Hyperbolic concave module hanging structure of corridor splicing unit

By setting screws and hanging ears on the main keel of the ring corridor splicing unit, the problems of low installation efficiency and unstable center of gravity of the hyperbolic concave module are solved, and efficient and stable installation and structural stability are achieved.

CN222632503UActive Publication Date: 2025-03-18FOSHAN POLEA BUILDING MATERIAL IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420578640.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2025-03-18
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

In the existing ring corridor splicing unit, the hyperbolic indentation module is inefficient during installation and is unstable in the center of gravity, which is prone to deformation, affecting the reliability of the connection.

Method used

A hyperbolic inward concave module hanging structure is designed. By setting a screw on the main keel, the hanging ear buckle is efficiently installed on the screw, and the clamping force of the hanging ear ensures that the module does not break away from the main keel. At the same time, the design of the shaped arm concentrates the center of gravity of the module.

Benefits of technology

The rapid and stable installation of the hyperbolic concave module is achieved, ensuring the stable center of gravity of the module and the stability of the structure, and avoiding the problems of deformation and poor connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222632503U_ABST
    Figure CN222632503U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of corridor building design, and discloses a hyperbolic concave module hanging structure of a corridor splicing unit. According to the hanging structure for the hyperbolic concave modules, the hyperbolic concave modules are assembled in advance, the screws are arranged on the main keels, the hanging lugs on the hyperbolic concave modules are buckled on the screws, and therefore the hyperbolic concave modules can be efficiently installed. The hanging lugs are distributed up and down in a concentrated mode, the gravity center position of the wide hyperbolic concave module is reliably supported, and deformation of the hyperbolic concave module is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of circular corridor building design, and particularly relates to a hanging structure of a hyperbolic concave module of a circular corridor splicing unit. Background Art

[0002] Circular corridors are provided in some large hotels, exhibition halls, and stations. On the one hand, it makes the indoor space more open, and at the same time increases the flexibility and diversity of the space; on the other hand, the shape of the indoor circular corridor can provide good visual effects and landscape experiences for the residents or users.

[0003] Due to the large and complex structure of the circular corridor, the circular corridor is usually formed by splicing multiple circular corridor splicing units end to end. In order to diversely display the shape of the circular corridor, the circular corridor splicing unit includes a keel frame and four outer modules respectively arranged around the keel frame. One of the outer modules is a hyperbolic concave module. The hyperbolic concave module not only extends widely in the horizontal direction but also has a large mass. If the top and bottom of the hyperbolic concave module are installed on the keel frame with screws, not only the installation efficiency is low, but also the middle part or the center of gravity position of the hyperbolic concave module cannot be effectively supported, and the hyperbolic concave module is prone to deformation, and it is also difficult to ensure the connection reliability between the hyperbolic concave module and the keel frame.

[0004] It can be seen that the existing technology still needs to be improved. Content of the Utility Model

[0005] In view of the deficiencies of the above-mentioned existing technology, the purpose of the utility model is to provide a hanging structure of a hyperbolic concave module that is easy to install and has a stable center of gravity.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A hanging structure of a hyperbolic concave module of a circular corridor splicing unit, including a main keel and a hyperbolic concave module. The hyperbolic concave module includes at least three C-shaped arms and a hyperbolic concave plate arranged on the C-shaped arms. At least two hanging ears arranged vertically are provided on the vertical pipes of the C-shaped arms. The main keel includes vertical beams with the same number as the C-shaped arms and arranged beside the C-shaped arms. Transversely extending screws corresponding to the hanging ears are provided on the vertical beams. Hanging grooves are formed on the hanging ears, and the screws are clamped into the hanging grooves of the hanging ears. The screws pass through the vertical beams and the two ends of the screws are fixed by positioning nuts.

[0008] As a further improvement of the above technical solution, the hanging ear includes a hanging plate part, a turning plate part, and an installation part. At least two installation holes are formed on the installation part, and the vertical pipes are provided with first through holes with the same number as the installation holes and corresponding to them one by one.

[0009] As a further improvement of the above technical solution, a plurality of ribs arranged at intervals in the transverse direction are provided on the back of the hyperbolic concave plate.

[0010] As a further improvement of the above technical solution, the C-shaped arm further includes an upper cross tube provided at the top of the vertical tube and a lower cross tube provided at the bottom of the vertical tube. The upper cross tube and the vertical tube are connected by an angle steel, and the lower cross tube and the vertical tube are connected by an angle steel.

