Connecting structure of assembly type primary beam and secondary beam

By adopting a connecting structure including the first connector and the second connector in the prefabricated building, the problems of poor connection strength of the primary and secondary beams and prone to breakage of the main beams in the prior art are solved, and a more stable and reliable connection is achieved.

CN222685740UActive Publication Date: 2025-03-28JIANGXI XINTIANDI SPECIAL REINFORCEMENT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421464437.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2025-03-28
Estimated Expiration
2034-06-25

AI Technical Summary

Technical Problem

The connection strength of the main and secondary beam connecting structure of existing prefabricated buildings is poor and destroys the integrity of the main beam, resulting in the main beam being prone to breaking, affecting the stability and reliability of the building.

Method used

A connection structure including a first connector and a second connector is adopted. The first embedded part of the first connector is pre-buried in the main beam when the main beam is pre-built, the first connecting part is exposed outside the main beam, the second embedded part of the second connecting part is pre-built in the secondary beam when the secondary beam is pre-built, and the second connecting part is exposed outside the secondary beam. The connection between the primary and secondary beams is realized through the connection between the first connecting part and the second connecting part, and the connection is fixedly connected by a fastener.

Benefits of technology

It avoids damage to the integrity of the main beam, enhances the strength of the connection position of the main and secondary beams, ensures the stability and reliability of the connection, and solves the problem of easy breakage of the main beam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222685740U_ABST
    Figure CN222685740U_ABST
Patent Text Reader

Abstract

The utility model provides a connecting structure of an assembly type primary beam and an assembly type secondary beam, and belongs to the technical field of assembly type building connecting structures. The connecting structure comprises a first connecting piece and a second connecting piece, the first connecting piece is provided with a first pre-buried part and a first connecting part which are fixedly connected, the first pre-buried part is used for being pre-buried in a main beam, and the first connecting part is arranged outside the main beam; the second connecting piece is provided with a second pre-buried part and a second connecting part which are fixedly connected, the second pre-buried part is used for being pre-buried in the secondary beam, and the second connecting part is arranged outside the secondary beam; one of the first connecting part and the second connecting part is provided with a connecting groove, the other one of the first connecting part and the second connecting part is provided with a connector used for stretching into the connecting groove, two opposite side walls of the connecting groove are provided with symmetrically-arranged penetrating holes, the connector is provided with through holes corresponding to the penetrating holes, and a fastener penetrates through the penetrating holes and the through holes at the same time, so that the connector is connected with the first connecting part and the second connecting part. The first connecting part and the second connecting part are fixed; the technical problems that an existing assembly type main beam and secondary beam connecting structure is poor in connecting strength and destroys the integrity of a main beam are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of assembled building connection structures, and in particular relates to an assembled main and secondary beam connection structure. Background Art

[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, transported to the construction site, and assembled and installed on site through reliable connection methods.

[0003] In prefabricated buildings, the main and secondary beam connection nodes are key assembly components and play an important role in the stability, safety and durability of the building structure.

[0004] The existing connection method of the main and secondary beam connection nodes of prefabricated buildings is to open a groove on the main beam, set a corresponding protrusion on the secondary beam, and then connect the protrusion and the groove together and then pour concrete to fix it. This connection method destroys the integrity of the main beam, causing the main beam to easily break at the groove during subsequent transportation. Even if the main beam does not break, the connection strength of the connection node after the main and secondary beams are connected is weak, which is not conducive to ensuring the overall stability and reliability of the prefabricated building.

[0005] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Utility Model Content

[0006] The utility model aims to provide a connection structure of assembled main and secondary beams to solve the technical problems that the existing connection structure of assembled main and secondary beams has poor connection strength and destroys the integrity of the main beam.

