Scaffold tie piece system for curtain wall panel construction technology

By designing a scaffolding tie-piece system for curtain wall panel construction, the problems of low installation efficiency and high construction difficulty in the prior art are solved, and efficient closed installation of curtain wall panels is achieved, which shortens the construction cycle and reduces costs.

CN222667541UActive Publication Date: 2025-03-25BEIJING JANGHO CURTAIN WALL SYST ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420634367.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2025-03-25
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

In the construction of curtain wall panels, the existing technology has caused the fixed scaffolding and curtain wall panels to remain unchanged, the installation efficiency is low, the process is many, the construction cycle is long, the work efficiency is low, and the panels need to be transported, stored, and stored multiple times, which increases the construction difficulty and cost.

Method used

A scaffolding tie piece system for curtain wall panel construction technology is designed, including curtain wall columns, tie nuts, tie bolts, U-shaped cross-section steel parts, tie rods, wall connecting rods and scaffolding. Through the connection of these components, the stable tie of the scaffolding and the closed installation of curtain wall panels are achieved.

Benefits of technology

This system solves the problem of scaffolding wall-connected ties with gaps of frame curtain wall panels greater than or equal to 10mm, realizes the one-time installation of curtain wall panels, reduces multiple handling and storage of panels, improves installation efficiency, shortens construction period, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667541U_ABST
    Figure CN222667541U_ABST
Patent Text Reader

Abstract

The utility model provides a scaffold tie piece system for a curtain wall panel construction technology. The scaffold tie piece system comprises a curtain wall stand column, a scaffold tie piece and a scaffold tie piece, the curtain wall stand column is connected with a building structure through a connecting piece. A tie nut is fixedly arranged on the side wall of the curtain wall stand column; the tie bolt is connected with the tie nut; one end of the tie bolt is connected with the U-shaped section steel part; the tie rod is connected with the U-shaped section steel piece; the wall connecting rod is connected with the tie rod; the scaffold is connected with the wall connecting rod; the tie bolt is arranged in a gap of a building curtain wall panel. According to the technical scheme, the problem of tying of the scaffold wall-connecting tying rod with the frame curtain wall panel gap larger than or equal to 10 mm is solved, a scaffold is still adopted for constructing a frame curtain wall, the curtain wall panel can be installed in a closed mode at a time, the installation efficiency is improved, and the construction cost is reduced. The additional work of repeated carrying, storing and keeping and the like due to the fact that a panel cannot be installed at a time in a traditional tying mode is eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of scaffold installation, in particular to a scaffold anchoring member system used in curtain wall panel construction technology. Background Art

[0002] During the construction of building frame curtain wall, double-row scaffolding is usually used as the construction platform for workers to install. The scaffolding is tied to the main structure to maintain the overall stability of the scaffolding. The scaffolding is tied in two steps and three spans, that is, the scaffolding has two steps (the step height is generally set to 1.8 meters), and the span is set to 1.8 meters or 2 meters. This requires a height of 3.6 meters. A span of 3.6 meters or 4 meters requires four ties with the main structure. When the curtain wall panel cannot be installed and the scaffolding needs to be dismantled, the dismantling work is stopped after the first step is dismantled. The curtain wall panel installation workers will tie the ties at the ties. The panels that cannot be installed are installed and glued, and then the scaffolding workers remove the next scaffolding. This work is repeated in a cycle, which is very inconvenient, with many processes, a long construction period, and low work efficiency. It requires close cooperation between scaffolding workers, curtain wall installers, and glue workers, and the construction is difficult. Moreover, when installing a large area of ​​curtain wall, the panels that cannot be installed at the tie points need to be selected, stored in one place, and renumbered and marked at the locations where they need to be installed later, which reduces work efficiency and increases the work of selection, handling, storage, secondary transportation, and re-installation, which prolongs the construction period and increases construction costs. Utility Model Content

[0003] The utility model provides a scaffolding tie-joint system for curtain wall panel construction technology, which is used to solve the problems of unchanged construction and installation of scaffolding and curtain wall panel and low installation efficiency.

