Leveling and butting device for pipeline welding

By designing a pipe welding leveling docking device including butt plates and cross beams, the problem of inaccurate docking in pipeline welding is solved, and the efficiency, accuracy and safety of pipeline welding is achieved.

CN222608569UActive Publication Date: 2025-03-14CHINA 19TH METALLURGICAL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420863310.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-03-14
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

In the engineering industry, due to inaccurate docking during pipeline welding, the construction efficiency, high cost and poor welding quality are also increased accordingly as the pipe diameter increases.

Method used

A pipe welding leveling and docking device is designed, including two opposite butt plates and at least three beams surrounding the docking holes. Bolt holes and bolts are provided on the beams to achieve rapid and precise docking and leveling of the pipes through these components.

Benefits of technology

The device can quickly and accurately connect, level and align the two pipes, improve welding construction efficiency and quality, and reduce labor intensity and construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222608569U_ABST
    Figure CN222608569U_ABST
Patent Text Reader

Abstract

The utility model discloses a leveling and butting device for pipeline welding, and relates to the technical field of pipeline welding. The problems that in the prior art, during pipeline welding, leveling and alignment are not easy to achieve in butt joint, construction quality is poor, construction efficiency is low, and labor intensity is high are solved. Comprising two butt-joint plates which are oppositely arranged, each butt-joint plate is provided with a butt-joint hole used for being connected with a pipeline in a sleeved mode, at least three cross beams are connected between the butt-joint plates, the cross beams are evenly distributed around the peripheries of the butt-joint holes, bolt holes are formed in the cross beams at intervals, and bolts matched with the bolt holes are arranged in the bolt holes. The leveling and butt-joint device for pipeline welding is used for butt-joint leveling during pipeline welding, the structure is simple, operation is convenient, a constructor can rapidly and accurately conduct butt joint, leveling and alignment on two pipelines, it is guaranteed that the butt-joint ends of the two to-be-welded pipelines are aligned and fixed, the pipeline welding construction efficiency and construction quality are improved, and the labor intensity and the construction cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline welding, in particular to a pipeline welding leveling butt joint device. Background Art

[0002] In the construction process of the engineering industry, various types of metal pipes are usually used, such as stainless steel pipes or cast iron pipes. Metal pipes are usually made of multiple short pipes connected by welding into a whole pipe. Pipe welding is not easy to align. As the diameter of the pipe increases, it is more difficult to align the pipe during welding, and the construction becomes more difficult.

[0003] During the pipeline installation and connection process, operators often use artificial pads or hand winches to level and align the pipeline, which results in low construction efficiency, high labor costs, high labor intensity for operators, poor welding quality, and difficulty in guaranteeing the construction period. Utility Model Content

[0004] In order to solve the above problems, the utility model provides a pipeline welding leveling and docking device, which can quickly and accurately dock, level and align two pipelines, improve pipeline welding construction efficiency and construction quality, and reduce labor intensity and construction costs.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] The utility model discloses a pipeline welding leveling docking device, comprising two oppositely arranged docking plates, the docking plates are provided with docking holes for sleeved pipes, at least three crossbeams are connected between the docking plates, the crossbeams are evenly distributed around the periphery of the docking holes, the crossbeams are provided with bolt holes at intervals, and the bolt holes are provided with bolts matching the bolt holes.

[0007] Furthermore, four cross beams are connected between the butt joint plates.

[0008] Furthermore, the butt joint plate is cylindrical in shape.

[0009] Furthermore, the docking plate and the docking hole are coaxial.

[0010] Furthermore, the cross beam is vertically arranged between the docking plates, and the distance between the cross beam and the edge of the docking hole is the same.

[0011] Furthermore, the bolt holes are evenly distributed along the length direction of the crossbeam.

[0012] Furthermore, the butt joint plate and the cross beam are both steel structural members, and the butt joint plate and the cross beam are fixedly connected by welding.

[0013] Furthermore, the outer walls of the butt joint plate and the cross beam are both provided with a protective layer.

[0014] Furthermore, the protective layer is a paint layer.

[0015] Furthermore, the number of the paint layers is two.

