Comprehensive energy supply station
By integrating distribution rooms, parking spaces, charging piles and parking space control systems in the multi-story building area of the city center area, a comprehensive energy supply station is designed to solve the problem of land resources shortage, efficient land use and energy management is achieved, and the flexibility and economicality of the system are improved.
Patent Information
- Application Number
- CN202421286966.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-06-06
AI Technical Summary
The shortage of public land in the central urban areas has led to the problem of "competing for land resources" between people's livelihood functions such as power supply, energy use, parking, and communications, affecting the healthy and orderly development of the city.
A comprehensive energy supply station is designed to achieve modular design and network operation mode by setting up distribution rooms, parking spaces and charging piles in the multi-story building area, and equipped with parking space control systems, and integrating photovoltaic power stations and communication base stations.
Save land area, improve land utilization, improve flexibility and universality of comprehensive energy supply stations, shorten construction cycles, save investment costs, and improve power regulation capabilities and wireless signal quality.
Smart Images

Figure CN222667801U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of energy replenishment, and in particular to a comprehensive energy replenishment station. Background Art
[0002] With the development of global urbanization, the living standards of residents are improving, and the demands of residents in urban centers for livelihood functions such as power supply, energy use, parking, and communications are gradually increasing.
[0003] However, due to the shortage of public land in the city center, there is a problem of "competition for land resources" between various livelihood functional needs, which affects the healthy and orderly development of the city. Therefore, how to reduce the phenomenon of competition for land resources and improve the land utilization rate in the city center has become a technical problem that needs to be solved urgently in this field. Utility Model Content
[0004] Based on this, it is necessary to provide a comprehensive energy supply station that can improve the land utilization rate in the city center to address the above technical problems.
[0005] The present application provides a comprehensive energy supply station. The comprehensive energy supply station includes a multi-story building area, a power distribution room is arranged in the first floor building area of the multi-story building area, parking spaces and charging piles corresponding to the parking spaces are arranged in at least two floors of the multi-story building area, and a parking space control system is arranged in the multi-story building area; the at least two floors of the building area include the first floor building area.
[0006] In one embodiment, the integrated energy supply station achieves a modular design by using prefabricated structural materials.
[0007] In one embodiment, the charging piles installed in the first-floor building area include vehicle-to-grid V2G charging piles, and the charging piles installed in other-floor building areas include fast charging piles.
[0008] In one embodiment, the integrated energy supply station also includes a photovoltaic power station, which is disposed on the top of the integrated energy supply station.
[0009] In one of the embodiments, the power distribution room includes a first transformer;
[0010] The low voltage side of the first transformer is connected to the photovoltaic power station and the charging pile through the same section of busbar.
[0011] In one embodiment, the integrated energy supply station also includes a photovoltaic grid-connected cabinet, a V2G grid-connected cabinet and an adjustable user load grid-connected cabinet, and the high-voltage side of the first transformer, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet, and the adjustable user load grid-connected cabinet are provided with IoT meters.
[0012] In one embodiment, the integrated energy supply station also includes a communication base station, which is disposed on the top of the integrated energy supply station.
[0013] In one of the embodiments, the low voltage side of the first transformer is connected to the communication base station and each parking space control system through the same section of busbar.
[0014] In one of the embodiments, the power distribution room includes a second transformer;
[0015] The second transformer is connected to the user's electrical equipment in a preset area around the integrated energy supply station.
[0016] In one embodiment, the first transformer and the second transformer are provided with an electric meter.
[0017] The above-mentioned integrated energy supply station includes a multi-story building area, a distribution room is arranged in the first-floor building area of the multi-story building area, parking spaces and charging piles corresponding to the parking spaces are arranged in at least two-floor building areas of the multi-story building area, and a parking space control system is arranged in the multi-story building area. By arranging the distribution room and multi-story parking spaces in the multi-story building area, it is possible to save floor space and improve land utilization rate, and the actual number of floors and structure of the building area of the integrated energy supply station can be determined according to the actual building area and parking space requirements, thereby improving the flexibility and universality of the integrated energy supply station in actual application, and the integrated energy supply station has a simpler structure and lower equipment cost, thereby shortening the construction period and saving investment costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of a comprehensive energy supply station provided in an embodiment of the present application;
[0019] Figure 2 This is a wiring diagram of a power distribution room in an isolated grid operation mode provided in an embodiment of the present application;
[0020] Figure 3 This is a wiring diagram of a power distribution room provided in an embodiment of the present application.
