Tubular pile foundation pit supporting structure
By adopting the staggered joint technology of lower section pipe piles and upper section pipe piles in steel pipe piles, combined with the use of limit components and inclination sensors, the time-consuming problem of welding displacement and sinking measurement of steel pipe piles is solved, and the rapid, accurate and stable pipe pile connection and pile sinking effect is achieved.
Patent Information
- Application Number
- CN202421496074.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-27
AI Technical Summary
Existing steel pipe piles are easily displaced during welding, resulting in poor welding effect and require manual measurement during sinking, which is time-consuming and labor-intensive and inefficient.
The lower section pipe pile and the upper section pipe pile are inserted in a staggered joint through grooves and plug blocks, and the pipe piles are ensured vertically sinking through limiting components and inclination sensors, achieving fast, accurate and stable connection.
It realizes rapid, accurate and stable connection of the lower section pipe piles and the upper section pipe piles to ensure that the pipe piles sink vertically and improves the stable support effect of the foundation pit.
Smart Images

Figure CN222758900U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of foundation pit engineering, and in particular to a pipe pile foundation pit support structure. Background Art
[0002] The pipe pile foundation pit support structure uses the strength and rigidity of steel pipe piles to form a pile wall around the foundation pit to support the weight and water pressure of the surrounding soil and ensure the stability and safety of the foundation pit. Steel pipe piles generally use steel pipes with larger diameters and thicker walls. Different lengths and diameters can be used according to actual needs. During the construction process, the steel pipe piles first need to be statically pressed down by a crane to form a pile wall. The steel pipe piles need to be connected to form an overall pile wall structure.
[0003] Existing steel pipe piles are generally divided into two sections, one section is first driven into the ground, and then the other section is welded to the steel pipe pile, and then the two sections of steel pipe piles are driven into the ground. However, the two sections of steel pipe piles are easily displaced during the welding process, resulting in poor welding effect, unstable fixation of the two sections of steel pipe piles, and the steel pipe piles generally need to be continuously measured by staff during the sinking process to ensure that they sink vertically, which is time-consuming and labor-intensive, and inefficient, so there is a large room for improvement;
[0004] The above information disclosed in the background technology is only used to increase the understanding of the background technology of the present application, and therefore, it may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content
[0005] In order to solve the above-mentioned problems, the present application provides a pipe pile foundation pit support structure.
[0006] The present application provides a pipe pile foundation pit support structure adopting the following technical solution:
[0007] A pipe pile foundation pit support structure comprises a lower pipe pile and an upper pipe pile, the top of the lower pipe pile is provided with a groove, the bottom of the upper pipe pile is fixedly connected with a plug-in block, the plug-in block is adapted to the groove, the lower pipe pile and the upper pipe pile are staggeredly plugged through the groove and the plug-in block, the outer surface of the lower pipe pile is movably connected with a limiting assembly, the limiting assembly comprises a fixed block, two fixed rings, a plurality of balls, an inclination sensor and a plurality of ground nails, the two fixed rings are fixedly connected with the fixed block, the plurality of balls are respectively rotatably connected with the inner side of the fixed ring, the fixed ring is adapted to the lower pipe pile, the bottom of the fixed block is fixedly connected with a fixed plate, the plurality of ground nails are fixedly connected to the bottom of the fixed plate, and the inclination sensor is fixedly connected to one side of the fixed block.
[0008] Preferably, the groove and the plug-in block are bonded together by sulfur cement.
[0009] Preferably, handles are fixedly connected to both sides of the fixed block.
[0010] Preferably, the ball bearings are made of steel.
[0011] Preferably, the tilt sensor is electrically connected to the external controller.
[0012] In summary, this application includes the following beneficial technical effects:
[0013] By setting the lower pipe pile, the upper pipe pile and the limit assembly, the fixed block is adjusted to a vertical state according to the inclination sensor, the lower pipe pile is manually lifted by a crane, and the lower pipe pile is inserted into the fixed ring to ensure that the lower pipe pile is in a vertical state. After confirmation, the lower pipe pile is sunk by the static pressure of the crane, and the lower pipe pile is left a certain distance from the ground. The upper pipe pile is hoisted to the top of the lower pipe pile and fixedly connected to it by the crane, and then the upper and lower pipe piles are sunk by the static pressure of the crane, thereby completing the pile connection and the vertical sinking of the lower and upper pipe piles, which plays a stabilizing support role for the foundation pit. Compared with the existing technology, the method has the effects of quickly, accurately and stably connecting the lower and upper pipe piles and accurately and stably sinking the piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the embodiment of the application;
[0015] Figure 2 is a schematic diagram of the structure of the plug-in block of the embodiment of the application;
[0016] Figure 3 It is a schematic diagram of the structure of the limit assembly of the embodiment of the application.