[0007] In order to achieve the above-mentioned purpose, the connection structure of the assembled primary and secondary beams of the utility model provides the following technical solutions:

[0008] An assembled primary and secondary beam connection structure, characterized by comprising:

[0009] A first connecting member, wherein the first connecting member comprises a first embedded portion and a first connecting portion which are fixedly connected, wherein the first embedded portion is used to be embedded inside the main beam when the main beam is prefabricated, and the first connecting portion is arranged outside the main beam;

[0010] a second connecting member, the second connecting member comprising a second embedded portion and a second connecting portion which are fixedly connected, the second embedded portion being used to be embedded inside the secondary beam when the secondary beam is prefabricated, and the second connecting portion being arranged outside the secondary beam;

[0011] One of the first connecting part and the second connecting part has a connecting groove, and the other has a connecting head for extending into the connecting groove. The two opposite side walls of the connecting groove have symmetrically arranged through holes, and the connecting head is provided with through holes corresponding to the through holes. The connecting head extends into the connecting groove and can pass through the through holes and the through holes at the same time by fasteners to fix the first connecting part and the second connecting part.

[0012] As a further optimized technical solution, the first embedded portion is a U-shaped structure enclosed by two side walls and a bottom wall, and the first connecting portion is fixed on one of the side walls.

[0013] As a further optimized technical solution, the connecting groove has a top opening and a side opening, the side opening is arranged on a side away from the first embedded part for allowing the connecting head to extend into the connecting groove, and the top opening is used for pouring the consolidation material.

[0014] As a further optimized technical solution, a plurality of anchor components are arranged in parallel between the two side walls of the U-shaped structure. The anchor components are arranged on a side close to the top opening of the U-shaped structure to increase the tensile strength of the U-shaped structure.

[0015] As a further optimized technical solution, the anchoring component is a screw rod, and both ends of the screw rod are fixedly connected to the two side walls of the U-shaped structure respectively.

[0016] As a further optimized technical solution, the second embedded part is a tubular structure with an inner cavity, and the opening of the tubular structure is arranged at an end away from the second connecting part.

[0017] As a further optimized technical solution, a fixing plate is fixedly connected to the end of the cylindrical structure opposite to the opening, and the second connecting portion is fixedly connected to the second embedded portion via the fixing plate.

[0018] As a further optimized technical solution, the cross-section of the cylindrical structure is a quadrilateral.

[0019] As a further optimized technical solution, the connecting head has two relatively parallel arranged side panels and a connecting plate arranged between the two side panels, the width of the side panel is smaller than the width of the top opening of the connecting groove, and the connecting plate divides the space between the two side panels into two accommodating grooves.

[0020] As a further optimized technical solution, after the connecting head is inserted into the connecting groove, two pouring holes are opened on the side plate facing the top opening, and each pouring hole corresponds to a receiving groove for pouring the consolidation material into the receiving groove.

[0021] Beneficial effect: The utility model sets a first connecting member and a second connecting member, wherein the first embedded part of the first connecting member is embedded in the main beam during the prefabrication of the main beam, and the first connecting part is exposed outside the main beam, and the second embedded part of the second connecting member is embedded in the secondary beam during the prefabrication of the secondary beam, and the second connecting part is exposed outside the secondary beam, and the connection between the main beam and the secondary beam is achieved through the connection between the first connecting part and the second connecting part. Compared with the existing main and secondary beam connection method, the integrity of the main beam does not need to be destroyed, and the technical problem that the main beam is prone to breakage is solved; and the first embedded part and the second embedded part also effectively enhance the strength of the connection position between the main beam and the secondary beam, which can effectively ensure the strength of the connection position; in addition, by using fasteners to connect the first connecting member and the second connecting member, the stability and reliability of the connection between the main and secondary beams are effectively guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:

[0023] Figure 1 This is a schematic diagram of the connection method of the primary and secondary beams of an embodiment of the utility model;

[0024] Figure 2 This is a schematic diagram of the structure of the first connecting member in the main beam of an embodiment of the utility model;

[0025] Figure 3 This is a schematic diagram of the structure of the second connecting member in the secondary beam of an embodiment of the utility model;

[0026] Figure 4 This is a schematic diagram of the structure of the second connecting member of an embodiment of the utility model.

