Prestressed concrete building wall

By synchronously making and prestressing treatment of columns, load-bearing beams and load-bearing walls in advance, the problem of long wall production cycle in the existing technology is solved, and the rapid construction of concrete building walls is achieved.

CN222614616UActive Publication Date: 2025-03-14WUHAN HUAJIANG XINGFU PREFABRICATED CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420490584.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2025-03-14
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

In the prior art, the wall production cycle of prestressed construction is long, and it is necessary to wait for the concrete wall to harden before bending, resulting in a slow construction pace.

Method used

By designing columns, load-bearing beams and load-bearing walls, they can be made simultaneously and assembled during construction. The load-bearing beams and load-bearing walls are prestressed in advance, making concrete walls easier to build.

Benefits of technology

The wall production steps are simplified, the construction time is reduced, and the construction of concrete building walls is faster and easier.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614616U_ABST
    Figure CN222614616U_ABST
Patent Text Reader

Abstract

The utility model discloses a prestressed concrete building wall, and relates to the technical field of building construction. The device comprises a stand column used for determining the position of a wall body; the bearing beam is used for supporting the superstructure, and the top of the bearing beam is fixedly connected with the top of the stand column; the bearing wall is used for supporting the bearing beam, the top of the bearing wall is fixedly connected with the bottom of the bearing beam, the bearing beam and the bearing wall can be synchronously manufactured by arranging the stand columns and can be manufactured in advance at the same time, the bearing beam and the bearing wall can be assembled when construction needs, and meanwhile the bearing beam and the bearing wall are subjected to prestress treatment; the bearing beam is matched with the bending device, and the bending device converts the gravity of the bearing beam into the force for bending the prestressed steel bars, so that the stand columns are subjected to prestress treatment while the concrete wall body is built by the stand columns; the purpose that the building wall can be quickly built while the concrete member is treated through prestress is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a prestressed concrete building wall. Background Art

[0002] Prestressing refers to applying pre-tensioning stress to the steel bars in the tension module before the engineering structural components are subjected to external loads, thereby increasing the rigidity of the components, delaying the time for cracks to appear, and increasing the durability of the components. Before the structure is subjected to external loads, compressive stress is applied to the tension zone under the action of external loads in advance to improve the performance of the structure. This type of structure is called a prestressed structure. For example, in a concrete structure, applying compressive stress to concrete components in advance can improve the crack resistance and rigidity of concrete components.

[0003] In the existing technology, when encountering a wall that requires prestressed construction during the construction process, a machine is needed to bend the steel bars in the wall. The traditional technology not only requires large machinery such as concrete pouring machines for construction, but also requires waiting for the concrete wall to harden before bending. This makes the wall production cycle long, which is not conducive to the rapid development of subsequent work and slows down the construction pace. Utility Model Content

[0004] In view of the deficiencies in the prior art, the technical solution adopted by the utility model to solve the technical problems is: a prestressed concrete building wall, comprising: a column, the column is used to determine the position of the wall; a load-bearing beam, the load-bearing beam is used to support the superstructure, the top of the load-bearing beam is fixedly connected to the top of the column; a load-bearing wall, the load-bearing wall is used to support the load-bearing beam, the top of the load-bearing wall is fixedly connected to the bottom of the load-bearing beam; the column comprises a concrete column, the inner wall of the concrete column is fixedly connected with the prestressed steel bar through a limiting groove, and the limiting groove is opened in the wall of the concrete column, a sliding groove is opened in the wall of the concrete column, and a positioning groove is opened in the wall of the concrete column. The bottom of the prestressed steel bar is fixedly connected with a positioning block, and the top of the prestressed steel bar is fixedly connected with a bending device; the top of the column is fixedly connected with a limit plate, the outer wall of the column is slidably connected with an insulation board, the inner wall of the load-bearing wall is fixedly connected with a first tensioned steel bar, the outer wall of the limit plate is fixedly connected to the outer wall of the load-bearing beam, the outer wall of the first tensioned steel bar is slidably connected to the outer wall of the concrete column, and the outer wall of the concrete column is slidably connected to the outer wall of the insulation board. The columns, load-bearing beams and load-bearing walls can be manufactured simultaneously and in advance, and can be assembled when construction requires. At the same time, the load-bearing beams and load-bearing walls have been prestressed, making it easier to build concrete walls.

