Pipeline installation construction device
By designing a pipeline installation construction device including concrete base surface, prefabricated steel plate abutment seat, prefabricated counterweight blocks and jacks, the problem of inconvenient application of tension in the prior art is solved, and efficient butt installation of the pipeline and structural stability and bearing capacity are improved.
Patent Information
- Application Number
- CN202421562070.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-07-03
AI Technical Summary
The prior art has inconvenient ways to apply tension during pipeline construction, which affects construction efficiency.
A pipeline installation construction device is designed, including concrete base surface, prefabricated steel plate abutment seat, prefabricated counterweight blocks and jacks. The friction force of the prefabricated counterweight block and the resistance of the steel plate abutment seat, the thrust of the jack is used to achieve close docking of the pipeline.
It realizes efficient butt and installation of pipelines, improves construction efficiency, and enhances the stability and bearing capacity of the structure.
Smart Images

Figure CN222650710U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a pipeline installation construction device, belonging to the technical field of pipeline construction. Background Art
[0002] At present, in the process of municipal pipeline construction, when there are no external factors affecting the grooving and pipe laying at the construction site, the construction cost of grooving and pipe laying is more advantageous, and the pipes need to be tightly connected during the construction process.
[0003] After searching the prior art, it was found that a Chinese patent with publication number CN101907202A disclosed a mobile bracket type jack pipe installation construction method. In this patent, the pipe jacking force application method uses ropes wrapped around the pipe to be installed and the installed pipe, and the ropes on the pipe to be installed and the ropes on the installed pipe are used to apply tension through a hand winch. However, it was found during use that this method of applying tension is relatively inconvenient. Summary of the invention
[0004] The technical problem to be solved by the utility model is to overcome the defects of the prior art and provide a pipeline installation construction device, which can realize the jacking installation of the slotted jacking pipeline.
[0005] In order to solve the above technical problems, the technical solution of the utility model is: a pipeline installation construction device, used for butt installation of pipelines, comprising:
[0006] Concrete base;
[0007] A plurality of prefabricated steel plate abutment seats, wherein the plurality of prefabricated steel plate abutment seats are installed on the concrete base surface at intervals along the pipeline laying direction;
[0008] A plurality of prefabricated counterweight blocks, wherein the plurality of prefabricated counterweight blocks are arranged between the prefabricated steel plate abutment seat and the pipeline;
[0009] At least one jack is installed on a side of the prefabricated ballast block close to the pipeline, and the jack is suitable for being driven to abut against the end surface of the pipeline to butt against the adjacent pipeline.
[0010] Furthermore, in order to enhance the stability and durability of the prefabricated counterweight block, the prefabricated counterweight block includes concrete and a steel reinforcement skeleton cast in the concrete.
[0011] Furthermore, in order to facilitate the transportation and installation of the prefabricated ballast weight block, at least one lifting hook is provided on the prefabricated ballast weight block.
[0012] Furthermore, in order to increase the stability and bearing capacity of the lifting hook, the lifting hook is pre-embedded in the concrete, and the lifting hook is connected to the steel frame.
[0013] Further, in order to facilitate the installation of the jack, a jack mounting bracket is provided on the side of at least one of the prefabricated counterweight blocks;
[0014] The jack is suitable for being mounted on the jack mounting bracket.
[0015] Furthermore, in order to limit the lateral relative displacement of adjacent prefabricated counterweight blocks, the prefabricated counterweight blocks are also provided with lateral displacement limiting blocks and lateral displacement limiting grooves;
[0016] The lateral displacement limiting block of the prefabricated ballast weight block is suitable for being embedded in the lateral displacement limiting groove of the adjacent prefabricated ballast weight block to limit the lateral relative displacement of a pair of adjacent prefabricated ballast weight blocks.
[0017] Further, in order to improve the structural stability of the prefabricated steel plate abutment seat, the prefabricated steel plate abutment seat comprises:
[0018] At least one triangular support plate, one side of which is fixedly embedded in the concrete base surface;
[0019] Abutting steel plate, wherein the abutting steel plate is fixed to the other side of the triangular supporting plate, and the abutting steel plate is arranged perpendicular to the concrete base surface.
[0020] Furthermore, a specific type of jack is provided, wherein the jack is a screw jack.
[0021] By adopting the above technical solution, the utility model has the following beneficial effects:
[0022] In the utility model, a layer of concrete base is first laid on the bottom surface of the groove, and a prefabricated steel plate abutment seat is embedded in the concrete base. The prefabricated steel plate abutment seat is arranged at intervals according to the forward direction of the pipeline installation. Then before the pipeline is installed, a prefabricated counterweight block is cast in situ at a nearby site. A plurality of prefabricated counterweight blocks are placed between the end face of the pipeline and the prefabricated steel plate abutment seat. A jack is installed on the prefabricated counterweight block close to the end face of the pipeline. The friction of the prefabricated counterweight block and the reverse resistance of the steel plate abutment seat act as the backrest of the jack, and then the horizontal thrust of the jack is used to tightly connect the pipeline to be installed with the end face of the installed pipeline.