[0004] To solve the above technical problems, the technical solution of this novel invention is as follows:

[0005] A scaffolding anchor system for curtain wall panel construction technology, comprising:

[0006] Curtain wall columns;

[0007] The curtain wall columns are connected to the building structure via connectors;

[0008] The side walls of the curtain wall columns are fixedly provided with tie nuts;

[0009] A tie bolt connected to the tie nut;

[0010] One end of the tie bolt is connected to the U-section steel piece;

[0011] A tie rod connected to the U-section steel member;

[0012] A wall connecting rod connected to the tie rod;

[0013] A scaffold connected to the wall connecting rod;

[0014] The tie bolts are arranged in the gaps of the building curtain wall panels.

[0015] Optionally, the U-shaped cross-section steel member includes a first section, a second section, and a third section that are integrally formed;

[0016] The first subsection is provided with a first hole;

[0017] The second subsection is provided with a second hole and a third hole;

[0018] The third subsection is provided with a fourth hole and a fifth hole;

[0019] The second hole, the third hole, the fourth hole and the fifth hole are aligned.

[0020] Optionally, the second hole and the third hole are arranged according to a first preset spacing;

[0021] The fourth hole and the fifth hole are arranged according to a first preset interval.

[0022] Optionally, a sixth hole and a seventh hole are provided at one end of the tie rod;

[0023] The sixth hole and the seventh hole are arranged according to a first preset spacing and are used to connect the tie rod with the U-section steel member.

[0024] Optionally, the wall connecting rods are arranged according to a three-step two-span module.

[0025] Optionally, the diameters of the first hole, the second hole, the third hole, the fourth hole, and the fifth hole are all of a first preset specification;

[0026] The third hole is at a second preset distance from the edge of the second subsection;

[0027] The fifth hole is at a second preset distance from the edge of the third section.

[0028] Optionally, the diameters of the sixth hole and the seventh hole are both of the first preset specification;

[0029] The sixth hole is at a second preset distance from the edge of the tie rod.

[0030] Optionally, the tie nut is an M10 hexagonal head nut.

[0031] Optionally, the thickness of the U-section steel part is a first preset thickness.

[0032] Optionally, the tie nut is welded to the side wall of the curtain wall column;

[0033] The height between the tie nut and the curtain wall column welding foot is a first preset height.

[0034] The above solution of the utility model includes at least the following beneficial effects:

[0035] The above scheme of the utility model includes: curtain wall columns; the curtain wall columns are connected to the building structure through connecting pieces; the side walls of the curtain wall columns are fixedly provided with tie nuts; tie bolts connected to the tie nuts; one end of the tie bolts is connected to a U-section steel piece; a tie rod connected to the U-section steel piece; a wall connecting rod connected to the tie rod; a scaffolding connected to the wall connecting rod; the tie bolts are arranged in the gaps of the building curtain wall panels. The technical scheme of the utility model solves the problem of tying the scaffolding wall tie rods when the gap of the frame curtain wall panel is greater than or equal to 10mm, so that the frame curtain wall is still constructed by using the scaffolding, and the curtain wall panel can be installed in a closed manner at one time, without dropping the panel at the connection position, and can be installed by filling the hole when the scaffolding is dismantled in the future, thereby improving the installation efficiency, shortening the installation period, reducing the cost, and eliminating the additional work of multiple transportation, storage and preservation of the panels that cannot be installed at one time due to the traditional tying method; the design and construction process technology of the scheme are scientific and reasonable, with strong versatility, suitable for the scaffolding of the frame curtain wall system, can be used in different projects, saves materials and is environmentally friendly, can be repeatedly used in construction, and can be used in multiple projects, with a high degree of assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a schematic diagram of a scaffolding anchor system used in a curtain wall panel construction technology according to an embodiment of the utility model;

[0037] Figure 2 It is a schematic diagram of the connection arrangement of the scaffolding and the wall connecting rod in the embodiment of the utility model;

