Rapidly-stored lofting rod for bridge engineering construction

By designing a staked rod for bridge construction that can be quickly stored, the risk of existing staked rods tripping or collision at the construction site is solved, and the safety and space efficiency of the staked rods are improved.

CN222652234UInactive Publication Date: 2025-03-21SICHUAN ZHONGDA DONGFANG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421197569.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-03-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the integrated installation of existing staking rods, when the construction site space is limited, it is easy to cause the risk of tripping or collision, affecting construction safety.

Method used

A staking rod for bridge construction that can be quickly stored is designed, including a storage module, a first telescopic module and a second telescopic module. Through the adjustment of the telescopic module and the use of laser indicators, the length adjustment and measurement of the staking rod are realized, and through the design of the elastic connecting belt and the rotating cover, the rapid storage and safe movement of the staking rod are realized.

Benefits of technology

It effectively avoids the risk of tripping or collision of the lofting poles at the construction site, improves the safety of the construction site, and optimizes the space utilization of the construction site through the rapid storage design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222652234U_ABST
    Figure CN222652234U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of lofting rods, in particular to a lofting rod capable of being rapidly stored for bridge engineering construction. The technical problems that most of existing lofting rods are integrally arranged, due to the fact that the space of a construction site is limited, many devices are arranged, the lofting rods may cause potential risks of stumbling or collision on the construction site, and the construction safety is affected are solved. According to the technical scheme, the lofting rod capable of being rapidly stored for bridge engineering construction comprises a storage module, a first telescopic module and a second telescopic module, a telescopic sleeve is moved out along a sleeve through manual adjustment, after the telescopic sleeve is moved to a proper position, a first plug pin penetrates through a first insertion hole and is in positioning connection with the telescopic sleeve through a positioning hole, and a second plug pin penetrates through a second insertion hole; and then the telescopic rod is moved out along the telescopic sleeve, after the telescopic rod is moved to a proper position, a second bolt penetrates through a second insertion hole and is in positioning connection with the telescopic rod through a connecting hole, and then the laser indicator is fixedly connected with the telescopic rod through a mounting circular groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lofting rods, in particular to a lofting rod which can be quickly stored and is used for bridge engineering construction. Background Art

[0002] The stakeout rod is one of the tools used for stakeout in bridge engineering. Stakeout refers to the corresponding marking and arrangement work on site according to the dimensions and requirements on the design drawings. The stakeout rod is usually a long rod with scales or lengths marked on it, which is used to measure and mark the position and dimensions of various parts of the bridge. During the bridge construction process, the stakeout rod can help construction workers accurately locate and arrange components to ensure construction quality and accuracy. Most of the existing stakeout rods are integrated settings. Since the construction site often has limited space and many equipment, the stakeout rod may cause potential tripping or collision risks on the construction site, affecting the safety of construction; therefore, we propose a stakeout rod for bridge construction that can be quickly retracted to solve the above-mentioned problems. Utility Model Content

[0003] In order to overcome the problem that most existing stakeout rods are integrated, since construction sites often have limited space and a large number of equipment, stakeout rods may cause potential tripping or collision risks at the construction site, affecting the safety of construction.

[0004] The technical solution of the utility model is: a quickly foldable stakeout rod for bridge engineering construction, comprising a storage module, a first telescopic module and a second telescopic module; the storage module is internally sleeved with the first telescopic module for moving in and out to facilitate adjustment of the length of the stakeout rod according to measurement requirements, and the first telescopic module is internally sleeved with the second telescopic module for moving in and out to facilitate adjustment of the length of the stakeout rod and measurement.

[0005] Preferably, when the length is adjusted, hold the handle and measure with the laser pointer. During this process, the groove can increase friction to prevent the layout rod from slipping during measurement. After the measurement is completed, remove the laser pointer, the first pin and the second pin in turn, then move the telescopic sleeve and the telescopic rod back into the sleeve, and then manually rotate the rotating cover. The rotating cover is rotatably connected to the sleeve through the connecting shaft, so that the rotating cover and the sleeve are closed, and then the elastic connecting belt passes through the circular hole through the positioning button and is positioned and connected to the sleeve. Finally, by lifting the handle, the sleeve is driven to move to the next position to be measured to avoid potential tripping or collision risks at the construction site.