[0017] Explanation of the reference numerals: 1. lower pipe pile; 2. upper pipe pile; 3. groove; 4. plug-in block; 5. fixing block; 6. fixing ring; 7. ball bearing; 8. inclination sensor; 9. handle; 10. fixing plate; 11. ground nail. DETAILED DESCRIPTION
[0018] The following is combined with Figure 1-3 This application is described in further detail.
[0019] The present application embodiment discloses a pipe pile foundation pit support structure, referring to Figure 1-Figure 3, including a lower section pipe pile 1 and an upper section pipe pile 2. The materials of the lower section pipe pile 1 and the upper section pipe pile 2 are steel. The steel has high strength and is not easy to break. It can withstand strong lateral forces of the soil. A groove 3 is opened on the top of the lower section pipe pile 1. A plug-in block 4 is fixedly connected to the bottom of the upper section pipe pile 2. The plug-in block 4 is adapted to the groove 3. The lower section pipe pile 1 and the upper section pipe pile 2 are staggered and plugged through the groove 3 and the plug-in block 4. The plug-in can make the lower section pipe pile 1 and the upper section pipe pile 2 dock more accurately and stably, and the joints of the lower section pipe pile 1 and the upper section pipe pile 2 are welded. The lower pipe pile 1 and the upper pipe pile 2 are fixedly connected, and the staggered joints can make the joints of the lower pipe pile 1 and the upper pipe pile 2 not at the same elevation, increase the joint area, and make the lower pipe pile 1 and the upper pipe pile 2 more tightly connected, so as to facilitate the rapid, accurate and stable connection of the lower pipe pile 1 and the upper pipe pile 2. The outer surface of the lower pipe pile 1 is movably connected to the limit assembly, and the limit assembly includes a fixed block 5, two fixed rings 6, multiple balls 7, an inclination sensor 8 and multiple ground nails 11. The two fixed rings 6 are fixedly connected to the fixed block 5, and multiple balls 7 are fixedly connected to the fixed block 5. The beads 7 are rotatably connected to the inner side of the fixing ring 6 respectively, the fixing ring 6 is adapted to the lower pipe pile 1, the bottom of the fixing block 5 is fixedly connected with a fixing plate 10, a plurality of ground nails 11 are fixedly connected to the bottom of the fixing plate 10, and the inclination sensor 8 is fixedly connected to one side of the fixing block 5. The limit assembly is placed at the specified position, and the limit assembly is pressed downward to insert the ground nail 11 into the soil, and the fixing block 5 is adjusted to a vertical state according to the inclination sensor 8. The lower pipe pile 1 is manually lifted by a crane and inserted into the fixing ring 6. At this time, The lower pipe pile 1 is perpendicular to the fixed block 5, thereby ensuring that the lower pipe pile 1 is in a vertical state. After confirmation, the lower pipe pile 1 is sunk by the static pressure of the crane. Multiple balls 7 contact the lower pipe pile 1 and roll. The lower pipe pile 1 continues to move downward, leaving the lower pipe pile 1 a certain distance from the ground. The upper pipe pile 2 is hoisted to the top of the lower pipe pile 1 and fixedly connected with it by the crane, and then the upper pipe pile 2 and the lower pipe pile 1 are sunk by the static pressure of the crane, thereby completing the pile connection and the vertical sinking of the lower pipe pile 1 and the upper pipe pile 2, which plays a stable supporting role in the foundation pit.
[0020] Reference Figure 1 and Figure 2 The groove 3 and the plug-in block 4 are bonded by sulfur cement, which can preliminarily fix the groove 3 and the plug-in block 4, and then preliminarily fix the lower section pipe pile 1 and the upper section pipe pile 2 to prevent movement during the welding process of the lower section pipe pile 1 and the upper section pipe pile 2, so as to facilitate the welding of the lower section pipe pile 1 and the upper section pipe pile 2.
[0021] Reference Figure 3 , handles 9 are fixedly connected to both sides of the fixed block 5. After the lower section pipe pile 1 and the upper section pipe pile 2 are sunk, the two handles 9 can be manually held by hand to pull out the limit assembly and place it at the next designated pile sinking location.