[0027] In the figure: 1. first connecting member; 1-1. first embedded part; 1-2. first connecting part; 1-3. connecting groove; 1-3-1. top opening; 1-3-2. side opening; 1-4. through hole; 1-5. anchoring member; 2. main beam; 3. second connecting member; 3-1. second embedded part; 3-2. second connecting part; 3-3. connector; 3-3-1. side plate; 3-3-2. connecting plate; 3-3-3. receiving groove; 3-4. through hole; 3-5. fixing plate; 3-6. casting hole; 4. secondary beam; 5. fastener. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the present invention.

[0029] In the description of the present invention, the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connection" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0030] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0031] The utility model provides a connection structure of assembled main and secondary beams, which realizes the connection of the main and secondary beams by pre-embedding part of a first connection member in the main beam, pre-embedding part of a second connection member in the secondary beam, and then connecting part of the first connection member protruding from the main beam with the second connection member protruding from the secondary beam.

[0032] Please refer to Figure 1-4 , see Figure 1 The connection structure of the assembled primary and secondary beams includes a first connection member 1 and a second connection member 3 that can realize assembly connection.

[0033] See Figure 2 The first connecting member 1 includes a first embedded portion 1-1 and a first connecting portion 1-2 fixedly connected by welding. The first embedded portion 1-1 is used to be embedded inside the main beam 2 when the main beam 2 is prefabricated, and the first connecting portion 1-2 is exposed on the outside of the main beam 2 for connecting the secondary beam.

[0034] The first embedded part 1-1 is a U-shaped structure formed by two side walls and a bottom wall, and the first connecting part 1-2 is fixed on one of the side walls. In order to increase the tensile strength of the U-shaped structure, a plurality of anchoring components 1-5 are installed in parallel between the two side walls of the U-shaped structure, and the anchoring components 1-5 are arranged on a side close to the top opening 1-3-1 of the U-shaped structure.

[0035] In this embodiment, the anchoring member 1-5 is a screw with external threads. The threads on the outside of the screw can increase the contact area with the concrete during the main beam pouring process, thereby helping to strengthen the connection with the main beam. Threaded holes that match the anchoring members 1-5 are arranged on the two side walls of the U-shaped structure, and the screw is fixedly connected to the U-shaped structure by threaded connection. In other embodiments, the screw can also be welded to the U-shaped structure.

[0036] See Figure 3 , Figure 4 The second connecting member 3 includes a second embedded portion 3-1 and a second connecting portion 3-2 which are fixedly connected by welding. The second embedded portion 3-1 is used to be embedded inside the secondary beam 4 when the secondary beam 4 is prefabricated, and the second connecting portion 3-2 is exposed on the outside of the secondary beam 4 for connecting the main beam.

[0037] The second embedded part 3-1 is a cylindrical structure with a quadrilateral cross section formed by four steel plates, the cylindrical structure has an inner cavity, and the opening of the cylindrical structure is arranged at an end away from the second connecting part 3-2. In this way, when the second embedded part 3-1 is poured on the secondary beam, concrete will also flow into the inner cavity of the cylindrical structure, thereby increasing the bonding strength between the second embedded part 3-1 and the secondary beam. In other embodiments, the second embedded part 3-1 can also be a rod-shaped structure.

[0038] One end of the cylindrical structure opposite to the opening is fixedly connected to a fixing plate 3-5 by welding, and the second connecting portion 3-2 is fixedly connected to the second embedded portion 3-1 by the fixing plate 3-5.

[0039] One of the first connection part 1-2 and the second connection part 3-2 has a connection groove 1-3, and the other has a connection head 3-3 for extending into the connection groove 1-3. In this embodiment, the connection groove 1-3 is arranged on the first connection part 1-2, and the connection head 3-3 is arranged on the second connection part 3-2. In other embodiments, the connection groove 1-3 can also be arranged on the second connection part 3-2, and the connection head 3-3 is arranged on the first connection part 1-2.

