Water conservancy construction diversion equipment
By designing a water conservancy construction diversion equipment with components including corrugated hoses, installation pipes, clamps, etc., the problem that existing equipment cannot flexibly respond to the diversion operation needs, and flexible adjustment of water flow output and introduction height is achieved, and the convenience and diversity of construction are improved.
Patent Information
- Application Number
- CN202421358800.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-14
AI Technical Summary
The existing water conservancy construction diversion equipment cannot flexibly respond to the diversion operation needs and cannot adjust the height of the water flow position, resulting in inconvenience in construction.
A water conservancy construction flow diversion equipment is designed, including corrugated hoses, installation pipes, clamps, ropes, floats, ground cones, flow diversion cones and other components. Through the adjustment of clamps and installation pipes, the flexibility of water flow is achieved, and the height of the flow diversion equipment is adjusted through the coordination of counterweight rings and floating rings.
The equipment can flexibly adjust the height of water flow output and introduction, adapt to the construction needs of different sites and scenarios, and improve the convenience and diversity of construction.
Smart Images

Figure CN222758799U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy construction equipment, in particular to water conservancy construction diversion equipment. Background Art
[0002] Water conservancy construction, also known as water conservancy project construction, refers to the construction and maintenance of water conservancy project facilities using construction machinery, equipment, materials and labor in accordance with the planning and design documents of the water conservancy project and the requirements of the contract. This process involves a series of work such as construction plan design, construction organization, and construction site management according to the specific requirements of the project to ensure that the project is successfully completed in accordance with the planning design and standard requirements. Water conservancy projects have strict requirements on the foundation, because the projects are often located in areas and locations with complex geological conditions. If the foundation is not properly handled, it will leave hidden dangers that are difficult to remedy afterwards. In addition, water conservancy projects are mostly constructed in rivers, lakes, coastal areas and other waters, and construction diversion, interception and underwater operations must be carried out according to the natural conditions of the water flow and the requirements of the project construction.
[0003] In the process of water conservancy construction, it is generally necessary to divert water flows in different water areas in order to cooperate with operations, such as water use, sampling, and diversion of water diversion channels. However, the existing diversion equipment is generally interception and diversion, which cannot meet the needs of flexible diversion operations, thus causing many inconveniences and is unable to divert the height of the water flow position. Based on this, we propose a water conservancy construction diversion equipment. Utility Model Content
[0004] The purpose of the utility model is to provide a water conservancy construction diversion device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water conservancy construction diversion equipment, including a corrugated hose, one end of the corrugated hose is connected to a first mounting pipe, the outer side of the first mounting pipe is movably clamped with a first clamp, a rope is fixedly installed on the top of the first clamp, a buoy is fixedly installed on the top of the rope, a reflective sticker is arranged on the outer side of the buoy, a ground cone is fixedly installed on the bottom of the first clamp, a diversion cone is fixedly installed on the outer side of the first mounting pipe, the other end of the corrugated hose is connected to a second mounting pipe, the outer side of the second mounting pipe is movably clamped with a second clamp, and the second clamp is fixedly installed on the outer side of the second mounting pipe. A telescopic tube is fixedly installed on the top, a support plate is fixedly installed on the top of the telescopic tube, a floating ring is fixedly installed on the outer side of the top of the support plate, a counterweight ring is fixedly sleeved on the outer side of the second mounting tube, a filling pipe is connected to the top of the counterweight ring, a sealing plug is movably installed on the top of the filling pipe, a sealing ring is movably installed inside one end of the second mounting tube, a second cross bracket is fixedly installed inside the second mounting tube, a waterproof generator is fixedly installed inside the second cross bracket, the rotating end of the waterproof generator is transmission-connected with a spiral rotating rod, and the first cross bracket is installed on the outer side of the other end of the spiral rotating rod through a bearing.
[0006] Preferably, a plurality of barbed cones are fixedly mounted on the bottom end of the ground cone, and a flash light is arranged on the outer side of the buoy.
[0007] Preferably, the first clamp and the second clamp are fixedly clamped to the outer sides of the first mounting tube and the second mounting tube respectively by bolts.
[0008] Preferably, the sealing plug is connected to the inside of the filling pipe by threads.
[0009] Preferably, a soft sealing plug is provided on the inner side of the sealing ring, and the specification and size of the first mounting tube are matched with the specification and size of the second mounting tube.
[0010] Preferably, the first cross bracket is fixedly mounted on the inner side of the second mounting tube.