[0038] Figure 3 It is a schematic diagram of a U-shaped cross-section steel member according to an embodiment of the utility model;

[0039] Figure 4 yes Figure 1 Schematic diagram of the AA section;

[0040] Figure 5 yes Figure 1 Schematic diagram of the middle BB section;

[0041] Figure 6 yes Figure 1 Schematic diagram of the fastener;

[0042] Figure 7 yes Figure 1 Schematic diagram of the middle tie rod;

[0043] Figure 8 yes Figure 1 The enlarged schematic diagram of point D in the middle;

[0044] Reference numerals:

[0045] 1. Curtain wall column; 2. Connector; 3. Building structure; 4. Tie nut; 5. Tie bolt; 6. U-section steel piece; 7. Tie rod; 8. Wall connecting rod; 9. Scaffolding; 10. Building curtain wall panel; 21. Fixing nut; 22. Through-rod bolt; 23. Fastener; 61. First section; 62. Second section; 63. Third section; 611. First hole; 621. Second hole; 622. Third hole; 631. Fourth hole; 632. Fifth hole; 71. Sixth hole; 72. Seventh hole. DETAILED DESCRIPTION

[0046] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0047] like Figures 1 to 8 As shown, the embodiment of the utility model provides a scaffolding anchor system for curtain wall panel construction technology, comprising:

[0048] Curtain wall column 1;

[0049] The curtain wall column 1 is connected to the building structure 3 via a connecting piece 2;

[0050] The side wall of the curtain wall column 1 is fixedly provided with a tie nut 4;

[0051] A tie bolt 5 connected to the tie nut 4;

[0052] One end of the tie bolt 5 is connected to the U-section steel member 6;

[0053] A tie rod 7 connected to the U-section steel member 6;

[0054] A wall connecting rod 8 connected to the tie rod 7;

[0055] A scaffold 9 connected to the wall connecting rod 8;

[0056] The tie bolts 5 are arranged in the gaps of the building curtain wall panels 10 .

[0057] In this embodiment, the curtain wall column 1 bears vertical loads and lateral loads, and plays a role in stabilizing the curtain wall; it has to bear multiple loads such as deadweight, wind load, earthquake load, etc., and can effectively disperse the load to ensure the safety of the building; it plays a good role in dispersing the load in the curtain wall system; the curtain wall column 1 is connected to the building structure 3 through the connecting piece 2, and the curtain wall column 1 is firmly fixed;

[0058] The side wall of the curtain wall column 1 is fixedly provided with a tie nut 4, which can be an M10 hexagonal nut. The curtain wall column 1 and the tie nut 4 are welded according to a predetermined position, and the weld foot height is 4mm, so that the two are fixed more firmly;

[0059] A tie bolt 5 connected to the tie nut 4, wherein the tie bolt 5 is a M10×100 stainless steel bolt, and the tie bolt 5 is rotatably connected to the tie nut 4;

[0060] One end of the tie bolt 5 is connected to the U-shaped section steel piece 6, and the tie bolt 5 is connected to the U-shaped section steel piece 6 through the first hole 611, and the fixing nut 21 is tightened on the U-shaped section steel piece 6;

[0061] The tie rod 7 connected to the U-shaped section steel member 6 is inserted into the U groove of the U-shaped section steel member 6, and the sixth hole 71 and the seventh hole 72 on the tie rod 7 are aligned with the second hole 621, the third hole 622, the fourth hole 631, and the fifth hole 632 on the U groove. The through-rod bolt 22 is installed and tightened firmly to assemble a tie assembly steel member. The tie rod 7 can be designed as a Φ48×3.75 round steel tube with a length of L=200mm;

[0062] Align the tie bolt 5 on the tie assembly steel piece to the tie nut 4 and screw it in 20-30mm to complete the tie installation;

[0063] The wall-tying rod 8 connected to the tie rod 7 can be connected to the wall-tying rod 8 of the scaffolding 9 by using fasteners 23, and the wall-tying rods 8 at other positions are installed in sequence until all the installations are completed; the scaffolding 9 connected by the wall-tying rod 8; the tie bolts 5 are arranged in the gaps of the building curtain wall panels 10.

