Outer wall dry hanging heat preservation and insulation device based on assembly type phase change energy storage wall body
By installing a dry-hung insulation device of a prefabricated phase change energy storage wall on the exterior wall of the building, and using the air chamber to store air heat, the problem that the dry-hung plate cannot adjust the insulation performance in the prior art is solved, and efficient building energy-saving effects are achieved.
Patent Information
- Application Number
- CN202421318051.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-06-11
AI Technical Summary
The existing building dry-hanging board cannot adjust the insulation performance after installation, and it is difficult to meet the requirements of low thermal conductivity, strong heat storage capacity and light weight.
The dry-hanging insulation device of the exterior wall based on the prefabricated phase change energy storage wall is adopted. The distance between the dry-hanging plate and the phase change plate is adjusted through the cantilevered wall connecting parts and the transmission unit, and the air cavity is used to store air heat, improving the thermal insulation capacity of the building.
It greatly improves the heat storage capacity of building walls, can adjust the insulation performance according to temperature changes, and enhances the energy-saving effect of the building.
Smart Images

Figure CN222614570U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building facade construction, and relates to an exterior wall dry hanging thermal insulation device based on an assembled phase change energy storage wall. Background Art
[0002] As a commonly used material in modern building facade decoration projects, building dry hanging panels are currently widely used in various civil and public buildings. Building dry hanging panels have the characteristics of light total weight and good thermal insulation performance. During installation, they are fixed to the building facade through keels. There is usually a certain distance between them and the building exterior wall. This part of the space can play a role in thermal insulation.
[0003] As we all know, lightweight building materials have a low thermal conductivity, and such lightweight building materials are less effective in improving the thermal storage performance of buildings. After the common building dry-hanging panels are installed, they cannot be replaced or moved as a fixed whole, and their thermal insulation performance cannot be adjusted at any time according to climate changes. In addition, lightweight building materials such as dry-hanging panels themselves are difficult to improve the thermal storage capacity of buildings. It is difficult to simultaneously meet the requirements of low thermal conductivity, strong thermal storage capacity and light weight in the existing technology. Utility Model Content
[0004] In order to solve the above problems, the utility model provides an exterior wall dry hanging thermal insulation device based on an assembled phase change energy storage wall, and adopts the following technical solutions:
[0005] An exterior wall dry hanging thermal insulation device based on an assembled phase change energy storage wall, comprising:
[0006] A plurality of load-bearing columns, which are arranged at the ends of the outer wall and fixedly connected to the outer wall;
[0007] The bottom of the outer side surface of the exterior wall is connected with a cantilever plate;
[0008] A plurality of phase change panels are longitudinally arranged on the outer side surface of the outer wall;
[0009] A plurality of rows of cantilevered wall connecting members are longitudinally arranged on the first side surface of the phase change panel and the first side surface of the load-bearing column; a plurality of keels are arranged on the first side surface of the phase change panel and the first side surface of the load-bearing column to connect two cantilevered wall connecting members adjacent in the longitudinal direction and in the transverse direction; one end of the keel is movably connected to the cantilevered wall connecting member, and the other end of the keel is connected to a dry hanging panel;
[0010] A transmission unit is arranged between the cantilever wall connecting member and the cantilever plate, and a plurality of the cantilever wall connecting members arranged longitudinally are connected through the first end of the transmission unit, and the second end of the transmission unit is connected to the keel to adjust the distance between the dry hanging plate and the phase change plate.
[0011] Furthermore, vertical keels are longitudinally arranged on the first side surface of the phase change plate and the first side surface of the load-bearing column, and multiple transverse keels are transversely arranged on the outer side of the vertical keels; the vertical keels and the transverse keels are connected by the cantilevered wall connecting member; the vertical keels are passed through the cantilevered wall connecting member and are detachably connected to the cantilevered wall connecting member; the first end of the cantilevered wall connecting member and the transverse keel are movably connected by a cantilevered telescopic beam, the second end of the cantilevered wall connecting member located at the transverse edge position is detachably connected to the load-bearing column, and the second end of the cantilevered wall connecting member located at the transverse middle position is detachably connected to the phase change plate; the outer side of the transverse keel is detachably connected to the dry hanging panel.