[0006] Preferably, the storage module includes a grip, a handle, a sleeve, a positioning button, a first pin, a connecting shaft, a rotating cover and an elastic connecting belt. The grip is installed at one end of the sleeve, and multiple groups of grooves for increasing friction are arranged around the outside of the handle. A handle is installed at one end of the outside of the sleeve near the grip. When the length is adjusted, measurement is performed by holding the handle. During this process, the groove can increase friction to prevent the layout rod from slipping during measurement.

[0007] Preferably, a connecting shaft is installed at the edge of one end of the sleeve away from the handle, and a rotating cover is provided at the end of the sleeve away from the handle. The rotating cover is rotatably connected to the sleeve through the connecting shaft, and then the rotating cover is manually rotated and the rotating cover is rotatably connected to the sleeve through the connecting shaft, thereby closing the rotating cover and the sleeve.

[0008] Preferably, a positioning button is installed on the side of the sleeve away from the connecting shaft, and an elastic connecting belt is installed on the side of the rotating cover away from the connecting shaft. A circular hole for the positioning button to pass through is opened at the end of the elastic connecting belt away from the rotating cover. The elastic connecting belt passes through the circular hole through the positioning button to be positioned and connected to the sleeve. Then the elastic connecting belt passes through the circular hole through the positioning button to be positioned and connected to the sleeve. Finally, the handle is lifted to drive the sleeve to move to the next position to be measured, thereby avoiding potential tripping or collision risks at the construction site.

[0009] Preferably, a first plug hole for the first pin to pass through is provided above one end of the sleeve close to the connecting shaft, and the first plug pin is connected to the sleeve positioning tube through the first plug hole. After the measurement is completed, the laser indicator, the first plug pin and the second plug pin are removed in sequence, and then the telescopic sleeve and the telescopic rod are moved back into the sleeve.

[0010] Preferably, the first telescopic module includes a telescopic sleeve and a second pin. The telescopic sleeve is laterally provided with a plurality of positioning holes for the first pin to pass through. An outer side of the telescopic sleeve is provided with a second plugging hole for the second plugging hole for the second plugging hole. The second plugging pin is positioned and connected to the telescopic sleeve through the second plugging hole. Through manual adjustment, the telescopic sleeve is moved out along the sleeve. After moving to a suitable position, the first plugging pin passes through the first plugging hole and is positioned and connected to the telescopic sleeve through the positioning hole.

[0011] Preferably, the second telescopic module includes a telescopic rod and a laser pointer. The telescopic rod is laterally provided with a plurality of connecting holes for the second pin to pass through. An end of the telescopic rod away from the telescopic sleeve is provided with a mounting circular groove for installing the laser pointer. The laser pointer is fixedly connected to the telescopic rod through the mounting circular groove. Then the telescopic rod is moved out along the telescopic sleeve. After moving to a suitable position, the second pin passes through the second plug hole and is positioned and connected to the telescopic rod through the connecting hole. Then the laser pointer is fixedly connected to the telescopic rod through the mounting circular groove, and measurement can be performed.

[0012] Beneficial effects of the utility model:

[0013] 1. In the past, most of the stakeout rods were integrated. Since the construction site often has limited space and many equipment, the stakeout rod may cause potential tripping or collision risks on the construction site, affecting the construction safety. The difference is that after the length is adjusted, hold the handle and measure with the laser pointer. During this process, the groove can increase the friction to prevent the stakeout rod from slipping during measurement. After the measurement is completed, remove the laser pointer, the first pin and the second pin in turn, then move the telescopic sleeve and the telescopic rod back into the sleeve, and then manually rotate the rotating cover. The rotating cover is rotatably connected to the sleeve through the connecting shaft, so that the rotating cover and the sleeve are closed, and then the elastic connecting belt passes through the circular hole through the positioning button to position and connect with the sleeve. Finally, by lifting the handle, the sleeve is driven to move to the next position to be measured to avoid potential tripping or collision risks on the construction site.

[0014] 2. First, manually adjust the telescopic sleeve to move out along the sleeve. After it moves to the appropriate position, the first pin passes through the first plug hole and is positioned and connected to the telescopic sleeve through the positioning hole. Then, the telescopic rod is moved out along the telescopic sleeve. After it moves to the appropriate position, the second pin passes through the second plug hole and is positioned and connected to the telescopic rod through the connecting hole. Then, the laser pointer is fixedly connected to the telescopic rod through the mounting circular groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 It is an exploded schematic diagram of the storage module structure of the utility model;

[0017] Figure 3 This is an exploded schematic diagram of the first telescopic module structure of the utility model;

[0018] Figure 4 It is an exploded schematic diagram of the second telescopic module structure of the utility model.

