Drainage stand column in traffic platform

By fixing drainage pipes in the columns of the traffic station to form an integrated structure, the problems of complex construction of the existing drainage system and dependence on weather are solved, and the construction speed is improved.

CN222649253UActive Publication Date: 2025-03-21SICHUAN HUATI LIGHTING TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421384911.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-03-21
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

The drainage system of the existing transportation station requires additional construction steps to fix the drainage PVC pipe, and the construction requires high weather conditions and the glue solidifies for a long time, which affects the construction speed.

Method used

A drainage column in the transportation station is designed, and an integrated structure is formed by fixing the drainage pipes inside the columns, which avoids additional construction of the drainage structure.

Benefits of technology

The overall structure of columns and internal drainage is realized, reducing construction complexity and dependence on weather, and improving the construction speed of traffic stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222649253U_ABST
    Figure CN222649253U_ABST
Patent Text Reader

Abstract

A drainage stand column in a traffic platform comprises a bottom plate, a column body and an upper connecting assembly. A first circular groove is formed in the bottom plate. The column body is arranged on the bottom plate and comprises a main cylinder which is fixed in a first circular groove of the bottom plate and extends upwards, a water drainage pipe is arranged in the main cylinder, a water stopping ring is arranged on the peripheral side of the upper end of the water drainage pipe, a water covering ring located above the water stopping ring by a preset distance is further arranged in the main cylinder, and a plurality of first through holes penetrating downwards are formed in the water covering ring. The upper connecting assembly is arranged at the upper end of the column body and penetrates through the ceiling when the traffic platform is assembled, the upper connecting assembly comprises an upper plate arranged at the upper end of the main cylinder, a second circular groove penetrating downwards is formed in the upper plate, and a plurality of second through holes matched with the first through holes are further formed in the upper plate; the upper connecting assembly further comprises a screw rod which sequentially penetrates through and fixes the first through hole and the second through hole. According to the drainage stand column in the traffic platform, the inner drainage structure is directly fixed in the stand column, and the drainage structure does not need to be additionally constructed on site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of drainage of public transportation facilities, in particular to a drainage column in a transportation platform. Background Art

[0002] A transportation platform is a public transportation facility for passengers to wait for buses, trams and other vehicles. The basic components of a transportation platform include columns, roofs, etc. It takes a certain amount of time to build a transportation platform, so how to improve the construction speed of the transportation platform through structural improvements is one of the research and development directions of the researchers.

[0003] The rainwater collected on the roof of the traffic platform on rainy days needs to be drained from above to the drainage system under the ground. The existing traffic platform columns and drainage PVC pipes are set separately, which requires glue to fix the drainage PVC pipes during on-site construction. The construction is more troublesome, and there must be no water or dust when sealing with glue. The weather conditions are high during construction, and the glue takes a long time to solidify. Utility Model Content

[0004] In view of the above-mentioned defects, the utility model provides a drainage column in a traffic platform, in which an internal drainage structure is directly fixed in the column, and there is no need to construct the drainage structure separately on site.

[0005] In order to achieve the purpose of this utility model, the following technologies are proposed:

[0006] A drainage column in a traffic platform, comprising:

[0007] A bottom plate, wherein a first circular groove is formed on the bottom plate;

[0008] The column is arranged on the bottom plate, and comprises a main cylinder fixed in the first circular groove of the bottom plate and extending upward, wherein a drainage pipe is arranged in the main cylinder, a water cut-off ring is arranged on the outer peripheral side of the upper end of the drainage pipe, and a water cover ring is arranged in the main cylinder at a predetermined distance above the water cut-off ring, and a plurality of first through holes penetrating downward are opened on the water cover ring;

[0009] The upper connecting component is arranged at the upper end of the column and is passed through the ceiling when the traffic platform is assembled. The upper connecting component includes an upper plate arranged at the upper end of the main tube. The upper plate is provided with a second circular groove passing through downward. The upper plate is also provided with a plurality of second through holes that respectively match the first through holes. The upper connecting component also includes screws that pass through and fix the first through holes and the second through holes in sequence.