[0012] Furthermore, the transverse keel and the dry hanging plate are connected via a butterfly piece.
[0013] Furthermore, the distance between two adjacent cantilever wall connecting members arranged longitudinally is set within two meters.
[0014] Furthermore, a first connecting plate is provided at the first end of the cantilever wall connecting member; two second connecting plates arranged parallel to each other are provided at the first end of the first connecting plate; the second end of the first connecting plate located at the lateral edge position is detachably connected to the load-bearing column, and the second end of the first connecting plate located at the lateral middle position is detachably connected to the phase change plate; the first ends of the two second connecting plates are fixedly connected to the first connecting plate, and the second ends of the two second connecting plates are movably connected to the cantilever telescopic beam after passing through the vertical keel.
[0015] Furthermore, a connecting hole is formed at the second end of the second connecting plate; a rotating shaft is correspondingly provided on the first outer side wall and the second outer side wall of the cantilevered telescopic beam, and the rotating shaft is inserted into the connecting hole to enable the cantilevered telescopic beam to move in the connecting hole.
[0016] Further, the transmission unit includes a motor, a transmission shaft, a transmission gear, a chain and a transmission rod; the transmission gear is fixedly mounted on the transmission shaft; the transmission shaft is rotatably arranged on the top of the cantilever plate, and the motor is arranged at an end in the length direction of the cantilever plate; a first gear is arranged at the output end of the motor, and a second gear is arranged at one end of the transmission shaft, and the first gear is meshed with the second gear;
[0017] A flywheel is arranged on the side wall of the vertical keel, the first end of the flywheel is connected to the vertical keel through a rotating shaft, and the first end of the flywheel is arranged with a third gear, and the third gear is meshed with the transmission gear; the eccentric position of the second end of the flywheel is connected to the first end of the transmission rod, and the second end of the transmission rod is connected to the rotating shaft, so that the motor drives the rotating shaft to move in the connecting hole;
[0018] The chain is longitudinally hung on the side wall of the vertical keel to longitudinally connect the plurality of flywheels.
[0019] Beneficial effects:
[0020] (1) The utility model adopts a phase change energy storage wall to greatly improve the heat storage capacity of the building wall. The outer phase change plate is connected to the outer wall with bolts, which is convenient for maintenance during the building's use phase.
[0021] (2) The utility model drives the cantilever telescopic beam to extend or retract outward through a motor, and can adjust the distance between the dry hanging board and the wall according to the temperature change, so that the air cavity in the middle can store heat through the air, thereby improving the thermal insulation capacity of the building; when the external environment is high temperature, the air cavity can act as a thermal resistance layer, and can increase the volume of the air cavity, increase the distance between the dry hanging board and the wall, isolate and absorb part of the heat, and avoid the phase change board from excessive energy storage and losing its heat storage capacity. The thermal resistance and heat capacity are coordinated and matched to achieve the purpose of building energy saving.