[0011] As a further improvement of the above technical solution, the upper cross tubes of all the C-shaped arms jointly support and connect a top frame, and a curtain wall board is laid on the top frame.

[0012] The beneficial effects of the present utility model: Compared with the prior art, the hyperbolic concave module hanging structure provided by the present utility model pre-completes the assembly of the hyperbolic concave module. By setting a screw on the main keel and buckling the hanging ear on the hyperbolic concave module onto the screw, the installation of the hyperbolic concave module can be efficiently completed. In addition, the gravity of the hyperbolic concave module is cleverly converted into the clamping force of the hanging ear on the screw, ensuring that the hyperbolic concave module after hanging does not脱离 the main keel; the hanging ears are concentrated in the upper and lower distributions, reliably supporting the center of gravity position of the wide hyperbolic concave module to prevent the hyperbolic concave module from deforming. Description of the Drawings

[0013] Figure 1 It is a three-dimensional view of the hyperbolic concave module arranged in the annular corridor splicing unit.

[0014] Figure 2 It is Figure 1 The partial enlarged view of the L area in

[0015] Figure 3 It is a three-dimensional view of the hanging ear.

[0016] Figure 4 It is a three-dimensional Figure 1 .

[0017] Figure 5 It is a three-dimensional Figure 2 .

[0018] Main element symbol description: 1-main keel, 11-vertical beam, 12-screw, 13-positioning nut, 2-hyperbolic concave module, 21-C-shaped arm, 211-upper cross tube, 212-lower cross tube, 213-vertical tube, 214-angle steel, 22-hyperbolic concave plate, 23-rib, 3-hanging ear, 30-hanging groove, 31-hanging plate part, 32-bending plate part, 33-installation part, 34-installation hole, 35-locking hole, 41-top frame, 42-curtain wall board. Detailed Description of the Embodiment

[0019] The present utility model provides a hanging structure for a hyperbolic concave module 2 of a corridor splicing unit. To make the objectives, technical solutions and effects of the present utility model clearer and more definite, the following further describes the present utility model in detail with reference to the accompanying drawings and by way of examples. It should be understood that the specific examples described herein are only used to explain the present utility model and are not used to limit the protection scope of the present utility model.

[0020] Please refer to Figure 1-Figure 5 , the present utility model provides a hanging structure for a hyperbolic concave module 2 of a corridor splicing unit, including a main keel 1 and a hyperbolic concave module 2. The hyperbolic concave module 2 includes at least three U-shaped arms 21 and a hyperbolic concave plate 22 arranged on the U-shaped arms 21. At least two hanging ears 3 arranged one above the other are provided on the vertical pipe 213 of the U-shaped arm 21. The main keel 1 includes vertical beams 11 having the same number as the U-shaped arms 21 and arranged beside the U-shaped arms 21. A screw 12 extending horizontally corresponding to the hanging ears 3 is provided on the vertical beam 11. A hanging groove 30 is formed on the hanging ear 3, and the screw 12 is clamped into the hanging groove 30 of the hanging ear 3. The screw 12 passes through the vertical beam 11 and both ends of the screw 12 are fixed by positioning nuts 13.

[0021] In this embodiment, three U-shaped arms 21 are provided. The U-shaped arm 21 in the middle is provided with four hanging ears 3. Through such a device, the four hanging ears 3 jointly bear the gravity load at the middle part of the hyperbolic concave module 2, improving the reliability of hanging. And the U-shaped arms 21 on both sides are each provided with two hanging ears 3. When installing the hyperbolic concave module 2, the hanging ears 3 are first placed above the screw 12. After the screw 12 is clamped into the hanging groove 30, the hyperbolic concave module 2 is released. Under the action of gravity, the hyperbolic concave module 2 tightly clamps the screw 12, and the hyperbolic concave module 2 will not break away from the main keel 1.

[0022] Compared with the prior art, the hanging structure for the hyperbolic concave module 2 provided by the present utility model pre-completes the assembly of the hyperbolic concave module 2. By providing the screw 12 on the main keel 1 and buckling the hanging ears 3 on the hyperbolic concave module 2 onto the screw 12, the installation of the hyperbolic concave module 2 can be efficiently completed. In addition, the gravity of the hyperbolic concave module 2 is cleverly converted into the clamping force of the hanging ears 3 on the screw 12, ensuring that the hyperbolic concave module 2 after hanging will not break away from the main keel 1; the hanging ears 3 are concentrated in the up-and-down distribution, reliably supporting the center of gravity position of the wide hyperbolic concave module 2 to prevent the hyperbolic concave module 2 from deforming.

