Municipal gas pipeline hoisting construction device

By designing a municipal gas pipeline lifting construction device with fixture components, the problem of difficulty in fixing and disengagement when lifting and placing pipes in the prior art is solved, and the stable lifting and convenient operation of the pipelines are achieved.

CN222665124UActive Publication Date: 2025-03-25SHIJIAZHUANG XINAO ZHONGHONG GAS CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421181630.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-03-25
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

The existing lifting rope mechanism and jaw device are difficult to effectively fix and disengage the pipes when lifting and placing municipal gas pipelines, especially when the ditches are limited in width, resulting in inconvenient operation.

Method used

A municipal gas pipeline hoisting construction device is designed, using fixture components, including an annular frame, arc rail, clamp rod and transmission system. The bevel gear is driven to rotate through the handwheel, so that the clamp rod extends to both ends and holds the fixed pipe, and then retracts to release the holding.

Benefits of technology

It realizes the stable lifting and placement of the pipeline, makes operation more convenient, and the separation of the fixture components from the pipeline is more convenient, avoiding the problem of interference with the ditch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222665124U_ABST
    Figure CN222665124U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline hoisting devices, in particular to a municipal gas pipeline hoisting construction device which comprises a hanging bracket, clamp assemblies are connected to the two ends of the bottom side of the hanging bracket, each clamp assembly comprises an annular frame, and arc-shaped rails are fixedly connected to the two sides of the inner side wall of each annular frame. The outer side wall of the arc-shaped rail is slidably connected with a clamping rod, and one end of the arc-shaped outer side wall of the clamping rod is fixedly connected with a transmission rod. According to the pipeline clamping device, through the arrangement of the clamp assembly, the annular frame is placed on the pipeline through the suspension arm, the bevel gear is driven to rotate through the hand wheel, and therefore the two clamping rods stretch out of the annular frame towards the two ends, the pipeline is held and fixed through the two clamping rods, and after the pipeline is suspended and placed in a pipeline ditch, the bevel gear is reversely rotated through the hand wheel; the two clamping rods rotate around the axis, the clamping rods retract into the annular frame, the two clamping rods release holding of the pipeline, the clamp assembly is conveniently separated from the pipeline, and disassembly and assembly are more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline hoisting devices, in particular to a municipal gas pipeline hoisting construction device. Background Art

[0002] Natural gas is a high-quality energy source that is close to environmental protection. It contains almost no sulfur, dust and other harmful substances. It produces less carbon dioxide when burned than other fossil fuels, so it can fundamentally improve the quality of the environment. In addition, natural gas has the advantages of being economical, safe and reliable. Natural gas is generally supplied by pipeline transportation. Natural gas pipeline transportation has the advantages of low transportation cost, small land occupation and fast construction. When maintaining the gas pipeline, the pipeline must be placed in the excavated ditch through a lifting device.

[0003] When the existing lifting rope mechanism is used to lift the pipeline, one method is to use a single rope to be set on the pipeline, and then lift the rope through a hook. After the pipeline is lifted into the excavated ditch, the pipeline and the soil at the bottom of the ditch are pressed together, and it is troublesome to pull the rope out from between the pipeline and the bottom of the ditch. Another method is to use a clamp to hold the pipeline, but when the clamp is released, the two clamping ends of the clamp need to be deflected to both sides to open, but the width of the ditch is limited, so when the clamp is opened, it is easy to interfere with the ditch. Therefore, when the width of the ditch and the pipeline is close, the clamp is not easy to use. Utility Model Content

[0004] The purpose of the utility model is to provide a municipal gas pipeline hoisting construction device to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A municipal gas pipeline hoisting construction device includes a hanger, both ends of the bottom side of the hanger are connected to a clamp assembly, the clamp assembly includes an annular frame, both sides of the inner wall of the annular frame are fixedly connected with arc rails, the outer wall of the arc rail is slidably connected with a clamp rod, one end of the arc-shaped outer wall of the clamp rod is fixedly connected with a transmission rod, an installation cavity is provided in the middle position of the outer wall of the annular frame, a bevel gear is transmission-connected between the two transmission rods, a hand wheel is installed on the outer wall of the annular frame, and the hand wheel is transmission-connected to the bevel gear.

[0007] Furthermore, the outer side wall of the transmission rod is provided with a plurality of tooth grooves, and the two transmission rods are meshed with the bevel gears for transmission.

[0008] Furthermore, a transmission shaft is rotatably sleeved at the top of the installation cavity, the bottom end of the transmission shaft is fixedly sleeved with a bevel gear, a worm wheel is fixedly sleeved at the top of the transmission shaft, two fixing ears are fixedly connected to the top of the installation cavity, a worm is rotatably sleeved between the tops of the two fixing ears, the worm is meshed with the worm wheel, one end of the worm is fixedly connected to a round rod, and one end of the round rod is fixedly sleeved with the fixing ear.