[0023] In addition, the prefabricated steel plate abutment seat includes a triangular support plate and an abutment steel plate, which makes the overall structure more stable and can effectively enhance the bearing capacity; a lifting hook is arranged on the prefabricated counterweight block, which can facilitate the lifting and movement of the prefabricated counterweight block.
[0024] In summary, the utility model can utilize limited on-site conditions to achieve installation and docking of pipelines, is convenient to use, and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The structure diagram of the pipeline installation construction device of the utility model is shown in FIG. Figure 1 ;
[0026] Figure 2 The structure diagram of the pipeline installation construction device of the utility model is shown in FIG. Figure 2 ;
[0027] Figure 3 It is a structural schematic diagram of a prefabricated counterweight block of the pipeline installation construction device of the utility model. DETAILED DESCRIPTION
[0028] In order to make the content of the utility model more clearly understood, the utility model is further described in detail below based on specific embodiments and in conjunction with the accompanying drawings.
[0029] like Figure 1-3 As shown, a pipeline installation construction device is used for butt-jointing installation of a pipeline 1, comprising:
[0030] Concrete base 2;
[0031] A plurality of prefabricated steel plate abutment seats 3, wherein the plurality of prefabricated steel plate abutment seats 3 are installed on the concrete base surface 2 at intervals along the laying direction of the pipeline 1;
[0032] A plurality of prefabricated balancing weight blocks 4, wherein the plurality of prefabricated balancing weight blocks 4 are arranged between the prefabricated steel plate abutment seat 3 and the pipeline 1;
[0033] Two jacks 5 are installed on the side of the prefabricated counterweight block 4 close to the pipeline 1 , and the jacks 5 are suitable for being driven to abut against the end surface of the pipeline 1 to butt against the adjacent pipelines 1 .
[0034] In this embodiment, if Figure 1-3 As shown, first, a layer of concrete base 2 is laid on the bottom surface of the groove, and a prefabricated steel plate abutment seat 3 is embedded in the concrete base 2. The prefabricated steel plate abutment seat 3 is arranged at intervals according to the forward direction of the installation of the pipeline 1. Then, before the installation of the pipeline 1, a prefabricated counterweight block 4 is cast in situ at a nearby site. A plurality of prefabricated counterweight blocks 4 are placed between the end face of the pipeline 1 and the prefabricated steel plate abutment seat 3. A jack 5 is installed on the prefabricated counterweight block 3 close to the end face of the pipeline 1. The friction force of the prefabricated counterweight block 4 and the reverse resistance of the steel plate abutment seat 3 act as a backrest for the jack 5. Then, the horizontal thrust of the jack 5 is used to tightly connect the end face of the pipeline 1 to be installed with the installed pipeline 1.
[0035] Prefabricated steel plate abutment seats 3 are installed on both sides of the pipeline 1, and two jacks 5 are respectively abutted on the end faces of the pipeline 1 at the same height. When the pipeline 1 is a DN2000 reinforced concrete grade III F-type steel socket pipe and the weight of a single section of the pipeline is 8T, the prefabricated steel plate abutment seats 3 can be set every 8 meters, and the jacks 5 can be 20T grade, and the top position of the jacks 5 is on the end face of the pipeline 1 at a height of 80cm from the concrete base surface 2.
[0036] Specifically, Figure 1 and Figure 3 As shown, the prefabricated counterweight block 4 includes concrete and a steel reinforcement frame cast in the concrete.
[0037] In this embodiment, if Figure 1 and Figure 3 As shown, each prefabricated counterweight block 4 can be prefabricated according to the size of 1m*0.8m*1m (length*width*height).
[0038] Specifically, Figure 1 and Figure 3 As shown, the prefabricated counterweight block 4 is provided with two lifting hooks 41 .
[0039] In this embodiment, if Figure 3 As shown, the lifting hook 41 is made of hot-rolled round steel and bent into a ring or U shape.
[0040] Specifically, Figure 3 As shown, the lifting hook 41 is embedded in the concrete, and the lifting hook 41 is connected to the steel frame.
[0041] Specifically, Figure 1 and Figure 3 As shown, the sides of the two prefabricated counterweight blocks 4 are provided with jack mounting brackets 42;
[0042] The jack 5 is suitable for being mounted on a jack mounting bracket 42 .