[0010] Furthermore, a plurality of waist-shaped holes penetrating downward are provided on the bottom plate, which are used to fix the entire column to the ground by anchor bolts.

[0011] Furthermore, a plurality of triangular plates are arrayed on the outer peripheral side of the lower end of the main tube, and the bottom edges of the triangular plates are fixed to the bottom plate.

[0012] Furthermore, a ring plate is provided on the outer peripheral side of the upper part of the main tube, and a plurality of inner insert plates are arrayed on the inner peripheral side of the ring plate for inserting into the ceiling of the transportation platform.

[0013] Furthermore, a plurality of fixing plates are provided on the outer peripheral side of the lower part of the drainage pipe, and one end of the fixing plate is connected to the inner wall of the main tube.

[0014] Furthermore, a collar is provided at the lower end of the upper plate to fit the outer peripheral side of the main cylinder.

[0015] Furthermore, a plurality of reinforcing plates are provided on the outer peripheral side of the collar.

[0016] Furthermore, a downpipe is provided on the inner circumference of the second circular groove.

[0017] Furthermore, a plurality of nuts for fixing each screw rod are respectively provided at the lower end of the water cover ring.

[0018] The beneficial effects of this technical solution are:

[0019] A drainage pipe is fixed inside the column to realize an integrated structure of the column and internal drainage. When setting up a traffic platform, there is no need to construct a separate drainage structure, so that the construction is not affected by the weather, thereby increasing the construction speed of the traffic platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A stereoscopic view showing the embodiment of the present application as a whole and assembled with the top plate of a transportation platform is shown.

[0021] Figure 2 A three-dimensional diagram of the base plate and column of an embodiment of the present application is shown.

[0022] Figure 3 The present application embodiment is shown Figure 1 A magnified view of part A.

[0023] Figure 4 A cross-sectional view of an embodiment of the present application is shown.

[0024] Figure 5 A stereoscopic view of the upper connecting assembly of an embodiment of the present application is shown. DETAILED DESCRIPTION

[0025] The preferred embodiments of the present application are described below in conjunction with the accompanying drawings. It should be noted that the following embodiments do not limit the scope of protection of each claim.

[0026] like Figure 1~Figure 5 A drainage column in a traffic platform shown includes a base plate 1, a column body 2, and an upper connecting component 3.

[0027] The bottom plate 1 is provided with a plurality of waist-shaped holes 11 penetrating downwards, which are used to fix the entire column to the ground through anchor bolts. The bottom plate 1 is also provided with a first circular groove.

[0028] The column 2 is arranged on the base plate 1. The column 2 includes a main cylinder 21 fixed in the first circular groove of the base plate 1 and extending upward. A plurality of triangular plates 22 are arrayed on the outer peripheral side of the lower end of the main cylinder 21. The bottom edge of the triangular plate 22 is fixed on the base plate 1 to make the main cylinder 21 more stably fixed. A ring plate 23 is arranged on the outer peripheral side of the upper part of the main cylinder 21. After the construction of the traffic platform is completed, the ring plate 23 is located at the lower end of the ceiling of the traffic platform. For the convenience of representation, the entire ceiling is not shown in the accompanying drawings. A plurality of inner insert plates 24 for inserting into the ceiling are arrayed on the inner peripheral side of the ring plate 23. A drainage pipe 25 is arranged in the main cylinder 21. A plurality of fixing plates 26 are arranged on the outer peripheral side of the lower part of the drainage pipe 25. One end of the fixing plate 26 is connected to the inner side wall of the main cylinder 21. A water cut-off ring 27 is arranged on the outer peripheral side of the upper end of the drainage pipe 25. A water cover ring 28 is also arranged in the main cylinder 21 at a predetermined distance above the water cut-off ring 27. A plurality of first through holes 29 penetrating downward are opened on the water cover ring 28.

[0029] Specifically, some rainwater can be stored between the water cut-off ring 27 and the water cover ring 28. Generally, rainwater will fall directly from the ceiling and directly fall into the underground drainage pipe through the internal drainage columns. If the rainfall is too heavy, the space between the water cut-off ring 27 and the water cover ring 28 can carry more rainwater.