[0021] Description of reference numerals:
[0022] 101: power distribution room; 102: parking space; 103: fast charging pile;
[0023] 104: V2G charging pile; 105: photovoltaic power station; 106: first transformer;
[0024] 107: communication base station; 108: second transformer. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0026] With the development of global urbanization, the living standards of residents are improving, and the demands of residents in urban centers for livelihood functions such as power supply, energy use, parking, and communications are gradually increasing.
[0027] However, due to the shortage of public land in the city center, there is a problem of "competition for land resources" between various livelihood functional needs, which affects the healthy and orderly development of the city. Therefore, how to reduce the phenomenon of competition for land resources and improve the land utilization rate in the city center has become a technical problem that needs to be solved urgently in this field.
[0028] Specifically, conventional smart stereo garages are usually built in the corridors on the side of commercial office buildings, which easily affect the fire escape. In addition, the power supply system of the smart stereo garage needs to obtain power from the power distribution room of the nearby industrial and commercial buildings. The power supply distance is long, and the laying of cables requires additional ground breaking, which makes construction and coordination difficult. At present, the power distribution room is usually built separately in an independent public area, and the land resources are not fully utilized. In addition, the lines required for 5G communication base stations and distributed photovoltaic power stations to access the power distribution room are long and the line loss is high.
[0029] In one embodiment, Figure 1 As shown, Figure 1 It is a structural schematic diagram of a comprehensive energy supply station provided in an embodiment of the present application. The comprehensive energy supply station includes a multi-story building area, a distribution room 101 is arranged in the first-floor building area of the multi-story building area, parking spaces 102 and charging piles corresponding to the parking spaces 102 are arranged in at least two-story building areas in the multi-story building area, a parking space control system is arranged in the multi-story building area, and at least two-story building areas include the first-floor building area.
[0030] Specifically, a distribution transformer may be provided in the power distribution room 102, and electric energy may be received, transformed, distributed, controlled and protected through the distribution transformer, wherein the distribution is mainly for distributing electric energy to low-voltage user equipment.
[0031] The parking space control system can be used to control the raising and lowering of parking spaces in the integrated energy supply station, and monitor the usage of parking spaces in the integrated energy supply station in real time, so as to effectively manage the parking spaces in the integrated energy supply station and improve the utilization rate of the space in the integrated energy supply station.
[0032] Exemplarily, the power distribution room 101 may be a 10 kV power distribution room.
[0033] Optionally, the charging pile corresponding to the parking space 102 may be a fast charging pile; or, the charging pile corresponding to the parking space 102 may be a vehicle-to-grid (V2G) charging pile; or, the charging pile corresponding to the parking space 102 may be a fast charging pile and a V2G charging pile. In the case where the charging pile corresponding to the parking space 102 includes a fast charging pile and a V2G charging pile, a V2G charging pile may be set in the first floor building area of a multi-story building area, and a fast charging pile may be set in other building areas except the first floor building area.
[0034] In a possible implementation, a distribution room 101, parking spaces 102, and V2G charging piles corresponding to parking spaces 102 may be set up in the first-floor building area of a multi-story building area of a comprehensive energy supply station, and parking spaces 102 and fast charging piles corresponding to parking spaces 102 may be set up in other building areas except the first-floor building area.
[0035] In another possible implementation, a power distribution room 101, a parking space 102, and a V2G charging pile corresponding to the parking space 102 may be arranged in a multi-story building area of the integrated energy supply station.
[0036] In another possible implementation, a power distribution room 101 , a parking space 102 , and a fast charging pile corresponding to the parking space 102 may be arranged in a multi-story building area of the integrated energy supply station.
[0037] In an embodiment of the present application, the comprehensive energy supply station includes a multi-story building area, a distribution room is arranged in the first floor building area of the multi-story building area, parking spaces and charging piles corresponding to the parking spaces are arranged in at least two floors of the multi-story building area, and a parking space control system is arranged in the multi-story building area. By arranging the distribution room and multi-story parking spaces in the multi-story building area, it is possible to save floor space and improve land utilization rate, and the actual number of floors and structure of the building area of the comprehensive energy supply station can be determined according to the actual building area and parking space requirements, thereby improving the flexibility and universality of the comprehensive energy supply station in actual application, and the comprehensive energy supply station has a simple structure and low equipment cost, thereby shortening the construction period and saving investment costs.
