Simple device capable of quickly mounting tunnel inverted arch low side wall connecting steel bars

By designing a simple device including clamping, vertical flat steel and threaded hollow steel pipe, the problem of low installation efficiency and poor quality of tunnel arch low side wall joint steel bars in traditional methods is solved, and the rapid and precise positioning of vertical joint steel bars and the lossless fixation of the buried water stops is achieved, which improves construction efficiency and quality.

CN222615356UActive Publication Date: 2025-03-14CHINA CONSTR EIGHTH BUREAU SOUTH CHINA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421348872.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2025-03-14
Estimated Expiration
2034-06-13

AI Technical Summary

Technical Problem

When installing the tunnel arch low side wall connecting steel bars, the construction efficiency is low and the quality is difficult to guarantee. The installation of the medium buried water stop is complicated, which damages the water stop and delays the construction progress.

Method used

A simple device including clamping tools, vertical flat steel and threaded hollow steel pipes is designed. Through the precise positioning of clamping tools and vertical flat steel and the fixing of threaded hollow steel pipes, the rapid installation of vertical joint steel bars is realized, and the buried water stops are fixed without damage.

Benefits of technology

The precise positioning and rapid installation of vertical jointed steel bars is achieved, which solves the problems of long construction time and poor quality. At the same time, the installation of the buried water stop is simplified and the construction efficiency and quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222615356U_ABST
    Figure CN222615356U_ABST
Patent Text Reader

Abstract

The utility model discloses a simple device capable of quickly installing tunnel inverted arch low side wall connecting reinforcing steel bars, which comprises a clamp, vertical flat steel and a threaded hollow steel pipe, the vertical connecting reinforcing steel bars are arranged at the bottom end of the clamp, a middle-buried water stop belt is arranged at the bottom end of the vertical flat steel, and the threaded hollow steel pipe is arranged in the middle-buried water stop belt. The clamp and the vertical flat steel are arranged on the outer wall of the threaded hollow steel pipe, an installation assembly is arranged at the bottom end of the clamp, and a clamping assembly is arranged at the bottom end of the vertical flat steel. By means of the design of the clamp, the vertical flat steel, the threaded hollow steel pipe, the installation assembly and the clamping assembly, accurate positioning and rapid installation of the vertical connecting reinforcing steel bar are achieved, meanwhile, the embedded type water stop belt is fixed in a lossless mode, the problems of long construction time, poor construction quality and the like when the vertical connecting reinforcing steel bar and the embedded type water stop belt are installed at present are solved, and the construction efficiency is improved. Meanwhile, the device is simple in structure, convenient to operate, capable of being repeatedly used after being detached and particularly suitable for being widely popularized in the field of tunnel construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel engineering construction, in particular to a simple device which can quickly install joint steel bars of a tunnel invert short side wall. Background Art

[0002] In recent years, with the continuous development of tunnel engineering construction technology in my country, the requirements for construction progress and quality control of the project have gradually increased. However, traditional construction technology and equipment have certain limitations, and construction efficiency and construction quality are difficult to guarantee, which restricts the rapid development of tunnel engineering construction technology. For example, when installing the joint steel bars of the tunnel inverted arch low side wall, the traditional method is to drive positioning steel bars at both ends of the section of the inverted arch low side wall, do wire pulling between the two positioning steel bars, and then manually install the joint steel bars according to the linearity of the straight line, which often takes a lot of time, and the installation position, spacing, depth and angle of the joint steel bars are difficult to guarantee. In addition, before installing the joint steel bars, it is necessary to install the embedded waterstop. The traditional method is to make a steel frame and weld the embedded waterstop on the steel frame. This will not only damage the embedded waterstop, but also increase the difficulty of construction and delay the construction progress. Utility Model Content

[0003] The utility model aims to provide a simple device for quickly installing the joint steel bars of the short side wall of the tunnel invert, so as to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a simple device for quickly installing the joint steel bars of the short side wall of the tunnel invert arch, comprising a clamp, a vertical flat steel and a threaded hollow steel pipe, the bottom end of the clamp is provided with the vertical joint steel bars, the bottom end of the vertical flat steel is provided with an embedded waterstop, the clamp and the vertical flat steel are respectively arranged on the outer wall of the threaded hollow steel pipe, the bottom end of the clamp is provided with an installation component for installing the vertical joint steel bars, and the bottom end of the vertical flat steel is provided with a clamping component for positioning the embedded waterstop.