[0022] (3) The utility model uses a retractable exterior wall dry hanging system, and the dry hanging panels between each layer can be alternately extended to effectively dissipate heat from the wall at night. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of an exterior wall dry-hanging thermal insulation device based on an assembled phase-change energy storage wall in Example 1 of the utility model;
[0024] Figure 2 It is a structural schematic diagram of the cantilevered wall connecting member of the exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model;
[0025] Figure 3 It is a structural schematic diagram of the cantilever telescopic beam of the exterior wall dry-hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model;
[0026] Figure 4 This is a schematic structural diagram of the transverse keel of the exterior wall dry-hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model;
[0027] Figure 5This is a structural schematic diagram of a dry-hanging board of an exterior wall dry-hanging thermal insulation device based on an assembled phase-change energy storage wall in Example 1 of the utility model;
[0028] Figure 6 It is a structural schematic diagram of a butterfly member of an exterior wall dry-hanging thermal insulation device based on an assembled phase change energy storage wall in Example 1 of the utility model;
[0029] Figure 7 The external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model Figure 1 The enlarged schematic diagram at A in the middle;
[0030] Figure 8 The external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model Figure 1 The enlarged schematic diagram of point B in the middle;
[0031] Fig. 9 It is a schematic diagram of step S1 of the external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 2 of the utility model;
[0032] Fig.10 It is a schematic diagram of step S2 of the external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 2 of the utility model;
[0033] Fig.11 It is a schematic diagram of step S3 of the external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 2 of the utility model;
[0034] Fig.12 It is a schematic diagram of step S4 of the external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 2 of the utility model;
[0035] Fig.13 It is a schematic diagram of step S5 of the external wall dry hanging thermal insulation device based on the assembled phase change energy storage wall in Example 2 of the utility model;
[0036] Fig.14 This is a schematic diagram of the overall structure of an exterior wall dry-hanging thermal insulation device based on an assembled phase-change energy storage wall in Example 3 of the utility model;
[0037] Fig.15 This is the outdoor temperature difference effect diagram of the exterior wall of an ordinary building;
[0038] Fig.16 This is a rendering of the exterior wall dry-hanging thermal insulation device based on the assembled phase change energy storage wall in Example 1 of the utility model installed outside the exterior wall of an ordinary building;
[0039] Among them, 1. load-bearing column; 2. exterior wall; 3. phase change board; 31. expansion bolt; 4. vertical keel; 41. flywheel; 42. transmission rod; 43. chain; 5. cantilever wall connection; 6. cantilever telescopic beam; 7. cantilever board; 8. motor; 81. transmission shaft; 82. transmission gear; 9. dry hanging board; 10. horizontal keel; 101. butterfly piece. DETAILED DESCRIPTION
[0040] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the utility model more understandable, the specific implementation methods of the utility model are listed below.
[0041] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "horizontal", "inner", "outer", "one side" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present utility model; the terms "first", "second" and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0042] Example 1
[0043] Reference Figures 1 to 8 , an exterior wall dry hanging thermal insulation device based on an assembled phase change energy storage wall, comprising:
[0044] A plurality of load-bearing columns 1, wherein the outer wall 2 is arranged between two adjacent load-bearing columns 1 and is fixedly connected to the load-bearing columns 1;
[0045] A cantilever plate 7 is connected to the bottom of the outer side of the outer wall 2;
[0046] Multiple rows of phase change panels 3 are longitudinally arranged on the outer surface of the outer wall 2;
[0047] A plurality of rows of cantilevered wall connecting members 5 are longitudinally arranged on the first side surface of the phase change panel 3 and the first side surface of the load-bearing column 1; a plurality of keels are arranged on the first side surface of the phase change panel 3 and the first side surface of the load-bearing column 1 to connect two cantilevered wall connecting members 5 adjacent in the longitudinal direction and in the transverse direction; one end of the keel is movably connected to the cantilevered wall connecting member 5, and the other end of the keel is connected to a dry hanging panel 9;
[0048] A transmission unit is arranged between the cantilever wall connecting member 5 and the cantilever board 7. The multiple cantilever wall connecting members 5 arranged longitudinally are connected through the first end of the transmission unit, and the second end of the transmission unit is connected to the keel to adjust the distance between the dry hanging board 9 and the phase change board 3.
[0049] The phase change plate 3 is filled with a thermomass phase change material, and an organic or inorganic phase change material can be used. The phase change plate 3 can easily use a light material as a carrier of the phase change material.
[0050] Among them, preferably, two rows of phase change panels 3 are longitudinally arranged on the outer surface of the exterior wall 2, and each row is composed of three phase change panels 3; a row of cantilevered wall ties 5 are longitudinally arranged on the first side of the phase change panels 3, and a row of cantilevered wall ties 5 are longitudinally arranged on the first side of the load-bearing columns 1, and each row is composed of three cantilevered wall ties 5.