[0011] Compared with the prior art, the beneficial effect of the utility model is that when the structure is in use, the user clamps the first clamp and the second clamp on the outer sides of the first mounting tube and the second mounting tube respectively, and sinks one end of the first clamp into the water so that the bottom of the ground cone is inserted into the water ground, and in the process of sinking, the interior of the corrugated hose is filled with water, the second clamp at the other end is placed at the outlet where diversion is required, and the sealing plug is opened to inject a certain amount of water into the counterweight ring, so as to increase the weight of the counterweight ring, when the counterweight ring without water is matched with the floating ring to maximize the buoyancy, and the length of the telescopic tube is adjusted so that the height of the second mounting tube relative to the water surface can be adjusted, and finally the sealing ring is released, the water flow inside the corrugated hose is led out, and as the water flow flows, the water flow at one end of the first mounting tube is diverted and drawn out through the siphon principle, so as to facilitate the diversion operation, and the overall solution is easy to use, can adapt to different venues and scenes, is easy to combine, and increases the overall convenience of use;
[0012] By setting the first clamp and the second clamp, in actual use, the installation of the first clamp and the second clamp on the outside of the first mounting tube and the second mounting tube can be swapped, and the water inlet height can be changed according to needs to achieve the effect of diverting and sampling water flows at different heights, thereby increasing the diversified combined operation effects, facilitating the diversion needs of different water conservancy operations, and increasing the convenience of use. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the front three-dimensional appearance structure of the utility model.
[0014] Figure 2 It is a schematic diagram of the rear-view stereoscopic appearance structure of the utility model.
[0015] Figure 3 It is a front sectional structural schematic diagram of the utility model.
[0016] Figure 4 For this utility model Figure 3 Enlarged structural diagram at A in the middle.
[0017] In the figure: 1. corrugated hose; 2. first clamp; 3. rope; 4. buoy; 5. reflective tape; 6. ground cone; 7. guide cone; 8. first mounting pipe; 9. second mounting pipe; 10. second clamp; 11. counterweight ring; 12. sealing ring; 13. sealing plug; 14. telescopic pipe; 15. floating ring; 16. support plate; 17. first cross bracket; 18. spiral rotating rod; 19. waterproof generator; 20. second cross bracket; 21. filling pipe. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-Figure 4 The utility model provides a technical solution: a water conservancy construction diversion device, comprising a corrugated hose 1, one end of the corrugated hose 1 is connected with a first mounting pipe 8, the outer side of the first mounting pipe 8 is movably clamped with a first clamp 2, a rope 3 is fixedly installed on the top of the first clamp 2, a buoy 4 is fixedly installed on the top of the rope 3, a reflective sticker 5 is arranged on the outer side of the buoy 4, a ground cone 6 is fixedly installed on the bottom of the first clamp 2, a diversion cone 7 is fixedly installed on the outer side of the first mounting pipe 8, the other end of the corrugated hose 1 is connected with a second mounting pipe 9, the outer side of the second mounting pipe 9 is movably clamped with a second clamp 10, and the top of the second clamp 10 is fixedly installed with a telescopic pipe 14 A support plate 16 is fixedly installed on the top of the telescopic tube 14, and a floating ring 15 is fixedly installed on the outer side of the top of the support plate 16. A counterweight ring 11 is fixedly sleeved on the outer side of the second mounting tube 9. A filling pipe 21 is connected to the top of the counterweight ring 11, and a sealing plug 13 is movably installed on the top of the filling pipe 21. A sealing ring 12 is movably installed inside one end of the second mounting tube 9, and a second cross bracket 20 is fixedly installed inside the second mounting tube 9. A waterproof generator 19 is fixedly installed inside the second cross bracket 20. The rotating end of the waterproof generator 19 is transmission-connected with a spiral rotating rod 18, and a first cross bracket 17 is installed on the outer side of the other end of the spiral rotating rod 18 through a bearing.
[0020] The working principle of the above technical solution is as follows: when in use, the user clamps the first clamp 2 and the second clamp 10 on the outside of the first mounting tube 8 and the second mounting tube 9 respectively, and sinks one end of the first clamp 2 into the water so that the bottom of the ground cone 6 is inserted into the water ground, and in the process of sinking, the inside of the corrugated hose 1 is filled with water, and the second clamp 10 at the other end is placed at the outlet where the diversion is required, and the sealing plug 13 is opened to inject a certain amount of water into the counterweight ring 11, so as to increase the weight of the counterweight ring 11. When the counterweight ring 11 without water is combined with the floating ring 15 to make the floating ring 15 float, the counterweight ring 11 is not filled with water. The force is maximum, and the length of the telescopic tube 14 is adjusted so that the height of the second mounting tube 9 relative to the water surface can be adjusted. Finally, the sealing ring 12 is released, and the water flow inside the corrugated hose 1 is discharged. As the water flows, the water flow at one end of the first mounting tube 8 is diverted and drawn out through the siphon principle, which is convenient for the diversion operation. The impact of the water flow will drive the spiral rotating rod 18 to rotate, and then generate electricity through the waterproof generator 19, so as to achieve the purpose of lighting the small light bulb. The overall solution is easy to use, can adapt to different venues and scenes, is easy to combine, and increases the overall convenience of use.
[0021] In another embodiment, Figure 1-Figure 3 As shown, a plurality of barbed cones are fixedly mounted on the bottom end of the ground cone 6, and a flash light is arranged on the outside of the buoy 4.