[0005] Preferably, a vertical hollow steel pipe is internally sleeved at one end of the threaded hollow steel pipe, and a formwork for an inverted arch low side wall is fixedly connected to the bottom end of the vertical hollow steel pipe. One side of the formwork for the inverted arch low side wall is provided with inverted arch low side wall concrete for installing vertical joint steel bars and embedded waterstop strips, and a fixing piece for fixing the threaded hollow steel pipe is provided at the top of the vertical hollow steel pipe.

[0006] Preferably, the fixing member comprises a bolt, and the outer walls of the threaded hollow steel pipe and the vertical hollow steel pipe are respectively provided with vertical holes and steel pipe holes for inserting the bolts.

[0007] Preferably, the threaded hollow steel pipe is L-shaped, the outer wall of the threaded hollow steel pipe is provided with threads, and the threaded sleeve on the outer wall of the threaded hollow steel pipe is provided with nuts for fixing the position of the clamp and the vertical flat steel.

[0008] Preferably, the installation assembly includes a vertical sleeve, a circular hole is formed at the bottom end of the clamp, the vertical sleeve is sleeved inside the circular hole, the vertical joint steel bars are sleeved inside the vertical sleeve, the clamp is L-shaped, and a longitudinal hole for inserting a threaded hollow steel pipe is formed on one side of the clamp.

[0009] Preferably, the clamping assembly comprises a spring clamp, one side of which is fixedly connected to one side of the bottom of the vertical flat steel, and the top of the vertical flat steel is provided with a ring for inserting a threaded hollow steel pipe.

[0010] Technical effects and advantages of the utility model:

[0011] The utility model utilizes the designs of clamps, vertical flat steel, threaded hollow steel pipes, installation components and clamping components to achieve accurate positioning and rapid installation of vertical joint steel bars, and can simultaneously non-destructively fix the embedded waterstop, so as to solve the problems of long construction time and poor construction quality in the installation of vertical joint steel bars and embedded waterstop. At the same time, the device has a simple structure, is easy to operate, and can be reused after disassembly, and is particularly suitable for large-scale promotion in the field of tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the cross-sectional structure of the utility model.

[0013] Figure 2 It is a schematic diagram of the structure of the utility model from top view.

[0014] Figure 3 It is a schematic diagram of the three-dimensional structure of the clamp of the utility model.

[0015] Figure 4 It is a schematic diagram of the three-dimensional structure of the threaded hollow steel pipe of the utility model.

[0016] Figure 5 It is a schematic diagram of the three-dimensional structure of the vertical flat steel of the utility model.

[0017] Figure 6 It is a schematic diagram of the three-dimensional structure of the inverted arch low side wall formwork and the vertical hollow steel pipe of the utility model.

[0018] In the figure: 1. clamp; 2. vertical flat steel; 3. threaded hollow steel pipe; 4. bolt; 5. vertical hollow steel pipe; 6. inverted arch low side wall formwork; 7. inverted arch low side wall concrete; 8. nut; 9. vertical sleeve; 10. vertical joint steel bar; 11. spring clip; 12. embedded waterstop; 13. longitudinal hole; 14. vertical hole; 15. circular ring; 16. steel pipe hole. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] The utility model provides Figure 1-6 A simple device for quickly installing joint steel bars of the short side wall of a tunnel invert is shown, comprising a clamp 1, a vertical flat steel 2 and a threaded hollow steel pipe 3. The bottom end of the clamp 1 is provided with a vertical joint steel bar 10, the bottom end of the vertical flat steel 2 is provided with an embedded waterstop 12, the clamp 1 and the vertical flat steel 2 are respectively arranged on the outer walls of the threaded hollow steel pipe 3, the bottom end of the clamp 1 is provided with an installation component for installing the vertical joint steel bar 10, and the bottom end of the vertical flat steel 2 is provided with a clamping component for positioning the embedded waterstop 12.