[0064] This technical solution solves the problem of scaffolding wall tie rods for frame curtain wall panels with gaps greater than or equal to 10mm, and achieves the goal of still using scaffolding to construct frame curtain walls. The curtain wall panels can be installed in a closed manner at one time, without having to drop the panels at the connection position, and can be installed by patching the holes when the scaffolding is dismantled in the future. The installation process and flow rhythm are scientific and reasonable, which improves installation efficiency, shortens installation construction period, reduces costs, and eliminates the additional work of multiple transportation, storage and preservation of panels that cannot be installed at one time due to the traditional tie method. The design and construction process technology of this solution are scientific and reasonable, with strong versatility. It is suitable for the use of scaffolding tie rods in frame curtain wall systems, can be used in different projects, saves materials and is environmentally friendly, can be repeatedly used in construction, and can be used in multiple projects, with a high degree of assembly.

[0065] In an optional embodiment of the present utility model, the U-shaped cross-section steel member 6 includes an integrally formed first sub-section 61, a second sub-section 62, and a third sub-section 63;

[0066] The first subsection 61 is provided with a first hole 611;

[0067] The second subsection 62 is provided with a second hole 621 and a third hole 622;

[0068] The third subsection 63 is provided with a fourth hole 631 and a fifth hole 632;

[0069] The second hole 621 , the third hole 622 , the fourth hole 631 , and the fifth hole 632 are aligned.

[0070] In this embodiment, the U-shaped cross-section steel member 6 includes a first section 61, a second section 62, and a third section 63; the first section 61, the second section 62, and the third section 63 are integrally formed steel plates, and the thickness of the steel plates can be selected to be 4 mm;

[0071] The first sub-portion 61 is provided with a first hole 611 for connecting with the tie bolt 5;

[0072] The second subsection 62 is provided with a second hole 621 and a third hole 622;

[0073] The third subsection 63 is provided with a fourth hole 631 and a fifth hole 632;

[0074] The second hole 621 , the third hole 622 , the fourth hole 631 , and the fifth hole 632 are aligned and arranged for connection with the tie rod 7 .

[0075] In an optional embodiment of the present utility model, the second hole 621 and the third hole 622 are arranged according to a first preset distance;

[0076] The fourth hole 631 and the fifth hole 632 are arranged according to a first preset interval.

[0077] In this embodiment, the diameters of the second hole 621 and the third hole 622 are both 11 mm, the distance between the second hole 621 and the third hole 622 is 15 mm, and the distance between the third hole 622 and the edge is 15 mm;

[0078] The diameters of the fourth hole 631 and the fifth hole 632 are both 11 mm; the distance between the fourth hole 631 and the fifth hole 632 is 15 mm, and the fifth hole 632 is 15 mm away from the edge.

[0079] In an optional embodiment of the present utility model, a sixth hole 71 and a seventh hole 72 are provided at one end of the tie rod 7;

[0080] The sixth hole 71 and the seventh hole 72 are arranged at a first preset interval and are used to connect the tie rod 7 with the U-section steel member 6 .

[0081] In this embodiment, the sixth hole 71 is 15 mm away from the edge of the tie rod 7 , and the sixth hole 71 is 15 mm away from the seventh hole 72 , which is used to connect the tie rod 7 to the U-section steel member 6 .

[0082] In an optional embodiment of the present invention, the wall connecting rod 8 is arranged according to a three-step two-span module.