[0016] The beneficial effects of the utility model are as follows: a pipeline welding leveling docking device of the present application is used for docking, leveling and aligning during pipeline welding. When the pipeline welding leveling docking device is leveling the pipeline docking, the docking hole of the docking plate at one end of the pipeline welding leveling docking device is passed through the docking end of a pipeline, the docking plate is sleeved on the docking end of the pipeline, and the butt end of another pipeline is passed through the docking hole of the docking plate at the other end of the pipeline welding leveling docking device, so that the two pipelines form a preliminary docking, leveling and alignment (alignment), the two bolts on the crossbeam are respectively opposite to the side walls of the butt ends of the two pipelines, the bolts are tightened so that the bolts are against the side walls of the pipelines, and the corresponding bolts are tightened respectively to quickly and accurately level and align the two pipelines, so as to ensure that the butt ends of the two pipelines are aligned and fixed. After the butt ends of the two pipelines are aligned and fixed, the two pipelines can be welded by arc welding. After the welding is completed, the bolts are loosened in the opposite direction, the bolts are separated from the side walls of the pipeline, and the pipeline welding leveling docking device is removed for docking, leveling, aligning and fixing of other pipelines to be welded. The pipeline welding leveling and docking device of the present application has a simple structure and is easy to operate. Operators can quickly and accurately dock, level and align two pipelines, thereby improving the welding construction efficiency and construction quality of the pipelines to be welded and reducing labor intensity and construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a structural schematic diagram of a pipeline leveling butt joint device for pipeline welding of the utility model;

[0019] Figure 2 It is a cross-sectional view of a pipeline leveling butt joint device for pipeline welding of the utility model;

[0020] Figure 3 The utility model is a front view of a pipeline welding leveling butt joint device.

[0021] Reference numerals: docking plate 1 , docking hole 101 , crossbeam 2 , bolt hole 201 , bolt 3 , pipe 4 . DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.

[0023] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0024] like Figure 1 , Figure 2 , Figure 3 As shown, a pipeline welding leveling docking device of the utility model comprises two oppositely arranged docking plates 1, the docking plates 1 are provided with docking holes 101 for sleeved pipes 4, at least three crossbeams 2 are connected between the docking plates 1, the crossbeams 2 are evenly distributed around the periphery of the docking holes 101, the crossbeams 2 are provided with bolt holes 201 at intervals, and bolts 3 cooperating therewith are provided in the bolt holes 201. The bolts 3 corresponding to the bolt holes 201 arranged at intervals on the crossbeams 2 are respectively opposite to the side walls of the docking ends of the two pipes 4 to be welded. The two oppositely arranged docking plates 1 are fixedly connected by the crossbeams 2, and the number of the crossbeams 2 is three or four or more. The shape of the docking plate 1 is cylindrical or square columnar.

[0025] A pipeline welding leveling docking device based on the above structure, a pipeline welding leveling docking device of the present application is used for docking and leveling when the pipeline 4 is welded. When the pipeline welding leveling docking device docks and level the pipeline 4, the docking hole 101 of the docking plate 1 at one end of the pipeline welding leveling docking device is passed through the docking end of a pipeline 4, and the docking plate 1 is sleeved on the docking end of the pipeline 4, and the butt end of another pipeline 4 is passed through the docking hole 101 of the docking plate 1 at the other end of the pipeline welding leveling docking device, so that the two pipelines 4 form a preliminary docking and leveling alignment (alignment), and the two bolts 3 on the crossbeam 2 are respectively opposite to the side walls of the butt ends of the two pipelines 4, and the bolts 3 are tightened so that the bolts 3 are against the side walls of the pipeline 4, and the corresponding bolts 3 are tightened respectively to quickly and accurately level and align the two pipelines 4, so as to ensure that the butt ends of the two pipelines 4 are aligned (aligned) and fixed. After the butt ends of the two pipes 4 are aligned and fixed, the two pipes 4 can be welded by arc welding. After welding is completed, the bolts 3 are reversely loosened, the bolts 3 are separated from the side wall of the pipe 4, and the pipe welding leveling butt device is removed and used for butt, leveling, aligning and fixing of another pipe 4 to be welded. The pipe welding leveling butt device of the present application has a simple structure and is easy to operate. The operator can quickly and accurately butt, level and align the two pipes 4, thereby improving the efficiency and quality of the pipe 4 welding construction and reducing the labor intensity and construction cost. The butt end of the pipe 4 is the welding end of the pipe 4.

[0026] Preferably, four cross beams 2 are connected between the butt joint plates 1 .

[0027] The four cross beams 2 are evenly distributed on the periphery of the docking hole 101 or close to the periphery of the docking hole 101. When the pipeline welding leveling docking device docks and level the pipeline 4, the pipeline 4 is adjusted from four different directions to facilitate rapid leveling.

[0028] Wherein, the butt joint plate 1 is in a cylindrical shape.