[0021] Specifically, a vertical hollow steel pipe 5 is sleeved inside one end of the threaded hollow steel pipe 3, and a low arch side wall formwork 6 is fixedly connected to the bottom end of the vertical hollow steel pipe 5. A low arch side wall concrete 7 for installing vertical joint steel bars 10 and a buried water stop 12 is arranged on one side of the low arch side wall formwork 6. A fixing for fixing the threaded hollow steel pipe 3 is arranged on the top of the vertical hollow steel pipe 5. The fixing includes a bolt 4. The outer walls of the threaded hollow steel pipe 3 and the vertical hollow steel pipe 5 are respectively provided with vertical holes 14 and steel pipe holes 16 for inserting the bolts 4. The threaded hollow steel pipe 3 is L-shaped. The outer wall is provided with a thread, and the outer wall thread of the threaded hollow steel pipe 3 is provided with a nut 8 for fixing the position of the clamp 1 and the vertical flat steel 2. The installation assembly includes a vertical sleeve 9, and a circular hole is provided at the bottom end of the clamp 1. The vertical sleeve 9 is sleeved inside the circular hole, and the vertical joint steel bar 10 is sleeved inside the vertical sleeve 9. The clamp 1 is L-shaped, and a longitudinal hole 13 for inserting the threaded hollow steel pipe 3 is provided on one side of the clamp 1. The clamping assembly includes a spring clip 11, and one side of the spring clip 11 is fixedly connected to one side of the bottom of the vertical flat steel 2. A ring 15 for inserting the threaded hollow steel pipe 3 is provided on the top of the vertical flat steel 2.

[0022] It should be noted that two fixtures 1 and a vertical flat steel 2 are set at the crossbar of the threaded hollow steel pipe 3. The two fixtures 1 are respectively set on both sides of the vertical flat steel 2. The number and longitudinal spacing of the vertical flat steel 2, the threaded hollow steel pipe 3 and the vertical hollow steel pipe 5 are consistent. The diameters of the longitudinal holes 13 and the rings 15 are 1.02 times the outer diameter of the threaded hollow steel pipe 3, so as to ensure that the fixtures 1 and the rings 15 can pass through the threaded hollow steel pipe 3. The rings 15 are set At the top of the vertical flat steel 2, the vertical flat steel 2 consists of two sections, and the two sections of the vertical flat steel 2 are fixed to the top and bottom ends of the circular ring 15 by welding respectively, so that the two sections of the vertical flat steel 2 are in the same straight line, and the outer wall of the top of the vertical sleeve 9 is fixedly connected to the inner wall of the circular hole of the clamp 1 by welding. The depth of the vertical sleeve 9 is 5 cm, and its inner diameter is 1.02 times the diameter of the vertical joint steel bar 10. The thread of the outer wall of the threaded hollow steel pipe 3 is meshed with the thread of the inner wall of the nut 8.

[0023] Furthermore, the length of the fixture 1 is 12m, and a plurality of longitudinal holes 13 are opened 1m away from the end of the fixture 1, and the spacing between the plurality of longitudinal holes 13 is 2m. The vertical flat steel 2, the threaded hollow steel pipe 3 and the vertical hollow steel pipe 5 are a group, and a group is set at a spacing of 2m. The diameters of the vertical holes 14 and the steel pipe holes 16 are both 0.5cm, and the spacing is 2cm. By sleeve-mounting the threaded hollow steel pipe 3 on the outer wall of the vertical hollow steel pipe 5, moving the threaded hollow steel pipe 3 along the vertical direction of the vertical hollow steel pipe 5, determining the elevation of the threaded hollow steel pipe 3, and then aligning the vertical hole 14 with the steel pipe hole 16, and inserting the bolts 4 at the same time The height of the threaded hollow steel pipe 3 can be fixed inside the vertical hole 14 and the steel pipe hole 16. Secondly, based on the threaded hollow steel pipe 3, the outer wall of the threaded hollow steel pipe 3 is installed in the order of the clamp 1, the vertical flat steel 2 and the clamp 1, so that the vertical flat steel 2 and the two clamps 1 can be adjusted in the crossbar part of the threaded hollow steel pipe 3 by sliding. Nuts 8 are respectively provided on both sides of the clamp 1 and the ring 15. By rotating the nuts 8 on both sides respectively, the position of the clamp 1 or the ring 15 is clamped and fixed, thereby completing the fixation of the entire device, and then clamped by the spring clip 11. The position of the embedded waterstop 12 can be fixed. When fixing the embedded waterstop 12, the head and tail ends of the embedded waterstop 12 need to be clamped with spring clips 11, but the clamping position of the spring clips 11 needs to avoid the welding parts of the embedded waterstop 12. Finally, before the initial setting of the concrete 7 of the inverted arch low side wall, the vertical joint steel bars 10 are installed through the vertical sleeve 9 set at the bottom of the clamp 1. The installation method is to insert the vertical joint steel bars 10 into the interior of the vertical sleeve 9, and use a hammer to continuously knock on the top of the vertical joint steel bars 10 to prevent the bottom of the vertical joint steel bars 10 from being stuck. It is continuously inserted into the concrete 7 of the low side wall of the inverted arch. When the top of the vertical joint steel bar 10 coincides with the top of the vertical sleeve 9, the hammering of the hammer is stopped to complete the installation of the vertical joint steel bar 10. Through the above method, it is possible to achieve accurate positioning and rapid installation of the vertical joint steel bar 10, and at the same time, the embedded waterstop 12 can be fixed without damage, so as to solve the problems of long construction time and poor construction quality when installing the vertical joint steel bar 10 and the embedded waterstop 12. At the same time, the device has a simple structure, is easy to operate, can be reused after disassembly, and has high economic benefits. It is particularly suitable for large-scale promotion in the field of tunnel construction.