[0083] In this embodiment, the wall connecting rod 8 is arranged according to the three-step two-span module. The three-step two-span means that the setting spacing of the wall connecting rod is the spacing between two vertical poles in the horizontal direction of three "layers". The step refers to the step height, which is the height between the large horizontal poles; the span refers to the span, which is the distance between the poles; the vertical direction is one step, and the left and right direction is one span; there are two ways to arrange the wall connecting parts (rods), the first is two steps and three spans; the second is three steps and three spans. Two steps and three spans are suitable for racks with pole spacing of 1.05, 1.30, and 1.55 meters;

[0084] There are two ways to arrange the wall parts (rods): two steps and three spans, and three steps and three spans. Two steps and three spans are suitable for racks with pole spacing of 1.05, 1.30, and 1.55 meters, while three steps and three spans are not suitable for racks with a pole spacing of 1.55 meters.

[0085] If the horizontal and vertical directions of the external scaffolding are spaced 1.8 meters apart, then a wall tie rod is set every 3.6 meters in the vertical direction of the floor, and a wall tie rod is set every 5.4 meters in the horizontal direction of the floor. However, in fact, the vertical direction is generally set according to the floor height, and the position of each floor is the same, which is more convenient.

[0086] In a specific actual project, the wall ties are arranged in three steps and two spans, with a step height of 1800mm, a longitudinal distance of 2000mm, a horizontal distance of 900m, and a setting height of 20m.

[0087] In an optional embodiment of the present invention, the diameters of the first hole 611, the second hole 621, the third hole 622, the fourth hole 631, and the fifth hole 632 are all of a first preset specification;

[0088] The third hole 622 is at a second preset distance from the edge of the second subsection 62;

[0089] The fifth hole 632 is at a second preset distance from the edge of the third section 63 .

[0090] In this embodiment, the diameters of the first hole 611, the second hole 621, the third hole 622, the fourth hole 631, and the fifth hole 632 are all 11 mm, and other diameters of holes may be selected according to actual needs;

[0091] The distance between the third hole 622 and the edge of the second sub-portion 62 is 15 mm, and other distances may be set according to actual needs;

[0092] The distance between the fifth hole 632 and the edge of the third section 63 is 15 mm, and other distances may be set according to actual needs.

[0093] In an optional embodiment of the present utility model, the diameters of the sixth hole 71 and the seventh hole 72 are both of the first preset specification;

[0094] The sixth hole 71 is at a second preset distance from the edge of the tie rod 7 .

[0095] In this embodiment, the diameters of the sixth hole 71 and the seventh hole 72 are both the first preset specification, the diameters of the sixth hole 71 and the seventh hole 72 are both 11 mm, the distance between the sixth hole 71 and the edge of the tie rod 7 is 15 mm, and the distance between the sixth hole 71 and the seventh hole 72 is 15 mm; the size and spacing of the sixth hole 71 and the seventh hole 72 can be set according to actual needs.

[0096] In an optional embodiment of the present invention, the tie nut 4 is an M10 hexagonal head nut.

[0097] In this embodiment, the tie nut 4 is a hexagonal head nut of M10 size, and different specifications of hexagonal head nuts can be selected as needed; the hexagonal nut, also known as the hexagonal nut, is a hexagonal fastener; it is composed of a hexagonal nut body, a top plane and a thread, wherein the hexagonal nut body is made of high-strength alloy steel through heat treatment, surface treatment and other processes, and has the characteristics of high strength, reliability and corrosion resistance; the hexagonal nut is made of high-strength alloy steel, has high tensile strength and torque bearing capacity, and can be used in occasions with high strength requirements; the hexagonal nut adopts an internal hexagonal structure, which can be easily turned with a wrench or a spanner, and can be quickly installed and disassembled. When working, the nut can tightly fix the fastened object through the thread; the hexagonal nut is not easy to slide during the installation process, ensuring the stability and reliability of the fastening; the hexagonal nut has a plurality of different sizes and strength grades to choose from, meeting the needs of different fields and assembly requirements.

[0098] In an optional embodiment of the present invention, the thickness of the U-shaped cross-section steel member 6 is a first preset thickness.