[0038] Based on the above embodiments, the integrated energy supply station realizes modular design by using prefabricated structural materials.
[0039] Specifically, the integrated energy supply station can be divided into multiple independent functional modules according to a modular design. The multiple independent functional modules of the integrated energy supply station can be assembled according to the actual site area, parking space requirements, and the scale of the distribution room owner. In addition, when constructing the integrated energy supply station, prefabricated structural materials can be used, that is, each functional module can be pre-manufactured and assembled in the factory, and then the assembled functional modules can be transported to the site for installation.
[0040] Exemplarily, the functional modules of the integrated energy supply station may include a distribution room module, an intelligent garage module, a photovoltaic power station module, and a communication base station module. The multiple pre-installed functional modules of the integrated energy supply station are assembled according to the actual site area, parking space requirements, and the scale of the distribution room. If the parking space demand increases, the pre-installed intelligent garage module can be added to the integrated energy supply station.
[0041] Optionally, the integrated energy supply station can be divided into multiple sub-integrated energy supply stations, and a suitable number of sub-integrated energy supply stations can be selected for assembly according to the actual site area, parking space requirements, and the size of the power distribution room. The sub-integrated energy supply stations can use prefabricated structural materials.
[0042] In the embodiment of the present application, the comprehensive energy supply station realizes a modular design by using prefabricated structural materials, thereby improving the flexibility of the construction of the comprehensive energy supply station. In addition, the use of prefabricated structural materials in the construction of the comprehensive energy supply station reduces the workload of on-site construction, shortens the construction period, and can improve the service life and safety of the comprehensive energy supply station.
[0043] Based on the above embodiment, the charging piles arranged in the first-floor building area include vehicle-to-grid V2G charging piles 104 , and the charging piles arranged in the other-floor building areas include fast charging piles 103 .
[0044] Specifically, the vehicle-to-grid V2G charging pile 104 is a Vehicle-to-Grid charging pile. The V2G charging pile 104 can treat the electric vehicle in a stopped state as a mobile energy storage device, responding to the demand side of the grid to provide emergency power supply. For example, during periods of low power demand or low electricity prices, electric vehicles can absorb electricity from the grid for charging; and during peak power demand or heavy grid load, electric vehicles can release electricity to the grid through the V2G charging pile 104 to provide power support for the grid.
[0045] In the embodiment of the present application, the charging piles installed in the first-floor building area include V2G charging piles, and the charging piles installed in the other-floor building areas include fast charging piles. By setting up V2G charging piles to respond on the demand side of the power grid and provide emergency power supply, the power regulation capability of the integrated energy supply station can be improved, as well as the stability and flexibility of the integrated energy supply station.
[0046] On the basis of the above-mentioned embodiment, the integrated energy supply station further includes a photovoltaic power station 105, and the photovoltaic power station 105 is arranged on the top and side walls of the integrated energy supply station.
[0047] Exemplarily, the photovoltaic power station 105 may be a distributed photovoltaic power station.
[0048] Specifically, the photovoltaic power station 105 arranged on the top and side walls of the integrated energy supply station can be used to convert solar energy into electrical energy and provide electrical energy to the distribution room and charging station in the integrated energy supply station to reduce the integrated energy supply station's dependence on traditional energy.
[0049] In an embodiment of the present application, the comprehensive energy supply station also includes a photovoltaic power station. The photovoltaic power station 105 is arranged on the top and side walls of the comprehensive energy supply station. The photovoltaic power station converts solar energy into electrical energy to provide electrical energy to the distribution room and charging station in the comprehensive energy supply station, thereby reducing the comprehensive energy supply station's dependence on traditional energy. In addition, setting the photovoltaic power station on the top and side walls of the comprehensive energy supply station can save floor space, improve land utilization, shorten the length of the power supply line of the fast charging pile, and save construction costs. At the same time, the photovoltaic power station arranged on the top of the comprehensive energy supply station can block direct sunlight and rain from impacting the top of the comprehensive energy supply station, reduce the aging rate of the top of the comprehensive energy supply station, and thus extend the service life of the comprehensive energy supply station.
[0050] Based on the above embodiment, the power distribution room includes a first transformer 106 .
[0051] The low voltage side of the first transformer 106 is connected to the photovoltaic power station 105 and the charging pile through the same section of busbar.