[0022] The barbed cone setting of the piercing cone 6 is convenient for piercing into the mud on the bottom of the water, which increases the stability of the structure and facilitates stabilizing the working position. The flash light on the outside of the buoy 4 can be lit up when the power is connected to the output of the waterproof generator 19, which is convenient for operators to determine the location of the first clamp 2 and increases the convenience of use.
[0023] In another embodiment, Figure 1-Figure 4 As shown, the first clamp 2 and the second clamp 10 are fixedly clamped on the outer sides of the first mounting tube 8 and the second mounting tube 9 respectively by bolts.
[0024] By setting the first clamp 2 and the second clamp 10, in actual use, the installation of the first clamp 2 and the second clamp 10 on the outside of the first mounting tube 8 and the second mounting tube 9 can be exchanged, and the height of the water inlet can be changed according to needs, so as to achieve the effect of diverting and sampling water flows at different heights, increase the diversity of combined operation effects, facilitate the diversion needs of different water conservancy operations, and increase the convenience of use.
[0025] In another embodiment, Figure 3 and Figure 4 As shown, the sealing plug 13 is connected to the inside of the filling pipe 21 by threads.
[0026] The function of the filling pipe 21 is to pour water or other fluids inside to fill the space inside the counterweight ring 11, so that the counterweight ring 11 can adapt to different weights, and then cooperate with the floating ring 15, so that the second mounting pipe 9 and the second clamp 10 are in relative positions, which is convenient for adjusting different positions, increases the adjustment degree of the coordinating buoyancy, and is easy to use.
[0027] In another embodiment, Figure 1-Figure 4 As shown, a soft sealing plug is provided on the inner side of the blocking ring 12 , and the specification and size of the first mounting tube 8 are matched with the specification and size of the second mounting tube 9 .
[0028] The blocking ring 12 can block the first mounting tube 8 and the second mounting tube 9, making it easy to change the positions of the two ends according to needs during installation, thereby increasing the convenience of blocking during deployment.
[0029] In another embodiment, Figure 3 and Figure 4 As shown, the first cross bracket 17 is fixedly mounted on the inner side of the second mounting tube 9 .
[0030] The first cross bracket 17 provides support for the spiral rotating rod 18 through the bearing, so as to facilitate rotation support, stabilize the transmission torque of the spiral rotating rod 18, and facilitate the application of the rotation torque to the waterproof generator 19, so that the waterproof generator 19 can be driven to rotate through the transmission connection, thereby stabilizing the operating torque.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water conservancy construction diversion device, comprising a corrugated hose (1), characterized in that: One end of the corrugated hose (1) is connected to a first mounting tube (8), the outer side of the first mounting tube (8) is movably clamped with a first clamp (2), the top of the first clamp (2) is fixedly mounted with a rope (3), the top of the rope (3) is fixedly mounted with a buoy (4), the outer side of the buoy (4) is provided with a reflective sticker (5), the bottom of the first clamp (2) is fixedly mounted with a ground cone (6), the outer side of the first mounting tube (8) is fixedly mounted with a guide cone (7), the other end of the corrugated hose (1) is connected to a second mounting tube (9), the outer side of the second mounting tube (9) is movably clamped with a second clamp (10), the top of the second clamp (10) is fixedly mounted with a telescopic tube (14), the top of the telescopic tube (14) is fixedly mounted A support plate (16) is provided, a floating ring (15) is fixedly installed on the outer side of the top of the support plate (16), a counterweight ring (11) is fixedly sleeved on the outer side of the second mounting tube (9), a filling pipe (21) is connected to the top of the counterweight ring (11), a sealing plug (13) is movably installed on the top of the filling pipe (21), a sealing ring (12) is movably installed inside one end of the second mounting tube (9), a second cross bracket (20) is fixedly installed inside the second mounting tube (9), a waterproof generator (19) is fixedly installed inside the second cross bracket (20), a rotating end of the waterproof generator (19) is transmission-connected with a spiral rotating rod (18), and a first cross bracket (17) is installed on the outer side of the other end of the spiral rotating rod (18) through a bearing.
2. A water conservancy construction diversion equipment according to claim 1, characterized in that: A plurality of barbed cones are fixedly mounted on the bottom end of the ground-piercing cone (6), and a flash light is arranged on the outer side of the buoy (4).
3. A water conservancy construction diversion equipment according to claim 1, characterized in that: The first clamp (2) and the second clamp (10) are respectively fixedly clamped on the outside of the first mounting tube (8) and the second mounting tube (9) by bolts.
4. A water conservancy construction diversion equipment according to claim 1, characterized in that: The sealing plug (13) is connected to the inside of the filling pipe (21) by means of threads.
5. A water conservancy construction diversion equipment according to claim 1, characterized in that: A soft sealing plug is provided on the inner side of the sealing ring (12), and the specification and size of the first mounting tube (8) are compatible with the specification and size of the second mounting tube (9).
6. A water conservancy construction diversion equipment according to claim 1, characterized in that: The first cross bracket (17) is fixedly mounted on the inner side of the second mounting tube (9).