[0051] Through the above technical solution, the phase change panel 3 can be connected to the outer wall 2 by gluing or anchoring. When the anchoring method is adopted, the phase change panel 3 has holes through which bolts can be passed, so that it is connected to the outer wall 2 by bolts. The phase change panel 3 is fixed to the outdoor side of the outer wall 2 by expansion bolts 31. The phase change panel 3 can be replaced according to different projects and climates.
[0052] In this embodiment, vertical keels 4 are longitudinally arranged on the first side surface of the phase change panel 3 and the first side surface of the load-bearing column 1, and multiple transverse keels 10 are transversely arranged on the outer side of the vertical keel 4; the vertical keel 4 and the transverse keel 10 are connected by a cantilevered wall connecting member 5; the vertical keel 4 is inserted into the cantilevered wall connecting member 5 and is detachably connected to the cantilevered wall connecting member 5; the first end of the cantilevered wall connecting member 5 and the transverse keel 10 are movably connected by a cantilevered telescopic beam 6, the second end of the cantilevered wall connecting member 5 located at the transverse edge position is detachably connected to the load-bearing column 1, and the second end of the cantilevered wall connecting member 5 located at the transverse middle position is detachably connected to the phase change panel 3; the outer side of the transverse keel 10 is detachably connected to the dry hanging panel 9.
[0053] The preferred vertical keel 4 is a rectangular square steel with a wall thickness of preferably 5 mm; the transverse keel 10 is preferably an aluminum alloy channel steel with a wall thickness of 5 mm.
[0054] The side of the vertical keel 4 is provided with holes for passing bolts and a rotating shaft for fixing the flywheel 41. The number of cantilevered wall ties 5 can be adjusted according to the floor height. The spacing between the cantilevered wall ties 5 connected to the vertical keel 4 should not exceed 2 meters.
[0055] Among them, the one located at the lateral edge position and the one located at the lateral middle position refer to the cantilevered wall connection member 5 arranged on the load-bearing column 1; the one located at the lateral middle position and the one located at the lateral middle position refer to the cantilevered wall connection member 5 arranged on the phase change plate 3.
[0056] Preferably, two rows of phase change panels 3 are longitudinally arranged on the outer surface of the exterior wall 2, and each row is composed of three phase change panels 3; a vertical keel 4 is arranged on the first side of the phase change panel 3, and the vertical keel 4 and the cantilevered wall connecting member 5 located in the horizontal middle position are both arranged between two adjacent rows of phase change panels 3, and two laterally adjacent phase change panels 3 are connected by the cantilevered wall connecting member 5 located in the horizontal middle position.
[0057] In this embodiment, the transverse keel 10 and the dry hanging board 9 are connected via a butterfly piece 101 .
[0058] Preferably, the upper and lower ends of the dry hanging board 9 are provided with grooves, and the depth of the grooves matches the butterfly piece 101; the dry hanging board 9 can be made of materials such as calcium silicate board, lightweight gypsum board or cement board.
[0059] In this embodiment, the distance between two adjacent cantilevered wall connecting members 5 arranged in the longitudinal direction is set within two meters.
[0060] In this embodiment, a first connecting plate is provided at the first end of the cantilever wall connecting member 5; two second connecting plates arranged parallel to each other are provided at the first end of the first connecting plate; the second end of the first connecting plate located at the lateral edge position is detachably connected to the load-bearing column 1, and the second end of the first connecting plate located at the lateral middle position is detachably connected to the phase change plate 3; the first ends of the two second connecting plates are fixedly connected to the first connecting plate, and the second ends of the two second connecting plates are movably connected to the cantilever telescopic beam 6 after passing through the vertical keel 4.
[0061] Among them, the first connecting plate located at the lateral edge position refers to the first connecting plate in the cantilevered wall connecting member 5 arranged on the load-bearing column 1; the first connecting plate located at the lateral middle position refers to the first connecting plate in the cantilevered wall connecting member 5 arranged on the phase change plate 3.
[0062] In this embodiment, a connecting hole is formed at the second end of the second connecting plate; a rotating shaft is correspondingly provided on the first outer side wall and the second outer side wall of the cantilever telescopic beam, and the rotating shaft is inserted into the connecting hole to enable the cantilever telescopic beam to move in the connecting hole.