[0043] In this embodiment, if Figure 1 and Figure 3 As shown, two prefabricated counterweight blocks 4 are respectively arranged on both sides of the pipeline 1, corresponding to the prefabricated steel plate abutment seats 3 on both sides, and the jack 5 is installed together to abut the end surface of the pipeline 1.
[0044] Specifically, Figure 1 and Figure 3 As shown, the prefabricated counterweight block 4 is also provided with a lateral displacement limiting block and a lateral displacement limiting groove;
[0045] The lateral displacement limiting block of the prefabricated ballast weight block is suitable for being embedded in the lateral displacement limiting groove of the adjacent prefabricated ballast weight block to limit the lateral relative displacement of a pair of adjacent prefabricated ballast weight blocks.
[0046] In this embodiment, if Figure 1 and Figure 3 As shown, a lateral displacement limiting block and a lateral displacement limiting groove matched therewith are provided on the opposite sides of the prefabricated counterweight block 4. Two adjacent prefabricated counterweight blocks 4 can limit the lateral relative displacement between them by embedding one lateral displacement limiting block into the lateral displacement limiting groove of the other.
[0047] The lateral displacement limiting block can be a raised square or semicircular structure, and the lateral displacement limiting groove is a corresponding concave shape, which can be directly molded when the prefabricated counterweight block 4 is cast, or grooved on the side and embedded in the prefabricated part afterwards.
[0048] Specifically, Figure 1-2 As shown, the prefabricated steel plate abutment seat 3 may have the following structure, including:
[0049] A pair of triangular support plates, one side of the triangular support plates is fixedly embedded in the concrete base surface 2;
[0050] The abutting steel plate is fixed to the other side of the triangular supporting plate, and the abutting steel plate is vertically arranged to the concrete base surface 2 .
[0051] In this embodiment, if Figure 1-2 As shown, during construction, the triangular support plate is first embedded or implanted into the concrete base 2, and then the abutting steel plate is welded or bolted to a vertical side of the triangular support plate.
[0052] Specifically, Figure 1 As shown, the jack 5 is a screw jack.
[0053] In this embodiment, if Figure 1 As shown, the manual operation uses a jack 5 to push the pipe 1 for docking. Compared with the method that requires a crane to cooperate with mechanical and manual pushing, the operation safety is greatly guaranteed.
[0054] The specific embodiments described above further illustrate the technical problems, technical solutions and beneficial effects solved by the present invention. It should be understood that the above are only specific embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pipeline installation construction device, used for butt installation of pipelines (1), characterized in that: include: Concrete base (2); A plurality of prefabricated steel plate abutment seats (3), wherein the plurality of prefabricated steel plate abutment seats (3) are installed on the concrete base surface (2) at intervals along the laying direction of the pipeline (1); A plurality of prefabricated counterweight blocks (4), wherein the plurality of prefabricated counterweight blocks (4) are arranged between the prefabricated steel plate abutment seat (3) and the pipeline (1); At least one jack (5) is installed on the side of the prefabricated counterweight block (4) close to the pipeline (1), and the jack (5) is suitable for being driven to abut against the end surface of the pipeline (1) to dock with the adjacent pipeline (1).
2. The pipeline installation construction device according to claim 1, characterized in that: The prefabricated counterweight block (4) comprises concrete and a steel reinforcement skeleton cast in the concrete.
3. The pipeline installation construction device according to claim 2, characterized in that: The prefabricated counterweight block (4) is provided with at least one lifting hook (41).
4. The pipeline installation construction device according to claim 3, characterized in that: The lifting hook (41) is pre-buried in the concrete, and the lifting hook (41) is connected to the steel bar skeleton.
5. The pipeline installation construction device according to claim 1, characterized in that: A jack mounting bracket (42) is provided on the side of at least one of the prefabricated counterweight blocks (4); The jack (5) is suitable for being mounted on the jack mounting bracket (42).
6. The pipeline installation construction device according to claim 1, characterized in that: The prefabricated counterweight block (4) is also provided with a lateral displacement limiting block and a lateral displacement limiting groove; The lateral displacement limiting block of the prefabricated ballast weight block is suitable for being embedded in the lateral displacement limiting groove of the adjacent prefabricated ballast weight block to limit the lateral relative displacement of a pair of adjacent prefabricated ballast weight blocks.
7. The pipeline installation construction device according to claim 1, characterized in that: The prefabricated steel plate abutment seat (3) comprises: At least one triangular support plate, one side of the triangular support plate is fixedly embedded in the concrete base surface (2); Abutting steel plate, the abutting steel plate is fixed to the other side of the triangular supporting plate, and the abutting steel plate is arranged perpendicular to the concrete base surface (2).
8. The pipeline installation construction device according to claim 1, characterized in that: The jack (5) is a screw jack.