[0030] The upper connecting assembly 3 is arranged at the upper end of the column 2, and is passed through the ceiling when the traffic platform is assembled. The upper connecting assembly 3 includes an upper plate 31, which is used to be assembled between the main tube 21 and the top plate 4 of the traffic platform. The lower end of the upper plate 31 is provided with a ring 32 that matches the outer peripheral side of the main tube 21, and the outer peripheral side of the ring 32 is also provided with a plurality of reinforcing plates 33. A second circular groove penetrating downward is opened on the upper plate 31, and a downpipe 34 is also provided on the inner peripheral side of the second circular groove. The downpipe 34 is fixed in the second circular groove through a plate located on the outer peripheral side thereof. A plurality of second through holes 35 that respectively match the first through holes 29 are also opened on the upper plate 31. A screw 36 penetrating the second through hole 35 is passed through the first through hole 29, and the head of the screw 36 is located on the top plate 4, and the screw 36 is fixed by a nut 37 at the lower end of the water ring 28, so that the column 2, the upper connecting assembly 3, and the top plate 4 are fixed.

[0031] Specific examples are used herein to illustrate the principles and implementation methods of the present application, and the description of the above embodiments is only used to help understand the technical solution and core ideas of the present application. For ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

Claims

1. A drainage column in a traffic platform, characterized in that: include: A bottom plate (1), wherein a first circular groove is formed on the bottom plate (1); The column (2) is arranged on the bottom plate (1), and comprises a main cylinder (21) fixed in a first circular groove of the bottom plate (1) and extending upward, wherein a drainage pipe (25) is arranged in the main cylinder (21), a water cut-off ring (27) is arranged on the outer peripheral side of the upper end of the drainage pipe (25), and a water cover ring (28) is also arranged in the main cylinder (21) and located a predetermined distance above the water cut-off ring (27), and a plurality of first through holes (29) penetrating downward are formed on the water cover ring (28); The upper connection assembly (3) is arranged at the upper end of the column (2) and is passed through the ceiling when the traffic platform is assembled. The upper connection assembly (3) includes an upper plate (31) arranged at the upper end of the main tube (21). The upper plate (31) is provided with a second circular groove penetrating downward. The upper plate (31) is also provided with a plurality of second through holes (35) respectively matching the first through holes (29). The upper connection assembly (3) also includes a screw rod (36) that passes through and fixes the first through hole (29) and the second through hole (35) in sequence.

2. The drainage column in the traffic platform according to claim 1, characterized in that: The bottom plate (1) is also provided with a plurality of waist-shaped holes (11) penetrating downwards, which are used to fix the entire column to the ground via anchor bolts.

3. The drainage column in the traffic station according to claim 1, characterized in that: A plurality of triangular plates (22) are arranged in an array on the outer peripheral side of the lower end of the main tube (21), and the bottom edges of the triangular plates (22) are fixed on the bottom plate (1).

4. The drainage column in the traffic station according to claim 1, characterized in that: An annular plate (23) is provided on the outer peripheral side of the upper part of the main tube (21), and a plurality of inner insert plates (24) for inserting into the ceiling of the transportation platform are arranged in an array on the inner peripheral side of the annular plate (23).

5. The drainage column in the traffic platform according to claim 1, characterized in that: A plurality of fixing plates (26) are provided on the outer peripheral side of the lower portion of the drainage pipe (25), and one end of the fixing plate (26) is connected to the inner wall of the main cylinder (21).

6. The drainage column in the traffic platform according to claim 1, characterized in that: A sleeve ring (32) is provided at the lower end of the upper plate (31) and is matched with the outer peripheral side of the main cylinder (21).

7. The drainage column in the traffic station according to claim 6, characterized in that: A plurality of reinforcing plates (33) are also provided on the outer peripheral side of the collar (32).

8. The drainage column in the traffic station according to claim 1, characterized in that: A downpipe (34) is also provided on the inner circumference of the second circular groove.

9. The drainage column in the traffic platform according to claim 1, characterized in that: A plurality of nuts (37) for fixing the screw rods (36) are respectively provided at the lower end of the water cover ring (28).