[0005] Preferably, the bending device includes a fixing sleeve, a fixing ring is fixedly connected to the top of the fixing sleeve, a welding plate is fixedly connected to the outer wall of the fixing ring, a welded plate is fixedly connected to the top of the welding plate, a welded steel bar is fixedly connected to the top of the welded steel bar, a load-bearing cylinder is fixedly connected to the outer wall of the concrete column, the inner wall of the fixing sleeve is fixedly connected to the outer wall of the prestressed steel bar, the top of the prestressed steel bar is fixedly connected to the bottom end of the load-bearing cylinder, the bending device provides support for the load-bearing cylinder and transmits the force exerted on the load-bearing cylinder at the same time, and the prestressed steel bar is bent as a whole by the bending device, which makes the prestressed steel bar easier to bend while protecting the connection between the prestressed steel bar and the load-bearing cylinder from breaking.

[0006] Preferably, the load-bearing beam comprises a concrete beam, the inner wall of the concrete beam is fixedly connected with a second tensioning steel bar, the inner wall of the concrete beam is fixedly connected with an inclined cylinder via a receiving groove, and the receiving groove is provided in the wall of the concrete beam, the outer wall of the concrete beam is fixedly connected with the outer wall of the limiting plate, the bottom of the concrete beam is fixedly connected with the top of the concrete column, the bottom of the concrete beam is fixedly connected with the top of the load-bearing wall, and the bending device converts the gravity of the load-bearing beam into a force for bending the prestressed steel bar, so that the column is prestressed while the concrete wall is being built.

[0007] The beneficial effects of the utility model are as follows:

[0008] 1. The utility model can be manufactured synchronously by setting columns, load-bearing beams and load-bearing walls, and can also be manufactured in advance, and can be assembled when construction requires it. At the same time, the load-bearing beams and load-bearing walls have been prestressed, making the construction of concrete building walls easier and faster.

[0009] 2. The utility model cooperates with a load-bearing beam and a bending device, and the bending device converts the gravity of the load-bearing beam into a force for bending prestressed steel bars, so that the columns are prestressed while the concrete walls are being built, to resist the thrust generated by the expansion and deformation of the load-bearing walls. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is the front view of the utility model;

[0011] Figure 2 It is an exploded view of the utility model;

[0012] Figure 3 It is a structural schematic diagram of the utility model column;

[0013] Figure 4 It is an enlarged schematic diagram of the structure of A of the utility model;

[0014] Figure 5It is a structural schematic diagram of a load-bearing beam of the utility model.

[0015] In the figure: 1. column; 2. limit plate; 3. load-bearing beam; 4. insulation board; 5. load-bearing wall; 6. first tensioning steel bar; 11. concrete column; 12. sliding groove; 13. positioning groove; 14. limit groove; 15. prestressed steel bar; 16. positioning block; 17. bending device; 171. fixing sleeve; 172. fixing ring; 173. welding plate; 174. welding steel bar; 175. load-bearing cylinder; 31. concrete beam; 32. second tensioning steel bar; 33. inclined cylinder; 34. receiving groove. DETAILED DESCRIPTION

[0016] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations are obvious to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and design various embodiments with various modifications suitable for specific purposes.

[0017] Example: See Figure 1 - Figure 5The utility model provides a technical solution: a prestressed concrete building wall, comprising: a column 1, the column 1 is used to determine the position of the wall; a load-bearing beam 3, the load-bearing beam 3 is used to support the superstructure, the top of the load-bearing beam 3 is fixedly connected to the top of the column 1; a load-bearing wall 5, the load-bearing wall 5 is used to support the load-bearing beam 3, the top of the load-bearing wall 5 is fixedly connected to the bottom of the load-bearing beam 3; the column 1 comprises a concrete column 11, the inner wall of the concrete column 11 is fixedly connected with a prestressed steel bar 15 through a limiting groove 14, and the limiting groove 14 is opened in the wall of the concrete column 11, a sliding groove 12 is opened in the wall of the concrete column 11, a positioning groove 13 is opened in the wall of the concrete column 11, the bottom of the prestressed steel bar 15 is fixedly connected with a positioning block 16, and the top of the prestressed steel bar 15 is fixedly connected with a bending device 17; the top of the column 1 is fixedly connected with a limiting plate 2, and the outer wall of the column 1 is slidably connected with The insulation board 4 and the inner wall of the load-bearing wall 5 are fixedly connected with the first tensioned steel bar 6, the outer wall of the limiting plate 2 is fixedly connected to the outer wall of the load-bearing beam 3, the outer wall of the first tensioned steel bar 6 is slidably connected to the outer wall of the concrete column 11, and the outer wall of the concrete column 11 is slidably connected to the outer wall of the insulation board 4. During the pouring process of the load-bearing wall 5, the steel bars are pre-tensioned to generate prestress. Similarly, the load-bearing beam 3 is prestressed at the same time using the pre-tensioning method. The second tensioned steel bar 32 prestresses the concrete beam 31. The pouring of the column 1 does not use the pre-tensioning method. The prestressed steel bar 15 is wrapped during the pouring of the concrete column 11. The concrete column 11 in the limiting groove 14 can be used after hardening. The load-bearing wall 5, the load-bearing beam 3 and the column 1 can be manufactured at the same time. The various components after the manufacturing are assembled to obtain a wall, which reduces the time required to build the wall, simplifies the wall manufacturing steps, and allows the wall to be quickly installed.

