixed rod 10.
[0028] Working principle: When in use, the climbing frame can be moved to the position of use, and then according to the position where the climbing frame is placed, if the ground in the area is uneven, the tilt of the climbing frame can be observed at this time, and then the torsion plate 4 on the inclined side can be rotated to drive the movable plate 5 to move downward, and at the same time drive the connecting plate 6 and the bottom plate 7 to move together, so that the bottom plate 7 is extended downward and can enter the recessed area, thereby better supporting the climbing frame. In order to improve the stability between adjacent climbing frames, the fixed plate 12 can be rotated so that the bottom end of the fixed plate 12 is clamped on the surface of the support rod of the other climbing frame, thereby fixing the two climbing frames, and then the limit sleeve 14 can be sleeved on the surface of the front frame 1. Finally, during the construction process, the tools can be placed inside the placement box 17 to facilitate the tools to be thrown on the surface of the pedal 3 at will, which will cause inconvenience to the staff in walking or falling.
[0029] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A construction engineering building climbing frame, comprising a climbing frame consisting of a frame body (1), a cross rod (2) and a pedal (3), characterized in that: Also includes: An external thread is provided at the bottom of the surface of the frame (1); the surface of the frame (1) is threadedly connected to a torsion disc (4); the bottom of the torsion disc (4) is rotatably connected to a movable disc (5); the interior of the movable disc (5) is movably connected to the surface of the frame (1); A connecting plate (6) is fixed to both ends of the movable disk (5), a bottom plate (7) is fixed to the other end of the connecting plate (6), a movable column (8) is fixedly connected to the top of the bottom plate (7), and the surface of the movable column (8) is movably connected to the inside of the bottom end of the frame (1); A limiting sleeve (14) is sleeved on the top of the left and right frames (1), and a movable rod (15) is fixedly connected to the upper and lower parts between the left and right limiting sleeves (14), a movable plate (16) is movably connected to the surface of the movable rod (15), and a placement box (17) is fixed to the surface of the movable plate (16).
2. A construction engineering building climbing frame according to claim 1, characterized in that: A movable sleeve (11) is movably connected to the surface of the inner support rod of the frame (1), and a fixing plate (12) for sleeved on the surface of another support rod of the frame (1) is fixedly connected to the bottom end of the movable sleeve (11).
3. A construction engineering building climbing frame according to claim 2, characterized in that: The other end of the fixing plate (12) is arranged in an arc shape, and the internal thread of the other end of the fixing plate (12) is connected with a fixing bolt (13).
4. A construction engineering building climbing frame according to claim 1, characterized in that: The front and rear sides of the movable column (8) are fixedly connected with sliders (9), and the surface of the slider (9) is movably connected to the inside of the frame (1).
5. A construction engineering building climbing frame according to claim 1, characterized in that: A limiting plate (18) is fixedly connected to the surface of the frame (1), and the limiting plate (18) is located below the limiting sleeve (14).
6. A construction engineering building climbing frame according to claim 1, characterized in that: A vertical rod (19) is fixedly connected to the middle position of the inner side of the frame body (1), and a plurality of fixing rods (10) are fixedly connected between one side of the vertical rod (19) and the inner side of the frame body (1).