[0009] The invention further comprises: an arc-shaped slide is fixedly connected to one side of the clamp rod, and the arc-shaped slide is slidably sleeved with the arc-shaped rail on the adjacent side.

[0010] Furthermore, the bottom sides of both ends of the hanger are fixedly connected with fixed seats, the bottom and top ends of the fixed seats are rotatably connected with support shafts, the two ends of the outer wall of the annular frame are fixedly connected with hanging rods, and a sling is transmission-connected between the two hanging rods and the two support shafts.

[0011] Furthermore, the arc angle of the annular frame is less than one hundred and eighty degrees, and the arc angle of the clamping rod is the same as the arc angle of the annular frame.

[0012] The invention further comprises: a lifting ring is rotatably sleeved at the middle position of the top end of the hanging bracket.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. Through the setting of the clamp assembly, the annular frame is placed on the pipeline through the lifting arm, and the bevel gear is driven to rotate by the hand wheel, so that the two clamping rods extend out of the annular frame at both ends, so that the pipeline is clamped and fixed by the two clamping rods. After the pipeline is placed in the pipeline ditch, the bevel gear is rotated in the opposite direction by the hand wheel to make the two clamping rods rotate around the axis, so that the clamping rods are retracted into the annular frame, so that the two clamping rods release the hold on the pipeline, which is convenient for the clamp assembly to be separated from the pipeline, and the disassembly and assembly are more convenient. Compared with directly lifting from the bottom of the pipeline through the rope and holding the pipeline by the clamp claw, the clamp assembly is easy to be separated from the pipeline after the pipeline is placed in the ditch, which is convenient for operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the overall use state of the utility model;

[0017] Figure 3 It is a schematic diagram of the overall side view structure of the utility model;

[0018] Figure 4 It is a schematic diagram of the structure of the clamp assembly in the utility model;

[0019] Figure 5This is a schematic diagram of the internal structure of the annular frame in the utility model;

[0020] Figure 6 It is a schematic diagram of the clamping rod structure of the utility model.

[0021] In the figure: 100, hanger; 110, lifting ring; 120, fixed seat; 121, supporting shaft; 130, lifting rope; 200, clamp assembly; 210, ring frame; 211, arc rail; 212, mounting cavity; 220, clamp rod; 221, transmission rod; 222, arc slide; 230, hanging rod; 240, bevel gear; 241, transmission shaft; 242, worm gear; 243, worm; 244, round rod; 245, fixing ear; 250, handwheel. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figures 1 to 6 In an embodiment of the utility model, a municipal gas pipeline hoisting construction device includes a hanger 100, both ends of the bottom side of the hanger 100 are connected to a clamp assembly 200, the clamp assembly 200 includes an annular frame 210, both sides of the inner wall of the annular frame 210 are fixedly connected with arc rails 211, the outer wall of the arc rail 211 is slidably connected with a clamp rod 220, one end of the arc-shaped outer wall of the clamp rod 220 is fixedly connected with a transmission rod 221, an installation cavity 212 is provided in the middle position of the outer wall of the annular frame 210, a bevel gear 240 is transmission-connected between the two transmission rods 221, a hand wheel 250 is installed on the outer wall of the annular frame 210, and the hand wheel 250 is transmission-connected to the bevel gear 240.

[0024] Specifically, initially the two clamping rods 220 are retracted in the annular frame 210, and the annular frame 210 is placed on the pipeline through the lifting arm, and the bevel gear 240 is manually driven to rotate by the hand wheel 250, so that the two clamping rods 220 extend out of the annular frame 210 at both ends, so that the pipeline is clamped and fixed by the two clamping rods 220. After the pipeline is hung and placed in the pipeline ditch, the bevel gear 240 is rotated in the opposite direction by the hand wheel 250, so that the two clamping rods 220 rotate around the axis, so that the clamping rods 220 are retracted into the annular frame 210, so that the two clamping rods 220 release their hold on the pipeline, which facilitates the separation of the clamp assembly 200 from the pipeline and makes disassembly and assembly more convenient.

[0025] Embodiment 1

[0026] like Figures 1 to 6 As shown, in the present embodiment, the outer wall of the transmission rod 221 is provided with a plurality of tooth grooves, and the two transmission rods 221 are meshed with the bevel gear 240 for transmission, the top end of the installation cavity 212 is rotatably sleeved with a transmission shaft 241, the bottom end of the transmission shaft 241 is fixedly sleeved with the bevel gear 240, the top end of the transmission shaft 241 is fixedly sleeved with a worm gear 242, the top end of the installation cavity 212 is fixedly connected with two fixing ears 245, a worm 243 is rotatably sleeved between the top ends of the two fixing ears 245, the worm 243 is meshed with the worm gear 242, one end of the worm 243 is fixedly connected with a round rod 244, one end of the round rod 244 is fixedly sleeved with the fixing ear 245, one side of the clamping rod 220 is fixedly connected with an arc slide 222, and the arc slide 222 is slidably sleeved with the arc rail 211 on the adjacent side.