[0018] The bending device 17 includes a fixing sleeve 171, a fixing ring 172 is fixedly connected to the top of the fixing sleeve 171, a welding plate 173 is fixedly connected to the outer wall of the fixing ring 172, a welding steel bar 174 is fixedly connected to the top of the welding plate 173, a force-bearing cylinder 175 is fixedly connected to the top of the welding steel bar 174, the outer wall of the fixing sleeve 171 is fixedly connected to the inner wall of the concrete column 11, the inner wall of the fixing sleeve 171 is fixedly connected to the outer wall of the prestressed steel bar 15, and the top of the prestressed steel bar 15 is fixedly connected to the force-bearing cylinder 175. 5, the load-bearing cylinder 175 converts part of the gravity given by the load-bearing beam 3 and transmits it to the welded steel bar 174, and then transmits the force downward through the welded plate 173. Since the fixing sleeve 171 connects all the welded plates 173 through the fixing ring 172, the bending device 17 forms a whole at this time. At this time, the bending device 17 wraps the top of the prestressed steel bar 15, making the prestressed steel bar 15 easier to bend, and the connection with the load-bearing cylinder 175 is not easy to break.

[0019] The load-bearing beam 3 includes a concrete beam 31, the inner wall of which is fixedly connected with a second tensioning steel bar 32, the inner wall of the concrete beam 31 is fixedly connected with an inclined cylinder 33 through a receiving groove 34, and the receiving groove 34 is opened in the wall of the concrete beam 31, the outer wall of the concrete beam 31 is fixedly connected to the outer wall of the limiting plate 2, the bottom of the concrete beam 31 is fixedly connected to the top of the concrete column 11, and the bottom of the concrete beam 31 is fixedly connected to the top of the load-bearing wall 5. Due to the gravity of the concrete beam 31 itself, the concrete beam 31 carries the inclined cylinder 33 to squeeze the load-bearing cylinder 175, and the contact surface between the inclined cylinder 33 and the load-bearing cylinder 175 decomposes the gravity of the concrete beam 31, and converts a part of it into a thrust moving in the direction away from the load-bearing wall 5.

[0020] Working principle:

[0021] When in use, before building the wall, the load-bearing wall 5, the load-bearing beam 3 and the column 1 are manufactured. During the pouring of the load-bearing wall 5, the steel bars are pre-tensioned to generate prestress, so the first tensioned steel bar 6 is placed in the mold for pouring the load-bearing wall 5 and bent. The prestressing direction is determined according to the bending direction of the steel bars at both ends of the first tensioned steel bar 6. Similarly, the load-bearing beam 3 is prestressed using the pre-tensioning method at the same time, and the second tensioned steel bar 32 prestresses the concrete beam 31. The pouring of the column 1 does not use the pre-tensioning method. The prestressed steel bar 15 is wrapped during the pouring of the concrete column 11, and the concrete column 11 in the limit groove 14 can be used after hardening. , the hardened load-bearing wall 5, the load-bearing beam 3 and the column 1 after pouring can be assembled, the protruding end of the first tensioned steel bar 6 of the load-bearing wall 5 is slid into the positioning groove 13, so as to locate the position of the column 1 and the load-bearing wall 5, and the heat insulation board 4 is installed on the front and rear sides of the load-bearing wall 5, and the heat insulation board 4 is inserted between the columns 1 through the sliding groove 12. Finally, the load-bearing beam 3 is installed, and the load-bearing beam 3 is positioned and fixed by the limiting plate 2 on the column 1, so as to obtain a prestressed wall. The wall obtained by assembling can reduce the time required for wall production, simplify the wall production steps, and make the wall quickly installable because the components can be poured and hardened at the same time.