[0019] Explanation of the accompanying drawings: 1. Storage module; 2. First telescopic module; 3. Second telescopic module; 101. Grip; 102. Handle; 103. Sleeve; 104. Positioning button; 105. First latch; 106. First plug-in hole; 107. Connecting shaft; 108. Rotating cover; 109. Elastic connecting belt; 110. Round hole; 201. Telescopic sleeve; 202. Positioning hole; 203. Second latch; 204. Second plug-in hole; 301. Telescopic rod; 302. Connecting hole; 303. Mounting circular groove; 304. Laser indicator. DETAILED DESCRIPTION

[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0021] See also Figure 1-2 The utility model provides an embodiment: a rapidly foldable lofting rod for bridge engineering construction, comprising a folding module 1, a first telescopic module 2 and a second telescopic module 3; the interior of the folding module 1 is sleeved with a first telescopic module 2 for moving in and out to facilitate adjusting the length of the lofting rod according to measurement requirements, the interior of the first telescopic module 2 is sleeved with a second telescopic module 3 for moving in and out to facilitate adjusting the length of the lofting rod and measuring, the folding module 1 comprises a grip 101, a handle 102, a sleeve 103, a positioning button 104, a first latch 105, a connecting shaft 107, a rotating cover 108 and an elastic connecting belt 109, one end of the sleeve 103 is provided with a grip 101, the outside of the grip 101 is surrounded by a plurality of grooves for increasing friction, the outside of the sleeve 103 is provided with a handle 102 at one end close to the grip 101, the sleeve A connecting shaft 107 is installed at the edge of the end of the tube 103 away from the handle 101, and a rotating cover 108 is provided at the end of the sleeve 103 away from the handle 101. The rotating cover 108 is rotatably connected to the sleeve 103 through the connecting shaft 107. A positioning button 104 is installed on the side of the sleeve 103 away from the connecting shaft 107, and an elastic connecting belt 109 is installed on the side of the rotating cover 108 away from the connecting shaft 107. A circular hole 110 for the positioning button 104 to pass through is opened at the end of the elastic connecting belt 109 away from the rotating cover 108. The elastic connecting belt 109 passes through the circular hole 110 through the positioning button 104 and is connected to the sleeve 103 in a positioning manner. A first plugging hole 106 for the first latch 105 to pass through is opened above the end of the sleeve 103 close to the connecting shaft 107, and the first latch 105 is connected to the positioning tube of the sleeve 103 through the first plugging hole 106.

[0022] See also Figure 3-4 In this embodiment, the first telescopic module 2 includes a telescopic sleeve 201 and a second pin 203. The telescopic sleeve 201 is horizontally provided with a plurality of positioning holes 202 for the first pin 105 to pass through. A second plugging hole 204 for the second pin 203 to pass through is provided on one side of the outer side of the telescopic sleeve 201. The second pin 203 passes through the second plugging hole 204 and is positioned and connected to the telescopic sleeve 201. The second telescopic module 3 includes a telescopic rod 301 and a laser indicator 304 (the model of the laser indicator 304 is YHJ-1200). The telescopic rod 301 is horizontally provided with a plurality of connecting holes 302 for the second pin 203 to pass through. An installation circular groove 303 for installing the laser indicator 304 is provided at one end of the telescopic rod 301 away from the telescopic sleeve 201. The laser indicator 304 is fixedly connected to the telescopic rod 301 through the installation circular groove 303.

[0023] When working, the telescopic sleeve 201 is first manually adjusted to move out along the sleeve 103. After moving to a suitable position, the first latch 105 passes through the first plug hole 106 and is positioned and connected to the telescopic sleeve 201 through the positioning hole 202. Then, the telescopic rod 301 is moved out along the telescopic sleeve 201. After moving to a suitable position, the second latch 203 passes through the second plug hole 204 and is positioned and connected to the telescopic rod 301 through the connecting hole 302. Then, the laser pointer 304 is fixedly connected to the telescopic rod 301 through the mounting circular groove 303.

[0024] When the length is adjusted, hold the handle 101 and measure with the laser pointer 304. During this process, the groove can increase friction to prevent the sample rod from slipping during measurement. After the measurement is completed, remove the laser pointer 304, the first latch 105 and the second latch 203 in turn, then move the telescopic sleeve 201 and the telescopic rod 301 back into the sleeve 103, and then manually rotate the rotating cover 108. The rotating cover 108 is rotatably connected to the sleeve 103 through the connecting shaft 107, so that the rotating cover 108 and the sleeve 103 are closed, and then the elastic connecting belt 109 passes through the circular hole 110 through the positioning button 104 and is positioned and connected to the sleeve 103. Finally, by lifting the handle 102, the sleeve 103 is driven to move to the next position to be measured to avoid potential tripping or collision risks at the construction site.