[0052] Specifically, the low-voltage side of the first transformer 106 can be connected to the photovoltaic power station 105 and the V2G charging pile 104 through the same section of 380V busbar to achieve an isolated network operation mode. The isolated network operation mode is to provide a stable power supply for the communication base station in the integrated energy supply station through the photovoltaic power station 105 and the V2G charging pile 104 when the external power supply of the integrated energy supply station cannot supply power normally, so as to ensure the normal operation of the communication network in the preset area near the integrated energy supply station.
[0053] For example, refer to Figure 2 , Figure 2This is a wiring diagram of a distribution room in an isolated grid operation mode provided by an embodiment of the present application, which can be Figure 2 The wiring method shown realizes the above-mentioned isolated grid operation mode. When the 10kV power supply outside the integrated energy supply station cannot supply power to the integrated energy supply station normally, the electric energy of the electric vehicle can be obtained through the V2G charging pile, and the 5G communication base station in the integrated energy supply station can be provided with stable power through the output of the photovoltaic power station to ensure the normal operation of the communication network in the preset area near the integrated energy supply station.
[0054] In an embodiment of the present application, the distribution room includes a first transformer, and the low-voltage side of the first transformer is connected to the photovoltaic power station and the charging pile through the same section of bus, realizing an isolated network operation mode. When the external power supply of the comprehensive energy supply station cannot supply power normally, the photovoltaic power station and the charging pile are used to provide a stable power supply for the communication base station in the comprehensive energy supply station, thereby ensuring the normal operation of the communication network in a preset area near the comprehensive energy supply station, thereby improving the stability and flexibility of the comprehensive energy supply station and ensuring the safe operation of the power grid.
[0055] Based on the above embodiment, the comprehensive energy supply station also includes a photovoltaic grid-connected cabinet, a V2G grid-connected cabinet and an adjustable user load grid-connected cabinet. The high-voltage side of the first transformer, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet, and the adjustable user load grid-connected cabinet are equipped with IoT meters.
[0056] Specifically, the photovoltaic power station 105 and the charging pile in the integrated energy supply station can be connected to the low-voltage side of the first transformer 106, and the Internet of Things meters can be installed on the high-voltage side of the first transformer 106, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet, and the adjustable user load grid-connected cabinet. The Internet of Things meters installed on the high-voltage side of the first transformer 106, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet, and the adjustable user load grid-connected cabinet can be used to collect the photovoltaic output data of the photovoltaic power station 105, the charging power data of the charging pile, and the battery capacity data of the electric vehicle in real time through the built-in sensors and data acquisition modules, and send the collected photovoltaic output data, charging power data, and battery capacity data to the "user-side virtual power plant platform" to achieve real-time monitoring of the photovoltaic power station, the V2G charging pile, and the first transformer 106. The "user-side virtual power plant platform" is responsible for receiving and decomposing the dispatching instructions of the "grid-side virtual power plant management platform", and sending the dispatching instructions to the control devices of the photovoltaic grid-connected cabinets and the V2G charging pile grid-connected cabinets. The control devices interact with the photovoltaic control system and the V2G charging pile control system to control the photovoltaic output of the photovoltaic power station 105 in the integrated energy supply station, the charging and discharging power of the V2G charging pile, and the adjustable load under the first transformer 106.
[0057] Optionally, when the charging piles in the integrated energy supply station include fast charging piles 103, the photovoltaic power station 105 and the fast charging piles 103 in the integrated energy supply station can be connected to the low-voltage side of the first transformer 106, and IoT meters can be installed on the high-voltage side of the first transformer 106, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet and the adjustable user load grid-connected cabinet, and the photovoltaic output data of the photovoltaic power station 105, the charging power data of the fast charging piles 103 and the battery capacity data of the electric vehicle are collected through the IoT meters. Alternatively, when the charging piles in the integrated energy supply station include the V2G charging piles 104, the photovoltaic power station 105 and the V2G charging piles 104 in the integrated energy supply station can be connected to the low-voltage side of the first transformer 106, and IoT meters can be installed on the high-voltage side of the first transformer 106, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet and the adjustable user load grid-connected cabinet, and the photovoltaic output data of the photovoltaic power station 105, the charging power data of the V2G charging piles 104 and the battery capacity data of the electric vehicle are collected through the IoT meters. Alternatively, when the charging piles in the integrated energy supply station include fast charging piles 103 and V2G charging piles 104, the photovoltaic power station 105, fast charging piles 103 and V2G charging piles 104 in the integrated energy supply station can be connected to the low-voltage side of the first transformer 106, and IoT meters can be installed on the high-voltage side of the first transformer 106, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet and the adjustable user load grid-connected cabinet, and the photovoltaic output data of the photovoltaic power station 105, the charging power data of the fast charging pile 103, the charging power data of the V2G charging pile 104 and the battery capacity data of the electric vehicle are collected through the IoT meters.
