Active monitoring and alarming device for water purification treatment
By designing a water purification treatment active monitoring and alarm device including positioning components, drainage components, detector body and alarm, the problem that existing purification devices cannot accurately monitor and alarm is solved, and the precise monitoring and alarm of the filter element is realized, which extends the service life and controls impurity emissions.
Patent Information
- Application Number
- CN202421298318.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-06-07
AI Technical Summary
The existing purification devices cannot accurately monitor and alarm, and cannot assist in filter element replacement and control impurity emissions, which affects the use cycle.
Design a water purification treatment active monitoring and alarm device, including positioning components, drainage components, detector bodies and alarms, through which precise monitoring and alarm of the filter element is achieved, assisting in replacement and controlling impurity emissions.
Accurate monitoring and alarm of the filter element is achieved, extending the service life of the filter element, reducing the need for manual replacement, and effectively controlling impurity emissions.
Smart Images

Figure CN222652992U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water purification, and more specifically, to an active monitoring and alarm device for water purification. Background Art
[0002] With the development of urban construction, cities use unified water supply. After purification, water is delivered to thousands of households through pipes. It is well known that even after treatment, water is not completely free of impurities, and in the process of transporting purified water, it is often accompanied by scale on the inner wall of the pipe and impurities such as copper rust or iron rust. For this reason, it is necessary to install a water purifier at home. The water purifier completes the water purification through the filter element.
[0003] However, most existing purification devices are unable to accurately monitor and alarm, are unable to assist in replacing the filter element body, and are unable to simply control impurity emissions, which affects the length of the service life. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the shortcomings of the prior art, the purpose of the utility model is to provide an active monitoring and alarm device for water purification treatment, which has the characteristics of being able to accurately monitor and alarm, assist in replacing the filter element body, simply control impurity emissions and ensure the length of the service life.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides an active monitoring and alarm device for water purification, including a filter element housing, a mounting frame is arranged on the top of the filter element housing, a positioning assembly is arranged on the surface of the mounting frame, a bottom plate is clamped at the bottom of the inner bottom of the filter element housing, a drainage assembly is arranged at the bottom of the bottom plate, a filter element body is fixedly connected to the top of the bottom plate, a slot is clamped at the top of the filter element body, a mounting plate is fixedly connected to the top of the slot, a water inlet and a water outlet are arranged on the top of the mounting plate, a detector body is arranged between the water inlet, the water outlet and the mounting plate, and an alarm is arranged on the top of the detector body.
[0008] When using an active monitoring and alarm device for water purification treatment of the present technical solution, by setting a positioning component, the positioning and installation of the structure can be facilitated; by setting a drainage component, impurities and waste can be discharged to a certain extent, and the filter element body can be assisted to be cleaned to a certain extent, thereby reducing the use of manpower during replacement and increasing the service life of the filter element body; by setting a detector body, the flow rate and pressure between the water inlet and the water outlet can be detected. When the filter element body is seriously clogged, the flow rate difference on both sides will be large, and the water pressure will also increase. At this time, in conjunction with the alarm, an alarm can be performed, and auxiliary personnel can replace the filter element body.
[0009] Furthermore, the positioning assembly includes a positioning plate, the positioning plate is fixedly connected to the surface of the mounting frame, and a positioning hole is opened inside the positioning plate.
[0010] Furthermore, a mounting block is fixedly connected to the surface of the mounting plate, a threaded hole is provided between the mounting block and the mounting frame, and a bolt is threadedly connected inside the threaded hole.
[0011] Furthermore, a sealing groove is provided between the bottom plate and the filter element housing, and a sealing ring is clamped inside the sealing groove.
[0012] Furthermore, the drainage assembly includes a drainage port, the drainage port is opened at the bottom of the base plate, and a protective cover is threadedly connected to the surface of the drainage port.
[0013] (III) Beneficial effects
[0014] In summary, the utility model has the following beneficial effects:
[0015] 1. By setting the positioning component, it is convenient to position and install the structure. By setting the drainage component, impurities and waste can be discharged to a certain extent, and the filter element body can be cleaned to a certain extent, reducing the use of manpower during replacement and prolonging the service life of the filter element body;
[0016] 2. By setting up the detector body, the flow rate and pressure between the water inlet and the water outlet can be detected. When the filter element body is seriously blocked, the flow rate difference on both sides will be large, and the water pressure will also increase. At this time, the alarm can be used in conjunction with the alarm, and the auxiliary personnel can replace the filter element body. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the drawings required for describing the specific implementation or the prior art will be briefly introduced below. Obviously, the drawings described below are only one implementation of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 This is a front view structural schematic diagram of the utility model;
[0019] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;
[0020] Figure 3 It is a structural schematic diagram of the positioning component in the utility model;
[0021] Figure 4 It is a structural schematic diagram of the drainage component in the utility model.
[0022] The symbols in the accompanying drawings are:
[0023] 1. Filter housing; 2. Positioning assembly; 201. Positioning plate; 202. Positioning hole; 3. Mounting frame; 4. Mounting plate; 5. Water inlet; 6. Detector body; 7. Alarm; 8. Water outlet; 9. Drain assembly; 901. Drain; 902. Protective cover; 10. Sealing groove; 11. Sealing ring; 12. Bottom plate; 13. Filter body; 14. Slot; 15. Threaded hole; 16. Mounting block; 17. Bolt. DETAILED DESCRIPTION
[0024] In order to make the technical means, creative features, objectives and effects achieved by the utility model easy to understand, the technical scheme in the specific implementation mode of the utility model is clearly and completely described below to further illustrate the utility model. Obviously, the specific implementation mode described is only a part of the implementation mode of the utility model, rather than all styles.
[0025] Example:
[0026] The following is combined with Figure 1-4 The utility model is described in further detail.