[0063] The connecting hole is a strip-shaped connecting hole, and the length of the connecting hole extends along the length direction of the second connecting plate.
[0064] Through the above technical scheme, the vertical keel 4 is connected to the load-bearing column or the outer wall 2 through the cantilevered wall connecting member 5. The side of the vertical keel 4 is provided with a flywheel 41. The flywheel 41 rotates, and the cantilevered telescopic beam is driven to perform telescopic movement through the transmission rod 42. The cantilevered end of the cantilevered wall connecting member 5 is provided with a slide groove, which can be used as a sliding track for the cantilevered telescopic beam. The cantilevered telescopic beam is connected to the transverse keel 10. The transverse keel 10 is provided with a butterfly piece 101, and the dry hanging board 9 is connected to the transverse keel 10 through the butterfly piece 101.
[0065] In this embodiment, the transmission unit includes a motor 8, a transmission shaft 81, a transmission gear 82, a chain 43 and a transmission rod 42; the transmission gear 82 is fixedly mounted on the transmission shaft 81; the transmission shaft 81 is rotatably arranged on the top of the cantilever plate 7, and the motor 8 is arranged at the end in the length direction of the cantilever plate 7; a first gear is arranged at the output end of the motor 8, and a second gear is arranged at one end of the transmission shaft 81, and the first gear is meshed with the second gear;
[0066] A flywheel 41 is provided on the side wall of the vertical keel 4. The first end of the flywheel 41 is connected to the vertical keel 4 through a rotating shaft 81, and the first end of the flywheel 41 is provided with a third gear, which is meshed with a transmission gear 82. The eccentric position of the second end of the flywheel 41 is connected to the first end of the transmission rod 42, and the second end of the transmission rod 42 is connected to the rotating shaft, so that the motor 8 drives the rotating shaft to move in the connecting hole.
[0067] The chain 43 is longitudinally hung on the side wall of the vertical keel 4 to longitudinally connect the plurality of flywheels 41 .
[0068] Among them, the motor 8 and the transmission shaft 81 are fixed on the cantilever plate 7, and the forward or reverse rotation of the motor 8 can be controlled by a switch. The cantilever plate 7 is equipped with anti-bending steel bars. During the equipment installation and replacement of the phase change plate 3, the cantilever plate 7 can be used as a construction platform; the motor 8 and the transmission shaft 81 are equipped with gears, and the gear plate thickness is 10mm.
[0069] Among them, the cantilever telescopic beam has a pulley and a rotating shaft on the side, which is placed in the slideway of the cantilever wall connecting member 5, and the rotating shaft of the cantilever telescopic beam is connected to the gear through a transmission rod 42;
[0070] The thickness of the transmission rod 42 is preferably 8 mm.
[0071] Among them, a plurality of transmission gears 82 are fixedly mounted on the transmission shaft 81 , and the transmission gears 82 are arranged corresponding to the vertical keels 4 .
[0072] Preferably, a transmission gear 82 is installed at both ends and the middle position of the transmission shaft 81, so that the positions of the three transmission gears 82 correspond one by one to the positions of the three vertical keels 4 respectively; the second gear is arranged at a position on the transmission shaft that meshes with the first gear of the motor.
[0073] Through the above technical solution, when the motor rotates, the first gear at the output end of the motor 8 meshes with the second gear on the transmission shaft 81, driving the transmission shaft 81 to start rotating, and the transmission gears 82 at both ends and the middle position of the transmission shaft 81 drive the third gear on the flywheel to rotate, so that the flywheels 41 on the three vertical keels 4 drive the chains 43 to rotate, so that the rotating shaft moves in the strip connecting hole of the second connecting plate of the cantilever telescopic beam 6; the motor 8 is the power source of the entire system, and each group of flywheels 41 is driven to rotate through the transmission shaft 81, the transmission gear 82 and the chain 43, and the entire system is driven by the motor 8 to operate, and the distance between the dry hanging plate 9 and the phase change plate 3 is adjusted.