[0058] For example, refer to Figure 3 , Figure 3 This is a wiring diagram of a power distribution room provided in an embodiment of the present application, which can be Figure 3 The wiring method shown in the figure enables the IoT meter to monitor the photovoltaic output of the photovoltaic power station, the charging power of the V2G charging pile and the charging power of the fast charging pile in real time.
[0059] In the embodiment of the present application, the high-voltage side of the first transformer, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet, and the adjustable user load grid-connected cabinet are provided with IoT meters, and the photovoltaic output of the photovoltaic power station and the charging power of the charging piles in the comprehensive energy supply station are monitored in real time through the IoT meters, and the photovoltaic output of the photovoltaic power station and the charging power of the charging piles in the comprehensive energy supply station can be controlled according to the photovoltaic output data, charging power data and battery capacity data through the photovoltaic control system and the charging pile control system to realize a "virtual power plant", so that the charging and discharging power and electricity of the virtual power plant in the embodiment of the present application can be adjusted in time according to the dispatching instructions of the virtual power plant management platform on the local power grid side, participate in providing demand-side response regulation services, improve the stability and flexibility of the comprehensive energy supply station, and assist the power grid in achieving power supply and demand balance.
[0060] On the basis of the above-mentioned embodiment, the integrated energy supply station further includes a communication base station 107, and the communication base station 107 is arranged on the top of the integrated energy supply station.
[0061] Exemplarily, the communication base station 107 may be at least one of a satellite mobile communication base station and a 5G communication base station.
[0062] Specifically, the communication base station 107 can be used to provide communication signals for mobile phones, computers and other communication devices within a preset area near the comprehensive energy supply station to ensure normal communication of mobile phones, computers and other communication devices within a preset area near the comprehensive energy supply station.
[0063] In an embodiment of the present application, the comprehensive energy supply station also includes a communication base station, which is arranged at the top of the comprehensive energy supply station. The communication base station provides communication signals for mobile phones, computers and other communication devices in a preset area near the comprehensive energy supply station to ensure normal communication of mobile phones, computers and other communication devices in the preset area near the comprehensive energy supply station. In addition, setting the communication base station at the top of the comprehensive energy supply station can save floor space, improve land utilization, shorten the length of the power supply line of the fast charging pile, save construction costs, and at the same time, improve the transmission range and coverage of the signal, reduce signal blind spots, and thereby improve the quality of wireless signals in the preset area near the comprehensive energy supply station.
[0064] On the basis of the above-mentioned embodiment, the low-voltage side of the first transformer 106 is connected to the communication base station 107 and each parking space control system through the same section of busbar.
[0065] Specifically, the first transformer 106 can be connected to the communication base station 107 and each parking space control system to convert high voltage electricity into low voltage electricity suitable for the communication base station 107 and each parking space control system, and provide power supply for the communication base station 107 and each parking space control system. In addition, the smart meter set on the first transformer 106 can monitor the electric energy delivered to the communication base station 107 and each parking space control system in real time.
[0066] In an embodiment of the present application, the low-voltage side of the first transformer is connected to the communication base station and each parking space control system through the same section of busbar, and power is supplied to the communication base station and each parking space control system through the first transformer, and the electric energy transmitted to the communication base station and each parking space control system is monitored in real time, thereby providing stable electric energy for the communication base station and each parking space control system, ensuring the normal operation of the communication base station and each parking space control system, and by real-time monitoring of the electric energy transmitted to the communication base station and each parking space control system, the occurrence of the communication base station or each parking space control system stopping working due to voltage fluctuations or insufficient power can be reduced, thereby improving the continuity of the communication network and the stability of the parking space control system.
[0067] Based on the above embodiment, the power distribution room includes a second transformer 108 .
[0068] The second transformer 108 is connected to the user's electrical equipment in a preset area around the integrated energy supply station.