[0027] See also Figure 1-4The utility model provides a technical solution: an active monitoring and alarm device for water purification, including a filter element housing 1, a mounting frame 3 is arranged on the top of the filter element housing 1, and a positioning component 2 is arranged on the surface of the mounting frame 3. By setting the positioning component 2, the structure can be conveniently positioned and installed. A bottom plate 12 is clamped at the bottom of the filter element housing 1, and a drainage component 9 is arranged at the bottom of the bottom plate 12. By setting the drainage component 9, impurities and waste can be discharged to a certain extent, and the filter element body 13 can be assisted to be cleaned to a certain extent, thereby reducing the use of manpower during replacement and improving the service life of the filter element body 13. The top of the bottom plate 12 is fixed A filter element body 13 is connected, a card slot 14 is clamped on the top of the filter element body 13, a mounting plate 4 is fixedly connected to the top of the card slot 14, a water inlet 5 and a water outlet 8 are arranged on the top of the mounting plate 4, a detector body 6 is arranged between the water inlet 5, the water outlet 8 and the mounting plate 4, an alarm 7 is arranged on the top of the detector body 6, by setting the detector body 6, the flow rate and pressure between the water inlet 5 and the water outlet 8 can be detected, when the filter element body 13 is seriously clogged, the flow rate difference between the two sides will be large, and the water pressure will also increase, at this time, with the cooperation of the alarm 7, an alarm can be performed, and the auxiliary personnel can replace the filter element body 13.
[0028] Specifically, the positioning assembly 2 includes a positioning plate 201, which is fixedly connected to the surface of the mounting frame 3. A positioning hole 202 is opened inside the positioning plate 201. A mounting block 16 is fixedly connected to the surface of the mounting plate 4. A threaded hole 15 is opened between the mounting block 16 and the mounting frame 3. A bolt 17 is threadedly connected inside the threaded hole 15.
[0029] By adopting the above technical solution, by providing the positioning plate 201 and the positioning hole 202, the structure can be conveniently positioned, and by providing the threaded hole 15 and the bolt 17, the mounting block 16 and the mounting plate 4 can be installed and fixed.
[0030] Specifically, a sealing groove 10 is provided between the bottom plate 12 and the filter element housing 1, a sealing ring 11 is clamped inside the sealing groove 10, and the drainage assembly 9 includes a drainage port 901, which is provided at the bottom of the bottom plate 12, and a protective cover 902 is threadedly connected to the surface of the drainage port 901.
[0031] By adopting the above technical solution, by providing the sealing groove 10 and the sealing ring 11, the stability of the connection between the bottom plate 12 of the filter element body 13 and the filter element housing 1 can be further guaranteed, and by providing the drain port 901, impurities can be discharged to a certain extent.
[0032] The working principle of the utility model is:
[0033] When the water purification needs to be installed, the structure can be positioned and installed with the help of the positioning component 2. After the structure is installed, the filter element body 13 is clamped inside the filter element housing 1. At the same time, the sealing ring 11 is clamped into the sealing groove 10. After the filter element body 13 is clamped, the filter element body 13 is fixed and supported by the mounting plate 4 and the clamping groove 14. Finally, the mounting block 16, the mounting plate 4 and the filter element body 13 are fixed and supported by the threaded hole 15 and the bolt 17. After the filter element body 13 is fixed, the water inlet can be The inlet 5 is connected to the water source, and the water outlet 8 is connected to the water use structure. When water supply is needed, water will enter the filter element body 13 from the water inlet 5, and then be discharged from the water outlet 8 after being filtered by the filter element body 13. The detector body 6 detects the flow rate and pressure between the water inlet 5 and the water outlet 8. When the flow rate difference is large, the alarm 7 is driven to work. At this time, the drainage component 9 can be opened to discharge some impurities. If the filtration is still affected after treatment, the filter element body 13 can be replaced.
[0034] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A water purification active monitoring alarm device, comprising a filter element housing (1), characterized in that: A mounting frame (3) is arranged at the top of the filter element housing (1), a positioning assembly (2) is arranged on the surface of the mounting frame (3), a bottom plate (12) is clamped at the bottom of the interior of the filter element housing (1), a drainage assembly (9) is arranged at the bottom of the bottom plate (12), a filter element body (13) is fixedly connected to the top of the bottom plate (12), a slot (14) is clamped at the top of the filter element body (13), a mounting plate (4) is fixedly connected to the top of the slot (14), a water inlet (5) and a water outlet (8) are arranged at the top of the mounting plate (4), a detector body (6) is arranged between the water inlet (5), the water outlet (8) and the mounting plate (4), and an alarm (7) is arranged at the top of the detector body (6).
2. The active monitoring and alarm device for water purification according to claim 1, characterized in that: The positioning assembly (2) comprises a positioning plate (201), the positioning plate (201) is fixedly connected to the surface of the mounting frame (3), and a positioning hole (202) is provided inside the positioning plate (201).
3. The active monitoring and alarm device for water purification according to claim 1, characterized in that: A mounting block (16) is fixedly connected to the surface of the mounting plate (4), a threaded hole (15) is provided between the mounting block (16) and the mounting frame (3), and a bolt (17) is threadedly connected inside the threaded hole (15).
4. The active monitoring and alarm device for water purification according to claim 1, characterized in that: A sealing groove (10) is provided between the bottom plate (12) and the filter element housing (1), and a sealing ring (11) is clamped inside the sealing groove (10).
5. The active monitoring and alarm device for water purification according to claim 1, characterized in that: The drainage assembly (9) comprises a drainage port (901), wherein the drainage port (901) is opened at the bottom of the base plate (12), and a protective cover (902) is threadedly connected to the surface of the drainage port (901).