[0025] Through the above steps, when the length is adjusted, hold the handle 101 and measure with the laser pointer 304. During this process, the groove can increase friction to prevent the sample rod from slipping during measurement. After the measurement is completed, remove the laser pointer 304, the first latch 105 and the second latch 203 in turn, then move the telescopic sleeve 201 and the telescopic rod 301 back into the sleeve 103, and then manually rotate the rotating cover 108. The rotating cover 108 is rotatably connected to the sleeve 103 through the connecting shaft 107, so that the rotating cover 108 and the sleeve 103 are closed, and then the elastic connecting belt 109 passes through the circular hole 110 through the positioning button 104 and is positioned and connected to the sleeve 103. Finally, by lifting the handle 102, the sleeve 103 is driven to move to the next position to be measured to avoid potential tripping or collision risks at the construction site.

[0026] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.

Claims

1. A rapidly foldable stakeout rod for bridge construction, comprising a folding module (1); characterized in that: It also comprises a first telescopic module (2) and a second telescopic module (3); the storage module (1) is internally sleeved with the first telescopic module (2) for moving in and out to facilitate adjustment of the length of the lofting rod according to measurement requirements, and the first telescopic module (2) is internally sleeved with the second telescopic module (3) for moving in and out to facilitate adjustment of the length of the lofting rod and measurement.

2. A rapidly foldable bridge construction stakeout rod according to claim 1, characterized in that: The storage module (1) comprises a grip (101), a handle (102), a sleeve (103), a positioning button (104), a first latch (105), a connecting shaft (107), a rotating cover (108) and an elastic connecting belt (109); the grip (101) is mounted on one end of the sleeve (103); a plurality of grooves for increasing friction are arranged around the outside of the grip (101); and the handle (102) is mounted on the outside of the sleeve (103) at one end close to the grip (101).

3. A rapidly foldable bridge construction stakeout rod according to claim 2, characterized in that: A connecting shaft (107) is installed at the edge of one end of the sleeve (103) away from the handle (101), and a rotating cover (108) is provided at one end of the sleeve (103) away from the handle (101). The rotating cover (108) is rotatably connected to the sleeve (103) via the connecting shaft (107).

4. The quickly foldable bridge construction stakeout rod according to claim 2, characterized in that: A positioning button (104) is installed on the side of the sleeve (103) away from the connecting rotating shaft (107), and an elastic connecting belt (109) is installed on the side of the rotating cover (108) away from the connecting rotating shaft (107). A circular hole (110) for the positioning button (104) to pass through is formed at one end of the elastic connecting belt (109) away from the rotating cover (108), and the elastic connecting belt (109) passes through the circular hole (110) through the positioning button (104) to be positioned and connected with the sleeve (103).

5. The quickly foldable bridge construction stakeout rod according to claim 2, characterized in that: A first plug hole (106) for the first plug pin (105) to pass through is provided above one end of the sleeve (103) close to the connecting shaft (107), and the first plug pin (105) is connected to the positioning tube of the sleeve (103) through the first plug hole (106).

6. The fast-storable bridge construction stakeout rod according to claim 2, characterized in that: The first telescopic module (2) comprises a telescopic sleeve (201) and a second latch (203); the telescopic sleeve (201) is provided with a plurality of positioning holes (202) for the first latch (105) to pass through in a transverse direction; a second plugging hole (204) for the second latch (203) to pass through is provided on one side of the outside of the telescopic sleeve (201); the second latch (203) passes through the second plugging hole (204) and is positioned and connected to the telescopic sleeve (201).

7. A rapidly foldable bridge construction stakeout rod according to claim 6, characterized in that: The second telescopic module (3) comprises a telescopic rod (301) and a laser pointer (304). The telescopic rod (301) is provided with a plurality of connecting holes (302) for the second latch (203) to pass through in a transverse manner. An end of the telescopic rod (301) away from the telescopic sleeve (201) is provided with a mounting circular groove (303) for mounting the laser pointer (304). The laser pointer (304) is fixedly connected to the telescopic rod (301) via the mounting circular groove (303).