[0029] The cylindrical butt joint plate 1 reduces the material and weight of the butt joint plate 1 and is convenient for operators to pick up and install.

[0030] Preferably, the docking plate 1 and the docking hole 101 are coaxial.

[0031] When the pipeline welding leveling docking device docks and level the pipeline 4, the two docking plates 1, the two docking holes 101 and the docking ends of the two pipelines 4 are coaxial, and the stress of the pipeline welding leveling docking device on the pipeline 4 and the reaction force of the pipeline 4 on the pipeline welding leveling docking device are uniform, which is conducive to the leveling and docking of the pipeline 4.

[0032] Preferably, the cross beam 2 is vertically arranged between the docking plates 1 , and the distance between the cross beam 2 and the edge of the docking hole 101 is the same.

[0033] The bolt holes 201 are evenly distributed along the length direction of the crossbeam 2 .

[0034] The bolt holes 201 are evenly distributed along the length direction of the beam 2. The two bolt holes 201 divide the beam 2 into three sections. When the pipeline welding leveling and docking device level and docks the pipeline 4, the stress of the bolts 3 on the pipeline 4 is uniform, which is conducive to the leveling and docking of the pipeline 4.

[0035] As an implementable embodiment, the butt joint plate 1 and the cross beam 2 are both steel structural members, and the butt joint plate 1 and the cross beam 2 are fixedly connected by welding.

[0036] The butt plate 1 and the cross beam 2 made of steel have high strength, high hardness, high toughness, high stability and corrosion resistance.

[0037] The outer walls of the butt joint plate 1 and the cross beam 2 are both provided with a protective layer.

[0038] A protective layer is provided on the outer wall of the butt joint plate 1 and the cross beam 2 to effectively prevent corrosion, thereby increasing the service life of the butt joint plate 1 and the cross beam 2, and thus increasing the service life of the pipeline welding leveling butt joint device. The number of protective layers is at least one layer, such as one layer or two layers or more layers. The protective layer may be a galvanized layer or an anti-corrosion paint layer.

[0039] Preferably, the protective layer is a paint layer.

[0040] The outer walls of the butt joint plate 1 and the cross beam 2 are sprayed with paint to form a paint layer, which reduces oxidation corrosion of the butt joint plate 1 and the cross beam 2. The anti-corrosion method of spraying paint to form a paint layer has low anti-corrosion cost.

[0041] Preferably, the number of the paint layers is two.

[0042] The number of paint layers is two, which provides better protection for the butt joint plate 1 and the cross beam 2 and brings better anti-corrosion effect to the butt joint plate 1 and the cross beam 2.

[0043] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention.

Claims

1. A pipeline welding leveling butt joint device, characterized in that: The invention comprises two butt joint plates (1) arranged opposite to each other, each of the butt joint plates (1) being provided with a butt joint hole (101) for sleeve-connecting a pipe (4), at least three cross beams (2) being connected between the butt joint plates (1), the cross beams (2) being evenly distributed around the periphery of the butt joint hole (101), the cross beams (2) being provided with bolt holes (201) at intervals, and bolts (3) cooperating therewith being provided in the bolt holes (201).

2. A pipeline welding leveling butt joint device according to claim 1, characterized in that: Four cross beams (2) are connected between the butt joint plates (1).

3. The pipeline welding leveling butt joint device according to claim 1 is characterized in that: The butt joint plate (1) is cylindrical in shape.

4. A pipeline welding leveling butt joint device according to claim 3, characterized in that: The docking plate (1) and the docking hole (101) are coaxial.

5. The pipeline welding leveling butt joint device according to claim 1 is characterized in that: The crossbeam (2) is vertically arranged between the docking plates (1), and the distance between the crossbeam (2) and the edge of the docking hole (101) is the same.

6. The pipeline welding leveling butt joint device according to claim 1 is characterized in that: The bolt holes (201) are evenly distributed along the length direction of the crossbeam (2).

7. The pipeline welding leveling butt joint device according to claim 1 is characterized in that: The butt joint plate (1) and the cross beam (2) are both steel structural parts, and the butt joint plate (1) and the cross beam (2) are fixedly connected by welding.

8. The pipeline welding leveling butt joint device according to claim 7 is characterized in that: The outer walls of the butt joint plate (1) and the cross beam (2) are both provided with a protective layer.

9. A pipeline welding leveling butt joint device according to claim 8, characterized in that: The protective layer is a paint layer.

10. A pipeline welding leveling butt joint device according to claim 9, characterized in that: The number of the paint layers is two.