A transmission cable erection device for renewable energy power generation

By designing a transmission cable mount device for new energy power generation including pulley mechanism, main mechanism and clamping mechanism, the problem that existing devices cannot limit and erection heights for cables of different diameters is solved, and convenient installation and stable clamping of cables are achieved.

CN222749979UActive Publication Date: 2025-04-11HONGHE YUNNENG INVESTMENT NEW ENERGY DEV CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420862896.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-04-11
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

The existing cable mount devices do not have the function of limiting cables of different diameters, and the mount height is inconvenient to adjust, which affects construction work.

Method used

A transmission cable mount device for new energy power generation, including a pulley mechanism, a main mechanism and a clamping mechanism, is designed. The pulley mechanism realizes convenient movement of the cable through the combination of the first and second sets of pulleys and T-shaped fixing frames. The main mechanism moves through a plurality of driving motors and spiral rods, and the clamping mechanism realizes stable clamping of the cable through an electric push rod and an arc fixing plate.

Benefits of technology

The device realizes convenient installation and movement of the cable through a combination of pulley mechanism and main mechanism, and the clamping mechanism ensures stable clamping of the cable, solving the problem that existing devices cannot limit and mount heights for cables of different diameters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222749979U_ABST
    Figure CN222749979U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of erection devices, specifically to an erection device for power transmission cables for new energy power generation, comprising a pulley mechanism, a main body mechanism, and a clamping mechanism, wherein the main body mechanism is fixedly arranged on the top of the pulley mechanism, and the clamping mechanism is fixedly arranged on the bottom of the main body mechanism, the pulley mechanism comprises a first group of pulleys, a second group of pulleys, and a T-shaped fixing frame, a second group of pulleys is fixedly arranged on one side of the first group of pulleys, and a T-shaped fixing frame is fixedly arranged on the tops of the first group of pulleys and the second group of pulleys, and a first drive motor fixing box, a first spiral rod, a second drive motor fixing box, a second spiral rod, a third drive motor fixing box, a third spiral rod, a fourth drive motor fixing box, a fourth spiral rod and a U-shaped fixing frame are fixed around a fixed shell of the device, and a first group of electric push rods, a first arc fixing plate, a second arc fixing plate, a second group of electric push rods, and a camera are fixed inside the erection device to facilitate installation and clamping of cable movement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of erection devices, in particular to an erection device for transmission cables used for renewable energy power generation. Background Art

[0002] New energy generally refers to renewable energy that is developed and utilized based on new technologies, including solar energy, biomass energy, wind energy, geothermal energy, wave energy, ocean current energy and tidal energy. During the construction of new energy projects, cable laying equipment is needed to support the cables.

[0003] In the specification of the Chinese utility model patent application CN219164082U, a transmission cable installation device for renewable energy power generation is disclosed, comprising a support plate, an adjustment box is arranged on the top of the support plate, a motor is fixedly connected to the top of the inner cavity of the adjustment box, and the output ends on both sides of the motor are fixedly connected to a first threaded rod, a threaded sleeve is threadedly connected to the surface of the first threaded rod, and a movable rod is movably connected to the bottom of the threaded sleeve, and the bottom of the movable rod passes through the adjustment box and is movably connected to the support plate. The utility model solves the problem that the existing cable installation device does not have the function of limiting the position of cables of different diameters, and the installation height is not easy to adjust, which is easy to affect the construction work, but the device does not solve the problem of inconvenience in installing and clamping the laying cable. For this reason, we propose a transmission cable installation device for renewable energy power generation. Utility Model Content

[0004] The purpose of the utility model is to provide a transmission cable installation device for renewable energy power generation to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A transmission cable installation device for renewable energy power generation comprises a pulley mechanism, a main body mechanism and a clamping mechanism, wherein the main body mechanism is fixedly arranged on the top of the pulley mechanism, and the clamping mechanism is fixedly arranged on the bottom of the main body mechanism, and the pulley mechanism comprises a first group of pulleys, a second group of pulleys and a T-shaped fixing frame, a second group of pulleys is fixedly arranged on one side of the first group of pulleys, and a T-shaped fixing frame is fixedly arranged on the top of the first group of pulleys and the second group of pulleys.

[0007] Preferably, the main body mechanism includes a device fixing shell, a first drive motor fixing box, and a first screw rod. The first drive motor fixing box is fixedly arranged on the left side of the device fixing shell, which is conducive to better fixing the main body mechanism.

[0008] Preferably, a first screw rod is fixedly provided on the top of the first drive motor fixing box, a second drive motor fixing box is fixedly provided on the right side of the first drive motor fixing box, a second screw rod is fixedly provided on the top of the second drive motor fixing box, a third drive motor fixing box is fixedly provided on the right side of the second drive motor fixing box, and a third screw rod is fixedly provided on the top of the third drive motor fixing box, which is conducive to better driving the movement of the power transmission cable erection device for new energy power generation.