[0069] Specifically, the second transformer 108 can be connected to the user's electrical equipment in the preset area around the integrated energy supply station, converting high voltage electricity into low voltage electricity suitable for the user's electrical equipment in the preset area around the integrated energy supply station, and providing power supply for the user's electrical equipment in the preset area around the integrated energy supply station. In addition, the smart meter set on the second transformer 108 can monitor the electric energy delivered to the user's electrical equipment in the preset area around the integrated energy supply station in real time.
[0070] In the embodiment of the present application, the distribution room includes a second transformer, which is connected to the user's electrical equipment in the preset area around the comprehensive energy supply station. The second transformer converts high voltage electricity into low voltage electricity suitable for the user's electrical equipment in the preset area around the comprehensive energy supply station, thereby providing power supply for the user's electrical equipment in the preset area around the comprehensive energy supply station, thereby providing stable electricity for the user's electrical equipment in the preset area around the comprehensive energy supply station, ensuring the normal operation of the user's electrical equipment in the preset area around the comprehensive energy supply station, and by real-time monitoring of the electricity delivered to the user's electrical equipment in the preset area around the comprehensive energy supply station, the occurrence of user's electrical equipment stopping working in the preset area around the comprehensive energy supply station due to voltage fluctuations or power shortage can be reduced, thereby improving the stability of user's electrical equipment in the preset area around the comprehensive energy supply station.
[0071] On the basis of the above embodiment, the first transformer 106 and the second transformer 108 are provided with an electric meter.
[0072] Specifically, smart meters with "four remote" functions can be installed on the first transformer 106 and the second transformer 108, respectively, so that the operation data of the first transformer 106 can be monitored in real time through the first meter installed on the first transformer 106, and the operation data of the second transformer 108 can be monitored in real time through the second meter installed on the second transformer 108. Among them, the "four remote" functions are remote measurement, remote communication, remote control, and remote adjustment, where remote measurement is remote measurement, remote communication is remote signal, remote control is remote control, and remote adjustment is remote adjustment.
[0073] In the embodiment of the present application, the first transformer and the second transformer are provided with electric meters, and the operating data of the first transformer and the second transformer are respectively monitored in real time through the electric meters, so as to ensure the normal operation of the first transformer and the second transformer, reduce the occurrence of voltage fluctuations or power shortages, and thus improve the safety and stability of the integrated energy supply station.
[0074] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0075] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A comprehensive energy supply station, characterized in that: The comprehensive energy supply station includes a multi-story building area, a distribution room is arranged in the first floor building area of the multi-story building area, parking spaces and charging piles corresponding to the parking spaces are arranged in at least two floors of the multi-story building area, and a parking space control system is arranged in the multi-story building area; the at least two floors of the building area include the first floor building area.
2. The integrated energy supply station according to claim 1, characterized in that: The integrated energy supply station achieves modular design by using prefabricated structural materials.
3. The integrated energy supply station according to claim 2, characterized in that: The charging piles arranged in the first-floor building area include vehicle-to-grid V2G charging piles, and the charging piles arranged in the other-floor building areas include fast charging piles.
4. The integrated energy supply station according to any one of claims 1 to 3, characterized in that: The comprehensive energy supply station also includes a photovoltaic power station, which is arranged on the top and side walls of the comprehensive energy supply station.
5. The integrated energy supply station according to claim 4, characterized in that: The power distribution room includes a first transformer; The low-voltage side of the first transformer is connected to the photovoltaic power station and the charging pile through the same section of busbar.
6. The integrated energy supply station according to claim 5, characterized in that: The integrated energy supply station also includes a photovoltaic grid-connected cabinet, a V2G grid-connected cabinet and an adjustable user load grid-connected cabinet. The high-voltage side of the first transformer, the photovoltaic grid-connected cabinet, the V2G grid-connected cabinet and the adjustable user load grid-connected cabinet are provided with IoT meters.
7. The integrated energy supply station according to claim 5 or 6, characterized in that: The integrated energy supply station also includes a communication base station, which is arranged on the top of the integrated energy supply station.
8. The integrated energy supply station according to claim 7, characterized in that: The low-voltage side of the first transformer is connected to the communication base station and each of the parking space control systems through the same section of busbar.
9. The integrated energy supply station according to claim 5 or 6, characterized in that: The power distribution room includes a second transformer; The second transformer is connected to the user's electrical equipment in a preset area around the integrated energy supply station.
10. The integrated energy supply station according to claim 9, characterized in that: The first transformer and the second transformer are provided with an electric meter.