[0099] In this embodiment, the thickness of the U-section steel part 6 can be selected to be 4 mm. Optionally, the height of the U-section steel part 6 is 58 mm, and the width is 60 mm. The second section 62 and the third section 63 of the U-section steel part 6 are symmetrically arranged, with a width of 60 mm and a length of 80 mm. U-section steel parts 6 of different thicknesses and sizes can also be selected as needed. The U-section steel part is a steel with a U-shaped cross-section. In this embodiment, a thickness of 4 mm can meet the safety, stability and economy of the steel structure.

[0100] In an optional embodiment of the utility model, the tie nut 4 is welded to the side wall of the curtain wall column 1;

[0101] The height between the welding feet of the tie nut 4 and the curtain wall column 1 is a first preset height.

[0102] In this embodiment, the tie nut 4 is welded to the side wall of the curtain wall column 1; the height of the welding feet of the tie nut 4 and the curtain wall column 1 can be selected to be 4 mm, and other heights of welding feet can also be set according to actual needs.

[0103] The weld foot height refers to the distance from the bottom surface to the highest part on both sides of the weld or in multiple layers of surfacing during the welding process. This parameter has an important impact on the quality and effect of welding, because it not only affects the strength and sealing of the weld, but also affects the heat-affected zone and deformation degree of the weld. If the weld foot height is too high, the size of the heat-affected zone will increase, resulting in excessive deformation, while if it is too low, it will affect the strength and sealing of the weld. Therefore, in welding, it is necessary to determine the size of the weld foot height according to the requirements and specific circumstances of the welding. In one embodiment of the present scheme, the weld foot height is 4mm, which can better meet the welding quality requirements.

[0104] Specific engineering construction technology and methods: When installing the frame curtain wall keel, set the tie rod 7 in accordance with the two-step three-span or three-step three-span method required in the scaffolding erection plan, lay out the line on the curtain wall column keel and the beam keel, locate the tie point, and then weld the tie nut 4 at the tie point and fix it firmly.

[0105] The U-section steel piece 6 is connected to the tie bolt 5 , the tie bolt 5 passes through the first hole 611 of the U-section steel piece 6 , and the fixing nut 21 is tightened outside to complete the installation.

[0106] Insert the tie rod 7 into the U-shaped groove of the U-section steel part 6, and align the circular holes (the sixth hole 71 and the seventh hole 72) on the tie rod 7 with the circular holes (the second hole 621, the third hole 622, the fourth hole 631, and the fifth hole 632) on the U-section steel part 6, that is, the sixth hole 71 is respectively aligned with the second hole 621 and the fourth hole 631 on the U-section steel part 6; the seventh hole 72 is respectively aligned with the third hole 622 and the fifth hole 632 on the U-section steel part 6; install the first through-rod bolt 22 and insert it into the second hole 621, the sixth hole 71, and the fourth hole 631 in sequence, and install the second through-rod bolt 22 and insert it into the third hole 622, the seventh hole 72, and the fifth hole 632 in sequence; and tighten it firmly with the nut.

[0107] Align the tie bolt 5 of the assembled tie piece with the tie nut 4 installed on the curtain wall keel and screw in the tie nut 20-30mm to complete the installation;

[0108] The wall connecting rod 8 and the tie rod 7 on the scaffold are connected by fasteners 23, and the tie rod 7 of the scaffold 9 is installed; the tie rods 7 at other positions are installed in sequence to complete the tie work of the entire scaffold 9. Then the building curtain wall panels 10 are installed, and the installation sequence is carried out in a slow manner, and the panel installation work of the curtain wall covering the entire scaffold 9 can be completed; after all the curtain wall panels are installed (after gluing the curtain wall seams if necessary), the scaffold is removed from top to bottom.