[0009] Preferably, a fourth drive motor fixing box is fixedly provided on one side of the third drive motor fixing box, a fourth screw rod is fixedly provided on the top of the fourth drive motor fixing box, a control button group is fixedly provided on the top of the device fixing box, and an information structure antenna is fixedly provided on one side of the control button group, which is conducive to better control of the transmission cable erection device for new energy power generation.

[0010] Preferably, the clamping mechanism comprises a U-shaped fixing frame, a first group of electric push rods, and a first arc fixing plate, and the first group of electric push rods are fixedly arranged inside the U-shaped fixing frame, which is conducive to better fixing the clamping mechanism.

[0011] Preferably, a first arc fixing plate is fixedly provided on one side of the first group of electric push rods, a second arc fixing plate is fixedly provided on one side of the first arc fixing plate, a second group of electric push rods is fixedly provided on one side of the second arc fixing plate, and a camera is fixedly provided on one side of the U-shaped fixing frame, which is conducive to better clamping the cable.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The transmission cable installation device for new energy power generation achieves the purpose of facilitating installation and clamping the movement of the transmission cable for new energy power generation by fixing the first drive motor fixing box, the first spiral rod, the second drive motor fixing box, the second spiral rod, the third drive motor fixing box, the third spiral rod, the fourth drive motor fixing box, the fourth spiral rod on the four sides of the device fixing shell of the main body mechanism and the first group of electric push rods, the first arc fixing plate, the second arc fixing plate, the second group of electric push rods and the camera inside the U-shaped fixing frame of the clamping mechanism.

[0014] The transmission cable erection device for renewable energy power generation achieves the purpose of facilitating the movement of the transmission cable erection device for renewable energy power generation through a pulley mechanism and a combined design in which a control button group and an information structure antenna are fixedly arranged on the top of a device fixed shell. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1This is a schematic diagram of the internal structure of the power transmission cable installation device for renewable energy power generation of the utility model;

[0016] Figure 2 This is a schematic diagram of the top structure of the fixed housing of the device of the utility model;

[0017] Figure 3 This is a schematic diagram of the bottom structure of the fixed housing of the device of the utility model;

[0018] Figure 4 It is a schematic diagram of a camera of the present utility model.

[0019] In the figure: 1. pulley mechanism; 101. first group of pulleys; 102. second group of pulleys; 103. T-shaped fixing frame; 2. main body mechanism; 201. device fixing shell; 202. first drive motor fixing box; 203. first screw rod; 204. second drive motor fixing box; 205. second screw rod; 206. third drive motor fixing box; 207. third screw rod; 208. fourth drive motor fixing box; 209. fourth screw rod; 210. control button group; 211. information structure antenna; 3. clamping mechanism; 301. U-shaped fixing frame; 302. first group of electric push rods; 303. first arc fixing plate; 304. second arc fixing plate; 305. second group of electric push rods; 306. camera. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-Figure 4 As shown, the utility model provides a technical solution for a transmission cable installation device for renewable energy power generation:

[0022] A transmission cable installation device for renewable energy power generation comprises a pulley mechanism 1, a main body mechanism 2, and a clamping mechanism 3. The main body mechanism 2 is fixedly arranged on the top of the pulley mechanism 1, and the clamping mechanism 3 is fixedly arranged on the bottom of the main body mechanism 2. The pulley mechanism 1 comprises a first group of pulleys 101, a second group of pulleys 102, and a T-shaped fixing frame 103. The second group of pulleys 102 is fixedly arranged on one side of the first group of pulleys 101, and the T-shaped fixing frame 103 is fixedly arranged on the top of the first group of pulleys 101 and the second group of pulleys 102.

[0023] In this embodiment, preferably, the main body mechanism 2 includes a device fixing shell 201, a first drive motor fixing box 202, and a first screw rod 203. The first drive motor fixing box 202 is fixedly arranged on the left side of the device fixing shell 201, which is conducive to better fixing the main body mechanism 2.

[0024] In this embodiment, preferably, a first screw rod 203 is fixedly provided on the top of the first drive motor fixing box 202, a second drive motor fixing box 204 is fixedly provided on the right side of the first drive motor fixing box 202, a second screw rod 205 is fixedly provided on the top of the second drive motor fixing box 204, a third drive motor fixing box 206 is fixedly provided on the right side of the second drive motor fixing box 204, and a third screw rod 207 is fixedly provided on the top of the third drive motor fixing box 206, which is conducive to better driving the movement of the transmission cable erection device for new energy power generation.