[0022] Reference Figure 3The material of the ball 7 is steel with high hardness. The ball 7 is in rolling contact with the lower pipe pile 1 and the upper pipe pile 2 for a long time and is not easily damaged, thereby extending the service life of the ball 7.
[0023] Reference Figure 1 The inclination sensor 8 is electrically connected to the external controller. The inclination sensor 8 can transmit the sensed inclination angle signal of the fixed block 5 to the external controller in real time, and display it on the screen of the external controller. The staff pays attention to the screen of the external controller in real time to promptly understand whether the fixed block 5 is tilted, and makes timely adjustments to the fixed block 5 to ensure stable vertical sinking of the lower section pipe pile 1 and the upper section pipe pile 2.
[0024] The implementation principle of a pipe pile foundation pit support structure in the embodiment of the present application is as follows: by setting a lower pipe pile 1, an upper pipe pile 2 and a limit assembly, the limit assembly can be placed in a specified position, and the limit assembly can be pressed downward to allow the ground nail 11 to be inserted into the soil. The inclination sensor 8 can transmit the sensed inclination angle signal of the fixed block 5 to the external controller in real time, and display it on the screen of the external controller. The staff can pay attention to the screen of the external controller in real time to timely understand whether the fixed block 5 is tilted, and make timely adjustments to the fixed block 5, adjust the fixed block 5 to a vertical state, manually use a crane to lift the lower pipe pile 1, and insert the lower pipe pile 1 into the fixing ring 6. At this time, the lower pipe pile 1 is perpendicular to the fixed block 5, thereby ensuring that the lower pipe pile 1 is vertical. The state is confirmed to be correct, and the lower section pipe pile 1 is sunk by the static pressure of the crane. Multiple balls 7 contact the lower section pipe pile 1 and roll, and the lower section pipe pile 1 continues to move downward, leaving the lower section pipe pile 1 a certain distance from the ground, and the upper section pipe pile 2 is hoisted to the top of the lower section pipe pile 1 by the crane, and the groove 3 and the plug-in block 4 are staggered and plugged, and they are bonded by sulfur cement, and the joints of the lower section pipe pile 1 and the upper section pipe pile 2 are welded, so that the lower section pipe pile 1 and the upper section pipe pile 2 are fixedly connected, and then the upper section pipe pile 2 and the lower section pipe pile 1 are sunk by the static pressure of the crane, so as to complete the pile connection and the vertical sinking of the lower section pipe pile 1 and the upper section pipe pile 2, which plays a role in stabilizing the support of the foundation pit, and has the effect of quickly, accurately and stably connecting the lower section pipe pile 1 and the upper section pipe pile 2 and accurately and stably sinking the piles.
[0025] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0026] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0027] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
[0028] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pipe pile foundation pit support structure, comprising a lower pipe pile (1) and an upper pipe pile (2), characterized in that: The top of the lower pipe pile (1) is provided with a groove (3), the bottom of the upper pipe pile (2) is fixedly connected with a plug-in block (4), the plug-in block (4) is adapted to the groove (3), the lower pipe pile (1) and the upper pipe pile (2) are staggeredly plugged through the groove (3) and the plug-in block (4), the outer surface of the lower pipe pile (1) is movably connected to a limit position assembly, the limit position assembly comprises a fixed block (5), two fixed rings (6), a plurality of balls (7), a tilting An angle sensor (8) and a plurality of ground spikes (11), two of the fixing rings (6) are fixedly connected to the fixing block (5), a plurality of the balls (7) are respectively rotatably connected to the inner side of the fixing rings (6), the fixing rings (6) are adapted to the lower pipe pile (1), a fixing plate (10) is fixedly connected to the bottom of the fixing block (5), a plurality of the ground spikes (11) are fixedly connected to the bottom of the fixing plate (10), and the inclination sensor (8) is fixedly connected to one side of the fixing block (5).
2. A pipe pile foundation pit support structure according to claim 1, characterized in that: The groove (3) and the plug-in block (4) are bonded together by sulfur cement.
3. The pipe pile foundation pit support structure according to claim 1, characterized in that: Handles (9) are fixedly connected to both sides of the fixed block (5).
4. The pipe pile foundation pit support structure according to claim 1, characterized in that: The material of the ball (7) is steel.
5. The pipe pile foundation pit support structure according to claim 1, characterized in that: The inclination sensor (8) is electrically connected to the external controller.