[0023] Specifically, the ear 3 includes a hanging plate portion 31, a turning plate portion 32, and a mounting portion 33. The hanging groove 30 is formed on the hanging plate portion 31. At least two mounting holes 34 are formed on the mounting portion 33, and the vertical pipe 213 is provided with first through holes having the same number and one-to-one correspondence as the mounting holes 34. At least one locking hole 35 is formed on the hanging plate portion 31, and the vertical beam 11 is provided with second through holes having the same number and one-to-one correspondence as the locking holes 35. After using the first bolt to sequentially pass through the mounting hole 34 and the first through hole, the first nut is used for fastening. After the ear 3 is hung on the screw rod 12, the second bolt is used to sequentially pass through the locking hole and the second through hole, and then the second nut is used for fastening. By means of the second bolt, the relative position of the ear 3 and the screw rod 12 is locked to prevent the ear 3 from detaching from the second bolt.

[0024] To improve the structural strength of the hyperbolic concave plate 22 and reduce the deformation of the hyperbolic concave plate 22, a plurality of ribs 23 arranged at intervals horizontally are provided on the back of the hyperbolic concave plate 22.

[0025] Specifically, the U-shaped arm 21 further includes an upper horizontal pipe 211 provided at the top of the vertical pipe 213 and a lower horizontal pipe 212 provided at the bottom of the vertical pipe 213. The upper horizontal pipe 211 and the vertical pipe 213 are connected by an angle steel 214, and the lower horizontal pipe 212 and the vertical pipe 213 are connected by an angle steel 214. The lower horizontal pipe 212 is screwed to the hyperbolic concave plate 22 through the angle steel 214, so that the hyperbolic concave plate 22 and the U-shaped arm 21 are fixedly connected to承接 the whole. The U-shaped arm 21 not only has high structural strength and is convenient to assemble; the vertical pipe 213 of the U-shaped arm 21 can also be parallel to the vertical beam 11 to ensure that the ear 3 on the vertical beam 11 can only move vertically.

[0026] The upper horizontal pipes 211 of all the U-shaped arms 21 commonly support and connect a top frame 41. The top frame 41 is in a horizontal ladder-like structure. The bottom of the top frame 41 is screwed to the upper horizontal pipe 211 of the U-shaped arm 21, and the structure is stable; a curtain wall board 42 is laid on the top frame 41. The curtain wall board 42 is spliced with the curtain wall module on the main keel 1.

[0027] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation to the present invention.

[0028] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0029] It is understandable that those skilled in the art can make equivalent substitutions or changes based on the technical solution and the utility model concept of the utility model, and all these changes or substitutions should fall within the protection scope of the utility model.

Claims

1. A hyperbolic concave module hanging structure of a ring corridor splicing unit, characterized in that: It includes a main keel and a hyperbolic concave module. The hyperbolic concave module includes at least three U-shaped arms and a hyperbolic concave plate arranged on the U-shaped arms. At least two hanging ears arranged vertically are provided on the vertical pipes of the U-shaped arms. The main keel includes vertical beams with the same number as the U-shaped arms and arranged beside the U-shaped arms. Transverse extending screws corresponding to the hanging ears are provided on the vertical beams. Hanging grooves are formed on the hanging ears, and the screws are snapped into the hanging grooves of the hanging ears. The screws pass through the vertical beams and both ends of the screws are fixed by positioning nuts.

2. The hyperbolic concave module hanging structure of the corridor splicing unit according to claim 1 is characterized in that: The hanging ear includes a hanging plate part, a turning plate part, and a mounting part. At least two mounting holes are formed on the mounting part. First through holes with the same number as and corresponding to the mounting holes one by one are formed on the vertical pipes.

3. The hyperbolic concave module hanging structure of the corridor splicing unit according to claim 1 is characterized in that: A plurality of ribs arranged at intervals horizontally are provided on the back of the hyperbolic concave plate.

4. The hyperbolic concave module hanging structure of the corridor splicing unit according to claim 1 is characterized in that: The U-shaped arm further includes an upper cross pipe arranged at the top of the vertical pipe and a lower cross pipe arranged at the bottom of the vertical pipe. The upper cross pipe and the vertical pipe are connected by an angle steel, and the lower cross pipe and the vertical pipe are connected by an angle steel.

5. The hyperbolic concave module hanging structure of the corridor splicing unit according to claim 4 is characterized in that: The upper cross pipes of all U-shaped arms commonly support and connect a top frame, and a curtain wall board is laid on the top frame.