[0025] In this embodiment, preferably, a fourth drive motor fixing box 208 is fixedly provided on one side of the third drive motor fixing box 206, a fourth screw rod 209 is fixedly provided on the top of the fourth drive motor fixing box 208, a control button group 210 is fixedly provided on the top of the device fixing shell 201, and an information structure antenna 211 is fixedly provided on one side of the control button group 210, which is conducive to better control of the transmission cable erection device for renewable energy power generation.

[0026] In this embodiment, preferably, the clamping mechanism 3 includes a U-shaped fixing frame 301 , a first set of electric push rods 302 , and a first arc fixing plate 303 . The first set of electric push rods 302 are fixedly arranged inside the U-shaped fixing frame 301 , which is conducive to better fixing the clamping mechanism 3 .

[0027] In this embodiment, preferably, a first arc fixing plate 303 is fixedly provided on one side of the first group of electric push rods 302, a second arc fixing plate 304 is fixedly provided on one side of the first arc fixing plate 303, a second group of electric push rods 305 is fixedly provided on one side of the second arc fixing plate 304, and a camera 306 is fixedly provided on one side of the U-shaped fixing frame 301, which is conducive to better clamping the cable.

[0028] When a power transmission cable installation device for renewable energy power generation of the present embodiment is in use, one end of the cable is clamped in the middle of the first arc fixing plate 303 and the second arc fixing plate 304, and the control button group 210 on the top of the fixed shell 201 of the control device controls the first group of electric push rods 302 and the second group of electric push rods 305 to clamp the cable. When the power transmission cable installation device for renewable energy power generation is working, the fixed shell 201 of the device is driven to move by the first drive motor fixed box 202, the first spiral rod 203, the second drive motor fixed box 204, the second spiral rod 205, the third drive motor fixed box 206, the third spiral rod 207, the fourth drive motor fixed box 208, and the fourth spiral rod 209. When the power transmission cable installation device for renewable energy power generation reaches the destination, the pulley mechanism 1 reduces the resistance and safely delivers the cable to the destination.

[0029] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A transmission cable installation device for renewable energy power generation, comprising a pulley mechanism (1), a main body mechanism (2), and a clamping mechanism (3), characterized in that; The main body mechanism (2) is fixedly arranged on the top of the pulley mechanism (1), the clamping mechanism (3) is fixedly arranged on the bottom of the main body mechanism (2), the pulley mechanism (1) comprises a first group of pulleys (101), a second group of pulleys (102), and a T-shaped fixing frame (103), the second group of pulleys (102) is fixedly arranged on one side of the first group of pulleys (101), and the T-shaped fixing frame (103) is fixedly arranged on the top of the first group of pulleys (101) and the second group of pulleys (102).

2. A power transmission cable installation device for renewable energy power generation according to claim 1, characterized in that: The main body mechanism (2) comprises a device fixing shell (201), a first drive motor fixing box (202), and a first spiral rod (203); the first drive motor fixing box (202) is fixedly arranged on the left side of the device fixing shell (201).

3. A power transmission cable installation device for renewable energy power generation according to claim 2, characterized in that: A first spiral rod (203) is fixedly arranged on the top of the first drive motor fixing box (202), a second drive motor fixing box (204) is fixedly arranged on the right side of the first drive motor fixing box (202), a second spiral rod (205) is fixedly arranged on the top of the second drive motor fixing box (204), a third drive motor fixing box (206) is fixedly arranged on the right side of the second drive motor fixing box (204), and a third spiral rod (207) is fixedly arranged on the top of the third drive motor fixing box (206).

4. A power transmission cable installation device for renewable energy power generation according to claim 3, characterized in that: A fourth drive motor fixing box (208) is fixedly arranged on one side of the third drive motor fixing box (206), a fourth screw rod (209) is fixedly arranged on the top of the fourth drive motor fixing box (208), a control button group (210) is fixedly arranged on the top of the device fixing shell, and an information structure antenna (211) is fixedly arranged on one side of the control button group (210).

5. The power transmission cable installation device for renewable energy power generation according to claim 1, characterized in that: The clamping mechanism (3) comprises a U-shaped fixing frame (301), a first group of electric push rods (302), and a first arc fixing plate (303); the first group of electric push rods (302) are fixedly arranged inside the U-shaped fixing frame (301).

6. A power transmission cable installation device for renewable energy power generation according to claim 5, characterized in that: A first arc fixing plate (303) is fixedly arranged on one side of the first group of electric push rods (302), a second arc fixing plate (304) is fixedly arranged on one side of the first arc fixing plate (303), a second group of electric push rods (305) is fixedly arranged on one side of the second arc fixing plate (304), and a camera (306) is fixedly arranged on one side of the U-shaped fixing frame (301).

Citation Information

Patent Citations

  • Power transmission cable erecting device for new energy power generation

    CN219164082U