[0022] The concrete beam 31 installed on the column 1 wraps the bending device 17 inside through the receiving groove 34. At the same time, due to the weight of the concrete beam 31 itself, the concrete beam 31 brings the inclined cylinder 33 to squeeze the load-bearing cylinder 175. The contact surface between the inclined cylinder 33 and the load-bearing cylinder 175 decomposes the weight of the concrete beam 31, and a part of it is converted into a thrust moving in the direction away from the load-bearing wall 5. This thrust pushes the load-bearing cylinder 175, so that the load-bearing cylinder 175 pushes the prestressed steel bar 15. The load-bearing cylinder 175 transfers part of the force to the welded steel bar 174, and transfers the force downward through the welded plate 173. Since the fixing sleeve 171 connects all the welded plates 173 through the fixing ring 172, the bending device 17 forms a whole at this time. At this time, the bending device 17 wraps the top of the prestressed steel bar 15, making the prestressed steel bar 15 easier to bend. At the same time, the connection with the load-bearing cylinder 175 is not easy to break, which prevents the prestressed steel bar 1 5 fails. Since the positioning block 16 and the concrete column 11 fix the bottom position of the prestressed steel bar 15, the bending device 17 bends the end of the prestressed steel bar 15 away from the positioning block 16 at this time, so that the bending direction is aligned with the position of the load-bearing wall 5. Under the weight of the load-bearing beam 3, the load-bearing wall 5 will produce partial deformation and push the columns 1 on both sides. At the same time, in a high temperature environment, concrete will expand under high temperature. The concrete wall prevents heat from entering the load-bearing wall 5 by setting an insulation board 4, and at the same time limits the expansion of the load-bearing wall 5. Since there are no load-bearing objects on the front and back sides of the load-bearing wall 5, even if the insulation board 4 fails and causes expansion, it will not affect the wall. The load-bearing wall 5 expanding to both sides will squeeze the column 1 at this time, which will affect the concrete wall. The load-bearing beam 3 and the bending device 17 cooperate to bend the prestressed steel bar 15, so that the prestressed steel bar 15 generates prestress to resist the thrust generated by the load-bearing wall 5, thereby achieving the purpose of protecting the concrete wall.

[0023] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. Structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to conventional means in the field unless otherwise specified and limited.

Claims

1. A prestressed concrete building wall, comprising: A column (1), wherein the column (1) is used to determine the position of the wall; A load-bearing beam (3), the load-bearing beam (3) being used to support the superstructure, the top of the load-bearing beam (3) being fixedly connected to the top of the column (1); A load-bearing wall (5), the load-bearing wall (5) being used to support the load-bearing beam (3), the top of the load-bearing wall (5) being fixedly connected to the bottom of the load-bearing beam (3); Features: The column (1) comprises a concrete column (11), the inner wall of the concrete column (11) is fixedly connected to a prestressed steel bar (15) via a limiting groove (14), and the limiting groove (14) is provided in the wall of the concrete column (11), a sliding groove (12) is provided in the wall of the concrete column (11), a positioning groove (13) is provided in the wall of the concrete column (11), a positioning block (16) is fixedly connected to the bottom of the prestressed steel bar (15), and a bending device (17) is fixedly connected to the top of the prestressed steel bar (15); The top of the column (1) is fixedly connected to a limit plate (2), the outer wall of the column (1) is slidably connected to a heat insulation plate (4), and the inner wall of the load-bearing wall (5) is fixedly connected to a first tensioned steel bar (6).

2. A prestressed concrete building wall according to claim 1, characterized in that: The outer wall of the limit plate (2) is fixedly connected to the outer wall of the load-bearing beam (3), the outer wall of the first tensioned steel bar (6) is slidably connected to the outer wall of the concrete column (11), and the outer wall of the concrete column (11) is slidably connected to the outer wall of the insulation board (4).

3. The prestressed concrete building wall according to claim 1, characterized in that: The bending device (17) comprises a fixing sleeve (171), the top of the fixing sleeve (171) is fixedly connected to a fixing ring (172), the outer wall of the fixing ring (172) is fixedly connected to a welding plate (173), the top of the welding plate (173) is fixedly connected to a welding steel bar (174), and the top of the welding steel bar (174) is fixedly connected to a load-bearing cylinder (175).

4. A prestressed concrete building wall according to claim 3, characterized in that: The outer wall of the fixing sleeve (171) is fixedly connected to the inner wall of the concrete column (11), the inner wall of the fixing sleeve (171) is fixedly connected to the outer wall of the prestressed steel bar (15), and the top end of the prestressed steel bar (15) is fixedly connected to the bottom end of the load-bearing cylinder (175).

5. The prestressed concrete building wall according to claim 1, characterized in that: The load-bearing beam (3) comprises a concrete beam (31), the inner wall of which is fixedly connected to a second tensioned steel bar (32), the inner wall of which is fixedly connected to an inclined cylinder (33) via a receiving groove (34), and the receiving groove (34) is provided in the wall of the concrete beam (31).

6. A prestressed concrete building wall according to claim 5, characterized in that: The outer wall of the concrete beam (31) is fixedly connected to the outer wall of the limiting plate (2), the bottom of the concrete beam (31) is fixedly connected to the top of the concrete column (11), and the bottom of the concrete beam (31) is fixedly connected to the top of the load-bearing wall (5).