[0074] The utility model provides an external wall dry hanging thermal insulation device 2 based on an assembled phase change energy storage wall, and the working principle is as follows: the motor 8 is the power source for the system operation, and the rotation of the motor 8 drives the transmission shaft 81 to rotate. The transmission shaft 81 is provided with a transmission gear 82, and the transmission gear 82 drives the chain 43 to rotate the flywheel 41. The flywheel 41 controls the cantilever telescopic beam through the transmission rod 42 to complete the telescopic movement. The dry hanging plate 9 is connected to the cantilever telescopic beam through the transverse keel 10. The whole system adjusts the distance between the dry hanging plate 9 and the phase change plate 3, and then adjusts the volume of the air cavity. The air cavity serves as an insulation layer, and the internal air can absorb and reduce the heat transfer to the phase change plate 3. When the outdoor ambient temperature rises, the volume of the air cavity can be increased to prevent the phase change material of the phase change plate 3 from losing its heat storage capacity prematurely. This system coordinates with the heat capacity material by adjusting the thermal resistance to achieve the purpose of building energy saving.
[0075] Example 2
[0076] like Figures 9 to 13 As shown, a method for installing a dry-hanging thermal insulation device for an exterior wall 2 based on an assembled phase change energy storage wall is provided, and a dry-hanging thermal insulation device for an exterior wall 2 based on an assembled phase change energy storage wall is provided, comprising the following steps:
[0077] Step S1: completing the pouring construction of the load-bearing column 1, the exterior wall 2, and the cantilever slab 7;
[0078] Step S2: drilling holes at the locations where the cantilever wall connection member 5 and the phase change plate 3 need to be installed on the load-bearing column 1 and the exterior wall 2, and then installing the cantilever wall connection member 5 and the phase change plate 3 using expansion bolts 31;
[0079] Step S3: Use bolts with nuts to install the vertical keel 4 and the cantilever telescopic beam, then install the flywheel 41, the transmission rod 42, and the chain 43 in place, apply butter to the shaft for lubrication, and after the installation is completed, test-run the flywheel 41. If the cantilever telescopic beam can smoothly complete the telescopic movement, the installation of this step is completed;
[0080] Step S4: Use bolts to install the transverse keel 10 on the cantilevered end of the cantilever telescopic beam, and then install the butterfly piece 101 on the transverse keel 10;
[0081] Step S5: Install the dry hanging board 9, adjust the verticality of the dry hanging board 9 by adjusting the butterfly piece 101, and after all components are installed, install the motor 8 and the transmission shaft 81.
[0082] Example 3
[0083] This embodiment is an improvement made on the basis of embodiment 3. Fig.14 As shown, this device is arranged with one set on each floor, and another set of system is required if the height exceeds 10m, and each system is independent of each other and can realize alternate operation.
[0084] When dissipating heat at night, the independent systems can adopt an alternating extension method to dissipate wall heat along the height direction, so that the dry-hanging panels between the systems are staggered, and the heat stored in the phase change panels during the day is dissipated into the air through air flow.
[0085] like Fig.15 and Fig.16 As shown, Fig.15 This is a schematic diagram of the temperature difference between the indoor environment and the outdoor environment of the exterior wall of an ordinary building. Fig.16 The schematic diagram of the temperature difference between the indoor environment and the outdoor environment when the device is installed outside the exterior wall of an ordinary building is as follows: the present embodiment proposes an exterior wall dry-hanging thermal insulation device based on an assembled phase change energy storage wall, in which the phase change plate is installed on the outside of the building wall and can be used as a heat storage layer for excess heat; in addition, the distance between the dry-hanging plate and the phase change plate is adjusted by a retractable cantilever beam to construct an air cavity whose volume can be changed according to climate change, thereby further improving the thermal insulation capacity of the exterior wall dry-hanging system; the air cavity serves as a thermal resistance layer, and the purpose of building energy saving is achieved by coordinating the thermal resistance and the heat capacity.