[0040] The two opposite side walls of the connection groove 1-3 are provided with a plurality of symmetrically arranged perforations 1-4, and the connector 3-3 is provided with through holes 3-4 corresponding to the perforations 1-4. The connector 3-3 is inserted into the connection groove 1-3 and can pass through the fastener 5 through the perforation 1-4 and the through hole 3-4 at the same time to fix the first connection part 1-2 and the second connection part 3-2. In this embodiment, the fastener 5 is a screw, and the inner wall of the perforation 1-4 has a thread adapted to the fastener 5, and the through hole 3-4 is a light hole. When connecting the connection groove 1-3 and the connector 3-3, the connector 3-3 is first inserted into the connection groove 1-3, and then the fastener 5 is used to pass through the perforation 1-4 and the through hole 3-4 at the same time, so that the connection groove 1-3 and the connector 3-3 are fixedly connected. In other embodiments, the fastener 5 can also be a connecting pin, and after the connecting pin passes through the perforation 1-4 and the through hole 3-4 at the same time, the connecting pin is welded and fixed to the perforation 1-4.

[0041] In this embodiment, the connection groove 1-3 has a top opening 1-3-1 and a side opening 1-3-2. The side opening 1-3-2 is arranged at a side away from the first embedded part 1-1 for the connection head 3-3 to extend into the connection groove 1-3, and the top opening 1-3-1 is used for pouring a consolidation. After the connection head 3-3 is inserted into the connection groove 1-3 through the side opening 1-3-2, the fixing plate 3-5 just blocks the side opening 1-3-2. At this time, the connection groove 1-3 and the fixing plate 3-5 form a cavity with only the top opening 1-3-1. By pouring concrete into the cavity as a consolidation, the strength of the connection between the primary and secondary beams can be further improved.

[0042] In this embodiment, the connecting head 3-3 is an I-beam, which has two relatively parallel side panels 3-3-1 and a connecting plate 3-3-2 arranged between the two side panels 3-3-1. The width of the side panel 3-3-1 is smaller than the width of the top opening 1-3-1 of the connecting groove 1-3. The connecting plate 3-3-2 divides the space between the two side panels 3-3-1 into two accommodating grooves 3-3-3.

[0043] In order to facilitate pouring concrete into the receiving groove 3-3-3, after the connector 3-3 is inserted into the connecting groove 1-3, two pouring holes 3-6 are provided on the side plate 3-3-1 facing the top opening 1-3-1, and each pouring hole 3-6 corresponds to a receiving groove 3-3-3, and is used to pour concrete into the receiving groove 3-3-3 as a consolidation material. In other embodiments, the consolidation material may also be an adhesive or glue.

[0044] The working principle of this utility model:

[0045] During the processing of the main and secondary beams, the first embedded part 1-1 and the second embedded part 3-1 are placed in the mold for casting the main beam 2 and the secondary beam 4 respectively, and then the main beam 2 and the secondary beam 4 are cast. After the casting of the main beam 2 and the secondary beam 4 is completed, the first connecting member 1 is integrally fixedly connected to the main beam, and the second connecting member 3 is integrally fixedly connected to the secondary beam. In the subsequent assembly process, the connecting head 3-3 of the second connecting part 3-2 is first extended into the side opening 1-3-2 of the connecting groove 1-3, and the first connecting part 1-2 is fixedly connected to the second connecting part 3-2 by the fastener 5, and then concrete is poured into the connecting groove 1-3 through the top opening 1-3-1 to further strengthen the connection between the main and secondary beams.

[0046] It should be understood that the above description is merely exemplary and the embodiments of the present application do not limit this.

[0047] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.