[0109] In a specific embodiment of the utility model, a double-row buckle scaffolding is provided with wall members in three steps and two spans, with a step height of 1800mm, a longitudinal distance of 2000mm, a horizontal distance of 900m, and a setting height of 20m. The wall connecting rod is provided with three steps and two spans. The scaffolding setting has met the relevant structural requirements of the specification. Here, only the force of the special wall connecting member is checked. The calculation of the scaffolding steel pipe is based on Steel pipe calculation;

[0110] 1. Calculation parameters:

[0111] Scaffolding pipe diameter: d = 48mm; wall thickness t = 3mm;

[0112] Cross-sectional area: A = 424.11 mm 2 ;

[0113] X-axis inertia moment: I = 107831.25 mm 4 , radius of gyration i = 15.94 mm;

[0114] X-axis resistance moment: W = 4492.96 mm 3 ; Elastic modulus: E = 206000MPa;

[0115] Gravity density: γ=78.5kN / m 3 ; The distance between the inner row of scaffolding poles and the structural surface is S = 200mm;

[0116] Scaffolding erection height H = 20000mm; Scaffolding step distance h = 1800mm; Wall connection step number m h =3;

[0117] Vertical distance of pole L a =2000mm; Number of spans of connecting wall parts n l =2;

[0118] Horizontal distance of pole L b =900mm;

[0119] Total operating layers n = 1; number of simultaneous operating layers m = 1;

[0120] 2. Load calculation

[0121] 2.1 Self-weight load, according to the "Safety Technical Standard for Coupler-type Steel Pipe Scaffolding in Construction" CECS699-2020;

[0122] Standard value of scaffolding board weight: g k1 =0.3kPa;

[0123] Standard value of deadweight of railings and baffles g k2 =0.16kN / m;

[0124] 2.2 Construction load effect, according to the "Safety Technical Standard for Fastener Steel Pipe Scaffolds in Building Construction" CECS699-2020;

[0125] Construction load of the scaffold: q k = 2 kPa;

[0126] 2.3 Wind load effect

[0127] Maximum elevation: Z = (100) m;

[0128] Ground surface roughness = "C";

[0129] Region name = "Beijing City";

[0130] Recurrence period wind pressure n = 10;

[0131] Basic wind pressure W o = 300 Pa;

[0132] Wind pressure height change coefficient μ z = 1.498;

[0133] Windward coefficient W = 0.8; When the scaffold is attached to a solid wall, k is taken as 1, otherwise 1.3;

[0134] Wind load shape coefficient

[0135] Standard value of wind load: W k = μ s 丨μ z 丨W o = 0.467 kPa;

[0136] 3. Load effect combination:

[0137] Check the bearing capacity of the connecting members: 1.5 times the wind load + 3 kN;

[0138] 4. Strength and stability check of the connecting members

[0139] Axial force of the connecting member generated by the out-of-plane deformation of the scaffold: N 0 = 3 kN;

[0140] Design value of the axial force of the connecting member: 1.5w k m h hn 1 L a + N 0 = 18.146 kN;

[0141] Calculation length of the connecting member: L 0 = max(L b , S) = 0.9 m;

[0142] Slenderness ratio of wall connection; λ = L 0 / i=56.462;

[0143] Stability coefficient of wall connection:

[0144] It is less than 0.85 as required by the specification, which meets the specification requirements.

[0145] 5. Check the connection of wall parts

[0146] The fastener specification is M16;

[0147] Effective cross-sectional area of ​​fastener: A jg =157mm 2 ;

[0148] Fastener tensile strength 8.8 grade: F a =400MPa;

[0149] Screw tensile strength F amax =A jg F a =62.8kN;

[0150] Less than 1, meeting the design specification requirements;

[0151] Shear resistance check of through-rod bolts:

[0152] The fastener specification is M12;

[0153] Effective cross-sectional area of ​​fastener: A jg =84.3mm 2 ;

[0154] Fastener tensile strength 8.8 grade F v =320MPa;

[0155] Screw shear capacity: F vmax =A jg F v =26.976kN;

[0156] Less than 1, meeting the design specification requirements;

[0157] U-section steel parts verification:

[0158] Axial force on one side: F 1 =N 1 / 2 = 9.073 kN;

[0159] U-section steel thickness: t = 4mm; effective force width b = 50mm;

[0160] Plate stress:

[0161] Less than 1, meeting the design specification requirements.