[0086] The above are only preferred embodiments of the present invention and do not limit the technical scope of the present invention. Therefore, any minor modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. An exterior wall dry hanging thermal insulation device based on an assembled phase change energy storage wall, characterized in that: include: A plurality of load-bearing columns, which are arranged at the ends of the outer wall and fixedly connected to the outer wall; The bottom of the outer side surface of the exterior wall is connected with a cantilever plate; A plurality of phase change panels are longitudinally arranged on the outer side surface of the outer wall; A plurality of rows of cantilevered wall connecting members are longitudinally arranged on the first side surface of the phase change panel and the first side surface of the load-bearing column; a plurality of keels are arranged on the first side surface of the phase change panel and the first side surface of the load-bearing column to connect two cantilevered wall connecting members adjacent in the longitudinal direction and in the transverse direction; one end of the keel is movably connected to the cantilevered wall connecting member, and the other end of the keel is connected to a dry hanging panel; A transmission unit is arranged between the cantilever wall connecting member and the cantilever plate, and a plurality of the cantilever wall connecting members arranged longitudinally are connected through the first end of the transmission unit, and the second end of the transmission unit is connected to the keel to adjust the distance between the dry hanging plate and the phase change plate.
2. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 1 is characterized in that: Vertical keels are longitudinally arranged on the first side surface of the phase change plate and the first side surface of the load-bearing column, and multiple transverse keels are transversely arranged on the outer side of the vertical keels; the vertical keels and the transverse keels are connected by the cantilevered wall connecting member; the vertical keels are passed through the cantilevered wall connecting member and are detachably connected to the cantilevered wall connecting member; the first end of the cantilevered wall connecting member and the transverse keel are movably connected by a cantilevered telescopic beam, the second end of the cantilevered wall connecting member located at the transverse edge position is detachably connected to the load-bearing column, and the second end of the cantilevered wall connecting member located at the transverse middle position is detachably connected to the phase change plate; the outer side of the transverse keel is detachably connected to the dry hanging panel.
3. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 2 is characterized in that: The transverse keel and the dry hanging plate are connected via a butterfly piece.
4. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 2 is characterized in that: The distance between two adjacent cantilever wall connecting members arranged longitudinally is set within two meters.
5. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 2 is characterized in that: A first connecting plate is provided at the first end of the cantilever wall connecting member; two second connecting plates arranged parallel to each other are provided at the first end of the first connecting plate; the second end of the first connecting plate located at the lateral edge position is detachably connected to the load-bearing column, and the second end of the first connecting plate located at the lateral middle position is detachably connected to the phase change plate; the first ends of the two second connecting plates are fixedly connected to the first connecting plate, and the second ends of the two second connecting plates are movably connected to the cantilever telescopic beam after passing through the vertical keel.
6. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 5 is characterized in that: A connecting hole is formed at the second end of the second connecting plate; a rotating shaft is correspondingly provided on the first outer side wall and the second outer side wall of the cantilever telescopic beam, and the rotating shaft is inserted into the connecting hole to enable the cantilever telescopic beam to move in the connecting hole.
7. The exterior wall dry hanging thermal insulation device based on the assembled phase change energy storage wall according to claim 6 is characterized in that: The transmission unit comprises a motor, a transmission shaft, a transmission gear, a chain and a transmission rod; the transmission gear is fixedly mounted on the transmission shaft; the transmission shaft is rotatably arranged on the top of the cantilever plate, and the motor is arranged at an end in the length direction of the cantilever plate; a first gear is arranged at the output end of the motor, and a second gear is arranged at one end of the transmission shaft, and the first gear is meshed with the second gear; A flywheel is arranged on the side wall of the vertical keel, the first end of the flywheel is connected to the vertical keel through a rotating shaft, and the first end of the flywheel is arranged with a third gear, and the third gear is meshed with the transmission gear; the eccentric position of the second end of the flywheel is connected to the first end of the transmission rod, and the second end of the transmission rod is connected to the rotating shaft, so that the motor drives the rotating shaft to move in the connecting hole; The chain is longitudinally hung on the side wall of the vertical keel to longitudinally connect the plurality of flywheels.