[0027] In this embodiment, the handwheel 250 drives the worm 243 to rotate through the round rod 244, and the rotation of the worm 243 drives the transmission shaft 241 to rotate through the worm wheel 242, thereby driving the bevel gear 240 to rotate, and the rotation of the bevel gear 240 drives the two clamping rods 220 to rotate towards each other through the two transmission rods 221, thereby controlling the two clamping rods 220 to extend out of the annular frame 210 or retract into the annular frame 210, thereby controlling the clamp assembly 200 to hold and release the pipe.

[0028] Embodiment 2

[0029] like Figures 1 to 6 As shown, in this embodiment, the bottom sides of both ends of the hanger 100 are fixedly connected with a fixing seat 120, the bottom and top ends of the fixing seat 120 are rotatably connected with a support shaft 121, the outer side walls of the annular frame 210 are fixedly connected with a hanging rod 230 at both ends, and a sling 130 is transmission-connected between the two hanging rods 230 and the two support shafts 121, the arc angle of the annular frame 210 is less than one hundred and eighty degrees, the arc angle of the clamping rod 220 is the same as the arc angle of the annular frame 210, and a lifting ring 110 is rotatably sleeved at the middle position of the top end of the hanger 100.

[0030] During specific implementation, the boom lifts the present invention through the lifting ring 110, and the arc angle setting of the ring frame 210 facilitates the placement of the ring frame 210 on the pipeline, and facilitates the fit of the ring frame 210 with the outer wall of the pipeline. The setting of the support shaft 121 and the lifting rod 230 facilitates the lifting of the clamp assembly 200 by the sling 130, and the clamp assembly 200 remains vertical under the action of gravity.

[0031] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0032] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A municipal gas pipeline hoisting construction device, comprising a hanger (100), characterized in that: Both ends of the bottom side of the hanger (100) are connected to a clamp assembly (200), and the clamp assembly (200) includes an annular frame (210), and both sides of the inner wall of the annular frame (210) are fixedly connected with arc rails (211), and the outer wall of the arc rail (211) is slidably connected with a clamp rod (220), and one end of the arc-shaped outer wall of the clamp rod (220) is fixedly connected with a transmission rod (221), and an installation cavity (212) is provided in the middle position of the outer wall of the annular frame (210), and a bevel gear (240) is transmission-connected between the two transmission rods (221), and a hand wheel (250) is installed on the outer wall of the annular frame (210), and the hand wheel (250) is transmission-connected to the bevel gear (240).

2. A municipal gas pipeline hoisting construction device according to claim 1, characterized in that: The outer side wall of the transmission rod (221) is provided with a plurality of tooth grooves, and the two transmission rods (221) are meshed with the bevel gear (240) for transmission.

3. A municipal gas pipeline hoisting construction device according to claim 2, characterized in that: The top end of the installation cavity (212) is rotatably sleeved with a transmission shaft (241), the bottom end of the transmission shaft (241) is fixedly sleeved with a bevel gear (240), the top end of the transmission shaft (241) is fixedly sleeved with a worm wheel (242), the top end of the installation cavity (212) is fixedly connected with two fixing ears (245), a worm (243) is rotatably sleeved between the top ends of the two fixing ears (245), the worm (243) is meshed with the worm wheel (242), one end of the worm (243) is fixedly connected with a round rod (244), and one end of the round rod (244) is fixedly sleeved with the fixing ear (245).

4. A municipal gas pipeline hoisting construction device according to claim 2, characterized in that: An arc-shaped slide (222) is fixedly connected to one side of the clamping rod (220), and the arc-shaped slide (222) is slidably sleeved with the arc-shaped rail (211) on the adjacent side.

5. A municipal gas pipeline hoisting construction device according to claim 2, characterized in that: The bottom sides of both ends of the hanger (100) are fixedly connected to a fixing seat (120), the bottom and top ends of the fixing seat (120) are rotatably connected to a support shaft (121), both ends of the outer wall of the annular frame (210) are fixedly connected to a hanging rod (230), and a sling (130) is transmission-connected between the two hanging rods (230) and the two support shafts (121).

6. A municipal gas pipeline hoisting construction device according to claim 3, characterized in that: The arc angle of the annular frame (210) is less than one hundred and eighty degrees, and the arc angle of the clamping rod (220) is the same as the arc angle of the annular frame (210).

7. A municipal gas pipeline hoisting construction device according to claim 3, characterized in that: A lifting ring (110) is rotatably sleeved at the middle position of the top end of the hanging bracket (100).

Citation Information