Claims

1. A connection structure of assembled primary and secondary beams, characterized in that: include: A first connecting member (1), the first connecting member (1) comprising a first embedded portion (1-1) and a first connecting portion (1-2) which are fixedly connected, the first embedded portion (1-1) being used to be embedded inside the main beam (2) when the main beam (2) is prefabricated, and the first connecting portion (1-2) is arranged outside the main beam (2); A second connecting member (3), the second connecting member (3) comprising a second embedded portion (3-1) and a second connecting portion (3-2) which are fixedly connected, the second embedded portion (3-1) being used to be embedded inside the secondary beam (4) when the secondary beam (4) is prefabricated, and the second connecting portion (3-2) being arranged outside the secondary beam (4); One of the first connecting part (1-2) and the second connecting part (3-2) has a connecting groove (1-3), and the other has a connecting head (3-3) for extending into the connecting groove (1-3); two opposite side walls of the connecting groove (1-3) have symmetrically arranged through holes (1-4); the connecting head (3-3) is provided with through holes (3-4) corresponding to the through holes (1-4); the connecting head (3-3) extends into the connecting groove (1-3) and can pass through the through holes (1-4) and the through holes (3-4) at the same time through a fastener (5) to fix the first connecting part (1-2) and the second connecting part (3-2).

2. The connection structure of the assembled primary and secondary beams according to claim 1 is characterized in that: The first embedded part (1-1) is a U-shaped structure formed by two side walls and a bottom wall, and the first connecting part (1-2) is fixed on one of the side walls.

3. The connection structure of the assembled primary and secondary beams according to claim 1 is characterized in that: The connecting groove (1-3) has a top opening (1-3-1) and a side opening (1-3-2); the side opening (1-3-2) is arranged on a side away from the first embedded part (1-1) and is used for allowing the connecting head (3-3) to extend into the connecting groove (1-3); and the top opening (1-3-1) is used for pouring a consolidation material.

4. The connection structure of the assembled primary and secondary beams according to claim 2 is characterized in that: A plurality of anchoring components (1-5) are arranged in parallel between the two side walls of the U-shaped structure. The anchoring components (1-5) are arranged on a side close to the top opening (1-3-1) of the U-shaped structure to increase the tensile strength of the U-shaped structure.

5. The connection structure of the assembled primary and secondary beams according to claim 4 is characterized in that: The anchoring component (1-5) is a screw rod, and the two ends of the screw rod are respectively fixedly connected to the two side walls of the U-shaped structure.

6. The connection structure of the assembled primary and secondary beams according to any one of claims 1 to 5, characterized in that: The second embedded part (3-1) is a tubular structure with an inner cavity, and the opening of the tubular structure is arranged at an end away from the second connecting part (3-2).

7. The connection structure of the assembled primary and secondary beams according to claim 6 is characterized in that: A fixing plate (3-5) is fixedly connected to one end of the cylindrical structure opposite to the opening, and the second connecting portion (3-2) is fixedly connected to the second embedded portion (3-1) via the fixing plate (3-5).

8. The connection structure of the assembled primary and secondary beams according to claim 6, characterized in that: The cross section of the cylindrical structure is a quadrilateral.

9. The connection structure of the assembled primary and secondary beams according to claim 3 is characterized in that: The connector (3-3) comprises two side plates (3-3-1) arranged relatively in parallel and a connecting plate (3-3-2) arranged between the two side plates (3-3-1); the width of the side plate (3-3-1) is smaller than the width of the top opening (1-3-1) of the connecting groove (1-3); and the connecting plate (3-3-2) divides the space between the two side plates (3-3-1) into two accommodating grooves (3-3-3).

10. The connection structure of assembled primary and secondary beams according to claim 9, characterized in that: After the connecting head (3-3) extends into the connecting groove (1-3), two pouring holes (3-6) are provided on the side plate (3-3-1) facing the top opening (1-3-1), and each pouring hole (3-6) corresponds to a receiving groove (3-3-3) and is used for pouring a consolidation material into the receiving groove (3-3-3).