[0024] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A simple device for quickly installing the joint steel bars of the tunnel invert short side wall, characterized in that: The invention comprises a clamp (1), a vertical flat steel (2) and a threaded hollow steel pipe (3); the bottom end of the clamp (1) is provided with a vertical joint steel bar (10); the bottom end of the vertical flat steel (2) is provided with an embedded water stop strip (12); the clamp (1) and the vertical flat steel (2) are respectively arranged on the outer wall of the threaded hollow steel pipe (3); the bottom end of the clamp (1) is provided with an installation component for installing the vertical joint steel bar (10); the bottom end of the vertical flat steel (2) is provided with a clamping component for positioning the embedded water stop strip (12).

2. A simple device for quickly installing the joint steel bars of the tunnel invert short side wall according to claim 1, characterized in that: A vertical hollow steel pipe (5) is sleeved inside one end of the threaded hollow steel pipe (3); a low arch side wall formwork (6) is fixedly connected to the bottom end of the vertical hollow steel pipe (5); a low arch side wall concrete (7) for installing vertical joint steel bars (10) and a buried water stop (12) is provided on one side of the low arch side wall formwork (6); and a fixing piece for fixing the threaded hollow steel pipe (3) is provided on the top of the vertical hollow steel pipe (5).

3. A simple device for quickly installing the joint steel bars of the tunnel invert short side wall according to claim 2, characterized in that: The fixing member comprises a bolt (4), and the outer walls of the threaded hollow steel pipe (3) and the vertical hollow steel pipe (5) are respectively provided with a vertical hole (14) and a steel pipe hole (16) for inserting the bolt (4).

4. A simple device for quickly installing the joint steel bars of the tunnel invert short side wall according to claim 1, characterized in that: The threaded hollow steel pipe (3) is L-shaped, the outer wall of the threaded hollow steel pipe (3) is provided with threads, and the outer wall of the threaded hollow steel pipe (3) is threadedly sleeved with nuts (8) for fixing the positions of the fixture (1) and the vertical flat steel (2).

5. A simple device for quickly installing the joint steel bars of the short side wall of a tunnel invert according to claim 1, characterized in that: The installation assembly comprises a vertical sleeve (9), a circular hole is provided at the bottom end of the clamp (1), the vertical sleeve (9) is sleeved inside the circular hole, the vertical joint steel bar (10) is sleeved inside the vertical sleeve (9), the clamp (1) is L-shaped, and a longitudinal hole (13) for inserting a threaded hollow steel pipe (3) is provided on one side of the clamp (1).

6. A simple device for quickly installing the joint steel bars of the tunnel invert short side wall according to claim 1, characterized in that: The clamping assembly comprises a spring clamp (11), one side of the spring clamp (11) is fixedly connected to one side of the bottom of the vertical flat steel (2), and the top of the vertical flat steel (2) is provided with a ring (15) for inserting a threaded hollow steel pipe (3).