[0162] Through the scheme of the embodiment of the utility model, the analysis and calculation results meet the requirements of the specification. The technical scheme solves the problem of scaffolding wall tie rods for frame curtain wall panels with gaps greater than or equal to 10mm, and achieves the goal of still using scaffolding to construct frame curtain walls. The curtain wall panels can be installed in a closed manner at one time, without having to drop the panels at the connection position, and can be installed by patching the holes when the scaffolding is dismantled in the future, thereby improving the installation efficiency, shortening the installation period, reducing the cost, and eliminating the additional work of multiple transportation, storage and preservation of panels that cannot be installed at one time due to the traditional tie method; the design and construction process technology of the scheme are scientific and reasonable, with strong versatility, suitable for the use of scaffolding tie rods for frame curtain wall systems, can be used in different projects, saves materials and is environmentally friendly, can be repeatedly used in construction, and can be used in multiple projects, with a high degree of assembly.

[0163] The above is a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A scaffolding anchor system for curtain wall panel construction technology, characterized in that: include: Curtain wall column (1); The curtain wall column (1) is connected to the building structure (3) via a connecting piece (2); The side wall of the curtain wall column (1) is fixedly provided with a tie nut (4); A tie bolt (5) connected to the tie nut (4); One end of the tie bolt (5) is connected to the U-section steel member (6); A tie rod (7) connected to the U-section steel member (6); A wall connecting rod (8) connected to the tie rod (7); A scaffold (9) connected to the wall connecting rod (8); The tie bolts (5) are arranged in the gaps of the building curtain wall panels (10).

2. The scaffolding anchor system for curtain wall panel construction technology according to claim 1, characterized in that: The U-shaped cross-section steel member (6) comprises a first section (61), a second section (62), and a third section (63) which are integrally formed; The first subsection (61) is provided with a first hole (611); The second section (62) is provided with a second hole (621) and a third hole (622); The third subsection (63) is provided with a fourth hole (631) and a fifth hole (632); The second hole (621), the third hole (622) and the fourth hole (631), the fifth hole (632) are arranged in alignment.

3. The scaffolding anchor system for curtain wall panel construction technology according to claim 2, characterized in that: The second hole (621) and the third hole (622) are arranged according to a first preset distance; The fourth hole (631) and the fifth hole (632) are arranged according to a first preset interval.

4. The scaffolding anchor system for curtain wall panel construction technology according to claim 1, characterized in that: A sixth hole (71) and a seventh hole (72) are provided at one end of the tie rod (7); The sixth hole (71) and the seventh hole (72) are arranged at a first preset spacing and are used to connect the tie rod (7) to the U-section steel member (6).

5. The scaffolding anchor system for curtain wall panel construction technology according to claim 1, characterized in that: The wall connecting rod (8) is arranged according to a three-step two-span module.

6. The scaffolding anchor system for curtain wall panel construction technology according to claim 2, characterized in that: The diameters of the first hole (611), the second hole (621), the third hole (622), the fourth hole (631), and the fifth hole (632) are all of a first preset specification; A second preset distance between the third hole (622) and the edge of the second subsection (62); The fifth hole (632) is at a second preset distance from the edge of the third section (63).

7. The scaffolding anchor system for curtain wall panel construction technology according to claim 4, characterized in that: The diameters of the sixth hole (71) and the seventh hole (72) are both of a first preset specification; The sixth hole (71) is at a second preset distance from the edge of the tie rod (7).

8. The scaffolding anchor system for curtain wall panel construction technology according to claim 1, characterized in that: The tie nut (4) is an M10 hexagonal nut.

9. The scaffolding anchor system for curtain wall panel construction technology according to claim 1, characterized in that: The thickness of the U-shaped cross-section steel piece (6) is a first preset thickness.

10. The scaffolding anchor system for curtain wall panel construction technology according to claim 4, characterized in that: The tie nut (4) is welded to the side wall of the curtain wall column (1); The height between the tie nut (4) and the welding foot of the curtain wall column (1) is a first preset height.